Lakhwar Dam

Last updated

Lakhwar Dam
India relief location map.jpg
Red pog.svg
Location of Lakhwar Dam in India
Country India
Location Lakhwar, Dehradun district, Uttarakhand
Coordinates 30°31′15″N77°54′52″E / 30.52083°N 77.91444°E / 30.52083; 77.91444 Coordinates: 30°31′15″N77°54′52″E / 30.52083°N 77.91444°E / 30.52083; 77.91444
PurposePower
StatusUnder construction
Construction began1987
Opening date1987
Owner(s)Uttarakhand Jal Vidyut Nigam Limited
Dam and spillways
Type of dam Gravity
Impounds Yamuna River
Height204 m (669 ft)
Reservoir
Total capacity580,000,000 m3 (470,000 acre⋅ft)
Active capacity333,000,000 m3 (270,000 acre⋅ft)
Inactive capacity247,000,000 m3 (200,000 acre⋅ft)
Surface area9.57 km2 (3.69 sq mi)
Normal elevation796 m (2,612 ft)
Commission date??
Hydraulic head 148 m (486 ft)
Turbines 3 x 100 MW Francis-type
Installed capacity 300 MW

Lakhwar-Vyasi Dam project on Yamuna River, includes under-construction Lakhwar Dam and Power Station, Vyasi Dam, Hathiari Power Station and Katapathar Barrage, near the Lakhwar town in Kalsi block of Dehradun district of Uttarakhand in India, for the purpose of irrigation of 40,000 hectare land and total 927 MW hydroelectric power generation. [1] [2] [3] "Lakhwar Dam" is a gravity dam near the Lohari village with 300MW power generation capacity. [2] [4] "Vyasi Dam" will be built 5 km downstream along with 120 MW "Hathiari Power Station" further 0.5 km downstream. [4] [2] [5] "Katapathar Barrage", with the maximum ponding water level at 514.5m elevation, will be built further 2.75 km downstream of the Hathiari Power Station to supply the water to stakeholder states. [6] [5] Project will hold 580 million cubic metres water during monsoon and release into Yamuna during dry months. [7]

Contents

Construction of Lakhwar dam commenced in early 2018 with the 4 year target completion date of December 2022. [8] Vyasi dam has already been under construction since 2016.

History

In 1976, Planning Commission granted approval for the project. [9] In 1986 environmental clearance was granted and construction on the 204 m (669 ft) tall dam began in 1987 by Jaypee Group under the supervision of the Uttar Pradesh Irrigation Department, when the area belonged to Uttar Pradesh. In 1992, the construction was halted at 35 percent progress after Jaypee Group pulled out due to the lack of funding. [2] [10] In 2008, it was notified as a national project by the union govt and the union govt will bear the 90% cost. [9] In November 2013, construction restarted on the Vyasi Dam and it once again received environmental clearance from the Ministry of Environment and Forests in February 2014. [11] Vyasi Dam was expected to be completed in 2016, revised to 2018. [2] [11] [12] Project was stalled for almost 30 years, which was expedited with enhanced compensation payment in 2016 to the displaced villagers. [7]

Current status

During 2016, Vyasi Dam and Hathiari Power Station were being constructed simultaneously, and Lakhwar Dam was planned to be constructed after the completion of Vyasi dam, [2] due to the lack of funds. [3] All approvals are in place for the whole project including the Lakhwar Dam, except for the funding from the union government (c. 2017). [3] [13]

In April 2016, things were expedited when Government of India, under Prime Minister Narendra Modi, granted clearance for the release of funding for the whole project at an estimated cost of INR39.7 billion (3966.51 crore), including INR25 billion (2578.23 crore) for the irrigation component to build dam and canals and INR13,9 billion (1388.28 crore) for the power generation component. [14] Subsequently, in January 2018, bid for the construction of Lakhwar dam and 300MW power station was called by the Uttrakhand Jal Vidyut Nigam Limited. [15] Soon after in early 2018, Prime Minister Modi laid the foundation stone, and construction commenced after contracts were awarded with a target completion deadline of 4 years by December 2022. [8]

The project

The 927MW electricity and 580 million cubic metres water capacity project will irrigate 40,000 hectare land, and submerge 50 villages and 868.08 ha of forest land. [7] [1]

Stakeholder states

The project will water to the states of Haryana, Uttrakhand, Uttar Pradesh, Himachal Pradesh, Delhi and Rajasthan. Haryana's share in this project is 1.22 lakh acre feet additional water. [9]

Lakhwar Dam and Power Station

head. Hydraulic head.PNG
head.

Lakhwar Dam is 192 meter high concrete gravity dam with 165.9 meter long head and 20 to 50 km long backwater reservoir on Yamuna River near Lohari village close to Lakhwar town, with 900 MW (3 X 300 MW) Underground power station on right/east side of Yamuna river. [1] [2] [3] [4] [7] It will have storage capacity of 333.04 million cubic meter. [1]

Vyasi Dam

Vyasi Dam, also Byasi Dam, is 86 meter high concrete gravity dam with 113.92 meter long head that will be built 5 km downstream from Lakhwar Dam, with 120 MW power generation capacity at Hathiari. [1] [2] [4] [16] It is close to Juddo village which will be flooded once the dam is complete. [2] Expected to be completed in May 2018. [16]

Hathiari Power Station

Hathiari Power Station, 0.5 km downstream from Vyasi dam on the right/east side of the Yamuna, [2] will have 120 MW of electricity generation capacity. [4] [5] The power station will have a 2.7 km long Run-of-the-river hydroelectricity power tunnel 7 meters in diameter with 70 Cumecs discharge, a 63.50 meter high Surge shaft 18 meters in diameter, two Pressure shafts each 209 meters long and 4 meters in diameter, and a Surface Power House (72 meters long x 24 meters wide x 40.2 meters high) with two Semi Umbrella Generators of 60 MW each composed of two Vertical Francis Turbines. [16] [1]

Katapathar Barrage

Katapathar Barrage, with the maximum ponding water level at 514.5m elevation, will be built further 2.75 km downstream of the "Hathiari Power Station". It will be used to store and uniformly distribute water to the stakeholder states. [6] [5]

Related Research Articles

Tehri Dam Dam in Uttarakhand, India

With a height of 260.5 m Tehri Dam is the tallest dam in India. It is currently ranked No 10 on the List of Tallest Dams in the world. With a total planned installed capacity of 2400 MW, it's the biggest Hydroelectric power plant in India. It is a multi-purpose rock and earth-fill embankment dam on the Bhagirathi River in New Tehri, Tehri Garhwal district in Uttarakhand, India. It is the primary dam of the THDC India Ltd. and the Tehri hydroelectric complex. Phase 1 was completed in 2006. The Tehri Dam withholds a reservoir for irrigation, municipal water supply and the generation of 1,000 megawatts (1,300,000 hp) of hydroelectricity. The dam's 1,000 MW variable-speed pumped-storage scheme is currently under construction with expected commissioning in 2025.

Chambal River River in India

The Chambal River is a tributary of the Yamuna River in Central and Northern India, and thus forms part of the greater Gangetic drainage system. The river flows north-northeast through Madhya Pradesh, running for a time through Rajasthan then forming the boundary between Rajasthan and Madhya Pradesh before turning southeast to join the Yamuna in Uttar Pradesh state.

Bhakra Dam Dam in Himachal Pradesh, India

Bhakra Dam is a concrete gravity dam on the Sutlej River in Bhakra Village near Bilaspur in Bilaspur district, Himachal Pradesh in northern India. The dam forms the Gobind Sagar reservoir.

The Balimela Reservoir is located in Malkangiri district, Odisha, India on the river Sileru which is a tributary of the Godavari river. The gross storage capacity of Balimela reservoir is 3610 million cubic meters.

Gandhi Sagar Dam Dam in Mandsaur District Madhya Pradesh

GandhisagarDam is situated at a distance of 168 Kms from the District headquarter. The Dam is constructed on the Chambal River.

Kalesar National Park Park in Haryana, India

Kalesar National Park and adjacent Kalesar Wildlife Sanctuary are protected areas in Yamunanagar district of Haryana state in India, 122 kilometres (76 mi) from Chandigarh. Both are also contiguous to Simbalbara National Park in Himachal Pradesh and Rajaji National Park in Uttrakhand. Kalesar is a popular destination for leopards, panthers, elephants, red jungle fowl and bird-watching. This forested area in the Shivalik foothills is covered primarily with sal with smattering of Semul, Amaltas and Bahera trees as well. Wildlife jeep safaris are available on 3 tracks. Park is closed July to September and during the remaining months visiting hours are 6 am to 10 am and 4 pm to 7 pm during summers, and 7 am to 11 am and 3.30 pm to 6 pm during winters.

Nagarjuna Sagar Dam Dam in Andhra Pradesh And Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Nalgonda district in Telangana and Palnadu district in Andhra Pradesh. The dam provides irrigation water to the Nalgonda, Suryapet, Krishna, NTR, Bapatla, Eluru, Palnadu, Khammam, West Godavari, Guntur, and Prakasam districts along with electricity generation.

The Indira Sagar Dam is the largest dam in India, in terms of volume of water stored in the reservoir. It is located on the Narmada River at the town of Narmada Nagar, Punasa in the Khandwa district of Madhya Pradesh in India. The foundation stone of the project was laid by late Smt Indira Gandhi, former Prime Minister of India on 23 October 1984. The construction of the main dam started in 1992. The downstream projects of ISP are Omkareshwar, Maheshwar, and Sardar Sarovar Project. To build it, a town of 22,000 people and 100 villages were displaced.

Rana Pratap Sagar Dam Dam in Chittorgarh District, Rajasthan

The Rana Pratap Sagar Dam is a gravity masonry dam of 53.8 metres (177 ft) height built on the Chambal River at Rawatbhata in Rajasthan in India. It is part of integrated scheme of a cascade development of the river involving four projects starting with the Gandhi Sagar Dam in the upstream reach in Madhya Pradesh and the Jawahar Sagar Dam on the downstream with a terminal structure of the Kota Barrage in Rajasthan for irrigation.

Almatti Dam Dam in North Karnataka, India

The Lal Bahadur Shastri Dam is also known as Almatti Dam is a hydroelectric project on the Krishna River in North Karnataka, India which was completed in July 2005. The target annual electric output of the dam is 560 MU.

Hydroelectric power in Himachal Pradesh

Himachal Pradesh is extremely rich in its hydroelectricity resources. The state has about twenty five percent of the national potential. About 27,436 MW of hydroelectric power can be generated in the state by the construction of various hydroelectric projects on the five perennial river basins. Out of total hydroelectric potential of the state, 10,519 MW is harnessed so far, out of which only 7.6% is under the control of Himachal Pradesh Government while the rest is exploited by the Central Government. The state government has been giving the highest priority for its development, since hydroelectric generation can meet the growing need of power for industry, agriculture and rural electrification. It is also the biggest source of income to the state as it provides electricity to other states.

The Jawahar Sagar Dam is the third dam in the series of Chambal Valley Projects on the Chambal River, located 29 km upstream of Kota city and 26 km downstream of Rana Pratap Sagar dam. It is a concrete gravity dam, 45 meters high and 393 meters long, generating 60 MW of power with an installed capacity of 3 units of 33 MW. Its construction was completed in 1972. The total catchment area of the dam is 27,195 km2, of which only 1,496 km2 are in Rajasthan. The free catchment area below Rana Pratap Sagar dam is 2,331 km2. The dam is located after the Gandhi Sagar Dam and Rana Pratap Sagar Dam, but before the Kota Barrage.

Kalpasar Project Dam

The Kalpasar Project or the Gulf of Khambhat Development Project envisages building a 30 km dam across the Gulf of Khambat in India for establishing a huge fresh water coastal reservoir for irrigation, drinking and industrial purposes. The project with 30 km sea dam will have the capacity to store 10,000 million cubic meters fresh water, equating to 25% of Gujarat’s average annual rainwater flow, from the rivers like Narmada, Mahi, Dhadhar, Sabarmati, Limbdi-Bhagovo, and two other minor rivers. A 10 lane road link will also be set up over the dam, greatly reducing the distance between Saurashtra and South Gujarat. The project, which will create world's largest freshwater lake in marine environment, will cost INR90,000 crore or US$12.75 billion excluding the cost of tidal power plant. Project entails construction of the main "Kalpasar dam" across Gulf of Khambat and another Bhadbhut barrage on Narmada river, as well as a canal connecting the two.

Sharda River River along the India–Nepal border

The Sharda River, also called Kali river and Mahakali River, originates at Kalapani in the Himalayas at an elevation of 3,600 m (11,800 ft) in the Pithoragarh district in Uttarakhand, India. It flows along Nepal's western border with India and has a basin area of 14,871 km2 (5,742 sq mi). It joins Ghaghra River, a tributary of the Ganges. It takes the name Kali River from the union of the two streams at Gunji as it flows through the hills. After Brahmadev Mandi near Tanakpur, it enters the Terai plains, where it is called Sharda River.

Polavaram Project Dam in Eluru district, Andhra Pradesh

The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Union Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.

Pandoh Dam Dam in Mandi district

The Pandoh Dam is an embankment dam on the Beas River in Mandi district of Himachal Pradesh, India. Under the Beas Project, the dam was completed in 1977 and its primary purpose is hydroelectric power generation. Part of a run-of-the-river power scheme, it diverts the waters of the Beas to the southwest through a 38 km (24 mi) long system of tunnels and channels. The water is used for power generation at the Dehar Power House before being discharged into the Sutlej River, connecting both rivers. The power house has an installed capacity of 990 MW. The system diverts 256 cumecs of Beas waters to the Satluj River. The project was completed in 1977.

Tungabhadra Dam Dam in Karnataka, India

The Tungabhadra Dam, also known as Pampa Sagar, is a water reservoir constructed across the Tungabhadra River in the city of Hosapete, Karnataka, India. It is a multipurpose dam serving irrigation, electricity generation, flood control, etc. for the state. It is one of the only two non-cement dams in India, the other being the Mullaperiyar Dam in Kerala.

The Kishau Dam is a proposed gravity dam on the Tons River which will straddle the border between the Indian states of Himachal Pradesh and Uttarakhand. The project site is about 39 km (24 mi) north of Dakpathar and upstream of the Ichari Dam. The primary purpose of the dam is power generation and downstream water supply. It will support a 660 MW power station and provide water for the irrigation of 97,076 hectares of crops.

Western Yamuna Canal is canal in river Yamuna that was dug out and renovated in 1335 CE by Firoz Shah Tughlaq. In 1750 CE, excessive silting caused it to stop flowing. The British raj undertook a three-year renovation in 1817 by Captain GR Blane of the Bengal Engineer Group. In 1832-33 Tajewala Barrage dam at Yamuna was also built to regulate the flow of water, and later Pathrala barrage at Dadupur and Somb river dam downstream of canal were constructed in 1875-76. In 1889-95 the largest branch of the canal Sirsa branch was constructed. The modern Hathni Kund Barrage was built in 1999 to handle the problem of silting to replace the older Tajewala Barrage.

The Palla barrage is a barrage located in Palla on the Yamuna-Faridabad canal in Faridabad district of Haryana state in India. This irrigation canal runs to the west of Yaumna through Fridabad, Palwal, Mathura and Agra districts where it terminates in the farms. Palla, Faridabad is not to be confused with Palla, Delhi, a Yamuna pollution monitoring station 23 km upstream of Wazirabad barrage.

References

See also

Citations

  1. 1 2 3 4 5 6 Lakhwar-Vyasi project
  2. 1 2 3 4 5 6 7 8 9 10 The wretched and the dammed, 22 July 2016.
  3. 1 2 3 4 Uttarakhand's new CM TS Rawat seeks release of funds for Lakhwar dam, Times of India, 22 March 2017.
  4. 1 2 3 4 5 1986, Confluence, Issues 8-16, Page 14.
  5. 1 2 3 4 "Lakhwar". UJVN Limited. Retrieved 12 May 2014.
  6. 1 2 1990 Records of the Geological Survey of India.
  7. 1 2 3 4 Lakhwar-Vuasi dam project to revive the Yamuna: Uma Bharti, India Today, 8 May 2016.
  8. 1 2 Kirishi Samvad Archived 30 November 2018 at the Wayback Machine , Oct 2018.
  9. 1 2 3 Haryana CM visits Lakhwar, Daily Post, 2016.
  10. "Centre wants NHPC to carry out 420-Mw Lakhwar-Vyasi hydel project". KSEB Officer's Association. 28 November 2008. Retrieved 12 May 2014.
  11. 1 2 "Project gets environment clearance despite SC order". The Hindu. 9 February 2014. Retrieved 12 May 2014.
  12. "Work on 720-MW hydroelectric power projects to begin soon". The Hindu. 22 November 2013. Retrieved 12 May 2014.
  13. A ‘green’ rap on the knuckles , The Hindu, 22 Sept 2016.
  14. Status of Lakhwar Dam, Business Standard, 2 Dec 2016.
  15. Haryana to rejuvenate the existing canal system, Times of India, 8 Jan 2018.
  16. 1 2 3 Vyasi dam Archived 30 December 2017 at the Wayback Machine .