Steel Winds

Last updated
Steel Winds
Steel Winds 2007.png
Steel Winds
Official nameSteel Winds I & Steel Winds II
CountryUnited States
Location Lackawanna, New York
Coordinates 42°48′N78°52′W / 42.800°N 78.867°W / 42.800; -78.867
StatusOperational
Commission date April 2007
Construction cost$40 Million
Owner(s)First Wind
Wind farm
Type Onshore
Power generation
Units operational14 x 2.5 MW
Make and model Clipper Windpower Liberty Series
Nameplate capacity 35 MW
External links
Website www.firstwind.com/projects/steel-winds-I
Commons Related media on Commons

Steel Winds (or Steel Winds I & Steel Winds II) is a wind energy project located on the coast of Lake Erie in Lackawanna, New York, just south of the City of Buffalo in Erie County. Its first phase was operational in 2007 and the second phase came online in 2012, for a combined production capacity of 35 MW. [1] The unique project was built on part of the brownfield of a former Bethlehem Steel plant. By using much of the existing infrastructure of roads and transmission lines, it could reduce project costs. It is one of the largest urban wind farms in the world and uses turbines manufactured in Iowa.

Contents

Background

According to the U.S. Department of Energy, wind farms are producing the fastest-growing energy source in the world. American wind farms generated an estimated 35,000 megawatts (MW) of wind energy in 2009, just over two percent of the U.S. electricity supply, powering the equivalent of nearly 10 million homes. [2] Prior to this project, studies for solar power options at the site were extensively studied. [3]

The Steel Winds project has been developed on 30 acres (12 ha) of the 1,600-acre (650 ha) brownfield remaining from the former Bethlehem Steel Plant. This facility, declining since 1983 and ending its coke production in 2001, [4] is being returned to productive use under the New York Department of Environmental Conservation Brownfield Cleanup Program. [5] EPA had completed sufficient cleanup of the Super Fund site by early 2006 to allow the next phase of the project to proceed under state supervision. [4]

A 2002 change in environmental laws gave the city and developers immunity from the costs of remediating the site. Such associated costs had earlier stymied redevelopment of the planned 1,600-acre site for public use under the state's brownfield cleanup program. [6] Brownfields are the remains of accumulated low-level toxic waste, which developed around factory operations. They were left when industry restructured, and factories were abandoned. [4]

Norman Polanski, then mayor of Lackawanna, New York and a former worker at Bethlehem Steel, has supported this project. He believes it can help attract industry to the area, as well as tourism. The city and state are studying the possibility of manufacturing turbine equipment locally to revive local industry and reduce costs of future projects in New York.

Description

The wind farm is designed to produce 35-MW of electricity, enough to power 16,000 homes in New York. Power is being sold into the NYS ISO grid for sale to retail customers. This is one of the largest urban wind power developments in the world, and its wind turbines are harnessing the power of the steady winds that blow from Lake Erie. [7]

The project is owned by First Wind, which will be selling energy, capacity and RECs to energy retailer Constellation NewEnergy through 2009. The project was built by Tennessee Valley Infrastructure Group, of Chattanooga, Tennessee. It is operated by First Wind. [8] Operation and maintenance services will be provided by Clipper Windpower, the manufacturer of the turbines, for the first five years. [9]

As the project uses the old steel mill's roads and off-site transmission lines, it required little construction of new infrastructure, often the most expensive part of an industrial project. The initial phase of the project cost an estimated $40 million. A 2012 expansion added $25 million to $30 million to the project's overall price tag. [10]

Project history

Construction was divided into two phases. Phase I called for the installation of 8 turbines by 2007, while phase II called for the installation of an additional 6 turbines by 2012.

The turbine components for phase I were manufactured in 2006 at Clipper's facility in Cedar Rapids, Iowa. They were shipped overland to the project site in early 2007, constructed, and placed online in April 2007. This marked the first commercial deployment of the 2.5 MW (3,400 hp) Liberty Series turbines. [11] Full commercial operations started June 5, 2007, with a capacity of 20 MW. [12]

The second phase of the project became active on January 27, 2012. [10] This phase completed the 14-turbine project, adding 15 MW, for a cumulative 35 MW of power. [1]

In community action, First Wind has used the Steel Winds project to raise awareness and funds for research into breast cancer. For five years, one of the turbines was illuminated by a pink light for National Breast Cancer Awareness Month, which is in the month of October. [13]

Specifications

The project consists of 14 Clipper Windpower 2.5-MW Liberty series wind turbines, which represents the latest technology in the largest commercially viable form. [14]

Clipper patented its Quantum Distributed Generation Drivetrain ("DGEN-Q") and the use of four unique permanent magnet generators. Grid integration is achieved through power factor regulation technology with ride-through capability. The 2.5 MW Liberty turbine installation can be accomplished with a crane sized for standard commercial 1.5 MW units. [15]

See also

Related Research Articles

<span class="mw-page-title-main">Wind farm</span> Group of wind turbines

A wind farm or wind park, also called a wind power station or wind power plant, is a group of wind turbines in the same location used to produce electricity. Wind farms vary in size from a small number of turbines to several hundred wind turbines covering an extensive area. Wind farms can be either onshore or offshore.

<span class="mw-page-title-main">Wind power in California</span> Electricity from large wind farms

Wind power in California had initiative and early development during Governor Jerry Brown's first two terms in the late 1970s and early 1980s. The state's wind power capacity has grown by nearly 350% since 2001, when it was less than 1,700 MW. In 2016, wind energy supplied about 6.9% of California's total electricity needs, or enough to power more than 1.3 million households. Most of California's wind generation is found in the Tehachapi area of Kern County, California, with some large projects in Solano, Contra Costa and Riverside counties as well. California is among the states with the largest amount of installed wind power capacity. In recent years, California has lagged behind other states when it comes to the installation of wind power. It was ranked 4th overall for wind power electrical generation at the end of 2016 behind Texas, Iowa, and Oklahoma. As of 2019, California had 5,973 megawatts (MW) of wind power generating capacity installed.

<span class="mw-page-title-main">Clipper Windpower</span>

Clipper Windpower is a wind turbine manufacturing company founded in 2001 by James G.P. Dehlsen. It designed one of the largest wind turbines in the United States, manufactured in Cedar Rapids, Iowa. It was working collaboratively with the National Renewable Energy Laboratory.

<span class="mw-page-title-main">Liberty Wind Turbine</span>

The 2.5 MW Liberty Wind Turbine was the largest wind turbine manufactured in the United States when it was first installed in 2007. It was developed through a partnership with U.S. Department of Energy and its National Renewable Energy Laboratory for Clipper Windpower.

<span class="mw-page-title-main">Wind power in Oregon</span> Electricity from wind in one U.S. state

The U.S. state of Oregon has large wind energy resources. Many projects have been completed, most of them in rural Eastern Oregon and near the Columbia River Gorge. Wind power accounted for 12.1% of the electricity generated in Oregon in 2016.

<span class="mw-page-title-main">Floating wind turbine</span> Type of wind turbine

A floating wind turbine is an offshore wind turbine mounted on a floating structure that allows the turbine to generate electricity in water depths where fixed-foundation turbines are not feasible. Floating wind farms have the potential to significantly increase the sea area available for offshore wind farms, especially in countries with limited shallow waters, such as Spain, Portugal, Japan, France and the United States' West Coast. Locating wind farms further offshore can also reduce visual pollution, provide better accommodation for fishing and shipping lanes, and reach stronger and more consistent winds.

The Titan Wind Project is 25MW wind farm which had a proposed expansion to 5,050 MW, formerly known as Rolling Thunder, based in South Dakota. The project developers, Clipper Windpower and BP Alternative Energy, expected to build Titan in several phases and, when completed, it would have been one of the largest wind farms in the world.

The Sherbino Mesa Wind Farm is located in Pecos County in west Texas. The first 150 megawatts (MW) of the project, which has a potential capacity of 750 MW, is in operation. Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW. BP will operate phase I of the project.

<span class="mw-page-title-main">Wind power in Wyoming</span> Electricity from wind in U.S. state

Wyoming has one of the highest wind power potentials of any state in the United States. In 2019, Wyoming had wind powered electricity generating capacity of 1,589 MW, which produced 9.85% of its electric generation, with an additional 3,753 MW under construction. However, the wind generation in that year was Wyoming's third-lowest in the 2010s. By 2020, wind capacity increased to 2738 MW and 8448 gigawatt-hours of electricity were produced from wind in 2021, more than double 2019 production. Additional wind capacity and needed transmission lines are under construction or planned, despite political headwinds from Wyoming's strong coal and oil sectors.

New York has 2,192 MW of installed wind power capacity as of 2022. Most of New York's wind power is located in upstate New York as onshore wind farms. New York has set a goal of developing 9,000 MW of offshore installed wind power capacity by 2035 that will power an estimated 6 million homes. As of October 2022, New York has five offshore wind farms in development with approximately 4,300 MW installed capacity.

<span class="mw-page-title-main">Offshore wind power</span> Wind turbines in marine locations for electricity production

Offshore wind power or offshore wind energy is the generation of electricity through wind farms in bodies of water, usually at sea. There are higher wind speeds offshore than on land, so offshore farms generate more electricity per amount of capacity installed. Offshore wind farms are also less controversial than those on land, as they have less impact on people and the landscape.

<span class="mw-page-title-main">Wind power in the Netherlands</span>

As of November 2023, wind power in the Netherlands has an installed capacity of 11,602 MW, 40.9% of which is based offshore. In 2022, the wind turbines provided the country with 18.37% of its electricity demand during the year. Windmills have historically played a major part in the Netherlands by providing an alternative to water driven mills.

In 2016, Arizona had 268 megawatts (MW) of wind powered electricity generating capacity, producing 0.5% of in-state generated electricity.

<span class="mw-page-title-main">James Dehlsen</span>

James G.P. Dehlsen is an American businessman, inventor, and entrepreneur. He is a pioneering figure in wind power and renewable energy development in the United States and holds 25 patents.

<span class="mw-page-title-main">Criterion Wind Project</span>

The Criterion Wind Project is a wind farm located on Backbone Mountain east of Oakland, Maryland, United States. The project has a rated capacity of 70 MW and uses 28 Liberty Wind Turbines manufactured by Clipper Windpower. Each of the wind turbines is about 415 feet tall. The Criterion Wind Project is owned by Criterion Power Partners, LLC, which is a subisiary of Exelon, and interconnected with the transmission system of the Potomac Edison Company. Electricity and renewable energy credits from the project are sold to the Old Dominion Electric Cooperative under a 20-year supply contract.

REG WindPower is a renewable energy company, in the United Kingdom.

<span class="mw-page-title-main">Wind power in Michigan</span> Electricity from wind in one U.S. state

Wind power in Michigan is a developing industry. The industrial base from the automotive industry has led to a number of companies producing wind turbine parts in the state. The development of wind farms in the state, however, has lagged behind. In January 2021, there were a total of 1,481 wind turbines in the state with a nameplate capacity of 2,549 MW. The nameplate total exceeded 2,000 MW when Pine River came online in March 2019. Wind provided 4.2% of the state's electricity in 2016.

Soma Wind Farm is an onshore wind power plant in Soma in Manisa Province in the northwestern Aegean Region of Turkey. Built in two phases and consisting of 119 wind turbines with an installed output power of 140 MW in total, it is one of Turkey's largest wind farms.

<span class="mw-page-title-main">Wind power in South Dakota</span> Electricity from wind in one U.S. state

The state of South Dakota is a leader in the U.S. in wind power generation with over 30% of the state's electricity generation coming from wind in 2017. In 2016, South Dakota had 583 turbines with a total capacity of 977 megawatts (MW) of wind generation capacity. In 2019, the capacity increased to 1525 MW.

<span class="mw-page-title-main">Massachusetts Military Reservation Wind Project</span> Wind turbines

The Massachusetts Military Reservation Wind Project is located in Barnstable County, Massachusetts on the Massachusetts Military Reservation (MMR), also known as the Joint Base Cape Cod. This Wind Project currently consists of one wind turbine, built in 2009, and two others recently completed in 2011. The first turbine was a Fuhrländer 1500/77 wind turbine with an 80-meter (260 ft) tower and a 77-meter (253 ft) rotor diameter. The two completed in 2011 were General Electric wind turbines. Each of these GE 1.5-77 wind turbines outputs 1.5 MW of power on top of an 80-meter (260 ft) tall tower. Therefore, the total net capacity for the MMR Wind project is approximately 4.5 MW. Clearance may soon become available to build more turbines.. The contracting company hired to build all three of the turbines is called ECC Corporate, and the plant code and utility ID of the facility are 57253 and 56619, respectively.

References

  1. 1 2 "Steel Winds I | First Wind". Archived from the original on 2013-06-25. Retrieved 2013-07-17.
  2. "Renewable Energy: Super Fund Programs", EPA
  3. "Archived copy" (PDF). Archived from the original (PDF) on 2014-03-03. Retrieved 2014-02-27.{{cite web}}: CS1 maint: archived copy as title (link)
  4. 1 2 3 David Staba, "An Old Steel Mill Retools to Produce Clean Energy", New York Times, 22 May 2007
  5. "Bethlehem Steel Site in Buffalo Gets New Life as Steel Winds Wind Farm"
  6. EBSCO Host (subscription required)
  7. Sean Brodfuehrer, M. Arch., Ecopolis, Design for Urban Contexts: A Case Study for Buffalo, NY, State University of New York at Buffalo, 2009, 147
  8. Anna Miller, "Green Energy: The answer is blowing in the wind", Buffalo Rising Magazine], May 2007
  9. Renewable Energy Access.
  10. 1 2 Buffalo News , 19 June 2012, accessed 30 December 2014.
  11. "Feature: Steel Winds Project". Archived from the original on 2007-10-13. Retrieved 2007-10-28.
  12. "Clipper Windpower Press Release". Archived from the original on 2013-01-19. Retrieved 2007-10-28.
  13. "Gale - Product Login".
  14. EBSCO Host (subscription required)
  15. "Press release", Clipper Wind, 24 June 2007