Seghill railway station

Last updated

Seghill
General information
Location Seghill, Northumberland
England
Coordinates 55°03′48″N1°32′34″W / 55.0633°N 1.5427°W / 55.0633; -1.5427 Coordinates: 55°03′48″N1°32′34″W / 55.0633°N 1.5427°W / 55.0633; -1.5427
Grid reference NZ293744
Platforms1
Other information
StatusDisused
History
Original companyBlyth, Seghill and Percy Main Railway
Pre-grouping North Eastern Railway
Post-grouping LNER
British Rail (North Eastern)
Key dates
28 August 1841 (1841-08-28)Opened
2 November 1964 [1] Closed to passengers
7 June 1965 (1965-06-07)Closed completely

Seghill railway station served the village of Seghill, Northumberland, England from 1841 to 1965 on the Blyth and Tyne Railway.

Contents

History

The station opened on 28 August 1841 by the Blyth, Seghill and Percy Main Railway. The station was situated on the A190 Station Road, on the south side of the level crossing. The Seghill Colliery was situated to the north, on the second of the third line that branched off the passenger line. The primary goods traffic handled at the station was bricks, clay and ganister; this was ceased on 9 December 1963. The station was closed to passengers on 2 November 1964 [2] 27 June 1964 and closed completely on 7 June 1965. [3]

Reopening proposals

There have been proposals to reintroduce passenger services to part of the former Blyth and Tyne Railway system since the 1990s; Denis Murphy, the then Labour MP for Wansbeck, expressed support in the House of Commons in an adjournment debate in April 1999 and again in a debate in January 2007. [4] The Railway Development Society (renamed Railfuture in 2000) also endorsed the proposal in 1998. [5]

Later, in 2009, the Association of Train Operating Companies published a £34 million proposal to restore passenger services from Newcastle to Ashington. [6]

In the early 2010s, Northumberland County Council (NCC) became interested in the reintroduction of passenger services onto remaining freight-only sections of the network. In June 2013 NCC commissioned Network Rail to complete a GRIP 1 study to examine the best options for the scheme. [7] The GRIP 1 study was received by NCC in March 2014 and in June 2015 they initiated a more detailed GRIP 2 Feasibility Study at a cost of £850,000. [8]

The GRIP 2 study, which NCC received in October 2016, confirmed that the reintroduction of a frequent seven-day a week passenger service between Newcastle, Ashington and possibly a new terminus to the east, at Woodhorn, was feasible and could provide economic benefits of £70 million with more than 380,000 people using the line each year by 2034. [9] The study suggested that due to the short distance between the former stations at Seghill and Seaton Delaval only one, rather than both, of them should be reopened. [10] At the time it was suggested that, subject to funding being raised for the £191 million [9] scheme, detailed design work could begin in October 2018 with construction commencing four months later and the first passenger services introduced in 2021 [9] though by October 2018 such works were yet to begin.

After receiving the GRIP 2 study, NCC initially announced that they were preceding with a GRIP 3 Study from Network Rail but such a report was not commissioned at the time. [11] Despite a change in the political leadership of Northumberland County Council following the 2017 local elections [12] the authority continued to work towards the reintroduction of a passenger service onto the line, [13] encouraged by the Department for Transport's November 2017 report, A Strategic Vision for Rail, which named the line as a possible candidate for a future reintroduction of passenger services. [14] [15] Consequentially, NCC commissioned a further interim study in November 2017 (dubbed GRIP 2B) to determine whether high costs and long timescales identified in the GRIP 2 Study could be reduced by reducing the initial scope of the project but the report failed to deliver on this. [11]

Despite this, the county council has continued to develop the project, announcing a further £3.46 million in funding for a further business case and detailed design study [16] (equivalent to GRIP 3) [11] to be completed by the end of 2019. It is envisaged that passenger trains could be introduced as early as 2022. [16] However, the revised proposals, released in July 2019, are reduced in scope from the plan considered in the 2016 GRIP 2 study and proposed 4-phase project [17] to reduce the initial cost of the scheme. Under these plans, the reopening of Seghill station appears to have been dropped in favour of Seaton Delaval station, though even that option was excluded [17] from the initial £90 million phase [16] and being instead proposed as part of Phase 2 of the project. [17] However, in August 2020, it was reported that these four proposed phases might be merged into a single one. [18]

Related Research Articles

<span class="mw-page-title-main">Morpeth railway station</span> Railway station in Northumberland, England

Morpeth is a railway station on the East Coast Main Line, which runs between London King's Cross and Edinburgh Waverley. The station, situated 16 miles 50 chains north of Newcastle, serves the market town of Morpeth, Northumberland, England. It is owned by Network Rail and managed by Northern Trains.

<span class="mw-page-title-main">Newcastle railway station</span> Mainline railway station in Newcastle upon Tyne, England

Newcastle Central Station is a major railway station in Newcastle upon Tyne. It is located on the East Coast Main Line, around 268 miles (432 km) north of London King's Cross. It is the primary national rail station serving Newcastle upon Tyne, with local rail services provided by the Tyne and Wear Metro network to which the station is connected to by Central Station Metro station, situated beneath the national rail station.

<span class="mw-page-title-main">North Tyneside Steam Railway</span> Visitor attraction in North East England

The North Tyneside Steam Railway and Stephenson Steam Railway are visitor attractions in North Tyneside, North East England. The museum and railway workshops share a building on Middle Engine Lane adjacent to the Silverlink Retail Park. The railway is a standard gauge line, running south for 2 miles (3.2 km) from the museum to Percy Main. The railway is operated by the North Tyneside Steam Railway Association (NTSRA). The museum is managed by Tyne and Wear Archives and Museums on behalf of North Tyneside Council.

<span class="mw-page-title-main">Seaton Delaval</span> Human settlement in England

Seaton Delaval is a village in Northumberland, England, with a population of 4,371. The largest of the five villages in Seaton Valley, it is the site of Seaton Delaval Hall, completed by Sir John Vanbrugh in 1727.

<span class="mw-page-title-main">Northumberland Park Metro station</span> Tyne and Wear Metro station in North Tyneside

Northumberland Park is a Tyne and Wear Metro and future National Rail station, serving the village of Backworth and suburbs of Northumberland Park and West Allotment, North Tyneside in Tyne and Wear, England. It joined the network on 11 December 2005, and is the second-newest station on the network as of March 2022.

<span class="mw-page-title-main">Seghill</span> Human settlement in England

Seghill is a large village located on the Northumberland border which is the county boundary between Northumberland and Tyne and Wear. Seghill is situated between the villages of Seaton Delaval and Annitsford, about 8 miles (13 km) north of Newcastle upon Tyne.

<span class="mw-page-title-main">New Hartley</span> Human settlement in England

New Hartley is a small village in South East Northumberland, England, adjacent to Hartley, Seaton Delaval and Seaton Sluice. The village is just off the A190 road about 6 miles north of Tynemouth and 4 miles south of Blyth.

The Blyth and Tyne Railway was a railway company in Northumberland, England, incorporated by Act of Parliament on 30 June 1852. It was created to unify the various private railways and waggonways built to carry coal from the Northumberland coalfield to Blyth and the River Tyne, which it took control of on 1st January 1853. Over time, the railway expanded its network to reach Morpeth (1857/8), North Seaton (1859), Tynemouth (1860/1), Newcastle upon Tyne (1864), and finally Newbiggin-by-the-Sea (1872). It became part of the much larger North Eastern Railway in 1874.

<span class="mw-page-title-main">Manors railway station</span> Railway station in Tyne and Wear, England

Manors is a railway station on the East Coast Main Line, which runs between London King's Cross and Edinburgh Waverley. The station serves the Quayside and Shieldfield areas of the city of Newcastle upon Tyne in Tyne and Wear, England. It is owned by Network Rail and managed by Northern Trains. The Metro station of the same name is not directly connected, and located a short walk away.

<span class="mw-page-title-main">Ashington</span> Town and parish in Northumberland, England

Ashington is a town and civil parish in Northumberland, England, with a population of 27,864 at the 2011 Census. It was once a centre of the coal mining industry. The town is 15 miles (24 km) north of Newcastle upon Tyne, west of the A189 and bordered to the south by the River Wansbeck. The North Sea coast at Newbiggin-by-the-Sea is 3 miles (5 km) away.

<span class="mw-page-title-main">Blyth railway station</span> Former railway station in Northumberland

Blyth railway station served Blyth, Northumberland on the Blyth Branch line in Northeast England.

Ashington railway station was a station on the Newbiggin-by-the-Sea branch of the Blyth and Tyne Railway network which served the town of Ashington in Northumberland, North East England. The station was closed by British Railways in 1964, but it has been the subject of a reopening campaign since at least the 1990s.

<span class="mw-page-title-main">Bedlington railway station</span> Disused railway station in Bedlington, Northumberland

Bedlington railway station was a railway station that served the town of Bedlington, Northumberland, England from 1850 to 1964 on the Blyth and Tyne Railway. The station was closed by British Railways in 1964, but it has been the subject of a reopening campaign since at least the 1990s.

<span class="mw-page-title-main">Bebside railway station</span> Disused railway station in Bebside, Northumberland

Bebside railway station was a railway station that served the village of Bebside in Northumberland, North East England from 1850 to 1964. It is proposed that a new station should be opened close to the original to serve Blyth as part of the Northumberland Line project.

Newsham railway station served the village of Newsham near Blyth, England, from 1851 to 1964 on the Blyth and Tyne Railway. It was located at the junction of the Percy Main to Blyth and Bedlington lines of the Blyth and Tyne Railway. The station was closed by British Railways in 1964, but it has been the subject of a reopening campaign since at least the 1990s.

<span class="mw-page-title-main">Seaton Delaval railway station</span> Disused railway station in Seaton Delaval, Northumberland

Seaton Delaval railway station served the village of Seaton Delaval in Northumberland, North East England, from 1841 to 1965 on what became part of the Blyth and Tyne Railway. The construction of a new station has been proposed nearby as part of the Northumberland Line project.

Woodhorn was a railway station proposed as part of the project to reintroduce passenger rail services onto the Ashington, Blyth & Tyne Railway which closed to passenger traffic in 1964. It was initially proposed that the newly reopened line could terminate at a new station, close to the Woodhorn Colliery Museum and Northumberland Archives, rather than at Ashington, the previous station however revised plans, released in July 2019 appear to have dropped Woodhorn station from project scope.

<span class="mw-page-title-main">Northumberland Line</span> Planned passenger rail route in NE England

The Northumberland Line is a planned railway project aimed at reintroducing passenger rail services to freight-only lines in South East Northumberland, North East England. Under the scheme, a new passenger service would link some of Northumberland's major population centres in Ashington and Blyth to the nearby city of Newcastle upon Tyne. Construction of new stations and works to upgrade the existing rail infrastructure to bring it up to passenger-carrying standards is reported as having begun by late August 2022, ahead of the anticipated launch of the new passenger service in December 2023.

References

  1. Railway Passenger Stations by M.Quick page 404
  2. Railway Passenger Stations by M.Quick page 404
  3. "Disused Stations: Seghill". Disused Stations. Retrieved 13 March 2017.
  4. Denis Murphy; et al. (10 January 2007). "Ashington, Blyth and Tyne Railway". Parliamentary Debates (Hansard) . United Kingdom: House of Commons. col. 135WH–139WH.
  5. Bevan 1998, p. 59.
  6. ATOC 2009, p. 17.
  7. "The Journal: Ashington Blyth and Tyne rail line restoration scheme gets green light" . Retrieved 10 March 2017.
  8. "New Post Leader: Plans for rail line reach milestone" . Retrieved 10 March 2017.
  9. 1 2 3 "Chronicle Live: Reopening of Newcastle to Ashington rail link moves one step closer" . Retrieved 10 March 2017.
  10. "Ashington Blyth & Tyne GRIP 2 Study" (PDF). Retrieved 10 March 2017.
  11. 1 2 3 "SENRUG - South East Northumberland Rail User Group: Re-open Ashington Blyth & Tyne Line" . Retrieved 22 April 2019.
  12. Kelly, Mike; Muncaster, Michael (5 May 2017). "Northumberland local elections results IN FULL - council held by Tories in 'straw draw' drama - Chronicle Live". Chronicle Live. Retrieved 22 July 2019.
  13. Graham, Hannah (1 June 2018). "Northumberland's draft local plan unveiled: What it means for houses, jobs and the green belt - Chronicle Live". Chronicle Live. Retrieved 22 July 2019.
  14. "Connecting people: a strategic vision for rail" (PDF). Department for Transport. November 2017. ISBN   9781528601252 . Retrieved 22 July 2019.
  15. Allen, Andrew (12 December 2017). "What's in the government's new rail strategy? | CityMetric". CityMetric. Retrieved 22 July 2019.
  16. 1 2 3 O'Connell, Ben (28 February 2019). "Phasing of proposed Northumberland rail line explained after concerns raised | News Post Leader". News Post Leader. Retrieved 22 July 2019.
  17. 1 2 3 O'Connell, Ben (15 July 2019). "Six new stations could open if Ashington to Newcastle passenger trains resume - Chronicle Live". Chronicle Live. Retrieved 22 July 2019.
  18. "Northumberland line could reopen in one phase | News Post Leader". News Post Leader. 15 August 2020. Retrieved 25 January 2021.{{cite web}}: CS1 maint: url-status (link)

Sources

Preceding station Disused railways Following station
Backworth (Holywell)
Line open; station closed
  Blyth and Tyne Railway   Seaton Delaval
Line open;station closed