Mission type | Gravitational research | ||||||||
---|---|---|---|---|---|---|---|---|---|
Operator | ESA | ||||||||
COSPAR ID | 2009-013A | ||||||||
SATCAT no. | 34602 | ||||||||
Website | http://www.esa.int/GOCE | ||||||||
Mission duration | Planned: 20 months Final: 4 years, 7 months, 3 days | ||||||||
Spacecraft properties | |||||||||
Manufacturer | Thales Alenia Space EADS Astrium | ||||||||
Launch mass | 1,077 kg (2,374 lb) | ||||||||
Dry mass | 872 kg (1,922 lb) | ||||||||
Dimensions | 5.3 m × 2.3 m (17.4 ft × 7.5 ft) | ||||||||
Power | 1,600 watts | ||||||||
Start of mission | |||||||||
Launch date | 17 March 2009, 14:21 UTC [2] | ||||||||
Rocket | Rockot/Briz-KM | ||||||||
Launch site | Plesetsk Cosmodrome | ||||||||
Contractor | Eurockot Launch Services | ||||||||
End of mission | |||||||||
Disposal | Orbital decay | ||||||||
Declared | 21 October 2013 UTC [3] | ||||||||
Last contact | 10 November 2013, 22:42 UTC [4] | ||||||||
Decay date | 11 November 2013, 00:16 UTC [5] | ||||||||
Orbital parameters | |||||||||
Reference system | Geocentric | ||||||||
Regime | Sun-synchronous [6] | ||||||||
Perigee altitude | 254.9 km (158.4 mi) [6] | ||||||||
Apogee altitude | 254.9 km (158.4 mi) [6] | ||||||||
Inclination | 96.7 degrees | ||||||||
Epoch | 28 June 2010 [6] | ||||||||
Transponders | |||||||||
Band | S band | ||||||||
Frequency | 2 GHz | ||||||||
Bandwidth | up to 1.2 Mbit/s download up to 4 kbit/s upload | ||||||||
| |||||||||
Insignia for the GOCE mission |
The Gravity Field and Steady-State Ocean Circulation Explorer (GOCE) was the first of ESA's Living Planet Programme heavy satellites intended to map in unprecedented detail the Earth's gravity field. The spacecraft's primary instrumentation was a highly sensitive gravity gradiometer consisting of three pairs of accelerometers which measured gravitational gradients along three orthogonal axes.
Launched on 17 March 2009, GOCE mapped the deep structure of the Earth's mantle and probed hazardous volcanic regions. It brought new insight into ocean behaviour; this in particular, was a major driver for the mission. By combining the gravity data with information about sea surface height gathered by other satellite altimeters, scientists were able to track the direction and speed of geostrophic ocean currents. The low orbit and high accuracy of the system greatly improved the known accuracy and spatial resolution of the geoid (the theoretical surface of equal gravitational potential on the Earth).
The satellite's unique arrow shape and fins helped keep GOCE stable as it flew through the thermosphere at a comparatively low altitude of 255 kilometres (158 mi). Additionally, an ion propulsion system continuously compensated for the variable deceleration due to air drag without the vibration of a conventional chemically powered rocket engine, thus limiting the errors in gravity gradient measurements caused by non-gravitational forces and restoring the path of the craft as closely as possible to a purely inertial trajectory.
After running out of propellant, the satellite began dropping out of orbit and made an uncontrolled re-entry on 11 November 2013. [1]
The final gravity map and model of the geoid will provide users worldwide with well-defined data product that will lead to:
The first Earth global gravity model based on GOCE data was presented at ESA's Living Planet Symposium, in June 2010. [6]
Initial results of the GOCE satellite mission were presented at the American Geophysical Union (AGU) 2010 Fall (Autumn) Meeting by Dr Rory Bingham from Newcastle University, UK. The maps produced from the GOCE data show ocean currents in much finer detail than had been available previously. [12] Even very small details like the Mann Eddy in the North Atlantic were visible in the data, [13] as was the effect of Hurricane Igor in 2010. [14] Detailed analysis of GOCE's thruster and accelerometer data serendipitously revealed that it had detected the infrasound waves generated by the 2011 Tōhoku earthquake (whereupon it inadvertently became the first seismograph in orbit). [15]
Later results from the GOCE data exposed details in the Earth's mantle including mantle plumes, ancient subduction zones, and remnants of the Tethys Ocean. [16]
Subsequent analysis of GOCE data has also provided new information about the geological makeup of the Antarctic continent, including the detection of ancient continent remnants and at least three cratons beneath the Antarctic ice. [17] [18] [19]
The first launch attempt on 16 March 2009 was aborted due to a malfunction with the launch tower. [20]
GOCE was launched on 17 March 2009 at 14:21 UTC from the Plesetsk Cosmodrome in northern Russia aboard a Rokot/Briz-KM vehicle. [21] The Rokot is a modified UR-100N intercontinental ballistic missile that was decommissioned after the Strategic Arms Reduction Treaty. The launcher used the two lower liquid fuel stages of the original missile and was equipped with a Briz-KM third stage developed for precise orbit injection. GOCE was launched into a Sun-synchronous dusk-dawn orbit with an inclination of 96.7° and an ascending node at 18:00. Separation from the launcher was at 295 km. The satellite's orbit then decayed over a period of 45 days to an operational altitude, planned at 270 km. During this time, the spacecraft was commissioned and the electrical propulsion system checked for reliability in attitude control [ needs update ]. [22]
In February 2010 a fault was discovered in the satellite's computer, which meant controllers were forced to switch control to the backup computer.
In July 2010, GOCE suffered a serious communications malfunction, when the satellite suddenly failed to downlink scientific data to its receiving stations. Extensive investigations by experts from ESA and industry revealed that the issue was almost certainly related to a communication link between the processor module and the telemetry modules of the main computer. [23] The recovery was completed in September 2010: as part of the action plan, the temperature of the floor hosting the computers was raised by some 7 °C (13 °F), resulting in restoration of normal communications. [24]
In November 2010, the due completion date for the original 20-month mission before it was delayed by the glitches, it was decided to extend the mission lifetime until the end of 2012 in order to complete the original work and carry out a further 18-month mission to improve the collected data. [25]
In November 2012 the orbit was lowered from 255 to 235 km (158 to 146 mi) to get higher resolution data, at which time fuel remained for another 50 weeks. [26]
In May 2013 a further lowering to 229 km (142 mi) took place.
The satellite ran out of its xenon propellant in October 2013, at which time it would take 2–3 weeks to re-enter. [27] On 18 October 2013, ESA reported that the pressure in the fuel system of GOCE's ion engine had dropped below 2.5 bar, which is the nominal operating pressure required to fire the engine. [28] Subsequently, end of mission was formally declared on 21 October when the spacecraft ran out of fuel; deprived of xenon, the ion drive stopped working at 03:16 UTC. [3] [29]
On 9 November 2013, a published report indicated that the satellite was expected to re-enter within a day or two. [30] [31] By this date, the perigee altitude had decayed to 155 km (96 mi). [32]
On 10 November, ESA expected re-entry to occur between 18:30 and 24:00 UTC that day, with the most probable impact ground swath largely running over ocean and polar regions. [33]
Its descending orbit on 11 November 2013 passed over Siberia, the western Pacific Ocean, the eastern Indian Ocean and Antarctica. [34] [35] The satellite finally disintegrated around 00:16 UTC on 11 November near the Falkland Islands. [5] [36]
The satellite's main payload was the Electrostatic Gravity Gradiometer (EGG) to measure the gravity field of Earth. This instrument consisted of three pairs of capacitive accelerometers arranged in three dimensions that responded to tiny variations in the 'gravitational tug' of the Earth as it traveled along its orbital path. Because of their different position in the gravitational field they all experienced the gravitational acceleration of the Earth slightly differently. The three axes of the gradiometer allowed the simultaneous measurement of the five independent components of the gravity gradient tensor.
Other payload was an onboard GPS receiver used as a Satellite-to-Satellite Tracking Instrument (SSTI); a compensation system for all non-gravitational forces acting on the spacecraft. The satellite was also equipped with a laser retroreflector to enable tracking by ground-based Satellite laser ranging stations. [37]
GOCE's 5 × 1.1 m (16 × 4 ft) frame had fixed solar panels covering its sun-facing side, which produced 1,300 watts of power. [38] The panels were shaped to act as fins, stabilising the spacecraft while it orbited through the residual air in the thermosphere.
The ion propulsion electric engine, designed and built at QinetiQ's space centre in Farnborough, England, ejected xenon ions at velocities exceeding 40,000 m/s (140,000 km/h; 89,000 mph), which compensated for the orbital decay losses. GOCE's mission ended when the 40 kg (88 lb) xenon fuel tank emptied. [7] The dual Kaufman-type ion thrusters could produce up to 20 millinewtons (0.0045 lbf) of thrust. [39]
Although its predicted lifetime was 20 months, an ESA report in June 2010 suggested that unusually low solar activity (meaning a calmer upper atmosphere, and hence less drag on the craft) meant the fuel would last longer than its predicted 20 months—possibly into 2014. In reality, the end of mission was formally declared on 21 October 2013 after 55 months, with the final 11 months in a lower orbit (with greater air density and therefore greater fuel use). [40]
Cassini–Huygens, commonly called Cassini, was a space-research mission by NASA, the European Space Agency (ESA), and the Italian Space Agency (ASI) to send a space probe to study the planet Saturn and its system, including its rings and natural satellites. The Flagship-class robotic spacecraft comprised both NASA's Cassini space probe and ESA's Huygens lander, which landed on Saturn's largest moon, Titan. Cassini was the fourth space probe to visit Saturn and the first to enter its orbit, where it stayed from 2004 to 2017. The two craft took their names from the astronomers Giovanni Cassini and Christiaan Huygens.
The geoid is the shape that the ocean surface would take under the influence of the gravity of Earth, including gravitational attraction and Earth's rotation, if other influences such as winds and tides were absent. This surface is extended through the continents. According to Gauss, who first described it, it is the "mathematical figure of the Earth", a smooth but irregular surface whose shape results from the uneven distribution of mass within and on the surface of Earth. It can be known only through extensive gravitational measurements and calculations. Despite being an important concept for almost 200 years in the history of geodesy and geophysics, it has been defined to high precision only since advances in satellite geodesy in the late 20th century.
SMART-1 was a Swedish-designed European Space Agency satellite that orbited the Moon. It was launched on 27 September 2003 at 23:14 UTC from the Guiana Space Centre in Kourou, French Guiana. "SMART-1" stands for Small Missions for Advanced Research in Technology-1. On 3 September 2006, SMART-1 was deliberately crashed into the Moon's surface, ending its mission.
BepiColombo is a joint mission of the European Space Agency (ESA) and the Japan Aerospace Exploration Agency (JAXA) to the planet Mercury. The mission comprises two satellites launched together: the Mercury Planetary Orbiter (MPO) and Mio. The mission will perform a comprehensive study of Mercury, including characterization of its magnetic field, magnetosphere, and both interior and surface structure. It was launched on an Ariane 5 rocket on 20 October 2018 at 01:45 UTC, with an arrival at Mercury planned for November 2026, after a flyby of Earth, two flybys of Venus, and six flybys of Mercury. The mission was approved in November 2009, after years in proposal and planning as part of the European Space Agency's Horizon 2000+ programme; it is the last mission of the programme to be launched.
Venus Express (VEX) was the first Venus exploration mission of the European Space Agency (ESA). Launched in November 2005, it arrived at Venus in April 2006 and began continuously sending back science data from its polar orbit around Venus. Equipped with seven scientific instruments, the main objective of the mission was the long term observation of the Venusian atmosphere. The observation over such long periods of time had never been done in previous missions to Venus, and was key to a better understanding of the atmospheric dynamics. ESA concluded the mission in December 2014.
In astrodynamics, orbital station-keeping is keeping a spacecraft at a fixed distance from another spacecraft or celestial body. It requires a series of orbital maneuvers made with thruster burns to keep the active craft in the same orbit as its target. For many low Earth orbit satellites, the effects of non-Keplerian forces, i.e. the deviations of the gravitational force of the Earth from that of a homogeneous sphere, gravitational forces from Sun/Moon, solar radiation pressure and air drag, must be counteracted. For spacecraft in a halo orbit around a Lagrange point, station-keeping is even more fundamental, as such an orbit is unstable; without an active control with thruster burns, the smallest deviation in position or velocity would result in the spacecraft leaving orbit completely.
The Gravity Recovery and Climate Experiment (GRACE) was a joint mission of NASA and the German Aerospace Center (DLR). Twin satellites took detailed measurements of Earth's gravity field anomalies from its launch in March 2002 to the end of its science mission in October 2017. The two satellites were sometimes called Tom and Jerry, a nod to the famous cartoon. The GRACE Follow-On (GRACE-FO) is a continuation of the mission on near-identical hardware, launched in May 2018. On March 19, 2024, NASA announced that the successor to GRACE-FO would be Gravity Recovery and Climate Experiment-Continuity (GRACE-C), to be launched in or after 2028.
Satellite geodesy is geodesy by means of artificial satellites—the measurement of the form and dimensions of Earth, the location of objects on its surface and the figure of the Earth's gravity field by means of artificial satellite techniques. It belongs to the broader field of space geodesy. Traditional astronomical geodesy is not commonly considered a part of satellite geodesy, although there is considerable overlap between the techniques.
The gridded ion thruster is a common design for ion thrusters, a highly efficient low-thrust spacecraft propulsion method running on electrical power by using high-voltage grid electrodes to accelerate ions with electrostatic forces.
CryoSat is an ESA programme to monitor variations in the extent and thickness of polar ice through use of a satellite in low Earth orbit. The information provided about the behaviour of coastal glaciers that drain thinning ice sheets will be key to better predictions of future sea level rise. The CryoSat-1 spacecraft was lost in a launch failure in 2005, however the programme was resumed with the successful launch of a replacement, CryoSat-2, launched on 8 April 2010.
Aeolus, or, in full, Atmospheric Dynamics Mission-Aeolus (ADM-Aeolus), was an Earth observation satellite operated by the European Space Agency (ESA). It was built by Airbus Defence and Space, launched on 22 August 2018, and operated until it was deorbited and re-entered the atmosphere over Antarctica on 28 July 2023. ADM-Aeolus was the first satellite with equipment capable of performing global wind-component-profile observation and provided much-needed information to improve weather forecasting. Aeolus was the first satellite capable of observing what the winds are doing on Earth, from the surface of the planet and into the stratosphere 30 km high.
Challenging Minisatellite Payload (CHAMP) was a German satellite launched July 15, 2000 from Plesetsk, Russia and was used for atmospheric and ionospheric research, as well as other geoscientific applications, such as GPS radio occultation, gravity field determination, and studying the Earth's magnetic field.
The exploration of Mercury has a minor role in the space interests of the world. It is the least explored inner planet. As of 2015, the Mariner 10 and MESSENGER missions have been the only missions that have made close observations of Mercury. MESSENGER made three flybys before entering orbit around Mercury. A third mission to Mercury, BepiColombo, a joint mission between the Japan Aerospace Exploration Agency (JAXA) and the European Space Agency, is to include two probes. MESSENGER and BepiColombo are intended to gather complementary data to help scientists understand many of the mysteries discovered by Mariner 10's flybys.
Artemis was a geostationary earth orbit satellite (GEOS) for telecommunications, built by Alenia Spazio for ESA. The Artemis satellite operated at the 21.5E orbital position until 2016, when it was moved to 123E to cover the L-Band spectrum rights for Indonesia's Ministry of Defense.
Soil Moisture and Ocean Salinity (SMOS) is a satellite which forms part of ESA's Living Planet Programme. It is intended to provide new insights into Earth's water cycle and climate. In addition, it is intended to provide improved weather forecasting and monitoring of snow and ice accumulation.
Swarm is a European Space Agency (ESA) mission to study the Earth's magnetic field. High-precision and high-resolution measurements of the strength, direction and variations of the Earth's magnetic field, complemented by precise navigation, accelerometer and electric field measurements, will provide data for modelling the geomagnetic field and its interaction with other physical aspects of the Earth system. The results offer a view of the inside of the Earth from space, enabling the composition and processes of the interior to be studied in detail and increase our knowledge of atmospheric processes and ocean circulation patterns that affect climate and weather.
The Jupiter Icy Moons Explorer is an interplanetary spacecraft on its way to orbit and study three icy moons of Jupiter: Ganymede, Callisto, and Europa. These planetary-mass moons are planned to be studied because they are thought to have significant bodies of liquid water beneath their frozen surfaces, which would make them potentially habitable for extraterrestrial life.
LISA Pathfinder, formerly Small Missions for Advanced Research in Technology-2 (SMART-2), was an ESA spacecraft that was launched on 3 December 2015 on board Vega flight VV06. The mission tested technologies needed for the Laser Interferometer Space Antenna (LISA), an ESA gravitational wave observatory planned to be launched in 2035. The scientific phase started on 8 March 2016 and lasted almost sixteen months. In April 2016 ESA announced that LISA Pathfinder demonstrated that the LISA mission is feasible.
Very low Earth orbit is a range of orbital altitudes below 400 km (250 mi), and is of increasing commercial importance in a variety of scenarios and for multiple applications, in both private and government satellite operations. Applications include earth observation, radar, infrared, weather, telecommunications, and rural internet access among others.