Amphibious Combat Vehicle (ACV) | |
---|---|
Type | Amphibious assault vehicle |
Place of origin | United States, Italy |
Service history | |
Used by | United States Marine Corps |
Production history | |
Designer | based on Iveco SuperAV |
Manufacturer | Iveco and BAE Systems |
Specifications | |
Passengers | 3 + 13[ citation needed ] |
Main armament | M2 Browning with Remote controlled weapon station (RCWS), for first 36 pilot units |
Secondary armament | (as a replacement) OTO Melara Hitfist OWS or Leonardo Hitrole |
The Amphibious Combat Vehicle (ACV) is a program initiated by Marine Corps Systems Command to procure an amphibious assault vehicle for the United States Marine Corps to supplement and ultimately replace the aging Assault Amphibious Vehicle (AAV). The program replaces the Expeditionary Fighting Vehicle (EFV) program canceled in 2011. Originally a plan to develop a high-water-speed vehicle, the program has expanded into a multi-phased approach to procure and develop several types of amphibious-capable vehicles to address near and long-term requirements.
The competition for the project ended in 2018 with the birth of an eight-wheel drive armoured fighting vehicle, based on the Italian Iveco SuperAV. Production by BAE Systems and Iveco started in 2020 with 36 units, and 80 vehicles per year from 2021, for five years. [1] [2] [3] [4] [5]
The ACV should have countermeasures able to contend with a full range of direct fire, indirect fire and land mine threats. Visible and thermal signature reduction technologies will be used. Modular protection can be applied as necessary. [6]
The vehicle must have the capability to transition from water to ground operations without tactical pause. It must be able to maneuver with the M1A1 Abrams in a mechanized task force. It must have the capability to destroy combat vehicles similar to itself. Weapons must have sufficient range to engage targets from a standoff distance. Weapons will apply precision fire from a stabilized system. It must provide direct fire support for dismounted infantry in an attack. [6]
The Marine Corps identified speed on water as a top requirement, even at the cost of troop carrying capacity. [7] The ACV must be able to self-deploy from an amphibious assault ship at least 12 miles from shore with 17 Marines aboard. It has to be able to travel 8 knots or faster through seas with waves up to three feet.[ citation needed ]
Initially, the objective of the USMC was to order 1,122 vehicles. As of March 2023, the objective is to procure 632 vehicles. [8]
Given the budget environment and the technological challenges involved, the ACV program was split into two separate phases. The first phase is for immediate upgrade to existing equipment types while testing and trying out new concepts. The second phase is to develop then field a single, ultimate vehicle using new technology and the lessons learned operating the improved vehicles to replace the equipment from the first phase.
The first phase, will consist of several hundred, commercial off-the-shelf wheeled armored vehicles, each costing $3–$4.5 million. It will rely on connectors to get it from ship-to-shore, like the Landing Craft Air Cushion (LCAC) and Joint High Speed Vessel. Relying on connectors to bring the vehicle to a beach allows the sea base to be located 100 miles from enemy threats. The less ambitious Phase 1 ACV will be fielded in the interim, while research and development will begin to refine the features of the Phase 2 ACV. [9]
Phase 1.1, the first increment of Phase 1 of procurement, will buy wheeled personnel carriers. Phase 1.2, the second increment of Phase 1, will include mission-role variants like command-and-control, logistics and weapons variants. These iterations may reintroduce tracks or stay wheeled. [10] ACV 1.1 vehicles will be an operational and commercially available design that is "good enough" to operate. Its water performance will be comparable to the AAV and will have survivability attributes of a Mine-Resistant Ambush Protected (MRAP) vehicle, including high-ground clearance and a V-shaped hull, with the ability to drive with a wheel blown off. For the second lot buy (1.2), engineering and design changes will be made to meet roughly half of desired amphibious vehicle fleet size requirements.
The ACV 1.1 is to carry 10–13 Marines, have a swim capability similar to the AAV and have equal or greater mobility to the M1 Abrams tank. Although tracks are traditionally considered better for all-terrain mobility, the Marines believe wheeled vehicle technology has advanced enough to enhance survivability and mobility in a 35-ton-class platform. The Marine Personnel Carrier technology demonstrator used "in-line" drive technology that enabled all four wheels on each side to pull together much like the way a track does. This demonstrated ability when combined with a higher ground clearance and central tire inflation system, substantially closes the maneuverability gap for wheeled vehicles and results in equal or better maneuverability than the M1A1 and better performance over the AAV, both of which are tracked. [ citation needed ]
Improved technology used to inform requirements to build ACV 1.2 vehicles will later be applied to delivered 1.1 versions to upgrade them to 1.2 standard. [11] [12] Each ACV 1.1 vehicle will have a 3-man crew and two vehicles will carry a reinforced rifle squad. Armament will consist of an M2 .50-caliber machine gun in a remote weapons station, with the potential to install a stabilized dual-mount M2/Mark 19 grenade launcher turret. Potential water speeds are for a 12 nmi (14 mi; 22 km) ship-to-shore capability, at 8 kn (15 km/h). [13]
The second phase is the original high-water-speed effort to develop a vehicle capable of self-deployment from ships, and travel at speeds of 13–15 kn (24–28 km/h) on water, each costing $12–$14 million. This last phase of ACV procurement would be purchasing a high-water-speed vehicle, but only if technologies make it achievable without sacrificing armor and weapons. [14]
This section may be too long and excessively detailed.(January 2015) |
A Request For Information (RFI) was issued to industry in February 2011. The document outlined expected requirements and asked industry for informal design proposals and program methodology feedback. Responses were due by 22 April 2011. [6] An industry day was held on 6 April 2011.
In August 2012, General Dynamics was awarded an ACV Hull Survivability Demonstrator contract for the design, fabrication and test support of a full-scale hull to demonstrate crew-protection technologies. In November 2012, they conducted simulated mine-blast tests on their ACV ballistic hull design, successfully meeting mine-blast survivability requirements. Work concluded by May 2013 and will be used to refine requirements for effective protection against under-vehicle threats. [15]
In April 2013, Defense Advanced Research Projects Agency (DARPA) awarded a $1 million prize to a team in the Fast Adaptable Next-Generation Ground Vehicle (FANG) contest. The team beat out 1,000 other competitors to submit their design for a drivetrain for the ACV. The FANG initiative was to demonstrate a way to procure working systems better than the current defense acquisition process, which frequently leads to delays and cost overruns. The Marines are in charge of the ACV program, so there was no guarantee that the DARPA-crowdsourced mobility drivetrain would result in a vehicle bought by the Corps. [16]
At a roundtable discussion in June 2013, Marine Corps General Jim Amos told the media that the program was still being pursued and that a Request For Proposals (RFP) would be issued in early 2014. The Corps has secured and saved a "moderate amount" of money for early development. With the previous EFV cancelled from cost overruns, the Marines are being cautious to identify trade-offs between requirements and cost for the platform. Amos noted that they were working with contractors to see which type of vehicle would meet requirements without proving too costly. [17]
In January 2013, the ACV team was created and tasked to evaluate the feasibility of building an affordable, survivable amphibious high water speed vehicle. The team includes representatives from over six Department of Defense commands. Their initial requirements and engineering analysis evaluated 198 requirements for the platform. [18]
From July 9–11, 2013, 25 Marines gathered at Marine Corps Base Quantico, Virginia for a Warfighter Requirements Workshop to review the team's capabilities analysis and determine the value of various capabilities. 30 requirements with cost and weight implications were considered "tradable," including armament and armor protection. Safety and design-specific capabilities, like fitting on an amphibious ship, were considered non-tradable. The point of the workshop was to get input from fleet Marines about what capabilities they wanted to prioritize with current financial pressures. Over the next month, the team ordered the preferences and applied actual cost and weight data to determine feasibility recommendations for Marine Corps leaders by the fall. [19]
In March 2015, the Marines revealed that the separate ACV 1.1 and 1.2 increments may be merged into a single vehicle. Given that the winner of phase 1.1 will likely be awarded the 1.2 contract, industry is already planning to make their submissions meet the later requirements early. The main differences between the phases is the 1.2's greater self-deploying capability and more seating capacity. Merging the two phases to meet higher requirements earlier could speed up the acquisition timeline and drive down price, since the quantities for both would be bought in bulk. [20] The Marines released the final RFP for ACV 1.1 in March 2015. [21]
In July 2015, Lockheed Martin revealed it had ended its association with Finnish company Patria on their previous collaborative Havoc offering for the program. [22] Lockheed unveiled their new ACV offering in September 2015. [23]
In October 2017 deputy Marine commandant Lt. Gen. Brian Beaudreault stated "We have to find a solution to getting Marines to shore, from over the horizon, at something greater than seven knots (8 mph)," the swimming speed of the existing Amphibious Assault Vehicle (AAV) and its Amphibious Combat Vehicle (ACV) replacement. Continuing, he said "we must find a high-water-speed vehicle on the surface. We must." [24]
The Deputy Commandant's statements seemly contradict the phased approach to having a non-self deploying vehicle in the ACV 1.1 and then a fully amphibious vehicle in ACV 1.2. The question remains if the Marines are still interested in procuring a high speed connector vehicle after merging ACV 1.1 and 1.2.
In May 2018 a former Marine officer, Jeff Groom, published an article concerning the ACV. Both BAE System's and SAIC's ACV 1.1 test vehicles could self-deploy and swim from a ship, in contradiction to General Dunford's testimony in March 2015. However, there is apparently no longer a need for speed on water as both test vehicles move through the water at 7 knots using traditional water propellers, the same speed as the legacy 1970s AAV. The article questioned the acquisition decision of a vehicle that swims at the same speed as the vehicle it replaces, carries fewer troops and is more expensive. [25]
On 24 November 2015, the Marines selected the BAE Systems and Iveco with Iveco SuperAV vehicle and the SAIC Terrex vehicle to move on to the Engineering and Manufacturing Development (EMD) phase of the ACV 1.1 program, beating out the vehicles from Lockheed Martin, General Dynamics and Advanced Defense Vehicle Systems. The Marine Corps valued swim operations, land operations, carrying capability and force protection equally in the selection process, but the two winners were chosen for emphasis focused on amphibious swim capability since the ACV is "fundamentally an amphibious vehicle". Each company was awarded a contract to build 16 vehicles by late 2016, 13 initially and three more when funding becomes available, with testing beginning in early 2017 and lasting one year. A winner is planned to be selected in 2018 to build 204 vehicles, with the first entering service in 2020 and all delivered by 2023. [26] [27]
In June 2018, the BAE design was selected, with an initial order of 30 ACVs. [28] In June 2019, BAE Systems and Iveco were awarded a contract to develop Command and 30mm gun armed variants. [29]
In October 2020, Iveco announced that the first fleet of 18 ACVs had been delivered to a platoon of Marines after five years of testing development. [2]
In December 2020, the Marine Corps and BAE Systems announced the commencement of full-rate production, with an initial batch of 36, expected to grow to 72 in early 2021, with an option for 80 vehicles per year thereafter. [30] The subcontract for the ACV's remote turret went to Kongsberg Defence Systems with the Protector RT20. [31]
A January 2021 report from the Department of Defense's Director of Operational Test & Evaluation (DOT&E) pointed to several problems with the ACV, including cramped quarters, difficult egress and frequent breakdown. [32]
In August 2022, the U.S. Marine Corps awarded BAE Systems a $88 million contract to build multiple ACV-30 Production Representative Test Vehicles (PRTVs). [33]
The variants include the Squad Maneuver/Fighting Vehicle, Command and Control Vehicle, Recovery and Maintenance Vehicle, and an armed variant with the Kongsberg RT-20 30mm remote weapons station. [34] [35]
The San Antonio class is a class of amphibious transport docks, also called a "landing platform, dock" (LPD), used by the United States Navy. These warships replace the Austin-class LPDs, as well as the Newport-class tank landing ships, the Anchorage-class dock landing ships, and the Charleston-class amphibious cargo ships that have already been retired.
A littoral combat ship (LCS) is either of two classes of relatively small surface vessels designed for near-shore operations by the United States Navy. It was "envisioned to be a networked, agile, stealthy surface combatant capable of defeating anti-access and asymmetric threats in the littorals", although their ability to perform these missions in practice has been called into question.
The Patria AMV is an 8×8 multi-role military vehicle produced by the Finnish defence industry company Patria.
The Type 26 frigate, also known as City-class frigate, is a class of frigates being built for the United Kingdom's Royal Navy, with variants also being built for the Australian and Canadian navies. The programme, known as the Global Combat Ship, was launched by the British Ministry of Defence to partially replace the navy's thirteen Type 23 frigates, and for export. Its primary role is to conduct advanced anti-submarine warfare missions while supporting air defence and general purpose operations. The type is the first naval platform shared between Australia, Canada and the United Kingdom since the pre-Second World War Tribal-class destroyer.
The Expeditionary Fighting Vehicle (EFV) was an amphibious assault vehicle developed by General Dynamics during the 1990s and 2000s for use by the U.S. Marine Corps. It would have been launched at sea, from an amphibious assault ship beyond the horizon, able to transport a full marine rifle squad to shore. It would maneuver cross country with an agility and mobility equal to or greater than the M1 Abrams.
The Assault Amphibious Vehicle (AAV)—official designation AAVP-7A1 —is a fully tracked amphibious landing vehicle manufactured by U.S. Combat Systems.
The Terrex Infantry Carrier Vehicle (ICV) is an armoured fighting vehicle (AFV) developed by ST Engineering of Singapore and Timoney Technology of Ireland, and produced by ST Engineering Land Systems for the Singapore Army as well as by Turkish auto-maker Otokar as the Yavuz (AV-82) for the Turkish military.
The LAV-25 is a member of the LAV II family. It is an eight-wheeled amphibious armored reconnaissance vehicle built by General Dynamics Land Systems and used by the United States Marine Corps and the United States Army.
The Naval Strike Missile (NSM) is an anti-ship and land-attack missile developed by the Norwegian company Kongsberg Defence & Aerospace (KDA).
A joint support ship (JSS) is a multi-role naval vessel capable of launching and supporting joint amphibious and airlift operations. It can also provide command and control, sealift and seabasing, underway replenishment, disaster relief and logistics capabilities for combined land and sea operations.
The Royal Australian Navy, although a significant force in the Asia-Pacific region, is nonetheless classed as a medium-sized navy. Its fleet is based around two main types of surface combatant, with limited global deployment and air power capability. However, in 2009, a white paper, Defending Australia in the Asia Pacific Century: Force 2030, was produced by the Australian government which set out a programme of defence spending that will see significant improvements to the RAN's fleet and capabilities.
The Joint Light Tactical Vehicle (JLTV) is a U.S. Army, U.S. Marine Corps and Special Operations Command program to partially replace the Humvee fleet with a family of more survivable vehicles having a greater payload. Early studies for the JLTV program were approved in 2006. The JLTV program incorporates lessons learned from the earlier Future Tactical Truck Systems program and other associated efforts.
The Spearhead-class expeditionary fast transport (EPF) is a United States Navy–led shipbuilding program to provide a high-speed, shallow draft vessel intended for rapid intra-theater transport of medium-sized cargo payloads. The EPFs can reach speeds of 35–45 knots, and allow the rapid transit and deployment of conventional or special forces, equipment and supplies.
The Marine Personnel Carrier (MPC) is a wheeled armored personnel carrier under development for acquisition by the United States Marine Corps. The program was canceled in 2013 but resurrected in 2014 as part of phase one of the Amphibious Combat Vehicle.
The Armored Gun System (AGS) was a U.S. Army competition in the 1990s to design a light tank to replace the M551 Sheridan and TOW-equipped HMMWVs. It was the ultimate incarnation of several research programs run in the 1970s with the aim of providing air-mobile light infantry forces with the firepower needed to last in the battlefield.
The Iveco SuperAV is an eight-wheel drive tactical vehicle developed by the Italian commercial vehicle company Iveco. A version made in collaboration with BAE Systems was selected by the United States Marine Corps for the Amphibious Combat Vehicle program.
The Lockheed Martin JLTV is a prototype armor-capable vehicle that was one of six original competitors for a Joint Light Tactical Vehicle that will replace the Humvee. The JLTV goal was to provide a family of vehicles able to perform multiple missions protected, sustained and networked mobility for personnel and payload over a full range of operations. Lockheed's JLTV design lost out to the Oshkosh L-ATV in August 2015.
The Unmanned Carrier-Launched Airborne Surveillance and Strike (UCLASS) was a United States Navy program to develop an autonomous carrier-based unmanned combat aerial vehicle providing an unmanned intelligence and strike asset to the fleet. After debate over whether the UCLASS should primarily focus on stealthy bombing or scouting, the Pentagon instead changed the program entirely into the Carrier-Based Aerial-Refueling System (CBARS) to create a UAV for aerial refueling duties to extend the range of manned fighters, which led to the Boeing MQ-25 Stingray.
The Oshkosh L-ATV is a light utility/combat multi-role vehicle that won the US military's Army-led Joint Light Tactical Vehicle (JLTV) program. In the very early stages of the program it was suggested that JLTV would replace the AM General High Mobility Multi-purpose Wheeled Vehicle (HMMWV) on a one-for-one basis. It is now suggested that the JLTV will partly replace the HMMWV, not replace it on a like-for-like basis.
This article incorporates public domain material from websites or documents of the United States Marine Corps .