This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations .(December 2014) |
Barry Railway Class F | |||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
| |||||||||||||||||||||||||||
|
Barry Railway Class F were 0-6-0 ST steam saddle tank engines of the Barry Railway in South Wales. They were designed by J. H. Hosgood and built by a number of British companies.
The purpose of this locomotive was to carry out heavy shunting duties at Barry Docks. They were in effect a saddle tank version of the Class A, a locomotive which had carried out shunting duties at the docks up to this point. 28 examples of the Class F were manufactured, making it the second largest locomotive class used on the Barry Railway, outnumbered only by the B1 Class. They were fitted with a reversing lever, far quicker for changing direction during shunting duties than the customary screw type reverser[ clarification needed ]. They were all shedded at Barry, and they occasionally worked goods and coal traffic on the main line in addition to their main shunting duties.
The locomotives passed to the Great Western Railway in 1922, but were withdrawn between 1926 and 1936. However, since they were still in workable condition many were sold privately, the details of which are listed below. None survived into British Railways ownership, with all examples ultimately scrapped.
Year | Quantity | Manufacturer | Serial Numbers | Barry Numbers | GWR Numbers | Notes |
---|---|---|---|---|---|---|
1890 | 3 | Sharp, Stewart & Co. | 3607–3609 | 47–49 | 710–712 | |
1892 | 2 | Vulcan Foundry | 1346–1347 | 64–65 | 714–715 | |
1894-1895 | 3 | Sharp Stewart | 4050–4502 | 70–72 | 716–718 | |
1900 | 8 | Sharp Stewart | 4593–4600 | 37, 52, 99–104 | 708, 713, 719–724 | |
1905 | 6 | North British Locomotive Company | 16628–16633 | 127–132 | 725–726, 807, 729, 742, 747 | |
1905 | 6 | Hudswell Clarke | 712–717 | 133–138 | 754, 776–780 | |
Barry Numbers | GWR Numbers | Date of Sale | Purchaser | Company Numbers | Scrapped | Notes |
---|---|---|---|---|---|---|
37 | 708 | March 1933 | Powell Duffryn Steam Coal Co Ltd, Bargoed Colliery | 708 | October 1947 | |
48 | 711 | August 1934 | Powell Duffryn Steam Coal Co Ltd, Bargoed Colliery | 711 | July 1960 | |
49 | 712 | March 1933 | Coltness Iron Co Ltd, New Mains Colliery | 11 | 1959 | scrapped by EG Steel Ltd, Hamilton |
52 | 713 | July 1936 | RH Longbotham, Northwood for John Bowes & Partners Ltd | 8 | September 1946 | scrapped by DS Bowran, Gateshead |
64 | 714 | September 1934 | DS Bowran, Gateshead for Backworth Coal Co Ltd | 9 | 1956 | boiler, tanks and wheels used to rebuild 719 |
65 | 715 | August 1932 | Ocean Coal Co Ltd, Deep Navigation Colliery, Treharris | 715 | September 1950 | |
71 | 717 | November 1934 | RH Longbotham, Northwood for John Bowes & Partners Ltd | 9 | withdrawn December 1963 | |
72 | 718 | January 1935 | Ashington Coal Co Ltd | 22 | June 1962 | |
99 | 719 | November 1934 | DS Bowran, Gateshead for Wallsend & Hebburn Coal Co Ltd, Rising Sun Colliery | ? | September 1962 | rebuilt with boiler, tanks and wheels off No. 714 |
100 | 720 | November 1936 | Partridge Jones & John Paton Ltd, Talywain Ironworks, Abersychan | 720 | February 1961 | |
101 | 721 | May 1935 | Ocean Coal Co Ltd, Treorchy Colliery | 721 | between August 1953 and April 1954 | |
102 | 722 | March 1936 | Robert Frazer & Sons Ltd for Cowpen Coal Ltd, Cambois Colliery | 13 | August 1958 | scrapped by Willoughby, Ashington |
103 | 723 | January 1935 | Ashington Coal Co Ltd | 23 | October 1960 | |
104 | 724 | May 1933 | Robert Frazer & Sons Ltd for Hartley Main Collieries Ltd | 24 | April 1960 | scrapped by Ellis, Gateshead |
127 | 725 | November 1934 | RH Longbotham, Northwood for John Bowes & Partners Ltd | 10 | February 1950 | scrapped by Marple & Gillot Ltd, Gateshead |
128 | 726 | February 1933 | RR Paton Ltd for Amalgamated Anthracite Collieries Ltd, Gwauncaegurwen Colliery | 726 | 1957 | |
130 | 729 | September 1932 | Robert Frazer & Sons Ltd for Hartley Main Collieries Ltd | 22 | withdrawn December 1963 | withdrawn at Hazelrigg Colliery |
131 | 742 | August 1932 | Ocean Coal Co Ltd, Treorchy Colliery | 742 | November 1962 | |
132 | 747 | May 1933 | Robert Frazer & Sons Ltd for Hartley Main Collieries Ltd | 25 | ? | |
133 | 754 | January 1937 | Powell Duffryn Associated Collieries Ltd, Bargoed Colliery | 754 | July 1960 | scrapped as side tank |
134 | 776 | February 1933 | Powell Duffryn Steam Coal Co Ltd, Aberaman Colliery | 776 | April 1960 | |
138 | 780 | May 1936 | Burnyeats Brown & Co Ltd, Nine Mile Point Colliery | 780 | June 1964 | |
A tank locomotive or tank engine is a steam locomotive that carries its water in one or more on-board water tanks, instead of a more traditional tender. Most tank engines also have bunkers to hold fuel; in a tender-tank locomotive a tender holds some or all of the fuel, and may hold some water also.
The GWR 5700 Class is a class of 0-6-0 pannier tank steam locomotive built by the Great Western Railway (GWR) and British Railways (BR) between 1929 and 1950. With 863 built, they were the most prolific class of the GWR, and one of the most numerous classes of British steam locomotive.
The 1361 Class were small 0-6-0ST steam locomotives built by the Great Western Railway at their Swindon Works, England, mainly for shunting in docks and other sidings where track curvature was too tight for large locomotives.
The GWR 5600 Class is a class of 0-6-2T steam locomotive built between 1924 and 1928. They were designed by Charles Collett for the Great Western Railway (GWR), and were introduced into traffic in 1924. After the 1923 grouping, Swindon inherited a large and variable collection of locomotives from historic Welsh railway companies, which did not fit into their standardisation programme. GWR boiler inspectors arrived en masse and either condemned the original locomotives or had them rebuilt. The systematic destruction of many examples of locomotives, most still in serviceable condition, followed, but various were worked alongside 5600 Class.
The Great Western Railway (GWR) 4500 Class or Small Prairie is a class of 2-6-2T steam locomotives.
During the 1880s and 1890s, William Dean constructed a series of experimental locomotives to test various new ideas in locomotive construction for the Great Western Railway.
Powlesland and Mason were a company that provided steam locomotives and crews for shunting within Swansea Docks. The first name has sometimes been spelt "Powesland" and it is uncertain which spelling is correct.
The 1661 Class was William Dean's second design of tank locomotive for England's Great Western Railway. Like the 1813 Class which preceded them, there were 40 1661s, turned out of Swindon Works in two batches.
Barry Railway Class B1 were 0-6-2T steam tank locomotives of the Barry Railway in South Wales. They were designed by J. H. Hosgood and built by Sharp Stewart, & Co., Vulcan Foundry and Société Franco-Belge. The locomotive, though similar to the B class, differed in having an increased tank capacity of 1,630 gallons compared with the 1,400 gallons of the B class. The purpose of this was to enable them to take a train of empty wagons from Cadoxton Yard to Trehafod Junction without the need to refill the tank.
Great Western Railway absorbed locomotives gives details of Great Western Railway absorbed locomotives which do not yet have individual pages.
Barry Railway Class L were 0-6-4T steam tank locomotives of the Barry Railway in South Wales. They were designed by John Auld, his only design for the Barry Railway, built by Hawthorn Leslie and Company and were introduced in 1914. They were originally intended for use on heavy coal trains from Trehafod but, as the B1 class proved more than adequate for the work, they were assigned to different duties. These included pulling mineral trains from Rhymney and New Tredegar on the Brecon and Merthyr, from Rogerstone Yard on the Great Western and from Neath Junction, also on the Great Western. They were also to be seen occasionally pulling the suburban service to Cardiff.
Barry Railway Class J were 2-4-2T steam locomotives of the Barry Railway in South Wales. They were designed by J. F. Hosgood, built by both Hudswell Clarke and Sharp, Stewart and Company and were introduced in 1897. Their main use was on the Barry to Cardiff suburban service and had a reputation for always being smartly turned out. They were all shedded at Barry. The locomotives passed to the Great Western Railway in 1922. None survived into British Railways ownership and none have been preserved.
Barry Railway Class G were 0-4-4T steam tank locomotives of the Barry Railway in South Wales. They were designed by J. F. Hosgood, built by both Vulcan Foundry and Sharp Stewart and were introduced in 1892. Initially used for the Barry to Cardiff suburban service, they were transferred to passenger duties on the main line between Barry and Porth as well as the service between Pontypridd Graig and Cardiff Clarence Road, once the 'J' class had displaced them on the Barry to Cardiff run. The company insisted that their passenger locomotives should be smartly turned out and the 'G' class was no exception. The locomotives passed to the Great Western Railway in 1922. None survived into British Railways ownership and none have been preserved.
Barry Railway Class D were 0-8-0 steam tender engines of the Barry Railway in South Wales. They were built to a standard Sharp, Stewart and Company design modified by John Waddington Mann, the Chief Mechanical Engineer for the Swedish & Norwegian Railway. In fact, 20 of these locomotives were ordered by this railway. However the company ran into severe financial difficulty with the result that only one and a half locomotives were paid for by the S&N.
Barry Railway Class K were 0-6-2T steam tank engines of the Barry Railway in South Wales. They were designed by J. H. Hosgood and built by an American company, Cooke Locomotive and Machine Works of Paterson, New Jersey. At the time the Barry wanted to order these locomotives, British manufacturers already had a full order book. In order not to face an indefinite wait, invitations to tender were advertised in the United States. Hosgood's aim was to have a tank engine equivalent to the “Class B1”. However, because of his desire for a speedy delivery, he agreed to certain compromises in the design. The order was placed in April 1899 and was delivered later that year. Like the 0-8-2 tank locomotives Cooke built for the Port Talbot Railway and Docks Company around the same time, the engines had the clean lines and uncluttered appearance of British practice, but had bar frames, the front buffer beam separate from the footplate, as well as cylinder and saddle designs typical of American practice.
Barry Railway Class E were 0-6-0T steam locomotives of the Barry Railway in South Wales. They were designed by J. H. Hosgood and built by Hudswell Clarke. The locomotive was designed for light shunting duties at the docks. Their small size made them particularly suited to shunting on the Barry Island Breakwater. Access to the breakwater was via a rough hewn tunnel whose dimensions and sharp curves made it impossible for the other locomotives to negotiate a way through.
Barry Railway Class C were originally 2-4-0T steam locomotives of the Barry Railway in South Wales. They were designed by J. H. Hosgood and built by Sharp Stewart.
The Taff Vale Railway H class was a class of three 0-6-0T steam tank locomotives designed by Tom Hurry Riches, built by Kitson & Co. and introduced to the Taff Vale Railway in 1884. They were primarily used on the Pwllyrhebog Colliery Incline, and had special tapered boilers for this purpose.
Barry Railway Class A were the first steam tank engines to be built for the Barry Railway in South Wales and had an 0-6-0T wheel arrangement. They were designed by John Wolfe Barry and built by Sharp Stewart.
The GWR Rheidol Tanks are a fleet of 2-6-2T steam locomotives of the Great Western Railway design built between 1923 and 1924. They were designed by the railway's Chief Mechanical Engineer, Charles Collett, for working services on the Vale of Rheidol Railway between Aberystwyth and Devil's Bridge.