Cygnus OA-4

Last updated

OA-4
OA-4 Cygnus AtlasV launch (2015-3497).jpg
An Atlas V 401 launches the S.S. Deke Slayton II.
NamesCRS OA-4
CRS Orb-4 (2008–2015)
Orbital-4 (2008–2015)
Mission type ISS resupply
Operator Orbital ATK
COSPAR ID 2015-072A OOjs UI icon edit-ltr-progressive.svg
SATCAT no. 41101 OOjs UI icon edit-ltr-progressive.svg
Mission duration75 days, 18 hours, 15 minutes
Spacecraft properties
SpacecraftS.S. Deke Slayton II
Spacecraft type Enhanced Cygnus [1]
Manufacturer
Launch mass7,492 kg (16,517 lb) [2]
Payload mass3,513 kg (7,745 lb)
Start of mission
Launch date6 December 2015, 21:44:57 (6 December 2015, 21:44:57)  UTC (4:44:57 pm  EST)
Rocket Atlas V 401 (AV-061)
Launch site Cape Canaveral, SLC41
Contractor United Launch Alliance
End of mission
DisposalDeorbited
Decay date20 February 2016, 16:00 (20 February 2016, 16:00) UTC [3]
Orbital parameters
Reference system Geocentric orbit [4]
Regime Low Earth orbit
Inclination 51.64°
Berthing at ISS
Berthing port Unity nadir
RMS capture9 December 2015, 11:19 UTC [5]
Berthing date9 December 2015, 14:26 UTC
Unberthing date19 February 2016, 10:38 UTC [6]
RMS release19 February 2016, 12:26 UTC
Time berthed71 days, 20 hours, 12 minutes
Orbital Sciences CRS Flight 4 Patch.png
NASA insignia
OA-6  

OA-4, previously known as Orbital-4, was the fourth successful flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its third flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. [7] [8] With the Antares launch vehicle undergoing a redesign following its failure during the Orb-3 launch, OA-4 was launched by an Atlas V launch vehicle. Following three launch delays due to inclement weather beginning on 3 December 2015, OA-4 was launched at 21:44:57 UTC on 6 December 2015. With a liftoff weight of 7,492 kg (16,517 lb), OA-4 became the heaviest payload ever launched on an Atlas V. [9] The spacecraft rendezvoused with and was berthed to the ISS on 9 December 2015. [5] It was released on 19 February 2016 after 72 days at the International Space Station. Deorbit occurred on 20 February 2016 at approximately 16:00 UTC. [3]

Contents

Spacecraft

OA-4 was the fourth of eight flights by Orbital ATK under the Commercial Resupply Services (CRS-1) contract with NASA and the inaugural flight of the larger Enhanced Cygnus PCM. The mission was originally scheduled for 1 April 2015. [10] The Atlas V launch vehicle launched in the 401 vehicle configuration with a four-meter fairing, no solid rocket boosters and a single-engine Centaur upper stage. [7]

In an Orbital ATK tradition, this Cygnus spacecraft was named Deke Slayton II after Deke Slayton, one of NASA's original Mercury Seven astronauts and Director of Flight Operations, who died in 1993. This spacecraft reuses the name Deke Slayton, originally applied to the Orb-3 spacecraft which was lost in an Antares rocket explosion in October 2014. [11]

Manifest

The mission was the first flight of the enhanced variant of Orbital ATK's Cygnus spacecraft, capable of delivering more than 3,500 kg (7,700 lb) of essential crew supplies, equipment and scientific experiments to the International Space Station (ISS).

Total cargo: 3,349 kilograms (7,383 lb) [5] [12]

Total cargo with packing material: 3,513 kg (7,745 lb)

See also

Related Research Articles

<span class="mw-page-title-main">Antares (rocket)</span> Medium-lift expendable rocket by Northrop Grumman

Antares, known during early development as Taurus II, is an American expendable medium-lift launch vehicle developed and built by Orbital Sciences Corporation with financial support from NASA under the Commercial Orbital Transportation Services (COTS) program awarded in February 2008, alongside the company's automated cargo spacecraft, Cygnus. Like other launch vehicles developed by Orbital, Antares leveraged lower-cost, off-the-shelf parts and designs.

<span class="mw-page-title-main">Cygnus (spacecraft)</span> Uncrewed cargo spacecraft developed by Orbital Sciences

Cygnus is an expendable American automated cargo spacecraft designed for International Space Station (ISS) resupply missions. Initially developed by Orbital Sciences Corporation with financial support from NASA under the Commercial Orbital Transportation Services (COTS) program. To create Cygnus, Orbital paired a pressurized cargo module, largely based on the Multi-Purpose Logistics Module, built by Thales Alenia Space and previously used by the Space Shuttle for ISS resupply, with a service module based on Orbital's GEOStar, a satellite bus. After a successful demonstration flight in 2013, Orbital was chosen to receive a Commercial Resupply Services (CRS) contract. A larger Enhanced Cygnus was introduced in 2015. Orbital Sciences was renamed Orbital ATK in 2015 and Northrop Grumman purchased Orbital in 2018 and has continued to operate Cygnus missions. A further enlarged Mission B Cygnus is expected to be introduced in 2025.

<span class="mw-page-title-main">Commercial Resupply Services</span> NASA program for delivery of cargo to the ISS

Commercial Resupply Services (CRS) are a series of flights awarded by NASA for the delivery of cargo and supplies to the International Space Station (ISS) on commercially operated spacecraft.

<span class="mw-page-title-main">Cygnus Orb-2</span> Mid-2014 cargo mission to the ISS

Orbital-2, also known as Orb-2, was the third flight of the Orbital Sciences' uncrewed resupply spacecraft Cygnus, its third flight to the International Space Station, and the fourth launch of the company's Antares launch vehicle. The mission launched from the Mid-Atlantic Regional Spaceport (MARS) on 13 July 2014 at 16:52:14 UTC.

<span class="mw-page-title-main">Cygnus Orb-3</span> Failed late 2014 cargo mission to the ISS

Orbital-3, also known as Orb-3, was an attempted flight of Cygnus, an automated cargo spacecraft developed by United States-based company Orbital Sciences, on 28 October 2014. The mission was intended to launch at 22:22:38 UTC that evening. This flight, which would have been its fourth to the International Space Station and the fifth of an Antares launch vehicle, resulted in the Antares rocket exploding seconds after liftoff.

<span class="mw-page-title-main">Cygnus OA-5</span> Late 2016 cargo mission to the ISS

OA-5, previously known as Orbital-5, was the seventh planned flight of the Orbital Sciences' uncrewed resupply spacecraft Cygnus and its sixth flight to the International Space Station under the Commercial Resupply Services contract with NASA. The mission launched on 17 October 2016 at 23:45:36 UTC. Orbital Sciences and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation System (COTS) program, Orbital designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft; and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

<span class="mw-page-title-main">Cygnus OA-6</span> Early 2016 cargo mission to the ISS

OA-6, previously known as Orbital-6, is the sixth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its fifth flight to the International Space Station under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 23 March 2016 at 03:05:52 UTC.

<span class="mw-page-title-main">Cygnus OA-7</span> Early 2017 cargo mission to the ISS

OA-7, previously known as Orbital-7, is the eighth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its seventh flight to the International Space Station (ISS) under the Commercial Resupply Services contract with NASA. The mission launched on 18 April 2017 at 15:11:26 UTC. Orbital and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation Services (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

<span class="mw-page-title-main">Cygnus OA-8E</span> Late 2017 cargo mission to the ISS

OA-8E was the ninth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its eighth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 12 November 2017 at 12:19:51 UTC. Orbital and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation System (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

<span class="mw-page-title-main">Cygnus OA-9E</span> Mid-2018 cargo mission to the ISS

OA-9E was the tenth flight of the Cygnus, an uncrewed resupply spacecraft. The flight was launched by Orbital ATK (OA), which was purchased by Northrop Grumman during the mission. It was the ninth flight under the Commercial Resupply Services (CRS) contract with NASA and conducted under an extension, leading to the "E" in the mission name. The mission launched on 21 May 2018 at 08:44:06 UTC.

<span class="mw-page-title-main">Cygnus NG-10</span> Late 2018 cargo mission to the ISS

NG-10, previously known as OA-10E, is the eleventh flight of the Northrop Grumman uncrewed resupply spacecraft Cygnus and its tenth flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 November 2018, at 09:01:31 UTC. This particular mission is part of an extension of the initial CRS contract that enables NASA to cover the ISS resupply needs until the Commercial Resupply Services-2 (CRS-2) contract enters in effect.

<span class="mw-page-title-main">Cygnus NG-11</span> Mid-2019 cargo mission to the ISS

NG-11, previously known as OA-11, is the twelfth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its eleventh flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 April 2019 at 20:46:07 UTC. This is the last mission from the extended CRS-1 contract; follow-up missions are part of the CRS-2 contract. Cygnus NG-11 was also the first mission to load critical hardware onto Cygnus within the last 24 hours prior to launch, a new Antares feature.

<span class="mw-page-title-main">Cygnus NG-12</span> 2019 American resupply spaceflight to the ISS

NG-12, previously known as OA-12, was the thirteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its twelfth Commercial Resupply Services flight to the International Space Station (ISS) for NASA. The mission launched on 2 November 2019 at 13:59:47 UTC). This was the first launch of Cygnus under the Commercial Resupply Services 2 (CRS-2) contract.

<span class="mw-page-title-main">Cygnus NG-13</span> 2020 American resupply spaceflight to the ISS

NG-13, previously known as OA-13, was the fourteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its thirteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 15 February 2020 at 20:21:01 UTC after nearly a week of delays. This is the second launch of Cygnus under the CRS-2 contract.

<span class="mw-page-title-main">Cygnus NG-15</span> 2021 American resupply spaceflight to the ISS

Cygnus NG-15, previously known as OA-15, was the fifteenth launch of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 20 February 2021 at 17:36:50 UTC. This is the fourth launch of Cygnus under the CRS-2 contract.

<span class="mw-page-title-main">Cygnus NG-16</span> 2021 American resupply spaceflight to the ISS

NG-16, previously known as OA-16, was the sixteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fifteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission was launched on 10 August 2021 at 22:01:05 UTC, for a (planned) 90-day mission at the ISS. This was the fifth launch of Cygnus under the CRS-2 contract.

<span class="mw-page-title-main">Cygnus NG-17</span> 2022 American resupply spaceflight to the ISS

NG-17, previously known as OA-17, was the seventeenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 19 February 2022 at 17:40:03 UTC. It was the sixth launch of Cygnus under the CRS-2 contract.

<span class="mw-page-title-main">Cygnus NG-18</span> 2022 American resupply spaceflight to the ISS

NG-18 was the eighteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its seventeenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission successfully launched on 7 November 2022 at 10:32:42 UTC. This was the seventh launch of Cygnus under the CRS-2 contract.

<span class="mw-page-title-main">Cygnus NG-19</span> Late 2023 cargo spacecraft mission to ISS

NG-19 was the nineteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its eighteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission launched on 2 August 2023 at 00:31:14 UTC. This was the eighth launch of Cygnus under the CRS-2 contract.

References

  1. "Space industry giants Orbital upbeat ahead of Antares debut". NASASpaceFlight.com. 22 February 2012. Retrieved 31 May 2021.
  2. "International Space Station and crew awaiting Atlas 5 launch of Cygnus". Spaceflight Now. 29 November 2015. Retrieved 2 December 2015.
  3. 1 2 "At ~11 am ET today..." twitter.com. Orbital ATK. 20 February 2016. Retrieved 20 February 2016.
  4. "Cygnus ORB-4". N2YO.com. Retrieved 9 December 2015.
  5. 1 2 3 Ray, Justin (9 December 2015). "U.S. resupply of space station successfully resumes". Spaceflight Now. Retrieved 9 December 2015.
  6. Evans, Ben (19 February 2016). "As OA-4 Cygnus Departs, Commercial Cargo Providers Prepare for Busy Visiting Vehicle Manifest". AmericaSpace. Retrieved 20 February 2016.
  7. 1 2 "Launch Schedule". Spaceflight Now. Retrieved 26 January 2015.
  8. "International Space Station Flight Schedule". SEDS. 15 May 2013.
  9. Ray, Justin (6 December 2015). "Atlas 5 rocket sends Cygnus in hot pursuit of space station". Spaceflight Now. Retrieved 7 December 2015.
  10. Graham, William; Bergin, Chris (28 October 2014). "Orbital's Antares fails seconds after launch". NASASpaceFight.com.
  11. "Orbital ATK's Cargo Delivery Mission to International Space Station Set to Launch". Orbital ATK. 1 December 2015. Archived from the original on 8 December 2015. Retrieved 2 December 2015.
  12. "Orbital ATK CRS-4 Mission Overview" (PDF). NASA. Archived from the original (PDF) on 5 March 2016. Retrieved 9 December 2015.PD-icon.svg This article incorporates text from this source, which is in the public domain .
  13. "Low Earth Orbiting Navigation Experiment for Spacecraft Testing Autonomous Rendezvous and Docking (LONESTAR)". NASA. Retrieved 12 December 2015.PD-icon.svg This article incorporates text from this source, which is in the public domain .

Commons-logo.svg Media related to Cygnus 5 at Wikimedia Commons