Peregrine Mission One

Last updated

Peregrine Mission One
Astrobotic Lunar Lander NASA Meatball Install (KSC-20231114-PH-ILW01 0100).jpg
Peregrine ahead of launch
Mission typeLunar landing and surface operations (planned), scientific experiments
Operator Astrobotic Technology
COSPAR ID 2024-006A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 58751
Mission duration10 days (final)
One lunar day (14 Earth days) on the Moon surface (planned)
Spacecraft properties
SpacecraftPeregrine
Launch mass1,283 kg (2,829 lb) [1]
Start of mission
Launch date8 January 2024, 07:18:38 (2024-01-08UTC07:18:38Z) UTC
Rocket Vulcan Centaur VC2S
Launch site Cape Canaveral SLC-41
End of mission
Decay date18 January 2024, 21:04 (2024-01-18UTC21:05Z) UTC
Moon lander
Spacecraft componentPeregrine Lunar Lander
Landing date23 February 2024 (precluded)
Landing site Sinus Viscositatis (Bay of Stickiness, precluded)
Peregrine Mission One Patch.png
Mission Patch  

Peregrine Lunar Lander flight 01, commonly referred to as Peregrine Mission One, was an unsuccessful American lunar lander mission. The lander, dubbed Peregrine, was built by Astrobotic Technology [2] and carried payloads for the NASA Commercial Lunar Payload Services (CLPS) program. Peregrine Mission One launched on 8 January 2024, at 2:18 am EST, on the maiden flight of the Vulcan Centaur (Vulcan) rocket. The goal was to land the first U.S.-built lunar lander on the Moon since the crewed Apollo Lunar Module on Apollo 17 in 1972.

Contents

The lander carried multiple payloads, with a payload capacity of 90 kg. [3] Shortly after the lander separated from the Vulcan rocket in lunar injection orbit, a propellant leak developed that prevented the lander from completing its mission. After six days in orbit, the spacecraft was redirected into Earth's atmosphere, where it burned up over the Pacific Ocean on 18 January 2024. [4]

History

Peregrine being rolled out to Space Launch Complex 41 atop a Vulcan Centaur on 5 January 2024 CLPS PM-1 Astrobotic-ULA Rollout for Launch (KSC-20240105-PH-CSH01 0079).jpg
Peregrine being rolled out to Space Launch Complex 41 atop a Vulcan Centaur on 5 January 2024

In July 2017, Astrobotic announced an agreement with United Launch Alliance (ULA) to launch their Peregrine lander aboard a Vulcan launch vehicle. [5] This first lunar lander mission, called Mission One, was initially to be launched in July 2021. [5] [6]

On 29 November 2018, Astrobotic was made eligible to bid on NASAs Commercial Lunar Payload Services (CLPS) to deliver science and technology payloads to the Moon. [7]

In May 2019, Mission One received its first lander contract from NASA for 14 payloads. [8] [9] [10] It also had 14 commercial payloads, including small rovers from Hakuto, Team AngelicvM, [11] and a larger rover from Carnegie Mellon University, named Andy, which has a mass of 33 kg (73 lb) and is 103 cm (41 in) tall. [12] Another small rover, Spacebit, weighing 1.5 kg (3.3 lb), was designed to travel at least 10 m (33 ft) on four legs. [13] [14] [15] [16] Other payloads include a library, in microprint on nickel, with Wikipedia contents and Long Now Foundation's Rosetta Project. [17] [18] Space burial companies Elysium Space and Celestis paid Astrobotic to carry human remains. [19] The decision to include human remains was criticized by the Navajo Nation, whose president, Buu Nygren, argued that the Moon is sacred to the Navajo and other American Indian nations. [20] [21]

In June 2021, ULA CEO Tory Bruno announced that payload and engine-testing problems would delay the maiden flight of Vulcan, with Mission One aboard, to 2022. [22] On 23 February 2023, ULA announced an expected launch date for the mission of 4 May 2023. [23] After an anomaly during testing of the Vulcan Centaur on 29 March, the launch was delayed until June or July, [24] and then until late 2023. [25]

In early December 2023, Bruno said problems found during a wet dress rehearsal of the rocket would likely delay the launch until to the next launch window, on 8 January. [26]

Peregrine carries a maximum payload mass of 90 kg (200 lb) during Mission One, [27] and it was planned to land on Gruithuisen Gamma. [1]

The payload mass for the planned second mission (Mission Two) is capped at 175 kg (386 lb), and the Mission Three and later missions would carry the full payload capacity of 265 kg (584 lb). [1]

Lander

Astrobotic Peregrine lander NASA Selects First Commercial Moon Landing Services for Artemis Program (47974859117).jpg
Astrobotic Peregrine lander

In 2016, Astrobotic announced plans to build the Peregrine lander, [28] based on their previous concept lander, Griffin, which was larger but with the same payload capacity. [28] [29] Astrobotic hired Airbus Defence and Space to help refine the lander's design.

The Peregrine bus is largely of aluminum alloy, and it is reconfigurable for specific missions. Its propulsion system has five thrusters built by Frontier Aerospace, [30] each producing 150 lb (667 N) thrust. This propulsion system was designed to handle the trans-lunar injection, trajectory corrections, lunar orbit insertion, and powered descent. The propulsion system can deliver an orbiter to the Moon and perform a powered soft landing. [1] The lander can carry up to 450 kg (990 lb) of bi-propellant mass in four tanks; its composition is MON-25/MMH, a hypergolic bi-propellant. [31] For attitude control (orientation), the spacecraft uses 12 thrusters (45 N each) also powered by MON-25/MMH. [1]

The spacecraft's avionics incorporate guidance and navigation to the Moon, and a Doppler LiDAR to assist the automated landing on four legs. [28] From Mission 2, its landing ellipse will be 100 m x 100 m, down from 24 km × 6 km previously. [1]

Peregrine is about 2.5 m wide and 1.9 m tall, and would have been able to deliver up to 265 kg (584 lb) of payload to the surface of the Moon. [28] [32] [1] [33]

Its electrical systems are powered by a lithium-ion battery that is recharged by a solar panel made of GaInP/GaAs/Ge. Radiators and thermal insulators are used to dispose of excess heat, but the lander does not carry heaters, so the first few Peregrine landers are not expected to survive the lunar night, [1] which lasts 14 Earth days. Future missions could be adapted to do so. [1]

For communications to Earth, the lander uses frequencies within the X-band range for uplink as well as downlink. [1] After landing, a 2.4 GHz Wi-Fi modem is to enable wireless communication between the lander and deployed rovers on the lunar surface. [1]

Payloads

Lunar rovers

CountryNameAgency or companySummary
Flag of Mexico.svg  Mexico Colmena × 5 Agencia Espacial Mexicana Agencia Espacial Mexicana (AEM), the Mexican Space Agency, attempted to fly the first Latin American scientific instruments to the surface of the Moon. The payload consisted of five small robots, weighing less than 60 grams and measuring 12 centimeters in diameter, which were to be catapulted onto the lunar surface. [34]
Flag of the United States.svg  United States Iris Carnegie Mellon University Carnegie Mellon University's Iris was a 2 kg rover designed by university students. Its shoebox-sized chassis and bottle-cap wheels were made from carbon fiber, a first for planetary robotics. Iris was designed to test small, lightweight rover mobility on the Moon, collect images for geological sciences, and gather UWB RF ranging data for testing new relative localization techniques. [35]

Instruments

CountryNameAgency or companySummary
Flag of the United States.svg  United States Laser Retroreflector Array (LRA) NASA A retroreflector is a device that bounces any light that shines on it directly backwards (180° from the incoming light) from it. The LRA was a collection of eight of these, each a 1.25-cm diameter glass corner cube prism, all embedded in an aluminum hemisphere (painted gold) and mounted to the lander deck. It was designed to efficiently retroreflect laser signals from other orbiting and landing spacecraft over a wide range of incoming directions, thereby enabling precise measurement of the distance between the orbiting or landing spacecraft to the lander. The LRA was to function as a location marker on the Moon for decades. (Note: this LRA design was too small for laser ranging from the Earth). [36]
Flag of the United States.svg  United States Linear Energy Transfer Spectrometer (LETS) NASA Space radiation can harm astronauts on exploration missions outside the Earth's protective atmosphere, and more so on the Moon than in Low Earth Orbit (LEO). The first source of risk is the total radiation dose from Galactic Cosmic Rays, which is about twice as high on the lunar surface as in LEO. The second source of risk is from space weather events resulting from solar activity. The Linear Energy Transfer Spectrometer (LETS) was a radiation monitor that was derived from heritage hardware flown on Orion EFT-1 and was slated to fly on the Orion EM-1 mission that would have enabled acquisition of knowledge of the lunar radiation environment and demonstrate the capabilities of the system on the lunar surface. This sensor was to measure the rate of incident radiation providing information that would be critical to understanding and mitigating the hazardous environment that people would experience as they explore the surface of the Moon. [36]
Flag of Germany.svg  Germany M-42 Radiation Detector DLR This radiation detector was a complement to another scientific experiment riding aboard NASA's Artemis I mission. These sensors were to precisely measure the level of radiation a human body will encounter on a trip to the Moon and back. The data from both Artemis I and Peregrine Missions will improve our understanding of lunar spaceflight environmental conditions with respect to astronaut health, as space radiation will be one of the key risks in the future of Human Space Exploration. [37]
Flag of the United States.svg  United States Navigation Doppler Lidar (NDL) NASA NDL was a LIDAR-based (Light Detection and Ranging) descent and landing sensor. This instrument (LIDAR) operates on the same principles of radar but uses pulses of light from a laser instead of radio waves. NDL was to measure vehicle velocity (speed and direction) and altitude (distance to ground) with high precision during descent to touchdown. [38]
Flag of the United States.svg  United States Near-Infrared Volatile Spectrometer System (NIRVSS) NASA The payload included a spectrometer context imager and a longwave calibration sensor. It was to measure surface and subsurface hydration (H2O and OH) and CO2 and methane (CH4) while simultaneously mapping surface morphology and surface temperature. The plan was for the measurements to take place during rover traverse when integrated onto a rover, throughout areas of targeted volatile investigation (called science stations), and during drilling activities. This instrument was created at NASA Ames Research Center. In total, it had three specific instruments: the near-infrared spectrometer, Ames imaging module, and longwave calibration sensor. [36]
Flag of the United States.svg  United States Neutron Spectrometer System (NSS) NASA The NSS instrument was to determine the abundance of hydrogen-bearing materials and the bulk regolith composition at the landing site and measure any time variations in hydrogenous volatile abundance during the diurnal cycle. NSS could measure the total volume of hydrogen up to three feet below the surface, providing high-resolution ground truth data for measurements made from instruments in orbit around the Moon. NSS was to measure the number and energy of neutrons present in the lunar surface environment, which can be used to infer the amount of hydrogen present in the environment. This detection is possible because when neutrons strike a hydrogen atom, they lose a lot of energy. [36]
Flag of the United States.svg  United States Peregrine Ion-Trap Mass Spectrometer (PITMS) NASA PITMS was to characterize the lunar exosphere after descent and landing, and throughout the lunar day, to understand the release and movement of volatile species. Previous missions have demonstrated the presence of volatiles at the lunar surface, but significant questions remain about the where those volatiles came from and how they are transported across the lunar surface. Investigating how the lunar exosphere changes over the course of a lunar day can provide insight into the transport process for volatiles on the Moon. The instrument had the ability to measure the low level of gases expected in the lunar exosphere and released by regolith interaction with surface disturbances, like rovers.

The PITMS sensor had direct heritage from the Ptolemy mass spectrometer that made the first in situ measurements of volatiles and organics on comet 67P with the Rosetta lander, Philae. PITMS was to operate in a passive sampling mode, where molecules fall into the zenith-facing aperture and are trapped by a radiofrequency field, then sequentially released for analysis. PITMS had a unit mass resolution up to an upper mass-to-charge (m/z) limit of 150 Da.

The PITMS investigation was to provide time-resolved variability of OH, H2O, noble gases, nitrogen, and sodium compounds released from the soil and present in the exosphere over the course of a lunar day. PITMS observations were to complement other instruments on board the Peregrine lander for a comprehensive approach to understanding the surface and exosphere composition, linking surface properties and composition to LADEE measurements from orbit, and providing a mid-latitude point of comparison for polar measurements planned by VIPER, PROSPECT, and other missions. The PITMS data was to provide a critical mid-latitude link to future polar mass specs to characterize the latitudinal migration of volatiles from equator to poles.

PITMS was a joint NASA-ESA project implemented by NASA's Goddard Space Flight Center (GSFC) and ESA's contractors Open University (OU) and STFC RAL Space, with coordination and support provided by ESA's Space Research and Technology Centre (ESTEC). The integrated PITMS payload and science investigation were to be operated by GSFC with an international team of scientists. [36]

Flag of the United States.svg  United States Terrain Relative Navigation (TRN) Astrobotic Astrobotic was to demonstrate its standalone Terrain Relative Navigation (TRN) sensor as a payload on its first mission to the Moon. TRN was to enable spacecraft to perform landings on planetary surfaces with an unparalleled accuracy of less than 100 meters. The TRN sensor was being developed under a $10 million NASA Tipping Point contract with NASA Johnson Space Center, Jet Propulsion Laboratory, and Moog. [37]

Time capsules

CountryNameAgency or companyType
Flag of the United States.svg  United States Bitcoin Magazine Genesis PlateBIT Inc.Plaque
Flag of Germany.svg  Germany DHL MoonBox DHL Commercial payload capsules
Flag of Canada (Pantone).svg  Canada Lunar Codex [39] IncandenceArtwork, books, stories, music
Flag of the United Kingdom.svg  United Kingdom Footsteps on the MoonLunar Mission OneImage bank
Flag of the United States.svg  United States Luna 02 Celestis Memorial capsule
Flag of Seychelles.svg  Seychelles Lunar Bitcoin BitMEX Cryptocurrency
Flag of Japan.svg  Japan Lunar Dream Capsule [40] Astroscale Time capsule
Flag of the United States.svg  United States Memorial Space Flight Services Elysium Space Memorial capsule
Flag of Hungary.svg  Hungary Memory of Mankind on the Moon Puli Space Technologies Time capsule
Flag of the United States.svg  United States MoonArk Carnegie Mellon University Lunar Museum
Flag of the United States.svg  United States The Arch Libraries Arch Mission Foundation Time capsule
Flag of Canada (Pantone).svg  Canada Flag of the United States.svg  United States Writers on the Moon Writers on the Moon Stories by 133 authors

Mission

Launch and trajectory

Launch of the Peregrine lunar lander on Vulcan's first flight Peregrine launch.jpg
Launch of the Peregrine lunar lander on Vulcan's first flight

On 8 January 2024 ULA used the inaugural flight the Vulcan Centaur rocket to launch the Peregrine mission. Lift-off from Cape Canaveral Space Launch Complex 41 took place at 2:18 am EST. [41] The rocket was launched in the VC2S configuration, with two solid rocket boosters and a standard-length fairing. The solid rocket boosters separated from the vehicle at T+1 minute 50 seconds. The first stage continued firing its BE-4 engines until T+4:59 and separated a few seconds later. The Centaur upper stage started its first burn at T+5:15, which took more than 10 minutes to complete and put the vehicle into a low Earth orbit. Following a coast phase, the Centaur fired for the second time at T+43:35 to start the trans-lunar injection burn, which lasted about three minutes. The Peregrine lander separated from the rocket at T+50:26. [42]

Peregrine was to take a 46-day trajectory to the Moon, performing burns to enter lunar orbit and slowly approach the lunar surface. Landing was planned for 23 February 2024. [42]

Animation of Peregrine – Original plan
Animation of Peregrine around Earth.gif
Around the Earth
Animation of Peregrine around Moon.gif
Around the Moon
   Peregrine  ·   Moon ·   Earth

Propellant leak

Roughly seven hours after the launch, Astrobotic reported that a problem, likely with the propulsion system, had "prevented [the lander] from achieving a stable sun-pointing orientation". [43] The company conducted an unplanned maneuver of the spacecraft to turn the solar panels toward the Sun, [44] and, after an expected communications blackout, confirmed that the spacecraft was once again generating sufficient power. However, the problem was identified as a gradual propellant leak that required constant consumption of fuel to counteract. At 21:16 EST, Astrobotic said in a statement that thrusters were operating "well beyond their expected service life cycles" and that the "spacecraft could continue in a stable sun-pointing state for approximately 40 more hours" before it would run out of fuel, then lose attitude control and power. [45]

Later, the company confirmed that Peregrine could no longer land on the Moon, although it could continue to operate as a spacecraft. [46] Photographs taken by the spacecraft showed damage to external insulation, [47] [48] perhaps caused by a valve that failed to fully close, causing the oxidizer tank to rupture. [49] [50]

Four days into the mission, the propellant leak appeared to slow, and Astrobotic reported that "there is growing optimism that Peregrine could survive much longer" than was previously anticipated. [45]

Reentry

The spacecraft eventually reached a position that would have allowed it to reach the Moon with trajectory corrections. [51] Six days into the mission, Astrobotic decided to direct the spacecraft to burn up in Earth's atmosphere to avoid space debris. [52] In the end, the spacecraft never left the (highly elliptical) Earth orbit that the carrier rocket injected it into (except to make a controlled re-entry into Earth's atmosphere).

A controlled re-entry took place at 15:59 on 18 January EST (20:59 UTC), [53] with possible impact somewhere near Point Nemo, a spacecraft cemetery in the South Pacific. The last contact with the spacecraft was achieved by DSS36, an antenna of the DSN in Canberra. [54]

Future

Peregrine was the first of NASA's CLPS missions, with the second, Intuitive Machines' Odysseus, which launched and landed on the moon in February 2024. [55] Astrobotic will have a second landing attempt, consisting of the larger Griffin lander and VIPER rover, with launch previously scheduled for November 2024. [56]

Related Research Articles

<span class="mw-page-title-main">Blue Origin</span> American aerospace company

Blue Origin Enterprises, L.P., commonly referred to as Blue Origin is an American aerospace manufacturer, defense contractor, launch service provider and space technologies company headquartered in Kent, Washington, United States. The company makes rocket engines for United Launch Alliance (ULA)'s Vulcan rocket and manufactures their own rockets, spacecraft, satellites, and heavy-lift launch vehicles. The company is the second provider of lunar lander services for NASA's Artemis program and was awarded a $3.4 billion contract. The four rocket engines the company has in production are the BE-3U, BE-3PM, BE-4 and the BE-7.

<span class="mw-page-title-main">Lunar lander</span> Spacecraft intended to land on the surface of the Moon

A lunar lander or Moon lander is a spacecraft designed to land on the surface of the Moon. As of 2023, the Apollo Lunar Module is the only lunar lander to have ever been used in human spaceflight, completing six lunar landings from 1969 to 1972 during the United States' Apollo Program. Several robotic landers have reached the surface, and some have returned samples to Earth.

<span class="mw-page-title-main">Masten Space Systems</span> Defunct American aerospace company

Masten Space Systems was an aerospace manufacturer startup company in Mojave, California that was developing a line of vertical takeoff, vertical landing (VTVL) rockets, initially for uncrewed research sub-orbital spaceflights and eventually intended to support robotic orbital spaceflight launches.

<span class="mw-page-title-main">Google Lunar X Prize</span> Inducement prize space competition

The Google Lunar X Prize (GLXP) was a 2007–2018 inducement prize space competition organized by the X Prize Foundation, and sponsored by Google. The challenge called for privately funded teams to be the first to land a lunar rover on the Moon, travel 500 meters, and transmit back to Earth high-definition video and images.

<span class="mw-page-title-main">Astrobotic Technology</span> American space robotics company

Astrobotic Technology inc., commonly referred to as Astrobotic is an American private company that is developing space robotics technology for lunar and planetary missions. It was founded in 2007 by Carnegie Mellon professor Red Whittaker and his associates with the goal of winning the Google Lunar X Prize. The company is based in Pittsburgh, Pennsylvania. Their first launch occurred on January 8, 2024, as part of NASA's Commercial Lunar Payload Services (CLPS) program. The launch carried the company's Peregrine lunar lander on board the first flight of the Vulcan Centaur rocket from Florida's Space Force Station LC-41. The mission was unable to reach the Moon for a soft or hard landing. On June 11, 2020, Astrobotic received a second contract for the CLPS program. NASA will pay Astrobotic US$199.5 million to take the VIPER rover to the Moon, targeting a landing in November 2024.

<span class="mw-page-title-main">Lunar rover</span> Vehicle that travels on the Moons surface

A lunar rover or Moon rover is a space exploration vehicle designed to move across the surface of the Moon. The Apollo program's Lunar Roving Vehicle was driven on the Moon by members of three American crews, Apollo 15, 16, and 17. Other rovers have been partially or fully autonomous robots, such as the Soviet Union's Lunokhods, Chinese Yutus, Indian Pragyan, and Japan's LEVs. Five countries have had operating rovers on the Moon: the Soviet Union, the United States, China, India, and Japan.

The (Japanese) Lunar Exploration Program is a program of robotic and human missions to the Moon undertaken by the Japanese Aerospace Exploration Agency (JAXA) and its division, the Institute of Space and Astronautical Science (ISAS). It is also one of the three major enterprises of the JAXA Space Exploration Center (JSPEC). The main goal of the program is "to elucidate the origin and evolution of the Moon and utilize the Moon in the future".

<span class="mw-page-title-main">Lunar CATALYST</span>

The Lunar CATALYST initiative is an attempt by NASA to encourage the development of robotic lunar landers that can be integrated with United States commercial launch capabilities to deliver payloads to the lunar surface.

<span class="mw-page-title-main">Vulcan Centaur</span> United Launch Alliance launch vehicle

Vulcan Centaur is a two-stage-to-orbit, expendable, heavy-lift launch vehicle by United Launch Alliance (ULA). It is principally designed to meet launch demands for the U.S. government's National Security Space Launch (NSSL) program for use by the United States Space Force and U.S. intelligence agencies for national security satellite launches. It will replace both of ULA's existing heavy-lift launch systems due to their retirement. Vulcan Centaur will also be used for commercial launches, including an order for 38 launches from Kuiper Systems.

<span class="mw-page-title-main">Blue Moon (spacecraft)</span> Lunar lander family developed by Blue Origin for the Artemis program

Blue Moon is a family of lunar landers and their associated infrastructure, intended to carry humans and cargo to the Moon, currently under development by a consortium led by Blue Origin and including Lockheed Martin, Draper, Boeing, Astrobotic, and Honeybee Robotics. Two versions of Blue Moon are under development: a robotic lander planned to land on the Moon in 2024, and a larger human lander planned to land a crew of four astronauts on the lunar surface for the NASA Artemis V mission in 2029.

<span class="mw-page-title-main">2024 in spaceflight</span> Spaceflight-related events during the year 2024

This article documents notable spaceflight events that have happened or are going to happen during the year 2024. Upcoming astronomical and space events for 2024 have been presented in The New York Times.

<span class="mw-page-title-main">Commercial Lunar Payload Services</span> NASA program contracting commercial transportation services to the Moon

Commercial Lunar Payload Services (CLPS) is a NASA program to hire companies to send small robotic landers and rovers to the Moon. Most landing sites are near the lunar south pole where they will scout for lunar resources, test in situ resource utilization (ISRU) concepts, and perform lunar science to support the Artemis lunar program. CLPS is intended to buy end-to-end payload services between Earth and the lunar surface using fixed-price contracts. The program was extended to add support for large payloads starting after 2025.

<span class="mw-page-title-main">Intuitive Machines Nova-C</span> Lunar lander developed by Intuitive Machines

The Intuitive Machines Nova-C, or simply Nova-C, is a class of lunar landers designed by Intuitive Machines (IM) to deliver small payloads to the surface of the Moon. Intuitive Machines was one of three service providers awarded task orders in 2019 for delivery of NASA science payloads to the Moon. The IM-1 lunar lander, named Odysseus, was launched by a SpaceX Falcon 9 rocket on 15 February 2024, reached lunar orbit on 21 February, and landed on the lunar surface on 22 February. This marked the inaugural Nova-C landing on the Moon and the first American spacecraft to perform a soft landing on the Moon in over 50 years. It is the first spacecraft to use methalox propulsion to navigate between the Earth and the Moon.

<span class="mw-page-title-main">CubeRover</span> Class of planetary rover

CubeRover is a class of planetary rover with a standardized modular format meant to accelerate the pace of space exploration. The idea is equivalent to that of the successful CubeSat format, with standardized off-the-shelf components and architecture to assemble small units that will be all compatible, modular, and inexpensive.

<span class="mw-page-title-main">Artemis program</span> NASA-led lunar exploration program

The Artemis program is a Moon exploration program that is led by the United States' NASA and was formally established in 2017 via Space Policy Directive 1. The Artemis program is intended to reestablish a human presence on the Moon for the first time since Apollo 17 in 1972. The program's stated long-term goal is to establish a permanent base on the Moon to facilitate human missions to Mars.

<i>VIPER</i> (rover) Planned NASA lunar rover

VIPER is a lunar rover developed by NASA, and currently planned to be delivered to the surface of the Moon in November 2024. The rover will be tasked with prospecting for lunar resources in permanently shadowed areas in the lunar south pole region, especially by mapping the distribution and concentration of water ice. The mission builds on a previous NASA rover concept called Resource Prospector, which was cancelled in 2018.

<span class="mw-page-title-main">DHL MoonBox</span> Box contained within 2024 moon launch

DHL MoonBox was a mementos box that was launched to the Moon in 2024 on Astrobotic Technology's Peregrine Lunar Lander. The DHL MoonBox was made by DHL. It contained 28 capsules all of which have been filled. It contained items from the USA, UK, Canada, Nepal, Germany and Belgium.

<span class="mw-page-title-main">IM-1</span> 2024 lunar landing mission

IM-1 was a lunar mission that was carried out jointly by a partnership between the NASA CLPS program and Intuitive Machines (IM), using an Nova-C lunar lander. IM named their lunar lander as its Odysseus lander. The Odysseus lander was the first commercial lunar lander to have successfully soft-landed on the Moon.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 "Astrobotic – Payload User Guide". Astrobotic Technology. 2018. Archived from the original on 3 June 2019. Retrieved 10 December 2018.
  2. Chang, Kenneth (7 January 2024). "Vulcan Rocket's Inaugural Launch Carries Moon Lander to Space – Here's what you need to know about United Launch Alliance and the robotic lunar spacecraft it is sending to orbit". The New York Times . Archived from the original on 7 January 2024. Retrieved 8 January 2024.
  3. "NASA – NSSDCA – Spacecraft – Details". nssdc.gsfc.nasa.gov. Archived from the original on 4 December 2023. Retrieved 31 October 2023.
  4. Wattles, Jackie (19 January 2024). "Astrobotic's Peregrine lunar lander burns up over Pacific Ocean". CNN. Archived from the original on 19 January 2024. Retrieved 19 January 2024.
  5. 1 2 SpaceX Falcon 9 Rocket Will Launch Private Moon Lander in 2021 Archived 4 October 2019 at the Wayback Machine Mike Wall, space.com , 2 October 2019
  6. "Astrobotic Awarded US$79.5 Million Contract to Deliver 14 NASA Payloads to the Moon" (Press release). Astrobotic Technology. 31 May 2019. Archived from the original on 4 September 2020. Retrieved 20 August 2019.
  7. "NASA Announces New Partnerships for Commercial Lunar Payload Delivery Services" (Press release). NASA. 29 November 2018. Archived from the original on 25 November 2020. Retrieved 29 November 2018.PD-icon.svg This article incorporates text from this source, which is in the public domain .
  8. "NASA funds commercial Moon landers for science, exploration". Astronomy Now. 2 June 2018. Archived from the original on 8 June 2019. Retrieved 20 August 2019.
  9. Wall, Mike (1 June 2018). "These Are the Private Lunar Landers Taking NASA Science to the Moon". space.com. Archived from the original on 9 August 2019. Retrieved 20 August 2019. Peregrine will tote as many as 14 agency payloads to a big crater on the Moon's near side called Lacus Mortis by July 2021, on the lander's Mission One.
  10. Grush, Loren (5 June 2019). "This tiny rover will test how well small mobile robots can survive on the Moon". The Verge. Archived from the original on 13 August 2023. Retrieved 20 August 2019.
  11. Cole, Michael (19 March 2018). "Astrobotic Ready to Become Delivery Service to the Moon". Spaceflight Insider. Archived from the original on 21 October 2019. Retrieved 20 August 2019.
  12. "Andy's Mission". Planetary Robotics Lab. Carnegie Mellon University. Archived from the original on 3 February 2015. Retrieved 20 December 2018.
  13. Britain's first Moon rover is a four-legged robot that will explore lunar tunnels Archived 12 October 2019 at the Wayback Machine Ryan Browne, CNBC, 10 October 2019
  14. "SpaceBit Moon rover set to land on lunar surface in 2021". Sky News. 10 October 2019. Archived from the original on 10 January 2024. Retrieved 10 January 2024.
  15. A lunar rover which will explore the Moon on foot in 2021 was unveiled in London on Thursday Archived 10 October 2019 at the Wayback Machine Reuters, 10 October 2019
  16. UK's 1st Moon Rover to Launch in 2021 Archived 13 October 2019 at the Wayback Machine Mike Wall, space.com, 12 October 2019
  17. Wall, Mike (16 May 2018). "'Lunar Library' Aims to Preserve Humanity's History On the Moon (Wikipedia, Too)". space.com. Archived from the original on 11 May 2019. Retrieved 16 May 2018.
  18. Grush, Loren (15 May 2018). "This nonprofit plans to send millions of Wikipedia pages to the Moon — printed on tiny metal sheets". The Verge. Archived from the original on 30 May 2019. Retrieved 16 May 2018.
  19. Wattles, Jackie (8 January 2024). "First US Moon landing mission in decades launches with NASA science, humans remains on board". CNN. Archived from the original on 11 January 2024. Retrieved 8 January 2024.
  20. Wattles, Jackie (7 January 2024). "First US Moon mission in decades to launch with NASA science, human remains on board". CNN. Archived from the original on 7 January 2024. Retrieved 8 January 2024.
  21. Clark, Stephen (7 January 2024). "Navajo objection to flying human ashes to the Moon won't delay launch". Ars Technica. Archived from the original on 7 January 2024. Retrieved 8 January 2024.
  22. Berger, Eric (25 June 2021). "Rocket Report: China to copy SpaceX's Super Heavy? Vulcan slips to 2022". Ars Technica . Archived from the original on 29 June 2021. Retrieved 30 June 2021.
  23. Grush, Loren (23 February 2023). "United Launch Alliance Delays Vulcan Debut Flight to Early May". Bloomberg. Archived from the original on 27 February 2023. Retrieved 22 March 2023.
  24. Doughty, Nate (19 April 2023). "ULA rocket taking Astrobotic's lunar lander to space pushes back departure date following explosion during testing". bizjournals.com. Archived from the original on 19 April 2023. Retrieved 25 April 2023.
  25. Berger, Eric (14 June 2023). "Vulcan aces engine test, but upper stage anomaly will delay launch for a while "Working corrective action and retest."". Arstechnica. Archived from the original on 14 June 2023. Retrieved 14 June 2023.
  26. Bruno, Tory (10 December 2023). "#VulcanRocket WDR update". X. Archived from the original on 10 December 2023. Retrieved 10 December 2023.
  27. "Peregrine Lander". Astrobotic Technology. Archived from the original on 23 February 2017. Retrieved 5 June 2019.
  28. 1 2 3 4 Foust, Jeff (3 June 2016). "Astrobotic unveils Peregrine lunar lander". SpaceNews. Archived from the original on 17 October 2022. Retrieved 20 August 2019.
  29. "Griffin Lander". Astrobotic Technology. Archived from the original on 11 December 2018. Retrieved 10 December 2018.
  30. "Frontier Aerospace Selected for NASA Award to Develop Deep Space Thruster Using MON-25/MMH Propellant". Astrobotic Technology. Archived from the original on 1 October 2019. Retrieved 1 October 2019.
  31. "Aerojet Rocketdyne Successfully Demonstrates Low-Cost, High Thrust Space Engine" (Press release). Aerojet Rocketdyne. 23 May 2018. Archived from the original on 20 August 2019. Retrieved 20 August 2019.
  32. Foust, Jeff (13 June 2016). "Landers, laws, and lunar logistics". The Space Review. Archived from the original on 14 August 2019. Retrieved 20 August 2019.
  33. "Spacebit forms partnership, prepares to send tiny rover to the Moon". SpaceNews. 24 October 2019. Archived from the original on 17 October 2022. Retrieved 28 January 2020.
  34. "Moon Manifest | Astrobotic Technology". Archived from the original on 4 January 2024. Retrieved 3 January 2024.
  35. "IRIS Home". Archived from the original on 6 January 2024. Retrieved 3 January 2024.
  36. 1 2 3 4 5 "Task Order TO2-AB Scientific Payloads – NASA Science". Archived from the original on 7 December 2023. Retrieved 5 December 2023.
  37. 1 2 "Astrobotic — Launch Info Packet 5.8-1" (PDF). Archived (PDF) from the original on 30 November 2023. Retrieved 5 December 2023.
  38. "Astrobotic-Press Kit 508" (PDF). Archived (PDF) from the original on 29 November 2023. Retrieved 5 December 2023.
  39. "A Time Capsule of Human Creativity, Stored in the Sky". The New York Times. 7 July 2023. Archived from the original on 27 July 2023. Retrieved 7 July 2023.
  40. "Otsuka's POCARI SWEAT Aims the Very First Moon Landing". businesswire.com. 15 May 2014. Archived from the original on 17 October 2022. Retrieved 6 February 2021.
  41. Foust, Jeff (8 January 2024). "Vulcan Centaur launches Peregrine lunar lander on inaugural mission". Spacenews. Archived from the original on 8 January 2024. Retrieved 8 January 2024.
  42. 1 2 McCrea, Aaron (8 January 2024). "Vulcan successfully launches Peregrine lunar lander on inaugural flight". NASASpaceFlight. Archived from the original on 8 January 2024. Retrieved 8 January 2024.
  43. Berger, Eric (8 January 2024). "Hours after its launch, a US lunar lander experiences an anomaly". Ars Technica. Archived from the original on 8 January 2024. Retrieved 8 January 2024.
  44. Tingley, Brett (8 January 2024). "Private Peregrine Moon lander suffers anomaly after historic Vulcan rocket launch, Astrobotic says". space.com. Archived from the original on 8 January 2024. Retrieved 8 January 2024.
  45. 1 2 Astrobotic [@astrobotic] (12 January 2024). "Update #13 [sic] for Peregrine Mission One: Peregrine has now been operational in space for more than 4 days. The spacecraft remains stable and operational, and is currently in a planned loss-of-signal period for about another hour and a half. The leak on Peregrine has continued to slow, and the spacecraft is estimated to now have 52 hours of propellant remaining. Our engineers continue to work on solutions to extend life expectancy and there is growing optimism that Peregrine could survive much longer than the current estimate" (Tweet) via Twitter.
  46. Astrobotic [@astrobotic] (9 January 2024). "Update #7 for Peregrine Mission One: The Peregrine spacecraft has now been operational for about 32 hours. Overnight, the team faced another spacecraft pointing issue, but continues to persevere. The spacecraft started to tilt away from the Sun and reduced its solar power generation. The team was able to update the control algorithm and fix this issue. The batteries are at full charge. Given the proppellent leak, there is unfortunately, no chance of a soft landing on the Moon. However, we do still have enough propellant to continue to operate the vehicle as a spacecraft. The team has updated its estimates, and we currently expect to run out of propellant in about 40 hours from now - an improvement from last night's estimate. The team continues to work to find ways to extend Peregrine's operational life. We are in a stable operating mode and are working payload and spacecraft tests and checkouts. We continue receiving valuable data and proving spaceflight operations for components and software relation to our next lunar lander mission, Griffin" (Tweet) via Twitter.
  47. Mike, Wall (8 January 2024). "1st photo from crippled private Peregrine moon lander holds clue to anomaly". space.com. Archived from the original on 10 January 2024. Retrieved 10 January 2024.
  48. Holmes, Oliver (9 January 2024). "Peregrine 1 has 'no chance' of landing on moon due to fuel leak". The Guardian . Archived from the original on 10 January 2024. Retrieved 10 January 2024. Astrobotic company says goal is now to get US spacecraft as far as possible before it loses power
  49. Wall, Mike (9 January 2024). "Stuck valve may have doomed private Peregrine moon lander mission, Astrobotic says". space.com. Archived from the original on 10 January 2024. Retrieved 10 January 2024.
  50. "Update #8 for Peregrine Mission One:". twitter.com. Astrobotic Technology. 9 January 2024. Archived from the original on 3 February 2024. Retrieved 24 February 2024.
  51. Astrobotic Technology (13 January 2024). "Update #15 for Peregrine Mission One". Twitter/X. Archived from the original on 15 January 2024. Retrieved 15 January 2024.
  52. Astrobotic Technology (14 January 2024). "Update #17 for Peregrine Mission One". Astrobotic. Archived from the original on 15 January 2024. Retrieved 15 January 2024.
  53. Richard Stephenson [@nascom1] (18 January 2024). "As predicted by the APM1 team, Peregrine had loss of signal at 20:59 over Canberra's DSS36. It was a shame it had to end this way, but the mission did it in style. This is the doppler profile from its final approach. It was a graceful dive" (Tweet) via Twitter.
  54. "US Moon mission on course for fiery destruction". BBC News. 18 January 2024. Archived from the original on 18 January 2024. Retrieved 18 January 2024.
  55. Foust, Jeff (19 December 2023). "Intuitive Machines delays first lunar lander launch to February". SpaceNews . Archived from the original on 11 January 2024. Retrieved 20 December 2023.
  56. "NASA Replans CLPS Delivery of VIPER to 2024 to Reduce Risk". NASA. 18 July 2022. Archived from the original on 18 July 2022. Retrieved 18 July 2022.