Typical Victory ship | |
History | |
---|---|
United States | |
Name | SS Pomona Victory |
Owner | U.S. Maritime Commission |
Builder | California Shipbuilding Corporation |
Yard number | 246181 |
Laid down | 29 April 1944 |
Launched | 26 June 1944 |
Acquired | 31 July 1944 |
Fate | Sold to Belgium, 29 March 1947 |
Belgium | |
Name | SS Tervaete |
Owner | Compagnie Maritime Belge |
Acquired | 29 March 1947 |
Fate | Sold to Liberia, 1965 |
Liberia | |
Name | SS Hongkong Delegate |
Owner |
|
Acquired | 1965 |
Fate | Sunk in a collision with the SS Columbus Canada, 4 October 1975 Raised and scrapped, 15 December 1975 |
General characteristics | |
Class and type | VC2-S-AP3 Victory ship |
Tonnage | 7612 GRT, 4,553 NRT |
Displacement | 15,200 tons |
Length | 455 ft (139 m) |
Beam | 62 ft (19 m) |
Draught | 28 ft (8.5 m) |
Installed power | 8,500 shp (6,300 kW) |
Propulsion | HP & LP turbines geared to a single 20.5-foot (6.2 m) propeller |
Speed | 16.5 knots |
Boats & landing craft carried | 4 Lifeboats |
Complement | 62 Merchant Marine and 28 US Naval Armed Guards |
Armament | |
Notes | [1] [2] |
The SS Pomona Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on April 29, 1944, and completed on July 31, 1944. The ship's United States Maritime Commission designation was 'VC2- S- AP3, hull number 31'. The 10,500-ton Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for World War II compared to Victory ships, which were designed to last longer and serve the US Navy after the war. Victory ships differed from Liberty ships in that they were faster, longer and wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle.
Following World War II service, Pomona Victory was sold to Belgium where she served as the SS Tervaete from 1947 to 1965. She was eventually resold to Liberia in 1965 where she served as the SS Hongkong Delegate until she was sunk in a collision with the SS Columbus Canada on October 4, 1975. Deemed beyond repair, was eventually raised and scrapped on December 15, 1975.
The SS Carroll Victory was the twenty-seventh Victory ship built during the World War II under the Emergency Shipbuilding program. It was launched by the California Shipbuilding Company on June 13, 1944, and completed on August 31, 1944. The ship was named after Carroll, Iowa. The ship’s United States Maritime Commission designation was VC2-S-AP3 with a hull number 27 (V-27). It was operated by the Lykes Brothers SS Company and it served in the Atlantic Ocean during World War II. The Carroll was one of the new 10,500-ton class ship known as Victory ships that were designed to replace the earlier Liberty Ships. Unlike Liberty ships, Victory ships were designed to last longer and serve the US Navy after the war. The Victory ships differed from Liberty ships in that they were faster, longer and wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle.
The SS Clovis Victory was the thirty-second Victory ship built during World War II, in 156 days under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on June 13, 1944 and completed on August 31, 1944. The ship's United States Maritime Commission designation was VC2- S- AP3, hull number 27, operated by Seas Shipping Company. SS Clovis Victory served in the Pacific Ocean. Victory ships were designed to replace the earlier Liberty ships. Liberty ships were designed to be used just for WW2. Victory ships were designed to last longer and serve the US Navy after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle. The sponsor of the Clovis Victory was the wife of the 200th Coast Artillery's Henry Max Miller of Clovis, New Mexico. Major Miller was lost in the sinking of the SS Shinyō Maru on September 7, 1944.
The SS Clarksdale Victory was the 80th Victory ship built during World War II. She was launched by the California Shipbuilding Company on January 27, 1945, and completed on February 26, 1945. The ship’s United States Maritime Commission designation was VC2-S-AP3, hull number 80. She was built in just 86 days under the Emergency Shipbuilding program. SS Clarksdale Victory served in the Pacific Ocean during WW2. SS Clarksdale Victory was 80th of the new 10,500-ton class ship known as Victory ships. Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for WW2. Victory ships were designed to last longer and serve the US Navy after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, a thinner stack set farther toward the superstructure and had a long raised forecastle.
SS Colby Victory was the 84th Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on January 27, 1945, and completed on March 12, 1945. The ship’s United States Maritime Commission designation was VC2- S- AP3, hull number V50, built in 83 days. SS Colby Victory served in the Pacific Ocean during World War II. The 10,500-ton Victory ships were designed to replace the earlier Liberty ships. Liberty ships were designed to be used just for World War II. Victory ships were designed to last longer and serve after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, a thinner stack set farther toward the superstructure and had a long raised forecastle.
The SS Claremont Victory was the 18th of 531 Victory ships built during World War II. She was built in the Oregon Shipbuilding Corporation shipyard in 1944. She served during the Battle of Okinawa. After the war, she was owned by a number of merchant shipping companies in Argentina before being scrapped in 1978.
The SS United States Victory was the fourth Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on March 6, 1944 and completed on April 30, 1944. The ship’s United States Maritime Commission designation was VC2- S- AP3, hull number 3 (V-3). SS United States Victory served in the Pacific Ocean during World War II. The 10,500-ton Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for World War II. Victory ships were designed to last longer and serve the US Navy after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, had a thinner stack set farther toward the superstructure and had a long raised forecastle.
The SS Philippines Victory was the fifth Victory ship built during World War II. She was launched by the California Shipbuilding Company on March 11, 1944 and completed on May 9, 1944. She was built in 113 days under the Emergency Shipbuilding program.
The SS New Zealand Victory was the sixth Victory ship built during World War II. She was launched at Terminal Island by the California Shipbuilding Company on March 20, 1944 and completed on May 13, 1944. She was built in 109 days under the Emergency Shipbuilding program. The ship’s United States Maritime Commission designation was VC2-S-AP3, hull number 6 (V-6). SS New Zealand Victory served in the Pacific Ocean during WW2. SS New Zealand Victory was sixth of the new 10,500-ton class ship to be known as Victory ships. Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for WW2. Victory ships were designed to last longer and serve the US Navy after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, a thinner stack set farther toward the superstructure and had a long raised forecastle.
The SSPanama Victory was a Victory ship built during World War II. She was launched by the California Shipbuilding Company on April 3, 1944 and completed on May 30, 1944. She was built in 115 days under the Emergency Shipbuilding program. The ship’s United States Maritime Commission designation was VC2-S-AP3, hull number 9 (V-9). SS Panama Victory served in the Pacific Ocean during World War II. SS Panama Victory was ninth of the new 10,500-ton class ship to be known as Victory ships. Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for WW2. Victory ships were designed to last longer and serve the US Navy after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, had a thinner stack set farther toward the superstructure and had a long raised forecastle. Engine was made by Joshua Hendy Iron Works Inc. of Sunnyvale, California.
The SS Luray Victory was the seventeenth Victory ship, a new 10,500 ton class ship built during World War II. The California Shipbuilding Company built the ship under the Emergency Shipbuilding program. She was launched on May 11, 1944, and completed on June 26, 1944. The ship’s United States Maritime Commission designation was VC2-S-AP3, hull number 17 (V-17). The SS Luray Victory served in the Pacific Ocean during World War II and was operated by the Black Diamond Steamship Company.
The SS Gainesville Victory was the 22nd Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on June 9, 1944, and completed on July 22, 1944. The ship’s United States Maritime Commission designation was VC2-S-AP3, hull number 22 (V-22). She was operated by the Seas Shipping Company. SS Gainesville Victory served in the Pacific Ocean during World War II. SS Gainesville Victory was number one of the new 10,500-ton class of ships, known as Victory ships. Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for WW2, while Victory ships were designed to last longer and serve the US Navy after the war. The Victory ships differed from the Liberty ships in that they were faster, longer, wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle.
The SS St. Lawrence Victory (MCV-735) was a type VC2-S-AP2 Victory-class cargo ship built for the United States during World War II. The ship was built as part of the Emergency Shipbuilding program by Permanente Metals Corporation in Yard 2 of the Richmond Shipyards in Richmond, California.
SS Elmira Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. It was built and launched by the Oregon Shipbuilding Corporation on May 12, 1944 and completed on May 31, 1944. The ship's United States Maritime Commission designation was VC2-S-AP3 and hull number 105 (1021). The ship was Oregon Shipbuilding Corporation's 21st victory ship. The Maritime Commission turned it over for Merchant navy operation to a civilian contractor, the Isthmian Steamship Company under the United States Merchant Marine act for the War Shipping Administration. She was named after the city of Elmira, New York.
SS Bozeman Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. It was built and launched by the Oregon Shipbuilding Corporation on December 9, 1944 and completed on February 17, 1945. The ship's United States Maritime Commission designation was VC2-S-AP3 and hull number 151 (1205). She was built in just 106 days. The Maritime Commission turned it over for Merchant navy operation to a civilian contractor, the Alaska SS Company under the United States Merchant Marine act for the War Shipping Administration. She was named after the city of Bozeman, Montana.
The SS Saginaw Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. It was laid down and launched by the Oregon Shipbuilding Corporation, and completed on February 9, 1945. The ship's United States Maritime Commission designation was VC2-S-AP3 and hull number 152. The Maritime Commission turned it over for merchant navy operation to a civilian contractor, the Pacific-Atlantic SS Company under the United States Merchant Marine act for the War Shipping Administration. She was named after Saginaw, Michigan. Victory ships were designed to supersede the earlier Liberty ships. Unlike Liberty ships, Victory ships were designed to serve the US Navy after the war and to last longer. Compared to Liberty ships, Victory ships were faster, longer, wider, taller, and had a thinner stack which was set further forward on the superstructure. They also had a long, raised forecastle.
The SS Sharon Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on April 15, 1944, and completed on September 28, 1944. The ship's United States Maritime Commission designation was 'VC2- S- AP3, hull number 29'. She was operated by the Matson Navigation Company of Hawaii. The 10,500-ton Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for World War II compared to Victory ships, which were designed to last longer and serve the US Navy after the war. Victory ships differed from Liberty ships in that they were faster, longer and wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle.
The SS Waco Victory was a Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on July 22, 1944, and completed on October 14, 1944. The ship's United States Maritime Commission designation was 'VC2- S- AP3, hull number 37'. The 10,500-ton Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for World War II compared to Victory ships, which were designed to last longer and serve the US Navy after the war. Victory ships differed from Liberty ships in that they were faster, longer and wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle.
USNS Victoria (T-AK-281) was a Norwalk class Fleet Ballistic Missile Cargo Ship, which was launched as a World War II commercial Victory cargo ship SS Ethiopia Victory under the Emergency Shipbuilding program. The Victoria Victory was acquired by the U.S. Navy in 1963.
The SS Alamo Victory was the 42nd Victory ship built during World War II under the Emergency Shipbuilding program. She was launched by the California Shipbuilding Company on July 13, 1944, and completed on August 18, 1944. The ship’s United States Maritime Commission designation was VC2- S- AP3, hull number 42 (V-32), she worked as merchant marine for all of her career. SS Alamo Victory served in the Pacific Ocean during World War II and was operated by the Isthmian Steamship Company. The 10,500-ton Victory ships were designed to replace the earlier Liberty Ships. Liberty ships were designed to be used just for World War II. Victory ships were designed to last longer and serve the US Navy after the war. The Victory ship differed from a Liberty ship in that they were: faster, longer and wider, taller, had a thinner stack set farther toward the superstructure, and had a long raised forecastle.
SS Skagway Victory was a Victory ship built for the United States during World War II. She was launched by the Oregon Shipbuilding Corporation on June 21, 1944, and was completed on July 15, 1944. The ship's US Maritime Commission designation was VC2-S-AP3, hull number 116 (V-116). She was built in 64 days under the Emergency Shipbuilding program. The Maritime Commission turned her over to a civilian contractor, the Alcoa, for operation until the end of World War II hostilities. She was operated under the US Merchant Marine Act for the War Shipping Administration.