Cygnus Orb-2

Last updated

Orbital-2
Cygnus CRS Orb-2 at ISS before grappling.jpg
Canadarm2 approaches the S.S. Janice Voss
Mission type ISS logistics
Operator Orbital
COSPAR ID 2014-039A
SATCAT no. 40084
Mission duration34 days, 20 hours, 29 minutes
Spacecraft properties
SpacecraftS.S. Janice Voss
Spacecraft type Standard Cygnus [1]
Manufacturer
Launch mass5,644 kg (12,443 lb)
Payload mass1,494 kg (3,294 lb)
Start of mission
Launch date13 July 2014, 16:52:14 UTC [2]
Rocket Antares 120 [1]
Launch site Wallops Pad 0A
ContractorOrbital
End of mission
DisposalDeorbited
Decay date17 August 2014, 13:22 UTC
Orbital parameters
Reference system Geocentric orbit [3]
Regime Low Earth orbit
Inclination 51.64°
Berthing at the International Space Station
Berthing port Harmony nadir
RMS capture16 July 2014, 10:36 UTC
Berthing date16 July 2014, 12:53 UTC
Unberthing date15 August 2014, 09:14 UTC
RMS release15 August 2014, 10:40 UTC
Time berthed29 days, 20 hours, 21 minutes
Orbital Sciences CRS Flight 2 Patch.png
NASA insignia  
  Orbital-1
Orbital-3  

Orbital-2, [4] [5] also known as Orb-2, was the third flight of the Orbital Sciences' uncrewed resupply spacecraft Cygnus, its third flight to the International Space Station, and the fourth launch of the company's Antares launch vehicle. The mission launched from the Mid-Atlantic Regional Spaceport (MARS) on 13 July 2014 at 16:52:14 UTC.

Contents

Spacecraft

This was the second of eight scheduled flights by Orbital Sciences under the Commercial Resupply Services (CRS-1) contract with NASA. It was the last planned usage of the enhanced Castor 30B second stage for this CRS Orb-x series.

In an Orbital Sciences tradition, the Cygnus spacecraft was named the S.S. Janice Voss after Janice E. Voss, a NASA astronaut and Orbital employee who died on 6 February 2012. [6]

Launch and early operations

The mission was originally scheduled to launch on 1 May 2014 [7] but the launch was delayed to 6 May 2014, then to 17 June 2014, then to 1 July 2014, again to 10 July 2014, again to 11 July 2014 due to test stand failure of an AJ-26 engine, to 12 July 2014 due to weather, and finally to 13 July 2014, again due to weather. [8] Orb-2 launched on 13 July 2014 at 16:52:14 UTC with berthing to the ISS following 3 days later on 16 July 2014. [9] The Cygnus Orb-2 delivered 1,650 kg (3,640 lb) of cargo to ISS and disposed of about 1,470 kg (3,240 lb) of trash through destructive reentry. [10]

Mission highlights

Manifest

Total weight of cargo: 1,650 kg (3,640 lb) [3] [11]

Images

See also

Related Research Articles

Antares (rocket) Launch vehicle produced by Orbital Sciences Corporation from the United States

Antares, known during early development as Taurus II, is an expendable launch system developed by Orbital Sciences Corporation and the Yuzhnoye Design Bureau to launch the Cygnus spacecraft to the International Space Station as part of NASA's COTS and CRS programs. Able to launch payloads heavier than 8,000 kg (18,000 lb) into low-Earth orbit, Antares is currently the largest rocket operated by Northrop Grumman. Antares launches from the Mid-Atlantic Regional Spaceport and made its inaugural flight on April 21, 2013.

Cygnus (spacecraft) Uncrewed cargo spacecraft developed by Orbital Sciences

The Cygnus spacecraft is an expendable American cargo spacecraft developed by Orbital Sciences Corporation and now manufactured and launched by Northrop Grumman Space Systems as part of NASA's Commercial Resupply Services (CRS) program. It is launched by Northrop Grumman's Antares rocket or ULA's Atlas V and is designed to transport supplies to the International Space Station (ISS) following the retirement of the American Space Shuttle. Since August 2000, ISS resupply missions have been regularly flown by the Russian Progress spacecraft, as well as by the European Automated Transfer Vehicle, and the Japanese H-II Transfer Vehicle. With the Cygnus spacecraft and the SpaceX Dragon, NASA seeks to increase its partnerships with domestic commercial aviation and aeronautics industry.

Commercial Resupply Services Series of contracts awarded by NASA from 2008-present for delivery of cargo and supplies to the ISS

Commercial Resupply Services (CRS) are a series of flights awarded by NASA for the delivery of cargo and supplies to the International Space Station (ISS) on commercially operated spacecraft. The first CRS contracts were signed in 2008 and awarded $1.6 billion to SpaceX for twelve cargo Dragon and $1.9 billion to Orbital Sciences for eight Cygnus flights, covering deliveries to 2016. The Falcon 9 and Antares rockets were also developed under the CRS program to deliver cargo spacecraft to the ISS.

Cygnus Orb-1 International Space Station (ISS) resupply mission

Orbital-1, also known as Orb-1, was the second flight of the Orbital Sciences Cygnus cargo spacecraft, its second flight to the International Space Station (ISS) and the third launch of the company's Antares launch vehicle. The mission launched on 9 January 2014 at 18:07:05 UTC.

Cygnus Orb-3 Failed International Space Station (ISS) resupply mission

Orbital-3, also known as Orb-3, was an attempted flight of Cygnus, an automated cargo spacecraft developed by United States-based company Orbital Sciences, on 28 October 2014. The mission was intended to launch at 22:22:38 UTC that evening. This flight, which would have been its fourth to the International Space Station and the fifth of an Antares launch vehicle, resulted in the Antares rocket exploding seconds after liftoff.

Cygnus OA-4 International Space Station (ISS) resupply mission

OA-4, previously known as Orbital-4, was the fourth successful flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its third flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. With the Antares launch vehicle undergoing a redesign following its failure during the Orb-3 launch, OA-4 was launched by an Atlas V launch vehicle. Following three launch delays due to inclement weather beginning on 3 December 2015, OA-4 was launched at 21:44:57 UTC on 6 December 2015. With a liftoff weight of 7,492 kg (16,517 lb), OA-4 became the heaviest payload ever launched on an Atlas V. The spacecraft rendezvoused with and was berthed to the ISS on 9 December 2015. It was released on 19 February 2016 after 72 days at the International Space Station. Deorbit occurred on 20 February 2016 at approximately 16:00 UTC.

Cygnus OA-5 International Space Station (ISS) resupply mission

OA-5, previously known as Orbital-5, was the seventh planned flight of the Orbital Sciences' uncrewed resupply spacecraft Cygnus and its sixth flight to the International Space Station under the Commercial Resupply Services contract with NASA. The mission launched on 17 October 2016 at 23:45:36 UTC. Orbital Sciences and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation System (COTS) program, Orbital designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft; and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

Cygnus OA-6 International Space Station (ISS) resupply mission

OA-6, previously known as Orbital-6, is the sixth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its fifth flight to the International Space Station under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 23 March 2016 at 03:05:52 UTC.

Cygnus OA-7 International Space Station (ISS) resupply mission

OA-7, previously known as Orbital-7, is the eighth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its seventh flight to the International Space Station (ISS) under the Commercial Resupply Services contract with NASA. The mission launched on 18 April 2017 at 15:11:26 UTC. Orbital and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation Services (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

Cygnus OA-8E International Space Station (ISS) resupply mission

OA-8E was the ninth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its eighth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 12 November 2017 at 12:19:51 UTC. Orbital and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation System (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

Cygnus OA-9E International Space Station (ISS) resupply mission

OA-9E was the tenth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its ninth flight to the International Space Station (ISS) under the Commercial Resupply Services with NASA. The mission launched on 21 May 2018 at 08:44:06 UTC. Orbital ATK and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station. Under the Commercial Orbital Transportation Services (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.

Cygnus NG-10 Cygnus International Space Station (ISS) resupply mission

NG-10, previously known as OA-10E, is the eleventh flight of the Northrop Grumman uncrewed resupply spacecraft Cygnus and its tenth flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 November 2018, at 09:01:31 UTC. This particular mission is part of an extension of the initial CRS contract that enables NASA to cover the ISS resupply needs until the Commercial Resupply Services-2 (CRS-2) contract enters in effect.

Cygnus NG-11 International Space Station (ISS) resupply mission

NG-11, previously known as OA-11, is the twelfth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its eleventh flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 April 2019 at 20:46:07 UTC. This is the last mission from the extended CRS-1 contract; follow-up missions are part of the CRS-2 contract. Cygnus NG-11 was also the first mission to load critical hardware onto Cygnus within the last 24 hours prior to launch, a new Antares feature.

Cygnus NG-13 International Space Station (ISS) resupply mission

NG-13, previously known as OA-13, was the fourteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its thirteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 15 February 2020 at 20:21:01 UTC after nearly a week of delays. This is the second launch of Cygnus under the CRS-2 contract.

Cygnus NG-14 International Space Station (ISS) resupply mission

NG-14, previously known as OA-14, was the fifteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission was launched on 3 October 2020, at 01:16:14 UTC.

Cygnus NG-15 American International Space Station (ISS) resupply mission

NG-15, previously known as OA-15, was the fifteenth launch of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 20 February 2021 at 17:36:50 UTC. This is the fourth launch of Cygnus under the CRS-2 contract.

Cygnus NG-16 International Space Station (ISS) resupply mission

Cygnus NG-16, previously known as Cygnus OA-16, was the sixteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fifteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission was launched on 10 August 2021 at 22:01:05 UTC, for a (planned) 90-day mission at the ISS. This was the fifth launch of Cygnus under the CRS-2 contract.

Cygnus NG-17 Uncrewed resupply spacecraft

Cygnus NG-17, previously known as Cygnus OA-17, is the seventeenth planned flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission is scheduled to launch on 19 February 2022. It is the sixth launch of Cygnus under the CRS-2 contract.

Cygnus NG-18 Uncrewed resupply spacecraft

NG-18 is the eighteenth planned flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission is planned for launch in August 2022. This is the seventh launch of Cygnus under the CRS-2 contract.

Cygnus NG-19 Uncrewed resupply spacecraft

NG-19 is the nineteenth planned flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission is planned to launch in Autumn 2023. This is the eighth launch of Cygnus under the CRS-2 contract.

References

  1. 1 2 Bergin, Chris (22 February 2012). "Space industry giants Orbital upbeat ahead of Antares debut". NasaSpaceFlight.com. Retrieved 29 March 2012.
  2. "Orbital Sciences - Cygnus Orb-2 Mission Overview". Spaceflight101. Archived from the original on 19 July 2016. Retrieved 4 April 2020.CS1 maint: unfit URL (link)
  3. 1 2 3 "Orbital-2 Mission Media Press Kit" (PDF) (Press release). NASA. July 2014.PD-icon.svgThis article incorporates text from this source, which is in the public domain .
  4. "Launch Schedule". Spaceflight Now. 3 October 2012. Archived from the original on 11 September 2013. Retrieved 3 October 2012.
  5. "International Space Station Flight Schedule". SEDS. 15 May 2013.
  6. Rawcliffe, Britt (11 July 2014). "After delays, Orbital Sciences Corporation's Antares rocket set to launch". Spaceflight Insider. Retrieved 11 July 2014.
  7. "Launch Schedule". Spaceflight Now. Archived from the original on 11 September 2013. Retrieved 29 May 2014.
  8. "ISS Commercial Resupply Services Mission (Orb-2)". Orbital Sciences. Archived from the original on 7 April 2014.
  9. Clark, Stephen (22 May 2014). "Antares rocket engine damaged in test mishap". Spaceflight Now. Retrieved 29 May 2014.
  10. Beneski, Barron (1 October 2012). "Orbital Begins Antares Rocket Operations at Mid-Atlantic Regional Spaceport". Orbital Sciences. Retrieved 2 October 2012.
  11. Garner, Rob (11 July 2014). "Orb-2 Science Briefing Highlights". NASA. Archived from the original on 22 December 2015. Retrieved 11 July 2014.PD-icon.svgThis article incorporates text from this source, which is in the public domain .