Company type | Public |
---|---|
Nasdaq: PTRA (2021-23) | |
Industry | Automotive |
Founded | 2004Golden, Colorado | in
Founder | Dale Hill |
Defunct | March 2024 [1] |
Fate | Bankrupted |
Headquarters | Burlingame, California |
Area served | North America |
Key people | Gareth Joyce (President and CEO) |
Production output |
|
Revenue | US$309.4 million (2022) |
US$(24) million (2022) | |
US$(238) million (2022) | |
Number of employees | 1,247 (2022) |
Website | proterra |
Footnotes /references Financials as of December 31,2022 [update] . References: [2] |
Proterra Inc. was an American electric vehicle and powertrain manufacturer based in Burlingame, California. The company designed and manufactured battery electric transit buses, powertrain systems for other heavy-duty vehicle builders and charging systems for fleets of heavy-duty vehicles.
Founded in 2004, it became a public company in June 2021. The company delivered 199 new transit buses and battery systems for 1,229 vehicles in 2022. The company filed for Chapter 11 bankruptcy in August 2023. [3] In November, its assets were split into three divisions and sold off. The Proterra Powered powertrain manufacturing business line will operate as an independent company within the Volvo Group. The transit bus manufacturing business line was sold to Phoenix Motorcars. The Proterra Energy business line which built charging systems for fleets of heavy-duty vehicles was purchased by Cowen Equity.
Proterra was founded in Golden, Colorado by Dale Hill in 2004. Hill had previously founded TransTeq, a Denver, Colorado, bus manufacturing company, as well as Alumatech, a manufacturing company that made aluminum dump trailers. TransTeq was best known for building the fleet of "EcoMark" buses used on the 16th Street Mall in Denver that were series hybrids with batteries charged by a generator connected to a small compressed natural gas fueled engine. [4]
Proterra would abandon the CNG technology used by its predecessor TransTeq, to take advantage of Federal Transit Administration's (FTA) push for alternative fuels and forms of mobility through such programs as the Clean Fuels Grant Program Bus and Bus Facilities, [5] [6] and the TIGER and TIGGER programs, which excluded CNG buses. [7]
A prototype of the company's first product, the EcoRide, was first shown at the 2008 APTA Expo. The battery-electric bus had a composite body and range-extending hydrogen fuel cell auxiliary power unit (APU). [8] : 34 Ultimately, the company decided to abandon the APU by the time the bus went on a tour of several cities in California in 2009. [9] The prototype helped secure an order from Southern California's Foothill Transit, which received several EcoRide BE35 buses in 2010. [10]
In February 2010, Proterra announced that it would move its manufacturing plant from Golden to a location in Greenville, South Carolina just outside of the Clemson University International Center for Automotive Research (CU-ICAR). [11] In October 2011, the company announced it would consolidate all operations in Greenville, moving management and research teams from Colorado. [12]
Ryan Popple, formerly of Tesla Motors, was appointed CEO in 2014. [13] In 2015, Proterra was awarded a $3 million grant from the California Energy Commission to fund the design, development and construction of the company's battery-electric transit bus manufacturing line in the City of Industry, California. Proterra moved its headquarters from Greenville, South Carolina, to Burlingame, California, in October 2015. [14] Popple served as CEO of Proterra until 2020 when board member Jack Allen was appointed CEO and Popple became the executive director. [15] Popple continued to work at Proterra until his death in 2021 [16]
In January 2021, the company became publicly listed on the Nasdaq after a reverse takeover of a special-purpose acquisition company, ArcLight Clean Transition Corporation. [17]
In December 2021, Gareth Joyce was appointed CEO, effective January 1, 2022, while Jack Allen retired from the CEO role but continued to serve on the board. [18]
On August 7, 2023, Proterra filed for Chapter 11 bankruptcy protection. [19] Among reasons cited for the bankruptcy were supply chain disruption, leading to penalties for not meeting supplier contract commitments and for subsequent delayed deliveries, as well as the nature of the business of producing highly customized products for each transit agency, and over a period of 12 to 18 months, during which inflation cut into margins. [3] [20] [21]
In mid-November 2023, in the first of two bankruptcy proceedings, Volvo Group placed a winning $210 million bid for the Proterra Powered business line, which builds batteries and drivetrains for other heavy-duty vehicle builders. [22] In the second auction, [23] the transit bus manufacturing business line was sold to Phoenix Motorcars and the Proterra Energy business line which built charging systems for fleets of heavy-duty vehicles was purchased by Cowen Equity. [24] [25]
The Proterra EcoRide was the first battery-electric bus offered by Proterra, first shown as a prototype at the 2008 APTA Expo in San Diego with a 35-foot (11 m) long composite body and range-extending hydrogen fuel cell auxiliary power unit (APU). [8] : 34 The first EcoRide BE35, which omitted the APU, toured several cities in California in 2009. [9] EcoRide was offered only with a lithium-titanate battery chemistry, which enabled fast on-route charging using the company's proprietary charger, but limited range. [26] Foothill Transit was the launch customer, accepting delivery of several EcoRide BE35 buses in 2010. [10]
The EcoRide was replaced by the larger Catalyst in 2014.
The Proterra Catalyst was an evolution of the EcoRide, initially available as a standard 40-foot (12 m) transit bus length in 2014 with the same fast-charging battery as the EcoRide and a similar composite chassis. [27] A 35-foot (11 m) Catalyst was introduced in 2015 to directly replace the earlier EcoRide. Also in 2015, Proterra introduced the extended range (XR) battery, which offered greater range with slow charging at a storage yard. [28] In 2016, Proterra introduced the Energy Efficient (E2) battery which offered even greater range. [29] In 2017, a second drivetrain option featuring two traction motors for greater efficiency (branded DuoPower) was introduced. [30] In 2018, Proterra discontinued its proprietary overhead "blade" charger in favor of the then standardized SAE J3105 charging options. [31]
The Catalyst was replaced by the ZX5 line in 2020.
The Proterra ZX5 was announced as the replacement to the Catalyst, available in 35-and-40-foot (11 and 12 m) nominal lengths. Edmonton Transit System of Edmonton, Alberta was the launch customer for the 40-foot ZX5.
The ZX5 features the same composite chassis as the Catalyst but incorporates several design changes. Visually, the vehicle appears more angular, while the roof fairing is more streamlined and 6 inches (150 mm) shorter. On the roof, provisions were added for additional battery packs and SAE J3105 (OppCharge) fast-charging rails. [32] [33]
The ZX5 is offered with multiple battery options, designated ZX5, ZX5+, and ZX5 MAX for the 220, 440, and 660 kWh models, respectively. Each of the three battery options is also offered with one of two drivetrains, which Proterra brands DuoPower (two traction motors) or ProDrive (single traction motor). [32] [33]
Originally a Proterra product, the ZX5 has been manufactured and offered by Phoenix Motorcars since 2024. Vehicles manufactured by Phoenix Motorcars no longer feature Proterra branding, instead using Phoenix's own.
Van Hool announced a partnership with Proterra in October 2017 to build an electric version of the CX45 motorcoach. [34] The CX45E would be followed by a shorter CX35E model. Both of the Van Hool coaches were powered by the Proterra E2 battery. [35]
Alexander Dennis has been offering an electric version of its Enviro500 double-decker bus with powertrains built by Proterra. [36] The Enviro500EV will use Proterra E2 battery packs, on-board charging hardware, and thermal management. [37]
Thomas Built Buses announced a partnership with Proterra in October 2018 to build an electric version of the Saf-T-Liner C2 school bus, called the "Jouley." [34] [38] The Jouley is equipped with 220 kWh of battery storage, providing an estimated range of 134 miles (216 km) and capable of recharging in three hours using 60 kW DC fast charging equipment provided by Proterra.
In November 2021, Proterra announced a battery deal with Colorado's Lightning eMotors, maker of passenger and cargo vans, shuttle buses and other fleet vehicles, for up to 10,000 vehicle battery systems in 2022-2025. [39]
ENC announced a partnership with Proterra in September 2022 to build an electric version of the Axess transit bus, a direct competitor to the ZX5. The Axess EVO-BE is expected to be available in 2023 with 738 kWh of battery storage. [40]
The partnerships with other bus OEMs led Proterra to announce in August 2019 the Proterra Powered initiative, which supports OEMs that are interested in using Proterra's battery-electric drivetrain for heavy-duty commercial vehicles. [41] [42]
In November 2023, Proterra's battery business was acquired by Swedish truck maker Volvo for $210 million. [43]
Proterra has its headquarters and a battery manufacturing facility in Burlingame, California, located in Silicon Valley. Batteries are also manufactured in Southern California's City of Industry. The company has a transit bus assembly facility in Greenville, South Carolina that sits directly outside the Clemson University International Center for Automotive Research (CU-ICAR).
The company's composite bus bodies are supplied by TPI Composites using its factory in Warren, Rhode Island. [44] TPI had previously developed a composite bus body for North American Bus Industries which was marketed as the Compobus. [45] Proterra says that compared to a traditional steel body and frame, the composite body is lighter and allows most of the battery packs to be placed below the floor of the vehicle, between the axles, to achieve a low center of gravity. [46]
Proterra offers a battery leasing program where customers pay for the price of the battery over time rather than upfront when the bus is purchased. The company says that many customers can make lease payments using their operational savings from reduced fuel and maintenance costs. [46]
25 Proterra buses, purchased by SEPTA in 2016 and delivered starting in June 2019 for transit service in Philadelphia, [47] were pulled from service in February 2020. It was reportedly the third-largest electric bus fleet in the United States. [48] [49] SEPTA transit agency discovered defects in the composite chassis of the buses, [48] including cracks that Proterra characterized as "non-structural" in May 2019 and failed equipment brackets in January 2020. [50]
In a March 2021 email, SEPTA General Manager Leslie Richards said she planned to tell Federal Transit Administration officials that she had doubts about "the future of electric vehicle procurement," adding, "I plan on explaining why we do not feel the current technology is a good investment at this time." The FTA helped underwrite the initial purchase of Proterra buses with a US$2.6 million federal grant. [50] SEPTA's chief vehicle engineering officer Dave Warner also said, "Proterra and its structural consultant … have been uncooperative in the resolution process." [50]
Proterra's composite frames use a mix of resin, fiberglass, carbon fiber, balsa wood, and steel reinforcement plates, according to a SEPTA report on the cracks. Proterra's lawyers would later analogize the issue discovered by SEPTA to cracking paint applied to a metal frame, raising doubts the issue could ever be "fixed." [50] "Proterra is unable to repair or permanently prevent the recurrence of cracking because it is an inherent part of the composite body material," wrote Josh Ensign, Proterra's chief operating officer. [50]
A similar issue was identified in New York's Tompkins Consolidated Area Transit where the frame on one of their Proterra buses separated from the axle when it was positioned on a lift on March 13, 2024. Additionally, mechanics identified cracks in the fiber-glass body of one of their buses. [51] [52] Similar issues have not been reported by other US transit agencies; Delaware's DART First State stated their Proterra buses were not experiencing the same issues. [53]
Competing transit bus manufacturers:
The Toronto Transit Commission (TTC) uses buses and other vehicles for public transportation. In 2018, the TTC bus system had 159 bus routes carrying over 264 million riders over 6,686 kilometres (4,154 mi) of routes with buses travelling 143 million kilometres in the year. As of 2021, the TTC has 192 bus routes in operation, including 28 night bus routes. In 2023, the system had a ridership of 362,041,400, or about 1,240,300 per weekday as of the second quarter of 2024.
The MTA Regional Bus Operations bus fleet is a fleet of buses in fixed-route service in New York City under the "MTA New York City Bus" and "MTA Bus" brands, both of which operate local, limited, express and Select Bus Service routes.
Van Hool NV is a Belgian coachbuilder and manufacturer of buses, coaches, trolleybuses, and trailers.
The Delaware Transit Corporation, operating as DART First State, is the only public transportation system that operates throughout the U.S. state of Delaware. DART First State provides local and inter-county bus service throughout the state and also funds commuter rail service along SEPTA Regional Rail's Wilmington/Newark Line serving the northern part of the state. The agency also operates statewide paratransit service for people with disabilities. DART First State is a subsidiary of the Delaware Department of Transportation (DelDOT).
Phoenix Cars LLC, d.b.a. Phoenix Motorcars, is a developer of zero emission, all-electric vehicles (EV) based in Anaheim, California, United States, focused on the deployment of light- and medium-duty EVs into the fleet and transit markets. The company was founded in 2002 and became a wholly owned subsidiary of Al Yousuf LLC in 2009 and of EdisonFuture in 2020. Phoenix launched its all-electric 14-22 passenger shuttle bus with 100 mile range per charge in 2013. The bus is based on the versatile Ford E350/450 Series vehicle.
The Thomas Saf-T-Liner C2 is a cowled-chassis bus manufactured by bus body manufacturer Thomas Built Buses. Introduced in 2004, the vehicle is produced primarily as a school bus; other configurations of the model line were developed for commercial use and specialty configurations.
A battery electric bus is an electric bus that is driven by an electric motor and obtains energy from on-board batteries. Many trolleybuses use batteries as an auxiliary or emergency power source.
Environmental Performance Vehicles (EPV), previously DesignLine Corporation, is a manufacturer of coach, electric and range-extended electric (hybrid) buses. It was founded in Ashburton, New Zealand in 1985. Initially it was a manufacturer of tour coaches. In the 1990s it diversified into conventional transit buses and then added hybrid city buses in the late 1990s. It was acquired by American interests in 2006, and DesignLine Corporation's headquarters was relocated to Charlotte, North Carolina. Following a bankruptcy in 2013, the assets of DesignLine were sold and the company was renamed.
A fuel cell bus is a bus that uses a hydrogen fuel cell as its power source for electrically driven wheels, sometimes augmented in a hybrid fashion with batteries or a supercapacitor. The only emission from the bus is water. Several cities around the world have trialled and tested fuel cell buses, with over 5,600 buses in use worldwide, the majority of which are in China.
A battery electric vehicle (BEV), pure electric vehicle, only-electric vehicle, fully electric vehicle or all-electric vehicle is a type of electric vehicle (EV) that uses energy exclusively from an on-board battery. This definition excludes hybrid electric vehicles. BEVs use electric motors and motor controllers instead of internal combustion engines (ICEs) for propulsion. They derive all power from battery packs and thus have no internal combustion engine, fuel cell, or fuel tank. BEVs include – but are not limited to – motorcycles, bicycles, scooters, skateboards, railcars, watercraft, forklifts, buses, trucks, and cars.
The lithium-titanate or lithium-titanium-oxide (LTO) battery is a type of rechargeable battery which has the advantage of being faster to charge than other lithium-ion batteries but the disadvantage is a much lower energy density.
Blue Water Area Transit (BWAT) is the public transit operator serving Port Huron, Michigan and surrounding St. Clair County. Operated by the Blue Water Area Transportation Commission (BWATC), the BWAT system includes fixed-route buses in the Port Huron area, plus commuter routes and paratransit services. In 2023, the system had a ridership of 1,013,200, or about 3,800 per weekday.
The BYD K-series bus are a line of battery electric buses manufactured by the Chinese automaker BYD, powered with its self-developed lithium iron phosphate battery, featuring a typical operating range of 250 kilometres (160 mi) per charge under urban road conditions. It is available in several different nominal lengths, from 7.0 to 13.7 m and also as a 18 m (60 ft) (articulated) bus. The rear axle is powered by two electric traction motors; the battery capacity and motor power of each model varies depending on the nominal length and passenger capacity.
The New Flyer Xcelsior is a line of transit buses available in 35-foot rigid, 40-foot rigid, and 60-foot articulated nominal lengths manufactured by New Flyer Industries since 2008. In addition to the different available lengths, the buses are sold with a variety of propulsion systems: conventional diesel, compressed natural gas (CNG), diesel-electric hybrid, hydrogen fuel cell, overhead electric wire and battery electric. A future autonomous bus variant was announced in January 2021.
As of 2019, King County Metro operates the seventh largest fleet of buses in the United States, with a total of 1,583 buses. The agency's buses traveled a total of 53 million miles (85,000,000 km) and transported over 123 million passengers in 2019.
The Proterra Catalyst is a battery-electric low-floor transit bus that was built by Proterra from 2014 to 2020. The second generation of Proterra's battery-electric buses, it succeeded the earlier EcoRide as the company's flagship product.
The ZX5 is a battery-electric, low-floor transit bus that was developed and originally manufactured by Proterra from 2020, and is since 2024 manufactured by Phoenix Motorcars.
SAE J3105 is a recommended practice for automated connection devices (ACD) that mate chargers with battery electric buses and heavy-duty vehicles. The practice is maintained by the SAE International with the formal title "Electric Vehicle Power Transfer System Using Conductive Automated Connection Devices Recommended Practice", and was first issued in January 2020. It covers the general physical, electrical, functional, testing, and performance requirements for automated conductive DC power transfer systems intended for heavy duty vehicles, focusing primarily on transit buses.
The Proterra EcoRide BE35 is a 35 foot (11 m) fast-charge battery electric bus that seats 38 with a total passenger capacity of 60 in its composite low floor body. Foothill Transit was the first transit agency to operate the buses in revenue service, starting in September 2010. It is the first 30 ft (9 m) or larger, heavy-duty all-electric bus ever to complete federally required durability, reliability and safety testing at the Bus Research and Testing Center in Altoona, Pennsylvania. The 12yr/500,000 mi (800,000 km) STURAA test was completed on March 5, 2012.