Company type | Private |
---|---|
Industry | |
Founded | 2015[1] |
Founders |
|
Headquarters | Long Beach, California, US |
Products | |
Services | Orbital launch |
Number of employees | c. 1,000+ [2] (2024) |
Website | relativityspace |
Part of a series on |
Private spaceflight |
---|
Active companies |
Active vehicles |
Contracts and programs |
Related |
Relativity Space Inc. is an American aerospace manufacturing company headquartered in Long Beach, California. [3] Relativity Space is developing manufacturing technologies, launch vehicles, and rocket engines for commercial orbital launch services. [4] The company is notable for manufacturing most of their Terran 1 and Terran R rocket parts using 3D printing. As of April 2024, Terran R is on track for initial launch in 2026. [5]
Relativity Space was founded in 2015 by CEO Tim Ellis and CTO Jordan Noone on the idea that existing private spaceflight companies were not tapping enough into the potential of additive manufacturing (3D printing). [6] Relativity is aiming to be the first company to successfully launch a fully 3D-printed launch vehicle into orbit. [7]
In November 2020, Relativity Space announced its US$500 million Series D funding at a calculated US$2.3 billion valuation. [8] In June 2021 Relativity announced another US$650 million funding round led by Fidelity Investments at a valuation of US$4.2 billion, bringing its total funding to US$1.335 billion. [9] The funding will help the development of a partially reusable heavy-lift launch vehicle, the Terran R, targeting a first orbital launch no earlier than 2026. [10] Relativity Space has investors including Baillie Gifford, Blackrock, BOND, Coatue, Fidelity, General Catalyst, ICONIQ Capital, K5 Global, Mark Cuban, Playground Global, Social Capital, Tiger Global, Tribe Capital, and Y Combinator among others. [11]
In June 2022, it was reported that Relativity Space would send OneWeb’s second-gen broadband satellites to orbit in 2025. The mission is to be completed using the Terran R, which marked a total value of binding launch deals for that rocket to over $1.2 billion despite the company having yet to have launched their first rocket. [12]
The company's initial attempt to launch its first rocket, named Terran 1, on March 8, 2023 was scrubbed due to technical issues, with a second attempt anticipated for March 11, 2023, which was also scrubbed. [13] [14]
On March 23, 2023 (UTC) the company launched its first rocket, but it experienced failure during its second stage of flight and failed to reach orbit. Terran 1 featured no payload. [15] [16] Following the failed launch, Relativity retired the rocket in favor of developing the much larger, reusable Terran R vehicle. [17]
The company was named as a CNBC Disruptor for the 5th straight year, a listing of private companies challenging the status quo in their respective industries. [18]
Relativity Space announced a new 11,000-square-metre (120,000 sq ft) Long Beach, California headquarters and factory in February 2020. [19] As of February 2020 [update] , the new headquarters is planned to house both business operations and Relativity's autonomous development operations that the company plans to build into a modern rocket manufacturing factory in the coming years. [20] According to an interview with CEO Tim Ellis in early 2020, the factory is planned to have no fixed tooling, which is hoped to allow it to be rapidly reconfigured and autonomous. [21] A new 93,000-square-metre (1,000,000 sq ft) factory was announced in June 2021, with Relativity set to takeover the former Boeing C-17 production plant in January 2022 to begin production of its Terran R reusable launch vehicle. [22] In 2024, with the headquarters building completed, the company looked to have permitting approved for a 200 foot tall test stand. The application is in progress. [23]
In March 2018, Relativity Space signed a 20-year lease at the Stennis Space Center in Mississippi, a NASA rocket testing facility, to test engine components and eventually full-scale test their Aeon 1 rocket engines. [3] [8] And in June 2019, Relativity Space expanded their work with the Stennis Space Center to include exclusive use of 20,000 m2 (220,000 sq ft) within Building 9101. [24] In mid-2019, Relativity Space planned to create 200 jobs and invest US$59 million in Mississippi over the course of this nine-year lease, which carries an option to extend for another 10 years. [24] In late 2023, the company expanded its presence at the site with an agreement to lease the A-2 test stand in order to perform vertical testing on Terran R. [25]
In January 2019, Relativity Space announced that it won a competitive bidding process with the United States Air Force to build and operate Launch Complex 16 (LC-16) at Cape Canaveral Space Force Station in Florida. [26] LC-16 has historical significance having been previously used by the US military to launch Titan and Pershing ballistic missiles. [26] In April 2024, the company shared an update on the site that initial groundwork for the Terran R launch pad was complete with water line installation in progress. [27]
In June 2020, Relativity Space announced it plans to develop a second launch pad at Vandenberg Space Force Base in California to launch payloads into polar orbits and Sun-synchronous orbits, including the Iridium satellite launches, between 2023 and 2030. [28]
Terran 1 was an expendable launch vehicle that consisted of two stages. The first stage used nine Aeon 1 engines, while the second stage used a single vacuum-optimized Aeon 1 engine. It was designed to launch a maximum payload of 1,250 kg (2,760 lb) to 185 km (115 mi) low Earth orbit (LEO), normal payload of 900 kg (2,000 lb) to 500 km (310 mi) Sun-synchronous orbit (SSO), and high-altitude payload of 700 kg (1,500 lb) to 1,200 km (750 mi) SSO. Relativity's advertised launch price was US$12 million per Terran 1 mission in June 2020. [28] Relativity conducted the first launch of Terran 1 on March 23, 2023 (UTC) after three scrubbed launch attempts. [29] Soon after launch, an anomaly occurred with the upper stage engine which prevented the rocket from achieving orbit. The second stage engine and nosecone splashed into the ocean about 4 minutes into the flight. [16] The Terran 1 rocket was retired after this failed maiden flight. [17]
Terran R is a heavy-lift two-stage, partially reusable launch vehicle that is currently under development. Compared to the smaller, expendable Terran 1, it is constructed using the same 3D printing technologies, but is substantially larger, with a maximum payload capacity of 33,500 kg (73,900 lb) to low Earth orbit. The first stage will use 13 Aeon R engines, while the second stage will use an upgraded Aeon Vac engine. With this design, Relativity is aiming to significantly exceed the Falcon 9 payload to low-Earth orbit. The first launch is expected to take place no earlier than 2026. [10]
The Aeon 1 rocket engine is designed to produce 23,000 pounds-force (100,000 N) at sea level and 25,400 pounds-force (113,000 N) in a vacuum. The engine is powered by liquid natural gas (LNG) and liquid oxygen (LOX). It is made out of a proprietary 3D-printed alloy. (GRCop [30] ) It is printed by selective laser sintering and assembled from fewer than 100 parts. [31] By February 2022, Relativity Space had completed 500+ test firings of its Aeon 1 engine, [32] using the E-3 test facility at NASA's Stennis Space Center. [8]
The vacuum-optimized version of Aeon 1, known as AeonVac, powers the second stage of Relativity's rockets. [33] [34]
The Aeon R engine, currently under development, is a high pressure gas generator cycle LOX/subcooled Methane propellants engine [35] designed to produce 258,000 lbf (1,150 kN) of thrust at sea level and 279,000 lbf (1,240 kN) in a vacuum. 13 Aeon R engines will power the first stage of Terran R with a combined liftoff thrust of 3,354,000 lbf. [36]
In order to 3D print large components such as rocket tanks and airframes, Relativity Space has created a system named Stargate, which it claims is the world's largest 3D printer of metals. [37] [38] Stargate uses existing welding technology to melt metal wire, layer by layer, into precise and complex structures that have minimal joints and parts. [39] The company 3D-printed 85% of their Terran 1 launch vehicle as of 2023 and aims to print 95% of the launch vehicle in the future. [40] The company plans to eventually 3D-print a complete launch vehicle within 60 days. [41] [8]
As of June 2020 [update] , Relativity Space has pre-sold more launches than any other company in the private space industry since SpaceX. [42]
On 5 April 2019, Relativity Space announced its first signed contract, with Telesat, a Canadian telecom satellite operator. The terms of this contract were not specified, but it did include "multiple" launches of Terran 1. [43]
Relativity Space publicly announced their contract with Mu Space in April 2019. It is expected that Relativity Space will launch a Mu Space satellite to low Earth orbit in the second half of 2022, aboard Relativity's Terran 1 rocket. [44]
In May 2019, Relativity Space signed a contract with Spaceflight Industries, a satellite rideshare and mission management provider, to launch Spaceflight's dedicated smallsat rideshares. The terms of this deal were not disclosed, however, it was shared that the contract included one launch of Relativity's Terran 1 rocket in the third quarter of 2021, with an option for an unspecified number of additional launches. [45]
In September 2019, Relativity Space and Momentus Space announced their launch service agreement at the 2019 World Satellite Business Week in Paris. The agreement stated that Relativity's Terran 1 launch vehicles will carry Momentus' Vigoride space tug service vehicles into orbit. The contract is for one launch, with an option for five additional missions. [46]
In June 2020, Relativity Space announced that they signed a new launch contract with Iridium. [42] This contract included up to six dedicated launches to deploy ground spare satellites to low Earth orbit (LEO) for Iridium NEXT's constellation on Relativity's Terran 1 vehicle. According to Suzi McBride, Iridium's COO, the satellite communication provider chose to partner with Relativity Space because of their flexible launch capability and the company's ability to launch one satellite at a time. [47] According to the deal these launches will not begin earlier than 2023. [47]
Lockheed Martin announced on 16 October 2020, that it will launch a cryogenic liquid hydrogen management demonstration mission on Terran 1. Lockheed Martin also specified that the launch will make use of Momentus' Vigoride orbital transfer vehicle to house the cryogenic payload. [48] This announcement came two days after NASA announced the recipients of its Tipping Point awards. [49]
OneWeb announced on 30 June 2022 that it signed the first contract for Terran R launches, with a value of over $1.2 billion for more than 20 launches starting in 2025. [50]
The Long March rockets are a family of expendable launch system rockets operated by the China Aerospace Science and Technology Corporation. The rockets are named after the Chinese Red Army's 1934–35 Long March military retreat during the Chinese Civil War.
The Dnepr rocket was a space launch vehicle named after the Dnieper River. It was a converted ICBM used for launching artificial satellites into orbit, operated by launch service provider ISC Kosmotras. The first launch, on April 21, 1999, successfully placed UoSAT-12, a 350 kg demonstration mini-satellite, into a 650 km circular Low Earth orbit.
Rocket Lab USA, Inc. is a publicly traded aerospace manufacturer and launch service provider. It operates and launches lightweight Electron orbital rockets used to provide dedicated launch services for small satellites and a suborbital Electron variant called HASTE. The company plans to offer a larger Neutron rocket as early as 2025. Electron rockets have launched to orbit 49 times from either Rocket Lab's Launch Complex 1 in New Zealand or at the Mid-Atlantic Regional Spaceport in Wallops Island, Virginia. In 2023 Rocket Lab launched one sub-orbital HASTE rocket from Wallops Island, Virginia. Rocket Lab manufactures and operates spacecraft and is a supplier of satellite components including star trackers, reaction wheels, solar cells and arrays, satellite radios, separation systems, as well as flight and ground software.
Falcon Heavy is a heavy-lift launch vehicle with partial reusability that can carry cargo into Earth orbit, and beyond. It is designed, manufactured and launched by American aerospace company SpaceX.
A space tug is a type of spacecraft used to transfer spaceborne cargo from one orbit to another orbit with different energy characteristics. The term can include expendable upper stages or spacecraft that are not necessarily a part of their launch vehicle. However, it can also refer to a spacecraft that transports payload already in space to another location in outer space, such as in the Space Transportation System concept. An example would be moving a spacecraft from a low Earth orbit (LEO) to a higher-energy orbit like a geostationary transfer orbit, a lunar transfer, or an escape trajectory.
LauncherOne was a two-stage orbital launch vehicle developed and flown by Virgin Orbit that had operational flights from 2021 to 2023, after being in development from 2007 to 2020. It was an air-launched rocket, designed to carry smallsat payloads of up to 300 kg (660 lb) into Sun-synchronous orbit (SSO), following air launch from a carrier aircraft at high altitude. The rocket was carried to the upper atmosphere on a modified Boeing 747-400, named Cosmic Girl, and released over ocean. Initial work on the program was done by Virgin Galactic, another Virgin Group subsidiary, before a separate entity — Virgin Orbit — was formed in 2017 to complete development and operate the launch service provider business separately from the passenger-carrying Virgin Galactic business.
Firefly Aerospace is an American private aerospace firm based in Cedar Park, Texas, that develops small and medium launch vehicles for commercial launches to orbit. The company completed its $75 million Series A investment round in May 2021, which was led by DADA Holdings. The current company was formed when the assets of the former company Firefly Space Systems were acquired by EOS Launcher in March 2017, which was then renamed Firefly Aerospace. Firefly's stated purpose is to increase access to space, similar to other private spaceflight companies.
3D printing began to be used in production versions of spaceflight hardware in early 2014, when SpaceX first flew a flight-critical propulsion system assembly on an operational Falcon 9 flight. A number of other 3D-printed spacecraft assemblies have been ground-tested, including high-temperature, high-pressure rocket engine combustion chambers and the entire mechanical spaceframe and integral propellant tanks for a small satellite.
Electron is a two-stage, partially reusable orbital launch vehicle developed by Rocket Lab, an American aerospace company with a wholly owned New Zealand subsidiary. Electron services the commercial small satellite launch market. It's the third most launched small-lift launch vehicle in history. Its Rutherford engines are the first electric-pump-fed engine to power an orbital-class rocket. Electron is often flown with a kickstage or Rocket Lab's Photon spacecraft. Although the rocket was designed to be expendable, Rocket Lab has recovered the first stage twice and is working towards the capability of reusing the booster. The Flight 26 (F26) booster has featured the first helicopter catch recovery attempt. Rocket Lab has, however, abandoned the idea of catching Electron.
Vector Launch, Inc. is an American space technology company which aims to launch suborbital and orbital payloads. Vector Launch declared bankruptcy in December 2019 and re-emerged in October 2020.
Firefly Alpha is a two-stage orbital expendable small lift launch vehicle developed by the American company Firefly Aerospace to compete in the commercial small satellite launch market. Alpha is intended to provide launch options for both full vehicle and rideshare customers.
Gilmour Space Technologies is a venture-funded Australian aerospace company that is developing hybrid-propellant rocket engines and associated technologies to support the deployment of a low-cost launch vehicle.
Vector-R is a two-stage orbital expendable launch vehicle under development by the American aerospace company Vector Launch to cover the commercial small satellite launch segment (CubeSats). Vector Launch went bankrupt in December 2019 and re-emerged in October 2020. Two prototypes were launched in 2017.
Curie is a liquid-propellant rocket engine designed and manufactured by Rocket Lab. A bipropellant is used for the propulsion of the third stage/kick stage of the Electron rocket, as well as the Photon. The composition of the propellant is a trade secret.
Skyrora Ltd is a British private space company based in Edinburgh, Scotland, since 2017.
This article documents expected notable spaceflight events during the year 2026.
ABL Space Systems is an American aerospace and launch service provider, based in El Segundo, California, that manufactures deployable launch vehicles and infrastructure for sending commercial small satellites into orbit. The company manufactures its components in the United States.
Terran R is a heavy-lift two-stage, partially reusable launch vehicle under development by Relativity Space. The vehicle is partially constructed with 3D printing technologies, like its predecessor, the small-lift Terran 1. The first flight is expected to be in 2026.
Terran 1 was an expendable two-stage small-lift launch vehicle developed by Relativity Space. Development began in 2017 and the rocket was retired in 2023. Most structures and components of the vehicle are manufactured with 3D printing processes.
Launcher was an American aerospace company based in Hawthorne, California. It was founded in New York City in 2017 by Max Haot.
...Relativity has grown to a team of over 1,000 employees across multiple locations.