West Toronto Railpath

Last updated
The railpath where it crosses over Dupont Street West Toronto Railpath 2011.jpg
The railpath where it crosses over Dupont Street

The West Toronto Railpath is a multi-use trail in Toronto, Ontario, Canada, running from The Junction neighbourhood toward downtown Toronto. The Railpath was developed by the City of Toronto for bicycle and pedestrian use. Like Toronto's Beltline and Don Mills trails, it is an urban rail-to-trail project. Phase 1 of the path opened in 2009. Phase 2, an extension south from Dundas Street West to Liberty Village, was approved and proceeding with detailed design as of September 2020 with funding of $2.9 million jointly from the City and the Government of Canada. Construction of Phase 2 is expected to begin in 2023. [1]

Contents

History

Following a trade route that Indigenous people used from the Davenport Trail to Lake Iroquois, this route formed the path of a railway that started in 1871. [1] In 1868, the Toronto, Grey and Bruce Railway was incorporated to provide rail service connecting Toronto to Southampton and Owen Sound (and points in between). [2] Sections of this railway in Toronto ran along the rights of way of other existing railways. As this railway was a different (narrower) gauge, a separate set of tracks was required along the right of way. Due to service problems associated with the narrow gauge, the line was eventually converted to standard gauge in 1881. By 1883, the Canadian Pacific Railway had acquired the line. [3] Into the 1960s, the portion of the track around Dupont was known as "The Old Bruce". It served several industries, including the Viceroy plant and the scrapyard. [3]

The City of Toronto Economic Development and Parks Committee and grassroots community support began for this project before 1990, but the project necessitated the purchase of land and negotiations with rail operators and other stakeholders. Organizations involved include the Evergreen Foundation and, although the railpath is multi-use, notable advocacy by bicycling interests such as Toronto's Community Bicycle Network. The City of Toronto first authorized purchase of the land for the portion from Cariboo Avenue to Dundas Street West (known as the CP LEAD spur) in 1997. Funds to the amount of $920,000 were approved in 2000.

This land was acquired in July 2003 by the City of Toronto from the St. Lawrence and Hudson Railway. The purchase agreement demanded that the vendor remediate the soil to industrial standards. After acquiring the lands, the City of Toronto needed to terminate a lease that a salvage yard (M&S Waste and Salvage) had for a portion of the land, leased when the land was owned by Canadian Pacific. [4]

Construction of Phase 1 of the path, running from Cariboo Avenue to Dundas Street West and Sterling Road, was designed by Scott Torrance Landscape Architect Inc. in conjunction with Brown and Storey Architects, and began in 2008 and was completed in 2009. [5] The project combined the restoration of historical rail bridges with the installation of new public art pieces by artist John Dickson, all situated among indigenous planting. New entrance points at Dupont and Bloor streets allow pedestrians to access the trail from the street and use the restored rail bridges that cross over these streets. Concrete plazas are located along the trail where existing streets intersect it, providing neighbourhood connections and gathering places.

The realization of Phase 2 will be coordinated with the Metrolinx's Georgetown South Project, a planned expansion of rail capacity along the line for GO Transit and the existing Union Pearson Express.

Location and phases

West Toronto Railpath, looking south as it passes over Bloor Street West. West Toronto RailPath bridge over Bloor Street.jpg
West Toronto Railpath, looking south as it passes over Bloor Street West.

In total, the railpath is proposed to run about 4 km from Cariboo Avenue in The Junction to Strachan Avenue near the downtown core (see map). [6] Like other rail trail projects, the path runs along railway rights-of-way established many years ago that have been narrowed or abandoned.

Phase 1 is 2.1 km long, beginning at Cariboo Avenue and running southeast to Dundas Street West and Sterling Road. The contract for Phase 1 construction was awarded in April 2008 at a cost of (CDN) $3.8 million. [7] Construction began in 2008 and was completed in summer 2009, with the formal opening on October 30, 2009. [8]

Phase 2 will continue a further 2 km from Dundas Street West and Sterling Road southeast and east to Strachan Avenue and Wellington Street, providing access to the Wellington Street bicycle lane, near the Liberty Village development. Rail line capacity expansion projects by Metrolinx could potentially conflict with Phase 2. [9] Toronto City Council continues to support the railpath. [10] Metrolinx has indicated that it will work with the railpath's advocates to try to include the path as part of the Georgetown South expansion plans. [11] The West Toronto Railpath Extension Study was completed and approved by Toronto City Council in January 2016 and included the functional design of the extension. [12] In August 2016, the federal government announced funding, in partnership with the province, for detailed design and implementation with design work planned to commence in September 2016. [13] Public consolation and feedback was completed in March 2020 and construction of the phase 2 extension was expected to begin in 2021 or 2022 [14] . Construction has been repeatedly delayed and, as of February 2024 is stated as planned to begin in 2024 [15] .

Other Toronto railpaths

See also

Notes

  1. 1 2 "West Toronto Railpath Extension". City of Toronto. 2017-11-22. Retrieved 2022-09-13.
  2. "TG&BR". Archived from the original on 2007-12-04. Retrieved 2008-03-13.
  3. 1 2 R.L.Kennedy. "Toronto, Grey & Bruce". Old Time Trains. Archived from the original on 2007-01-25. Retrieved 2007-03-27.
  4. "City of Toronto Staff Report. Subject: Termination of Lease of Lands Adjacent to 26 Ernest Avenue (Ward 18 - Davenport)" (PDF). City of Toronto. 2006-04-10. Retrieved 2007-03-21.
  5. "Friends of the West Toronto Railpath". Friends of the West Toronto Railpath. 2016-08-23. Retrieved 2023-01-21.
  6. "Map of the Railpath" (PDF). static1.squarespace.com.
  7. "City of Toronto - Minutes of the Bid Committee (item 63.3)" (PDF). www.toronto.ca.
  8. "History".
  9. "Draft Part One". metrolinx-consult.limehouse.com.
  10. "Toronto City Council Minutes - January 27–28, 2009". www.toronto.ca.
  11. "Backgrounder". www.metrolinx.com. Retrieved February 8, 2024.
  12. "West Toronto Railpath Extension Study". City of Toronto. Retrieved 30 August 2016.
  13. Bykova, Lina (25 August 2016). "The West Toronto Railpath Finally Gets Funding For Expansion". Torontoist. Retrieved 30 August 2016.
  14. Toronto, City of (22 November 2017). "West Toronto Railpath Extension". City of Toronto.
  15. Toronto, City of (19 February 2024). "West Toronto Railpath Extension". City of Toronto.

Related Research Articles

<span class="mw-page-title-main">Dundas West station</span> Toronto subway station

Dundas West is a subway station on Line 2 Bloor–Danforth of the Toronto subway in Toronto, Ontario, Canada. It is located just north of Bloor Street West at the corner of Dundas Street and Edna Avenue. The station is about 200 metres west of Bloor GO Station on the GO Transit Kitchener line and the Union Pearson Express.

<span class="mw-page-title-main">Milton line</span>

Milton is one of the seven train lines of the GO Transit system in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Milton, by way of Mississauga.

<span class="mw-page-title-main">Lakeshore East line</span> Railway line in Ontario, Canada

Lakeshore East is one of the seven commuter rail lines of GO Transit in the Greater Toronto Area, Ontario, Canada. It extends from Union Station in Toronto to Oshawa GO in Durham Region. Buses from Oshawa connect to communities further east in Newcastle, Bowmanville and Peterborough.

<span class="mw-page-title-main">Bloor GO Station</span> Railway station in Toronto, Ontario, Canada

Bloor GO Station is a railway station on GO Transit's Kitchener line and Union Pearson Express rail services, located in Toronto, Ontario, on Bloor Street east of Dundas Street West. It is near Dundas West station on the TTC's Line 2 Bloor–Danforth but is not directly connected to it.

<span class="mw-page-title-main">Weston GO Station</span> Railway station in Toronto, Ontario, Canada

Weston GO Station is a train station in Toronto, Ontario, serving the GO Transit Kitchener line and the Union Pearson Express. It is located on the south side of Lawrence Avenue West, just east of Weston Road, in the neighbourhood of Weston.

The Toronto Suburban Railway was a Canadian electric railway operator with local routes in west Toronto, and a radial (interurban) route to Guelph.

Transportation in the Canadian city of Toronto forms the hub of the road, rail and air networks in the Greater Toronto Area and much of southern Ontario. There are many forms of transport in the city, including railways, highways, and public transit. Toronto also has an extensive network of bicycle lanes and multi-use trails and paths.

The Relief Line was a proposed rapid transit line for the Toronto subway system, intended to provide capacity relief to the Yonge segment of Line 1 and Bloor–Yonge station and extend subway service coverage in the city's east end. Several plans for an east–west downtown subway line date back to the early 20th century, most of which ran along Queen Street.

<span class="mw-page-title-main">Metrolinx</span> Crown agency owned by the Government of Ontario

Metrolinx is a Crown agency of the Government of Ontario that manages and integrates road and public transport in the Greater Toronto and Hamilton Area (GTHA), which comprises much of Ontario's Golden Horseshoe region. Headquartered at Union Station in Toronto, the agency was created as the Greater Toronto Transportation Authority on June 22, 2006. The agency adopted its present name as a brand name in 2007 and eventually as the legal name in 2009.

<span class="mw-page-title-main">Narrow-gauge railways in Canada</span>

Although most railways of central and eastern Canada were initially built to a 5 ft 6 in broad gauge, there were several, especially in Atlantic Canada and Ontario, which were built as individual narrow-gauge lines. These were generally less expensive to build, but were more vulnerable to frost heaving because vertical displacement of one rail caused greater angular deflection of the narrower two-rail running surface. Most of the longer examples were regauged starting in the 1880s as the railway network began to be bought up by larger companies.

<span class="mw-page-title-main">Transit City</span> Proposed Toronto public transit plan

Transit City was a plan for developing public transport in Toronto, Ontario, Canada. It was first proposed and announced on 16 March 2007 by Toronto mayor David Miller and Toronto Transit Commission (TTC) chair Adam Giambrone. The plan called for the construction of seven new light rail lines along the streets of seven priority transit corridors, which would have eventually been integrated with existing rapid transit, streetcar, and bus routes. Other transit improvements outlined in the plan included upgrading and extending the Scarborough RT line, implementing new bus rapid transit lines, and improving frequency and timing of 21 key bus routes. The plan integrated public transportation objectives outlined in the City of Toronto Official Plan, the TTC Ridership Growth Strategy and Miller's 2006 election platform.

<span class="mw-page-title-main">Line 6 Finch West</span> Under-construction light rail line in Toronto, Ontario, Canada

Line 6 Finch West, also known as the Finch West LRT, is a light rail line under construction in Toronto, Ontario, Canada, to be operated by the Toronto Transit Commission. The 10.3-kilometre (6.4 mi), 18-stop line is to extend from Finch West station on Line 1 Yonge–University to the North Campus of Humber College in Etobicoke. The line will operate in a dedicated above-ground right-of-way, much of it within Finch Avenue, segregated from street traffic. The line will use transit signal priority and standard gauge rather than the broad Toronto gauge. The line is forecast to carry about 14.6 million rides a year or 40,000 a day by 2031 and will replace the 36 Finch West bus route, which is one of the three busiest bus routes in Toronto. Line 6 is expected to open within the first half of 2024, with an estimated cost of CA$2.5 billion. For budget purposes, the TTC made the assumption that Line 6 would open no earlier than September 2024. The builder, Mosaic Transit Group, expects the line to open by the end of 2024.

<span class="mw-page-title-main">Junction Triangle</span> Neighbourhood in Toronto, Ontario, Canada

Junction Triangle is a neighbourhood in Toronto, Ontario, Canada. It is located in the city's west end, just west of Lansdowne Avenue. The area is a triangle surrounded on all three sides by railway lines: the CNR/CPR mainline to the west, Metrolinx GO Transit Barrie line to the east, and the CPR east-west railway lines to the north. Bloor Street cuts across the middle of the neighbourhood, Dupont Street runs close to the northern edge, and Dundas Street is close to the southern boundary. By some accounts, the recent residential developments of Davenport Village and Foundry Lofts, built on former factory lands north of the CP Rail line, west of Lansdowne, south of Davenport and east of the GO Transit Bradford/Newmarket/Barrie line, also belong in this neighbourhood.

<span class="mw-page-title-main">Hurontario LRT</span> Light rail line under construction in Mississauga and Brampton, Ontario, Canada

The Hurontario LRT is a light rail line under construction in the cities of Mississauga and Brampton, Ontario, Canada. The line will run along Hurontario Street from Mississauga's Port Credit neighbourhood north to Steeles Avenue in Brampton. The line will be built and operated as a public-private partnership by Mobilinx, a consortium of private European and Japanese companies, with provincial transit agency Metrolinx retaining ownership of the line. It will be the only street railway operating in the Greater Toronto Area outside Toronto proper.

<span class="mw-page-title-main">Davenport Road</span> Thoroughfare in Toronto, Ontario

Davenport Road is an east–west arterial road in Toronto, Ontario, Canada. It is believed to follow an old native trail along the foot of the scarp of the old shoreline of glacial Lake Iroquois. It currently runs from Yonge Street in the east to Old Weston Road in the west.

Bloor–Lansdowne GO Station is a planned commuter train station in Toronto, Ontario, Canada. It will be an infill station on the Barrie line of GO Transit located between the future Caledonia and Spadina–Front stations. All three future stations are located between the active Downsview Park station and Union Station. Bloor–Lansdowne is one of five GO stations to be built as part of the SmartTrack Stations Program to adapt regional commuter service for urban public transit.

The Ontario Line is an under-construction rapid transit line in Toronto, Ontario, Canada. Its northern terminus will be at Eglinton Avenue and Don Mills Road, at Science Centre station, where it will connect with Line 5 Eglinton. Its southern terminus will be at the existing Exhibition GO Station on the Lakeshore West line. The Ontario Line was announced by the Government of Ontario on April 10, 2019. As of November 2022, the estimated cost for the 15.6-kilometre (9.7 mi) line is CA$17 to $19 billion with an estimated completion in 2031. Originally, the cost was estimated at $10.9 billion with completion by 2027. A groundbreaking ceremony for the project took place on March 27, 2022. Upon opening, the plan is for the line to assume the "Line 3" name, which was used by Line 3 Scarborough until its closure in July 2023.

The Wellington, Grey and Bruce Railway (WG&BR) was a railway in Ontario, Canada. It ran roughly northwest from Guelph to the port town of Southampton on Lake Huron, a distance of 101 miles (163 km). It also had a 66-mile (106 km) branch line splitting off at Palmerston and running roughly westward to Kincardine, another port town. A branch running south from Southampton was built during the construction of the Bruce Nuclear Generating Station in the 1970s.

<span class="mw-page-title-main">Toronto-gauge railways</span> Railway track gauge (1495 mm)

Toronto-gauge railways are tram and rapid transit lines built to Toronto gauge, a broad gauge of 4 ft 10+78 in. This is 2+38 in (60 mm) wider than standard gauge of 4 ft 8+12 in which is by far the most common track gauge in Canada. The gauge is unique to the Greater Toronto Area and is currently used on the Toronto streetcar system and the Toronto subway, both operated by the Toronto Transit Commission. As well, the Halton County Radial Railway, a transport museum, uses the Toronto gauge so its rail line can accommodate its collection of Toronto streetcars and subway trains. Several now-defunct interurban rail systems also once used this gauge.

Durham–Scarborough bus rapid transit (DSBRT) is a future bus rapid transit corridor proposed by Metrolinx for the eastern part of the Greater Toronto Area in Southern Ontario, Canada. The 36-kilometre (22 mi) bus corridor will run from downtown Oshawa to Scarborough Town Centre in Toronto, mainly along Durham Region Highway 2 in Durham Region and Ellesmere Road in the Scarborough district of Toronto. Dedicated bus lanes will be used where feasible. Buses of the Toronto Transit Commission, Durham Region Transit and GO Transit would use the busway. Metrolinx has indicated that the BRT could be easily converted to LRT in the future if required.