SMART-1

Last updated

SMART-1
Artist's impression of the SMART-1 mission ESA199399.jpg
Artist's impression of SMART-1
Mission typeTechnology
Lunar orbiter
Operator ESA
COSPAR ID 2003-043C OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 27949
Website SMART-1
Mission duration2 years, 11 months, 6 days, 6 hours, 27 minutes, 36 seconds
Spacecraft properties
Manufacturer Swedish Space Corporation
Launch mass367 kilograms (809 lb) [1]
Dry mass287 kilograms (633 lb)
Start of mission
Launch date27 September 2003, 23:14:46 (2003-09-27UTC23:14:46Z) UTC [1]
Rocket Ariane 5G
Launch site Kourou ELA-3
Contractor Arianespace
End of mission
Decay date3 September 2006, 05:42:22 (2006-09-03UTC05:42:23Z) UTC
Orbital parameters
Reference system Selenocentric
Eccentricity 0.352054
Periselene altitude 2,205 kilometres (1,370 mi)
Aposelene altitude 4,600 kilometres (2,900 mi)
Inclination 90.26 degrees
Period 4.95 hours
Epoch 18 July 2005, 11:14:28 UTC
Lunar orbiter
Orbital insertion15 November 2004
Impact site 34°15′43″S46°11′35″W / 34.262°S 46.193°W / -34.262; -46.193 [2]
SMART-1 insignia.png
Legacy ESA insignia for the SMART-1 mission  

SMART-1 was a Swedish-designed European Space Agency satellite that orbited the Moon. It was launched on 27 September 2003 at 23:14 UTC from the Guiana Space Centre in Kourou, French Guiana. "SMART-1" stands for Small Missions for Advanced Research in Technology-1. On 3 September 2006 (05:42 UTC), SMART-1 was deliberately crashed into the Moon's surface, ending its mission. [3]

Contents

Spacecraft design

SMART-1 was about one meter across (3.3 ft), and lightweight in comparison to other probes. Its launch mass was 367 kg or 809 pounds, of which 287 kg (633 lb) was non-propellant.

It was propelled by a solar-powered Hall effect thruster (Snecma PPS-1350-G) using 82 Kg of xenon gas contained in a 50 litres tank at a pressure of 150 bar at launch. The ion engine thruster used an electrostatic field to ionize the xenon and accelerate the ions achieving a specific impulse of 16.1 kN·s/kg (1,640 seconds), more than three times the maximum for chemical rockets. One kg of propellant (1/350 to 1/300 of the total mass of the spacecraft) produced a delta-v of about 45 m/s. The electric propulsion subsystem weighted 29 kg with a peak power consumption of 1,200 watts. SMART-1 was the first in the program of ESA's Small Missions for Advanced Research and Technology.

The solar arrays made capable of 1850W at the beginning of the mission, were able to provide the maximum set of 1,190 W to the thruster, giving a nominal thrust of 68 mN, hence an acceleration of 0.2 mm/s2 or 0.7 m/s per hour (i.e., just under 0.00002 g of acceleration). As with all ion-engine powered craft, orbital maneuvers were not carried out in short bursts but very gradually. The particular trajectory taken by SMART-1 to the Moon required thrusting for about one third to one half of every orbit. When spiraling away from the Earth thrusting was done on the perigee part of the orbit. At the end of the mission, the thruster had demonstrated the following capability:

As part of the European Space Agency's strategy to build very inexpensive and relatively small spaceships, the total cost of SMART-1 was a relatively small 110 million euros (about 170 million U.S. dollars). SMART-1 was designed and developed by the Swedish Space Corporation on behalf of ESA. Assembly of the spacecraft was carried out by Saab Space in Linköping. Tests of the spacecraft were directed by Swedish Space Corporation and executed by Saab Space. The project manager at ESA was Giuseppe Racca until the spacecraft achieved the moon operational orbit. He was then replaced by Gerhard Schwehm for the Science phase. The project manager at the Swedish Space Corporation was Peter Rathsman. The Principal Project Scientist was Bernard Foing. The Ground Segment Manager during the preparation phase was Mike McKay and the Spacecraft Operations manager was Octavio Camino.

Instruments

AMIE

The Advanced Moon micro-Imager Experiment was a miniature colour camera for lunar imaging. The CCD camera with three filters of 750, 900 and 950 nm was able to take images with an average pixel resolution of 80 m (about 260 ft). The camera weighed 2.1 kg (about 4.5 lb) and had a power consumption of 9 watts. [4]

D-CIXS

The Demonstration of a Compact X-ray Spectrometer was an X-ray telescope for the identification of chemical elements on the lunar surface. It detected the x-ray fluorescence (XRF) of crystal compounds created through the interaction of the electron shell with the solar wind particles to measure the abundance of the three main components: magnesium, silicon and aluminium. The detection of iron, calcium and titanium depended on the solar activity. The detection range for x-rays was 0.5 to 10 keV. The spectrometer and XSM (described below) together weighed 5.2 kg and had a power consumption of 18 watts.

XSM

The X-ray solar monitor studied the solar variability to complement D-CIXS measurements.

SIR

The Smart-1 Infrared Spectrometer was an infrared spectrometer for the identification of mineral spectra of olivine and pyroxene. It detected wavelengths from 0.93 to 2.4 μm with 256 channels. The package weighed 2.3 kg and had a power consumption of 4.1 watts. [5]

EPDP

The Electric Propulsion Diagnostic Package was to acquire data on the new propulsion system on SMART-1. The package weighed 0.8 kg and had a power consumption of 1.8 watts. [6]

SPEDE

The Spacecraft Potential, Electron and Dust Experiment. The experiment weighed 0.8 kg and had a power consumption of 1.8 watts. Its function was to measure the properties and density of the plasma around the spacecraft, either as a Langmuir probe or as an electric field probe. SPEDE observed the emission of the spacecraft's ion engine and the "wake" the Moon leaves to the solar wind. Unlike most other instruments that have to be shut down to prevent damage, SPEDE could keep measuring inside radiation belts and in solar storms, such as the Halloween 2003 solar storms. [7] [8] It was built by Finnish Meteorological Institute and its name was intentionally chosen so that its acronym is the same as the nickname of Spede Pasanen, a famous Finnish movie actor, movie producer, and inventor. The algorithms developed for SPEDE were later used in the ESA lander Philae. [8]

KATE

Ka band TT&C (telemetry, tracking and control) Experiment. The experiment weighed 6.2 kg and had a power consumption of 26 watts. The Ka-band transponder was designed as precursor for BepiColombo to perform radio science investigations and to monitor the dynamical performance of the electric propulsion system.

Flight

SMART-1 was launched 27 September 2003 together with Insat 3E and eBird 1, by an Ariane 5 rocket from the Guiana Space Centre in French Guiana. After 42 minutes it was released into a geostationary transfer orbit of 7,035 × 42,223 km. From there it used its Solar Electric Primary Propulsion (SEPP) to gradually spiral out during thirteen months.

The orbit can be seen up to 26 October 2004 at spaceref.com, when the orbit was 179,718 × 305,214 km. On that date, after the 289th engine pulse, the SEPP had accumulated a total on-time of nearly 3,648 hours out of a total flight time of 8,000 hours, hence a little less than half of its total mission. It consumed about 58.8 kg of xenon and produced a delta-v of 2,737 m/s (46.5 m/s per kg xenon, 0.75 m/s per hour on-time). It was powered on again on 15 November for a planned burn of 4.5 days to enter fully into lunar orbit. It took until February 2005 using the electric thruster to decelerate into the final orbit 300–3,000 km above the Moon's surface. [9] The end of mission performance demonstrated by the propulsion system is stated above.

Summary of osculating geocentric orbital elements
Epoch (UTC)Perigee (km)Apogee (km)EccentricityInclination (deg)
(to Earth equator)
Period (h)
27 September 2003~7,035~42,223~0.714~6.9~10.6833
26 October 2003, 21:20:00.08,687.99444,178.4010.6713236.91459611.880450
19 November 2003, 04:29:48.410,843.91046,582.1650.6223356.86135413.450152
19 December 2003, 06:41:47.613,390.35149,369.0490.5732806.82545515.366738
29 December 2003, 05:21:47.817,235.50954,102.6420.5167946.84791918.622855
19 February 2004, 22:46:08.620,690.56465,869.2220.5219366.90631124.890737
19 March 2004, 00:40:52.720,683.54566,915.9190.5277706.97979325.340528
25 August 2004, 00:00:0037,791.261240,824.3630.7287216.939815143.738051
19 October 2004, 21:30:45.969,959.278292,632.4240.61411512.477919213.397970
24 October 2004, 06:12:40.9179,717.894305,214.1260.25879120.591807330.053834

After its last perigee on 2 November, [10] on 11 November 2004 it passed through the Earth-Moon L1 Lagrangian Point and into the area dominated by the Moon's gravitational influence, and at 1748 UT on 15 November passed the first periselene of its lunar orbit. The osculating orbit on that date was 6,704 × 53,208 km, [11] with an orbital period of 129 hours, although the actual orbit was accomplished in only 89 hours. This illustrates the significant impact that the engine burns have on the orbit and marks the meaning of the osculating orbit, which is the orbit that would be travelled by the spacecraft if at that instant all perturbations, including thrust, would cease.

Summary of osculating selenocentric orbital elements
Epoch (UTC)Periselene (km)Aposelene (km)EccentricityInclination (deg)
(to Moon equator)
Period (h)
15 November 2004, 17:47:12.16,700.72053,215.1510.77632981.085129.247777
4 December 2004 10:37:47.35,454.92520,713.0950.58308583.03537.304959
9 January 2005, 15:24:55.02,751.5116,941.3590.43226187.8928.409861
28 February 2005, 05:18:39.92,208.6594,618.2200.35295290.0636034.970998
25 April 2005, 08:19:05.42,283.7384,523.1110.32898890.1414074.949137
16 May 2005, 09:08:52.92,291.2504,515.8570.32680789.7349294.949919
20 June 2005, 10:21:37.12,256.0904,549.1960.33696090.2326194.947432
18 July 2005, 11:14:28.02,204.6454,600.3760.35205490.2637414.947143

ESA announced on 15 February 2005 an extension of the mission of SMART-1 by one year until August 2006. This date was later shifted to 3 September 2006 to enable further scientific observations from Earth. [12]

Lunar impact

SMART-1 impacted the Moon's surface, as planned, on 3 September 2006 at 05:42:22 UTC, ending its mission. Moving at approximately 2,000 m/s (4,500 mph), SMART-1 created an impact visible with ground telescopes from Earth. It is hoped that not only will this provide some data simulating a meteor impact, but also that it might expose materials in the ground, like water ice, to spectroscopic analysis.

ESA originally estimated that impact occurred at 34°24′S46°12′W / 34.4°S 46.2°W / -34.4; -46.2 . [13] In 2017, the impact site was identified from Lunar Reconnaissance Orbiter data at 34°15′43″S46°11′35″W / 34.262°S 46.193°W / -34.262; -46.193 . [2] At the time of impact, the Moon was visible in North and South America, and places in the Pacific Ocean, but not Europe, Africa, or western Asia.

This project has generated data and know-how that will be used for other missions, such as the ESA's BepiColombo mission to Mercury.

Important events and discoveries

Smart-1 Ground Segment and Operations

Smart-1 spacecraft ESA's SMART-1- testing solar electric propulsion and studying the Moon ESA194476.jpg
Smart-1 spacecraft

Smart-1 operations were conducted from the ESA European Space Operations Center ESOC in Darmstadt Germany led by the Spacecraft Operations Manager Octavio Camino.

The ground segment of Smart-1 was a good example of infrastructure reuse at ESA: Flight Dynamics infrastructure and Data distribution System (DDS) from Rosetta, Mars Express and Venus Express. The generic mission control system software SCOS 2000, and a set of generic interface elements use at ESA for the operations of their missions.

The use of CCSDS TLM and TC standards permitted a cost effective tailoring of seven different terminals of the ESA Tracking network (ESTRACK) plus Weilheim in Germany (DLR).

The components that were developed specifically for Smart-1 were:  the simulator; a mix of hardware  and software derived from the Electrical Ground Support Equipment EGSE equipment, the Mission Planning System and the Automation System developed from MOIS Archived 3 August 2019 at the Wayback Machine (this last based on a prototype implemented for Envisat) and a suite of engineering tools called MUST. This last permitted the Smart-1 engineers to do anomaly investigation through internet, pioneering at ESA monitoring of spacecraft TLM using mobile phones and PDAs and receiving spacecraft alarms via SMS. [15] The Mission Control Team was composed of seven engineers in the Flight Control Team FCT, a variable group between 2–5 Flight Dynamics engineers and 1–2 Data Systems engineers. Unlike most ESA missions, there were no Spacecraft Controllers (SPACONs), and all operations and mission-planning activities were done by the FCT. This concept originated overtime and night shifts during the first months of the mission but worked well during the cruise and the Moon phases. The major concern during the first three months of the mission was to leave the radiation belts as soon as possible in order to minimize the degradation of the solar arrays and the star tracker CCDs.

The first and most critical problem came after the first revolution when a failure in the onboard Error Detection and Correction (EDAC) algorithm triggered an autonomous switch to the redundant computer in every orbit causing several reboots, finding the spacecraft in SAFE mode after every pericenter passage. The analysis of the spacecraft telemetry pointed directly to a radiation-triggered problem with the EDAC interrupt routine. [16]

Other anomalies during this period were a combination of environmental problems: high radiation doses, especially in the star trackers and onboard software anomalies: the Reed Solomon encoding became corrupt after switching data rates and had to be disabled. It was overcome by procedures and changes on ground operations approach. The star trackers were also subject of frequent hiccups during the earth escape and caused some of the Electric Propulsion (EP) interruptions. [17] They were all resolved with several software patches.

The EP showed sensitivity to radiation inducing shutdowns. This phenomenon identified as the Opto-coupler Single Event Transient (OSET), initially seen in LEOP during the first firing using cathode B, was characterized by a rapid drop in Anode Current triggering the alarm 'Flame Out' bit causing the shutdown of the EP. The problem was identified to be radiation induced Opto-coupler sensitivity. The recovery of such events was to restart the thruster. This was manually done during several months until an On Board Software Patch (OBSW) was developed to detect it and initiate an autonomous thruster restart. Its impact was limited to the orbit prediction calculation used for the Ground Stations to track the spacecraft and the subsequent orbit corrections.

The different kind of anomalies and the frequent interruptions in the thrust of the Electric Propulsion led to an increase of the ground stations support and overtime of the flight operations team who had to react quickly. Their recovery was sometimes time consuming, especially when the spacecraft was found in SAFE mode. [18] Overall, they impeded to run the operations as originally planned having one 8 hours pass every 4 days.

Smart-1 Moon orbit descend Once SMART-1 has been captured by the Moon's gravity, it begins to work its way closer to the lunar surface ESA234908.gif
Smart-1 Moon orbit descend

The mission negotiated the use the ESTRACK network spare capacity. This concept permitted about eight times additional network coverage at no extra cost but originated unexpected overheads and conflicts. It ultimately permitted additional contacts with the spacecraft during the early stage of the mission and an important increase of science during the Moon phase. This phase required a major reconfiguration of the on-board stores and its operation. This change designed by the flight control team at ESOC and implemented by the Swedish Space Corporation in a short time required to re-write part of the Flight Control Procedures FOP for the operations at the Moon.

The Operations during the Moon phase become highly automated: the flight dynamics pointing was "menu driven" allowing more than 98% of commanding being generated by the Mission Planning System MPS. The extension of the MPS system with the so called MOIS Executor, [16] became the Smart-1 automation system. It permitted to operate 70% of the passes unmanned towards the end of the mission and allowed the validation of the first operational "spacecraft automation system" at ESA. [19]

The mission achieved all its objectives: getting out of the radiation belts influence 3 months after launch, spiraling out during 11 months and being captured by the Moon using resonances, the commissioning and operations of all instruments during the cruise phase and the optimization of the navigation and operational procedures required for Electric Propulsion operation. [20] The efficient operations of the Electric Propulsion at the moon allowed the reduction of the orbital radius benefiting the scientific operations and extending this mission by one extra year.

A detailed chronology of the operations events is provided in ref. [16]

Smart- 1 Mission Phases

The full mission phases from the operations perspective is documented in [21] including the performance of the different subsystems.

See also

Related Research Articles

<span class="mw-page-title-main">Spacecraft propulsion</span> Method used to accelerate spacecraft

Spacecraft propulsion is any method used to accelerate spacecraft and artificial satellites. In-space propulsion exclusively deals with propulsion systems used in the vacuum of space and should not be confused with space launch or atmospheric entry.

<span class="mw-page-title-main">Hall-effect thruster</span> Type of electric propulsion system

In spacecraft propulsion, a Hall-effect thruster (HET) is a type of ion thruster in which the propellant is accelerated by an electric field. Hall-effect thrusters are sometimes referred to as Hall thrusters or Hall-current thrusters. Hall-effect thrusters use a magnetic field to limit the electrons' axial motion and then use them to ionize propellant, efficiently accelerate the ions to produce thrust, and neutralize the ions in the plume. The Hall-effect thruster is classed as a moderate specific impulse space propulsion technology and has benefited from considerable theoretical and experimental research since the 1960s.

<span class="mw-page-title-main">Ion thruster</span> Spacecraft engine that generates thrust by generating a jet of ions

An ion thruster, ion drive, or ion engine is a form of electric propulsion used for spacecraft propulsion. It creates thrust by accelerating ions using electricity.

<i>Jupiter Icy Moons Orbiter</i> Canceled NASA orbiter mission to Jupiters icy moons

The Jupiter Icy Moons Orbiter (JIMO) was a proposed NASA spacecraft designed to explore the icy moons of Jupiter. The main target was Europa, where an ocean of liquid water may harbor alien life. Ganymede and Callisto, which are now thought to also have liquid, salty oceans beneath their icy surfaces, were also targets of interest for the probe.

<i>Nozomi</i> (spacecraft) Failed Mars orbiter

Nozomi was a Japanese Mars orbiter that failed to reach Mars due to electrical failure. It was constructed by the Institute of Space and Astronautical Science, University of Tokyo and launched on July 4, 1998, at 03:12 JST with an on-orbit dry mass of 258 kg and 282 kg of propellant. The Nozomi mission was terminated on December 31, 2003.

<span class="mw-page-title-main">BepiColombo</span> European–Japanese satellites heading to Mercury

BepiColombo is a joint mission of the European Space Agency (ESA) and the Japan Aerospace Exploration Agency (JAXA) to the planet Mercury. The mission comprises two satellites launched together: the Mercury Planetary Orbiter (MPO) and Mio. The mission will perform a comprehensive study of Mercury, including characterization of its magnetic field, magnetosphere, and both interior and surface structure. It was launched on an Ariane 5 rocket on 20 October 2018 at 01:45 UTC, with an arrival at Mercury planned for on 5 December 2025, after a flyby of Earth, two flybys of Venus, and six flybys of Mercury. The mission was approved in November 2009, after years in proposal and planning as part of the European Space Agency's Horizon 2000+ programme; it is the last mission of the programme to be launched.

In astrodynamics, orbital station-keeping is keeping a spacecraft at a fixed distance from another spacecraft or celestial body. It requires a series of orbital maneuvers made with thruster burns to keep the active craft in the same orbit as its target. For many low Earth orbit satellites, the effects of non-Keplerian forces, i.e. the deviations of the gravitational force of the Earth from that of a homogeneous sphere, gravitational forces from Sun/Moon, solar radiation pressure and air drag, must be counteracted.

<span class="mw-page-title-main">Gridded ion thruster</span> Space propulsion system

The gridded ion thruster is a common design for ion thrusters, a highly efficient low-thrust spacecraft propulsion method running on electrical power by using high-voltage grid electrodes to accelerate ions with electrostatic forces.

Don Quijote is a past space mission concept that has been studied from 2005 until 2007 by the European Space Agency, and which would investigate the effects of crashing a spacecraft into an asteroid to test whether a spacecraft could successfully deflect an asteroid on a collision course with Earth. The orbiter was designed to last for seven years. The mission did not proceed beyond initial studies.

<span class="mw-page-title-main">TAU (spacecraft)</span> Cancelled NASA space probe to travel 1000 AU from the Sun

TAU was a proposed uncrewed interstellar probe that would go to a distance of one thousand astronomical units from the Earth and Sun by the NASA Jet Propulsion Laboratory in 1987 using tested technology. One scientific purpose would be to measure the distance to other stars via stellar parallax. Studies continued into 1990, working with a launch in the 2005–2010 timeframe.

<span class="mw-page-title-main">LADEE</span> Former NASA Lunar mission

The Lunar Atmosphere and Dust Environment Explorer was a NASA lunar exploration and technology demonstration mission. It was launched on a Minotaur V rocket from the Mid-Atlantic Regional Spaceport on September 7, 2013. During its seven-month mission, LADEE orbited around the Moon's equator, using its instruments to study the lunar exosphere and dust in the Moon's vicinity. Instruments included a dust detector, neutral mass spectrometer, and ultraviolet-visible spectrometer, as well as a technology demonstration consisting of a laser communications terminal. The mission ended on April 18, 2014, when the spacecraft's controllers intentionally crashed LADEE into the far side of the Moon, which, later, was determined to be near the eastern rim of Sundman V crater.

<span class="mw-page-title-main">Lunar Lander (spacecraft)</span> Proposed 2018 ESA Moon mission

The Lunar Lander was a robotic mission intended to send a lander vehicle to the Moon, led by ESA's Human Spaceflight and Operations directorate. The primary objective of the Lunar Lander mission was to demonstrate Europe's ability to deliver payload safely and accurately to the Moon's surface. More specifically the mission would have demonstrated the technologies required to achieve a soft and precise landing while autonomously avoiding surface hazards that can endanger landing and surface mission safety. These technologies will be an asset for future human and robotic exploration missions. However the project was put on hold at the 2012 ESA Ministerial Council.

<span class="mw-page-title-main">Busek</span> American spacecraft propulsion company

Busek Co. Inc. is an American spacecraft propulsion company that builds thrusters, electronics, and various systems for spacecraft.

<span class="mw-page-title-main">NEXT (ion thruster)</span> Space propulsion system

The NASA Evolutionary Xenon Thruster (NEXT) project at Glenn Research Center is a gridded electrostatic ion thruster about three times as powerful as the NSTAR used on Dawn and Deep Space 1 spacecraft. It was used in DART.

<span class="mw-page-title-main">Asteroid Redirect Mission</span> 2013–2017 proposed NASA space mission

The Asteroid Redirect Mission (ARM), also known as the Asteroid Retrieval and Utilization (ARU) mission and the Asteroid Initiative, was a space mission proposed by NASA in 2013; the mission was later cancelled. The Asteroid Retrieval Robotic Mission (ARRM) spacecraft would rendezvous with a large near-Earth asteroid and use robotic arms with anchoring grippers to retrieve a 4-meter boulder from the asteroid.

<span class="mw-page-title-main">NASA Solar Technology Application Readiness</span> Space propulsion system

The NASA Solar Technology Application Readiness (NSTAR) is a type of spacecraft ion thruster called electrostatic ion thruster. It is a highly efficient low-thrust spacecraft propulsion running on electrical power generated by solar arrays. It uses high-voltage electrodes to accelerate ions with electrostatic forces.

<i>ArgoMoon</i> Nanosatellite

ArgoMoon is a CubeSat that was launched into a heliocentric orbit on Artemis 1, the maiden flight of the Space Launch System, on 16 November 2022 at 06:47:44 UTC. The objective of the ArgoMoon spacecraft is to take detailed images of the Interim Cryogenic Propulsion Stage following Orion separation, an operation that will demonstrate the ability of a cubesat to conduct precise proximity maneuvers in deep space.

<span class="mw-page-title-main">Double Asteroid Redirection Test</span> 2021 NASA planetary defense mission

Double Asteroid Redirection Test (DART) was a NASA space mission aimed at testing a method of planetary defense against near-Earth objects (NEOs). It was designed to assess how much a spacecraft impact deflects an asteroid through its transfer of momentum when hitting the asteroid head-on. The selected target asteroid, Dimorphos, is a minor-planet moon of the asteroid Didymos; neither asteroid poses an impact threat to Earth. Launched on 24 November 2021, the DART spacecraft successfully collided with Dimorphos on 26 September 2022 at 23:14 UTC about 11 million kilometers from Earth. The collision shortened Dimorphos' orbit by 32 minutes, greatly in excess of the pre-defined success threshold of 73 seconds. DART's success in deflecting Dimorphos was due to the momentum transfer associated with the recoil of the ejected debris, which was substantially larger than that caused by the impact itself.

DESTINY+ (Demonstration and Experiment of Space Technology for INterplanetary voYage with Phaethon fLyby and dUst Science) is a planned mission to flyby the Geminids meteor shower parent body 3200 Phaethon, as well as various minor bodies originating from the "rock comet". The spacecraft is being developed by the Japanese space agency JAXA, and will demonstrate advanced technologies for future deep space exploration. As of 2020, DESTINY+ is planned to be launched in 2024.

<span class="mw-page-title-main">Advanced Electric Propulsion System</span> Spacecraft propulsion system by NASA

Advanced Electric Propulsion System (AEPS) is a solar electric propulsion system for spacecraft that is being designed, developed and tested by NASA and Aerojet Rocketdyne for large-scale science missions and cargo transportation. The first application of the AEPS is to propel the Power and Propulsion Element (PPE) of Gateway, to be launched in 2024. The PPE module is built by Maxar space solutions in Palo Alto, California. Two identical AEPS engines would consume 25 kW being generated by the roll-out solar array (ROSA) assembly, which can produce over 60 kW of power.

References

  1. 1 2 "SMART-1". NASA's Solar System Exploration website. Retrieved 2 December 2022.
  2. 1 2 Klesman, Alison (22 September 2017). "New observations reveal a lunar orbiter's final resting place". Astronomy Magazine . Retrieved 27 September 2017.
  3. "Probe crashes into Moon's surface". BBC News. 3 September 2006. Retrieved 23 May 2010.
  4. Josset J. L.; Beauvivre S.; Cerroni P.; De Sanctis M. C.; et al. (2006). "Science objectives and first results from the SMART-1/AMIE multicolour micro-camera". Advances in Space Research. 37 (1): 14–20. Bibcode:2006AdSpR..37...14J. doi:10.1016/j.asr.2005.06.078.
  5. Basilevsky A. T.; Keller H. U.; Nathues A.; Mall J.; et al. (2004). "Scientific objectives and selection of targets for the SMART-1 Infrared Spectrometer (SIR)". Planetary and Space Science. 52 (14): 1261–1285. Bibcode:2004P&SS...52.1261B. doi:10.1016/j.pss.2004.09.002.
  6. Di Cara D. M.; Estublier D. (2005). "Smart-1: An analysis of flight data". Acta Astronautica. 57 (2–8): 250–256. Bibcode:2005AcAau..57..250D. doi:10.1016/j.actaastro.2005.03.036.
  7. "ESA Science & Technology - Instruments".
  8. 1 2 Schmidt, Walter; Mälkki, Anssi (2014). "SMART-1 SPEDE: Results and Legacy after 10 Years". EGU General Assembly Conference Abstracts. 16: 13174. Bibcode:2014EGUGA..1613174S.
  9. Rathsman P.; Kugelberg J.; Bodin P.; Racca G. D.; et al. (2005). "SMART-1: Development and lessons learnt". Acta Astronautica. 57 (2–8): 455–468. Bibcode:2005AcAau..57..455R. doi:10.1016/j.actaastro.2005.03.041.
  10. SMART-1: On Course for Lunar Capture | Moon Today – Your Daily Source of Moon News Archived 2 November 2005 at the Wayback Machine
  11. SMART-1 completes its first orbit around the Moon | Moon Today – Your Daily Source of Moon News Archived 15 December 2004 at the Wayback Machine
  12. ESA Portal – SMART-1 manoeuvres prepare for mission end
  13. "SMART-1 impacts Moon". European Space Agency . 3 September 2006. Archived from the original on 5 September 2006. Retrieved 3 September 2006.
  14. ESA – SMART-1 – Intense final hours for SMART-1
  15. ESA, 6th ICLCPM 2005 SMART-1 Lunar Mission – Reducing Mission Operations Costs.pdf (O.Camino et al) (22 September 2005), English: SMART-1 is the first of the European Space Agency's Small Missions for Advanced Research in Technology. (PDF), retrieved 8 May 2020
  16. 1 2 3 Camino, Octavio (10 February 2020), English: Smart-1 Operations Report (O.Camino et al) (PDF), retrieved 8 May 2020
  17. SMART-1 Lunar Mission Star Tracker Operations Experience (M.Alonso)
  18. ESA, SMART-1 AOCS and its relation with electric propulsion system (M.Alonso et al) (16 October 2005), English: SMART-1 is the first of the European Space Agency's Small Missions for Advanced Research in Technology. (PDF), retrieved 8 May 2020
  19. Camino, Octavio (10 February 2020), SMART-1 – Europe's Lunar Mission (O.Camino et al) (PDF), retrieved 8 May 2020
  20. Operationally Enhanced Electric Propulsion Performance on Electrically Propelled Spacecraft (D.Milligan)
  21. Camino, Octavio (10 February 2020), English: Smart-1 Operations Report (O.Camino et al) (PDF), retrieved 8 May 2020
General