Mission type | ISS logistics |
---|---|
Operator |
|
COSPAR ID | 2018-046A |
SATCAT no. | 43474 |
Mission duration | 70 days, 32 minutes |
Spacecraft properties | |
Spacecraft | S.S. J.R. Thompson |
Spacecraft type | Enhanced Cygnus [1] [2] |
Manufacturer |
|
Launch mass | 6,172 kg (13,607 lb) [3] |
Start of mission | |
Launch date | 21 May 2018, 08:44:06 UTC [4] |
Rocket | Antares 230 [2] [5] [6] |
Launch site | Wallops Pad 0A |
Contractor | Orbital ATK |
End of mission | |
Disposal | Deorbited |
Decay date | 30 July 2018, 09:17[7] | UTC
Orbital parameters | |
Reference system | Geocentric orbit |
Regime | Low Earth orbit |
Inclination | 51.66° |
Berthing at the International Space Station | |
Berthing port | Unity nadir |
RMS capture | 24 May 2018, 09:26 UTC [8] |
Berthing date | 24 May 2018, 12:13 UTC |
Unberthing date | 15 July 2018, 10:20 UTC |
RMS release | 15 July 2018, 12:37 UTC [9] |
Time berthed | 52 days, 54 minutes |
Cargo | |
Mass | 3,350 kg (7,390 lb) [10] |
Pressurised | 3,268 kg (7,205 lb) |
Unpressurised | 82 kg (181 lb) |
NASA insignia |
OA-9E was the tenth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its ninth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS contract) with NASA. [11] [12] The mission launched on 21 May 2018 at 08:44:06 UTC. Orbital ATK and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station. Under the Commercial Orbital Transportation Services (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space. [13]
The COTS demonstration mission was successfully conducted in September 2013, and Orbital commenced operational ISS cargo missions under the Commercial Resupply Service (CRS) program with two missions in 2014. Regrettably, the third operational mission, Orb CRS-3, resulted was not successful due to spectacular Antares failure during launch. The company decided to discontinue the Antares 100 series and accelerate the introduction of a new propulsion. The Antares system will be upgraded with newly built RD-181 first-stage engines to provide greater payload performance and increased reliability. [5]
In the meantime, the company had contracted with United Launch Alliance for an Atlas V launch of CRS OA-4 in late 2015 from Cape Canaveral, Florida, with a second Atlas V Cygnus launch in 2016. [5] [6] The company had planned Cygnus missions for the first (CRS OA-5), second (CRS OA-6) and fourth quarters (CRS OA-7) of 2016. Two of which flew on the new Antares 230 and one on the aforementioned second Atlas V. These three missions enabled Orbital ATK to cover their initial CRS contracted payload obligation. [6] [14] This particular mission, known as CRS OA-9E, is part of an extension program that will enable NASA to cover the ISS resupply needs until the Commercial Resupply Services-2 (CRS-2 contract) enters in effect, and thus the "E" indicates that it actually is an extension above the originally contracted payload transport. [14]
Production and integration of Cygnus spacecraft is performed in Dulles, Virginia. The Cygnus service module is mated with the pressurized cargo module at the launch site, and mission operations are conducted from control centers in Dulles, Virginia and Houston, Texas. [13]
This is the ninth of ten flights by Orbital ATK under the Commercial Resupply Services contract with NASA, and it is considered an extension over the originally contracted flights. This is the sixth flight of the Enhanced sized Cygnus PCM. [6] The mission launched on 21 May 2018. [15] [16]
In an Orbital ATK tradition, this Cygnus spacecraft was named the S.S. J.R. Thompson after the former president and chief executive officer at Orbital Sciences Corp. who died in 2017. Thompson served in multiple management positions at Orbital, overseeing development of the Antares rocket and other vehicles in the company's launcher family. [17]
NASA contracted for the CRS OA-9E mission from Orbital ATK and therefore determined the primary payload, date/time of launch, and orbital parameters for the Cygnus space capsule. CRS OA-9E carried a total of 3,350 kg (7,390 lb) of material into orbit. This includes 3,268 kg (7,205 lb) of pressurised cargo with packaging bound for the International Space Station, and 82 kg (181 lb) of unpressurised cargo. The unpressurised cargo consists of a Nanoracks deployer and six CubeSats which will be released after Cygnus unberths from the ISS.
The following is a breakdown of cargo bound for the ISS: [10]
Several days before unberthing operations were underway, a unique task was performed by Cygnus—a test of the spacecraft’s reboost capability. It was the first time a commercial vehicle performed this task, which is typically handled by Russian Progress spacecraft.
At 4:25 p.m. EDT (20:25 GMT) July 10, Cygnus’s main engine was fired for about 50 seconds. Although it was just a brief reboost test, it still raised the altitude of about 295 feet, according to NASA. [18]
Antares, known during early development as Taurus II, is an expendable launch system developed by Orbital Sciences Corporation and the Yuzhnoye Design Bureau to launch the Cygnus spacecraft to the International Space Station as part of NASA's COTS and CRS programs. Able to launch payloads heavier than 8,000 kg (18,000 lb) into low Earth orbit, Antares is currently the largest rocket operated by Northrop Grumman. Antares launches from the Mid-Atlantic Regional Spaceport and made its inaugural flight on April 21, 2013.
Cygnus is an expendable American cargo spacecraft developed by Orbital Sciences Corporation and now manufactured and launched by Northrop Grumman Space Systems as part of NASA's Commercial Resupply Services (CRS) program. It is launched by Northrop Grumman's Antares rocket or ULA's Atlas V and is designed to transport supplies to the International Space Station (ISS) following the retirement of the American Space Shuttle. Since August 2000, ISS resupply missions have been regularly flown by the Russian Progress spacecraft, as well as by the European Automated Transfer Vehicle, and the Japanese H-II Transfer Vehicle. With the Cygnus spacecraft and the SpaceX Dragon, NASA seeks to increase its partnerships with domestic commercial aviation and aeronautics industry.
Commercial Resupply Services (CRS) are a series of flights awarded by NASA for the delivery of cargo and supplies to the International Space Station (ISS) on commercially operated spacecraft. The first CRS contracts were signed in 2008 and awarded $1.6 billion to SpaceX for twelve cargo Dragon and $1.9 billion to Orbital Sciences for eight Cygnus flights, covering deliveries to 2016. The Falcon 9 and Antares rockets were also developed under the CRS program to deliver cargo spacecraft to the ISS.
Orbital-3, also known as Orb-3, was an attempted flight of Cygnus, an automated cargo spacecraft developed by United States-based company Orbital Sciences, on 28 October 2014. The mission was intended to launch at 22:22:38 UTC that evening. This flight, which would have been its fourth to the International Space Station and the fifth of an Antares launch vehicle, resulted in the Antares rocket exploding seconds after liftoff.
OA-4, previously known as Orbital-4, was the fourth successful flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its third flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. With the Antares launch vehicle undergoing a redesign following its failure during the Orb-3 launch, OA-4 was launched by an Atlas V launch vehicle. Following three launch delays due to inclement weather beginning on 3 December 2015, OA-4 was launched at 21:44:57 UTC on 6 December 2015. With a liftoff weight of 7,492 kg (16,517 lb), OA-4 became the heaviest payload ever launched on an Atlas V. The spacecraft rendezvoused with and was berthed to the ISS on 9 December 2015. It was released on 19 February 2016 after 72 days at the International Space Station. Deorbit occurred on 20 February 2016 at approximately 16:00 UTC.
OA-5, previously known as Orbital-5, was the seventh planned flight of the Orbital Sciences' uncrewed resupply spacecraft Cygnus and its sixth flight to the International Space Station under the Commercial Resupply Services contract with NASA. The mission launched on 17 October 2016 at 23:45:36 UTC. Orbital Sciences and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation System (COTS) program, Orbital designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft; and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.
OA-6, previously known as Orbital-6, is the sixth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its fifth flight to the International Space Station under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 23 March 2016 at 03:05:52 UTC.
OA-7, previously known as Orbital-7, is the eighth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its seventh flight to the International Space Station (ISS) under the Commercial Resupply Services contract with NASA. The mission launched on 18 April 2017 at 15:11:26 UTC. Orbital and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation Services (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.
OA-8E was the ninth flight of the Orbital ATK uncrewed resupply spacecraft Cygnus and its eighth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 12 November 2017 at 12:19:51 UTC. Orbital and NASA jointly developed a new space transportation system to provide commercial cargo resupply services to the International Space Station (ISS). Under the Commercial Orbital Transportation System (COTS) program, then Orbital Sciences designed and built Antares, a medium-class launch vehicle; Cygnus, an advanced maneuvering spacecraft, and a Pressurized Cargo Module which is provided by Orbital's industrial partner Thales Alenia Space.
NG-10, previously known as OA-10E, is the eleventh flight of the Northrop Grumman uncrewed resupply spacecraft Cygnus and its tenth flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 November 2018, at 09:01:31 UTC. This particular mission is part of an extension of the initial CRS contract that enables NASA to cover the ISS resupply needs until the Commercial Resupply Services-2 (CRS-2) contract enters in effect.
NG-11, previously known as OA-11, is the twelfth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its eleventh flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 17 April 2019 at 20:46:07 UTC. This is the last mission from the extended CRS-1 contract; follow-up missions are part of the CRS-2 contract. Cygnus NG-11 was also the first mission to load critical hardware onto Cygnus within the last 24 hours prior to launch, a new Antares feature.
NG-12, previously known as OA-12, was the thirteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its twelfth Commercial Resupply Services flight to the International Space Station (ISS) for NASA. The mission launched on 2 November 2019 at 13:59:47 UTC). This was the first launch of Cygnus under the Commercial Resupply Services 2 (CRS-2) contract.
NG-13, previously known as OA-13, was the fourteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its thirteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-1) contract with NASA. The mission launched on 15 February 2020 at 20:21:01 UTC after nearly a week of delays. This is the second launch of Cygnus under the CRS-2 contract.
NG-14, previously known as OA-14, was the fifteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station under the Commercial Resupply Services (CRS-1) contract with NASA. The mission was launched on 3 October 2020, at 01:16:14 UTC.
NG-15, previously known as OA-15, was the fifteenth launch of the Northrop Grumman robotic resupply spacecraft Cygnus and its fourteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 20 February 2021 at 17:36:50 UTC. This is the fourth launch of Cygnus under the CRS-2 contract.
Cygnus NG-16, previously known as Cygnus OA-16, was the sixteenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its fifteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission was launched on 10 August 2021 at 22:01:05 UTC, for a (planned) 90-day mission at the ISS. This was the fifth launch of Cygnus under the CRS-2 contract.
Cygnus NG-17, previously known as Cygnus OA-17, is the seventeenth flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS) contract with NASA. The mission launched on 19 February 2022. It is the sixth launch of Cygnus under the CRS-2 contract.
NG-18 is the eighteenth planned flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission is planned for launch in August 2022. This is the seventh launch of Cygnus under the CRS-2 contract.
NG-19 is the nineteenth planned flight of the Northrop Grumman robotic resupply spacecraft Cygnus and its sixteenth flight to the International Space Station (ISS) under the Commercial Resupply Services (CRS-2) contract with NASA. The mission is scheduled to launch in February 2023. This is the eighth launch of Cygnus under the CRS-2 contract.