Sydney, the largest city in Australia, has an extensive network of passenger and goods railways. The passenger system includes an extensive suburban railway network, operated by Sydney Trains, a metro system and a light rail network. A dedicated goods network also exists.
Central station is the main interchange for Sydney Trains suburban services, also serving intercity and NSW TrainLink regional trains and Sydney's light rail network. Journey Beyond's Indian Pacific to Perth also departs from Central. [1]
Sydney's suburban rail network is the busiest in Australia, with over 359 million journeys made in the 2017–18 financial year. [2]
Suburban rail services in Sydney have been operated since 2013 by Sydney Trains. Over 1 million weekday passenger journeys are made, with 46,000 timetabled stops per weekday over 1,800 km (1,100 mi) of track and through 297 stations (including intercity lines). [3] Most trains do not operate between midnight and 4.30am, with NightRide buses substituting for suburban services during this time. [4] Suburban services operate along the portions of the main lines from Sydney to the north, west, south and south-west, and also along several dedicated suburban lines. All of these lines are electrified at overhead 1500 V DC, electrification having started in 1926. [5] [6] : 79f Some of the suburban stations are also served by the intercity and regional trains operated by NSW TrainLink, while some stations in the city centre and (imminently) Western Sydney provide interchanges with light rail.
Most suburban services operate through central Sydney via the underground City Circle (not a true circle line but a two-way loop extending under the CBD from Central station), the Eastern Suburbs line, or over the Harbour Bridge. The Metro North West Line travels below the harbour and through the city centre.
Timetables are published for all lines, and most lines run on minimum frequencies of every 15 minutes from early morning to midnight, 7 days a week. Frequencies are higher during peak periods and over shared routes. [7]
All suburban passenger trains in Sydney are electric multiple units.
Upon electrification in the 1920s Sydney operated single-deck multiple units, but these were progressively withdrawn from the 1960s until their demise in 1993. Single-deck automatic trains are utilised by the Sydney Metro, which opened in May 2019.
Double-deck trailer carriages were delivered to the NSW Government Railways in the 1960s, and incorporated into sets with single-deck power cars. When coupled with the double decker trailer carriages, they formed the world's first fully double decker electric multiple unit trains. [8]
Suburban trains are maintained at depots at Hornsby in the northern suburbs, Mortdale in the southern suburbs, and Flemington in the western suburbs. A depot at Punchbowl in the southwest closed in 1994 and has since been demolished. These four depots were all built and opened with the opening of electrified services in the 1920s.
Heavy maintenance of passenger cars was carried out at the Electric Carriage Workshops, Chullora and Suburban Car Workshops, Redfern. Heavy maintenance is now contracted out to Maintrain, a UGL Rail subsidiary, with workshops at Clyde. [9] [10]
Freight services operate over most of the suburban railway lines in Sydney, however due to the high frequency of passenger services and the lack of freight only tracks, there is a curfew on freight movements during peak hours. [11]
The major interstate freight routes are the Main Southern and Main North lines, with the Illawarra and Main Western lines serving lineside industries and as alternate interstate routes. In the inner city area the Metropolitan Goods lines connects major freight terminals to the main passenger lines and the Southern Sydney Freight Line which runs parallel to the Main South line from the western end of the Metropolitan Goods lines to a point beyond the end of suburban services. [12] The Northern Sydney Freight Corridor project along the Main Northern line between Sydney and Newcastle aimed at increasing the number of freight trains operating along the route, by separating passenger and freight traffic.
The main traffic is containerised freight. The main intermodal terminal are at Sydney Freight Terminal Chullora. Leightonfield, Yennora and Minto. [13] Interstate trains to Sydney terminals are up to 1,500 metres (4,900 ft) long, while short-haul container trains from the terminals to the Port Botany seaport are around 600 metres (2,000 ft) long. [11] Coal services to Port Kembla are another major traffic. Freight operators include Crawfords Freightlines, Pacific National, Qube Holdings and SCT Logistics. [14]
The first railway in Sydney was opened in 1855 between Sydney and Granville, now a suburb of Sydney but then a major agricultural centre. The railway formed the basis of the New South Wales Government Railways. Passenger and freight services were operated from the beginning. [15]
In 1886, the railway opened from Strathfield to Hornsby. [16] The North Shore line opened in 1890 to St Leonards and then in 1893 to a harbour-side station at Milsons Point. [17] More lines were being built at this time, such as the Bankstown line.
Sydney's suburban passenger service was severely hampered by the inconvenient location of its city terminus, at a site south of Devonshire Street. Most of Sydney's population was well served by trams, and the suburban railways had a relatively small initial role to play. This was to change in the 1920s.
The railway system as it exists today is really the result of the vision and foresight of John Bradfield, one of Australia's most respected and famous civil engineers. He was involved in the design and construction of Sydney underground railways in the 1920s and 1930s, but he is more famous for the associated design and construction of the Sydney Harbour Bridge. [18] Bradfield's vision for metro-style subways in Sydney was inspired by the subways he observed in Paris, London and New York City.
New South Wales uses an overhead electrification system at 1,500 volts direct current. [5] Whilst inferior to and more expensive than modern single phase alternating current equipment, it was in vogue during the 1920s, having been used in Melbourne since 1919 and is generally sufficient for the operation of electric multiple unit trains. However, the introduction of powerful electric locomotives in the 1950s, followed by the Millennium train in 2002, revealed drawbacks in this antiquated system of electrification. As the voltage is relatively low, high currents are required to supply a given amount of power, which necessitates the use of very heavy duty cabling and substation equipment. Until the retirement of electric locomotives from freight service in the 1990s, it was often necessary to observe a "power margin" to ensure that substations were not overloaded. This situation was similar to that which applied to The Milwaukee Road's 3,000 VDC electrification. Plans to electrify the Hunter Valley at 25 kV alternating current were abandoned in the 1990s.
Electrification came to Sydney's suburbs on 9 December 1926 with the first suburban electric service running between Central station and Oatley on the Illawarra line. [6] : 79f In the same year, the first underground railway was constructed north from Central station to St James in Sydney's central business district. Electric trains that had previously terminated at Central station continued north, diving underground at the Goulburn Street tunnel portal, stopping at Museum station and then terminating at St James. [19] Other lines were soon electrified. Also, in conjunction with the construction of the Sydney Harbour Bridge which opened in 1932, an additional four-track underground line was constructed from Central station to Town Hall and Wynyard. Two of the tracks continued over the Harbour Bridge connecting to the North Shore line.
It was only in 1956 that the two tracks terminating at Wynyard were linked to the line terminating at St James via the Circular Quay viaduct. This new arrangement, dubbed the City Circle, allowed services to make a continuous run through the city and return to the suburbs without having to terminate.
Electrification of heavy rail lines proceeded as follows:
New electrified suburban and metro lines were built:
The 2010s saw substantial investment in Sydney's railways. New suburban, metro and light rail lines have been constructed in the 2010s and 2020s, and a new focus emerged on urban rail in Australia. [21] [22] The Carlingford line and the Epping to Chatswood Rail Link, former parts of the suburban network, were subsumed by the Parramatta Light Rail and Metro North West Line respectively. [23] [24] Conversely, the Sydney Monorail was closed in 2013. [25] In 2020, transport minister Andrew Constance stated that Sydney had become a “train city, it wouldn’t matter if it was light rail, metro or the inter-city trains.” [26]
The goods system has also been expanded. The Southern Sydney Freight Line, an extension to the dedicated freight network from the end of the Metropolitan Goods line at Sefton to Macarthur, opened in 2013. [27] [28] The Northern Sydney Freight Corridor programme saw the loop between North Strathfield and Rhodes duplicated with an underpass, opened in 2015, whilst a third track between Epping and Thornleigh was opened in 2016. [29] [30]
The rail network in the metropolitan area of Sydney is owned, maintained and operated by Transport Asset Holding Entity, a NSW State Government owned corporation. Third party access to their tracks by other freight operators is allowed under an open-access arrangement. Track outside the Sydney metropolitan area is operated and maintained by the Australian Rail Track Corporation. Suburban passenger trains within Sydney are operated by Sydney Trains and long-distance trains that run through Sydney are operated by NSW TrainLink.
RailCorp was formed on 1 January 2004 by the merger of the State Rail Authority (SRA) and the metropolitan functions of the Rail Infrastructure Corporation (RIC). Until 1972, railways in NSW were operated by the Department of Railways New South Wales until this department was replaced by the Public Transport Commission (PTC), which was also responsible for bus and ferry services. In 1980 the PTC was broken up into the SRA, responsible for rail services, and the Urban Transit Authority (UTA), responsible for bus and ferry services. The UTA later became the State Transit Authority in 1989.
In 2001, the SRA had its 'above track' operations separated from its track ownership and maintenance operations. The track maintenance operations and track ownership were moved to the new RIC. However this separation into a horizontally operated rail system was criticised for the passing of blame for rail delays and accidents between authorities, and in 2004 railways in Sydney became a vertically operated system again with the creation of RailCorp, a fusion of the SRA and the urban sections of the RIC.
In July 2013, RailCorp was reduced to become the owner of the infrastructure and rolling stock, with the service provision that it operated under the CityRail and CountryLink brands transferred to Sydney Trains and NSW TrainLink. [31] [32] [33] [34]
With limited exceptions, all outside of Sydney, trains in New South Wales use standard gauge, with a distance of 1,435 mm (4 ft 8+1⁄2 in) between the rails. [35]
The railways in Sydney generally use British-derived terminology.
Four main 'trunk' lines radiate from Sydney to the north, south, west, and southwest:
Other passenger lines branch from or interconnect with the four main lines:
Lines with light rail specifications:
Several railway lines carry goods only:
There are several closed lines in Sydney:
Some former heavy rail lines, as mentioned above, have been converted to light rail.
The following lines are under construction:
Sydney has four underground lines. These sections of railway are extensions of suburban main line commuter services and are not a completely segregated true metro system. The underground sections, especially the City Circle, typically have frequent services. Sydney Metro forms the largest part of Sydney's underground railways and the first subway system in an Australian city. [36]
Sydney has several disused tunnels. The best known of these are those leading out of St James station. There are also several disused tunnels and platforms on the Eastern Suburbs line, which like St James station provided for the possibility of four tunnels even though only two are in use. There is a stub tunnel at North Sydney railway station, north of platform 2, for a never constructed Manly to Mona Vale line. [37] [38]
From the top of the northern stairs to platform 10 at Redfern station it is possible to view the unfinished structure for the low-level "up" (toward Central) Southern Suburbs platforms. The associated never-used tunnels are quite complex. Immediately to the left is the (surface level) stub tunnel for the "down" Southern Suburbs track. This short tunnel exits on the northern side of Lawson Street road bridge. There are at least nine railway tunnels under the suburb of Redfern: some in use, some never used.
Platforms 26 and 27 at Central lie above the Eastern Suburbs Railway platforms and have never been used for trains. [39] Like St James station, these stations have stub tunnels, although they are much shorter.
There are several tunnels on the old Rozelle–Darling Harbour Goods Line, most of which are now used by the Inner West Light Rail. One runs underneath Railway Square, near the Central station railway yards. For a time, this section of the line was used to service the Powerhouse Museum. [40] The corridor adjacent to the tunnel is now a pedestrian pathway, the tunnel itself is disused. A pair of tunnels run underneath Pyrmont and Glebe and are now part of the light rail line. [41] The third tunnel was created in 2000 when an extension to the City West Link Road through Leichhardt was built on top of a cutting. This is also now used by the light rail.
Commuter rail or suburban rail is a passenger rail transport service that primarily operates within a metropolitan area, connecting commuters to a central city from adjacent suburbs or commuter towns. Commuter rail systems can use locomotive-hauled trains or multiple units, using electric or diesel propulsion. Distance charges or zone pricing may be used.
The Epping to Chatswood rail link (ECRL) is a railway line in the northern suburbs of Sydney, Australia, which connects Epping station on the Northern line with Chatswood on the North Shore line. It was formerly considered its own railway line, but is now considered part of the Metro North West Line.
The North Shore Line is a railway line serving the North Shore in Sydney, New South Wales, Australia. The North Shore Line extends from Sydney Central station through the western limb of the City Circle, across the Sydney Harbour Bridge and through the North Shore area to Hornsby where it joins the Main North Line. Services on the line are primarily provided by the T1 North Shore & Western Line and T9 Northern Line, with some services to Wyong during peak hours.
The Eastern Suburbs & Illawarra Line is a commuter railway line on the Sydney Trains network in the eastern and southern suburbs of Sydney. The line was constructed in the 1880s to Wollongong to take advantage of agricultural and mining potentials in the Illawarra area. In March 1926, it became the first railway in New South Wales to run electric train services.
Chatswood railway station is a railway station located in the Sydney suburb of Chatswood. It is served by Sydney Trains services; the T1 North Shore & Western Line and the T9 Northern Line, and the Sydney Metro's North West & Bankstown Line.
Epping railway station is a heritage-listed railway station in Epping, in the northern region of Sydney. It is served by Sydney Trains' T9 Northern Line, NSW TrainLink's Central Coast & Newcastle Line, and Sydney Metro's North West & Bankstown Line services.
The Australian state of New South Wales has an extensive network of railways, which were integral to the growth and development of the state. The vast majority of railway lines were government built and operated, but there were also several private railways, some of which operate to this day.
The Rail Clearways Programme was conceived in 2004 with the aim of easing congestion of Sydney's suburban railway network, by reducing the amount of infrastructure shared by multiple services. The disparate projects at pinch points throughout the network were designed to increase passenger capacity and improve reliability. All projects were delivered by the Transport Construction Authority until it was subsumed in November 2011 by Transport for New South Wales. A new timetable was introduced in October 2013 that realised the benefit of many of the projects, and by January 2014—the programme was complete.
The Main North Line is a major railway in New South Wales, Australia. It runs through Strathfield to Armidale. The line is the main line between Sydney and Armidale. As of 1988, the line closed progressively north of Armidale with services gradually withdrawn till 2004, with the main route between Sydney and Brisbane now the North Coast line. The end of these services marked a significant shift in rail transport in the region, leading to an increased reliance on road transport and altering the dynamics of movement and passenger accessibility between these major cities..
The Northern Line is a commuter rail line operated by Sydney Trains in Sydney, New South Wales, Australia. It serves some of Sydney's Inner West and Northern suburbs. It was spun off from the old T1 North Shore, Northern & Western Line as a separate line in April 2019, to distinguish and make it more easily identified from the other T1 services. It is also a reincarnation of the older Northern Line which was under operation until 2013.
The Bankstown Line is a commuter rail line operated by Sydney Trains in Sydney, New South Wales, Australia. It serves Canterbury-Bankstown and parts of the Inner West and Western Sydney. The Bankstown railway line is the physical railway line which carries the section of the Bankstown Line between Sydenham and Birrong.
Transport in Sydney is provided by an extensive network of public transport operating modes including metro, train, bus, ferry and light rail, as well as an expansive network of roadways, cycleways and airports. According to the 2006 census, in terms of travel to work or study Sydney has the highest rate of public transport usage among the Australian capital cities of 26.3% with more than 80% of weekday trips to/from Central Sydney being made by public transport. According to the New South Wales State Plan, the state has Australia's largest public transport system. The public transport network is regulated by Transport for NSW.
The Sydney Freight Network is a network of dedicated railway lines for freight in Sydney, Australia, linking the state's rural and interstate rail network with the city's main yard at Enfield and Port Botany. Its primary components are the Southern Sydney Freight Line (SSFL) and a line from Sefton to Enfield and Port Botany. The Network has been managed by the Australian Rail Track Corporation (ARTC) since 2012. Prior to the completion of the SSFL, it was managed by RailCorp as the Metropolitan Freight Network.
Rouse Hill railway station is an elevated Sydney Metro station on Tempus Street in Rouse Hill, New South Wales, Australia. The station serves the Metro North West & Bankstown Line and was built as part of the Sydney Metro Northwest project.
Various railway lines have been proposed for Sydney, Australia, including both heavy rail extensions to the dominant suburban network, and more recently proposals for metro lines – one of which was completed in 2019. There have been various proposed light rail expansions, which are covered separately.
Sydney Trains is the operator and brand name of the principal train network serving the Greater Sydney metropolitan area in New South Wales, Australia. The network is a hybrid urban-suburban rail system with a central underground core that covers 369 km (229 mi) of route length over 813 km (505 mi) of track, with 170 stations on eight lines.
The North Shore & Western Line is a commuter rail line on the Sydney Trains network, serving the North Shore, parts of the Inner West and Western Suburbs of Sydney
The Carlingford railway line is a former heavy rail line in Sydney, New South Wales, Australia, which now largely forms part of the Parramatta Light Rail. It was opened from Clyde to Subiaco in January 1885, then by means of the construction of a bridge across the Parramatta River, to Carlingford in April 1896. It closed on 5 January 2020 with most of the line undergoing conversion to light rail, while a short section of the line was retained for use by Sydney Trains.
Sydney Metro City & Southwest is a 30-kilometre (19 mi) rapid transit construction project in Sydney, Australia. The project will extend the Metro North West & Bankstown Line from Chatswood on the North Shore, to Bankstown in the city's southwest via the Sydney central business district. The line is part of the Sydney Metro network and its first phase, Sydney Metro City, opened on 19 August 2024.
The 2010s saw many developments relating to transport in the Australian city of Sydney. The decade saw a substantial investment in infrastructure, including a new airport, motorway projects, light rail lines, Australia's first metro system, the new Waratah fleet and the demise of the non-air conditioned S sets from the rail network. Planning and branding of public transport services became substantially more centralised.