Handri-Neeva

Last updated

Handri Neeva Sujala Sravanthi project
Location
Country India
Physical characteristics
SourceSrisailam reservoir
  location 15°54′31″N78°14′08″E / 15.90861°N 78.23556°E / 15.90861; 78.23556 (Handri Neeva Canal)
  elevation253 m (830 ft)
Mouth Malyala
Length569 km (354 mi)
Discharge 
  locationAdivipalli
  average164.8 m3/s (5,820 cu ft/s)

Handri-Neeva Sujala Sravanthi project is the longest water canal project in the region of Rayalaseema, Andhra Pradesh, India. The project was conceived to provide a reliable irrigation and drinking water supply for the region through drawing flood waters from the Srisailam reservoir. [1] [2]

Contents

The first phase of the canal begins at Malyala and irrigates six lakh acres in four districts of Rayalaseema, while the second phase provides irrigation facilities and drinking water for Chittoor district. [3] This canal links the Handri, Penna, Chitravathi, Papagni, Mandavya, Bahuda, Cheyyeru, Gargeya, Vedavati, Palar and several smaller rivers in the Rayalaseema region. The canal is located in the Kurnool, Ananthapur, Kadapa, and Chittoor districts. [1] The canal feeds several reservoirs and water tanks in the region. More than 50 Tmcft of water is required to meet the region's drinking and irrigation water requirements.

History

The project was originally conceived by Englishman Sir Arthur Cotton in the late 19th century. [4] However, designs were only finalised during the term of N. T. Rama Rao in the 1980s and 1990s. [5] Budget allocation began in 2004 during the tenure of Y.S.Rajasekhara Reddy. [6]

The first phase of construction of the project began in 2005, during the tenure of Shri Y. S. Rajasekhara Reddy [7] [8] The project is designed to utilise surplus water from the Krishna River; [1] [8] however, this river is unreliable and does not ensure consistent allocation of water to the drought-prone Rayalaseema and Nellore districts. Several political members had previously demanded speedy completion of irrigation projects in Rayalaseema. [7] The two riparian states of the Krishna River, Andhra Pradesh and Telangana, are involved in a dispute over sharing water of the river. [9]

The Project

The lift canal has a length of nearly 550 km. The canal starts from the back waters of the Srisailam reservoir at Malyala and is routed along the hill ridges up to the highlands in Chittoor district via the many lifts and pumping stations in the Kurnool, Ananthapur and Kadapa districts. [10] The canal feeds many tanks used for drinking water and irrigation. The project plans to draw nearly 40 Tmcft of water annually from the Krishna River.

The minimum draw down level for the Malyala pump house is 830 feet (253 m) MSL. [11] The project's annual operational requirement is 653 MW and 1.9 billion KWh of electrical energy, which is used to pump nearly 30 Tmcft of water.

The first phase of the canal (220 kilometers in length), from Srisailam to Jeedipalli reservoir, has been completed. This reservoir is located at Chinna Mushtur village in Ananthapur district. 3 balancing reservoirs constructed in Phase 1. These include Krishnagiri (Kurnool District), Pathikonda Reservoir (Kurnool District), and Jeedipalli Reservoir (Anantapuramu District).

A view of Gollapalli Reservoir Gollapalli Reservoir.jpg
A view of Gollapalli Reservoir

The second phase (349 kilometers in length, 75% completed) of the main canal leading up to Adivipalli Reservoir in Chittoor district. Running at full capacity, it is predicted to give IP to 404,500 acres and drinking water facilities for 23 lakh people in 293 villages in the region. It will use 26 Tmcft of water to this effect, diverted through the 3 branch canals Madakasira, Punganur and Niva and the 3 distributaries Atmakuru, Thamballapalli, Vayalpadu. In the upland areas of Rayalaseema District (Anantapur, Kadapa and Chittoor), the canal will fill six reservoirs - Veligallu Dam Reservoir and 5 balancing reservoirs constructed in Phase-II, Gollapalli Reservoir (Anantapuramu), Cherlopalli Reservoir (Anantapuramu), Marala Reservoir (Anantapuramu), 4. Srinivasapuram Reservoir (Kadapa), and Adivipalli Reservoir (Chittoor).

The Handri-Neeva can also feed by gravity the Tungabhdra high level canal and many other medium & minor tanks in Penna River basin to provide drinking water during severe droughts. This canal also feeds water to Bhairivani Tippa reservoir and other medium & minor irrigation tanks located in Krishna river basin of Ananthapur district to ensure the sufficient water in the area even during droughts. Thus, the canal also serves as an alternate source to feed Krishna river water to major, medium & minor irrigation projects, which have access to nearly 45 Tmcft of Krishna water under Bachawat tribunal award allocations.

To make the lift canal operational for catering to drinking water needs even during a severe drought year, K.C. Canal water sourced from Sunkesula Barrage can be fed to the canal's pump house by gravity when water level in the Srisailam reservoir is below the minimum draw down level required by the water pumps.

A supplementary pump house at Mutchumarri, which will draw water from Srisailam reservoir at 800 feet (244 m) MSL is in an advanced stage of construction.[ when? ] This pump house with its pipelines and canals can feed the nearby K.C. canal in addition to the Malyala pump house of Handri Neeva lift canal from dead storage water even during very poor monsoon year. [11] [12]

Map

Google interactive Map for Rayalaseema Irrigation Projects.

See also

Related Research Articles

<span class="mw-page-title-main">Tungabhadra River</span> River in southern India

The Tungabhadra River is a river in India that starts and flows through the state of Karnataka during most of its course, Andhra Pradesh and ultimately joining the Krishna River near Murvakonda in Andhra Pradesh

<span class="mw-page-title-main">Nagarjuna Sagar Dam</span> Dam in Andhra Pradesh & Nalgonda district, Telangana

Nagarjuna Sagar Dam is a masonry dam across the Krishna River at Nagarjuna Sagar which straddles the border between Palnadu district in Andhra Pradesh and Nalgonda district in Telangana. The dam provides irrigation water to the districts of Palnadu, Guntur, Nalgonda, Prakasam, Khammam, Krishna, and parts of West Godavari. It is also a source of electricity generation for the national grid.

<span class="mw-page-title-main">Srisailam Dam</span> Dam in Andhra Pradesh and Telangana, India

The Srisailam Dam is constructed across the Krishna River in Nandyal district, Andhra Pradesh and Nagarkurnool district, Telangana near Srisailam temple town and is the 2nd largest capacity working hydroelectric station in India.

<span class="mw-page-title-main">Nandikotkur</span> Town in Andhra Pradesh, India

Nandikotkur is a municipality and capital of Nandikotkur mandal in Nandyal district of Andhra Pradesh, India.

<span class="mw-page-title-main">Kodumur</span> Town in Andhra Pradesh, India

Kodumur or Kodumuru is a town and assembly constituency in Kurnool District in the state of Andhra Pradesh in India. The town currently is maintained by Jaradoddi Sudhakar, a member of the Legislative Assembly (MLA) and is under control of the Yuvajana Sramika Rythu YSR Congress Party Former chief ministers Sri Damodaram Sanjeevaiah and Kotla Vijaya Bhaskara Reddy belong to this constituency. It comes under the Kurnool Parliamentary constituency and is the only SC reserved assembly constituency under the Kurnool Parliament segment.

The Kundu River also known as Kunderu, Kumudvathi is a tributary of the Penna River in the Rayalaseema region of Andhra Pradesh, India. Originating as a spring near the village of Uppalapadu in Orvakal Mandal of Kurnool District, it goes through many changes before merging with the Penna at kamalapuram of Kadapa District. It is known for frequent floods that bring heavy damage to the Nandyal and Koilkuntla areas, and hence it is popularly called the "Sorrow of Nandyal." But nowadays Nandyal town became a big town with huge population so that the drainage water is discharged to the Kundu river without prior treatment. Industrialists focused their vision at more and more profits and they polluted the river to the maximum extent. The villagers who are living at down flow of the river from Nandyala are suffering with different skin diseases. The pollution impacts even animals health too. In ancient times this river was known as the Kumudvathi. There is a saying in Rayalaseema that whoever drinks the water of the Kundu will gain enormous courage to face enemies. The valley of the Kundu is known as Renadu and is symbolic of the term "Renati Pourusham."

<span class="mw-page-title-main">Polavaram Project</span> Dam in Eluru district, Andhra Pradesh

The Polavaram Project is an under construction multi-purpose irrigation project on the Godavari River in the Eluru District and East Godavari District in Andhra Pradesh. The project has been accorded National project status by the Central Government of India. Its reservoir back water spreads up to the Dummugudem Anicut and approx 115 km on Sabari River side. Thus back water spreads into parts of Chhattisgarh and Odisha States. It gives major boost to tourism sector in Godavari Districts as the reservoir covers the famous Papikonda National Park, Polavaram hydro electric project (HEP) and National Waterway 4 are under construction on left side of the river. It is located 40 km to the upstream of Sir Arthur Cotton Barrage in Rajamahendravaram City and 25 km from Rajahmundry Airport.

<span class="mw-page-title-main">Rajiv Dummugudem Lift Irrigation Scheme</span>

Rajiv Dummugudem Lift Irrigation Scheme is a lift irrigation scheme under execution which are located near Dummugudem, Khammam district in Telangana, India. There are three lift irrigation schemes by names Rajiv Dummugudem lift irrigation scheme, Indirasagar Rudrammakota Dummugudem lift irrigation scheme and Dummugudem to Sagar tail pond canal project. Rajiv Dummugudem lift irrigation scheme starting at 17°54′05″N80°52′45″E is planned to supply irrigation water for 200,000 acres in Khammam and Warangal districts drawing Godavari River water from the Dummugudem pond. Indira Dummugudem lift irrigation scheme starting at 17°33′49″N81°14′49″E is planned to supply irrigation water for 200,000 acres in Khammam, Krishna and West Godavari districts drawing Godavari River water from the back waters of Polavaram reservoir.

<span class="mw-page-title-main">Galeru Nagari Sujala Sravanthi Project</span> Dam in Srisailam dam right main canal - Bhanakacherla

Galeru Nagari Sujala Sravanthi Project or GNSS project is an irrigation project in Kadapa and Chitoor districts of Andhra Pradesh.

<span class="mw-page-title-main">Tungabhadra Dam</span> Dam in Karnataka, India

The Tungabhadra Dam, also known as Pampa Sagar, is a water reservoir constructed across the Tungabhadra River in the city of Hosapete in Vijayanagara district, Karnataka, India. It is a multipurpose dam serving irrigation, electricity generation, flood control, etc. for the state. It is one of the only two non-cement dams in India, the other being the Mullaperiyar Dam in Kerala. The dam is built of surki mortar, a combination of mud and limestone, commonly used at the time of its construction.

Velugodu Reservoir is a balancing reservoir and located across the Galeru river, a tributary of Kundu River in Penner River basin, at Velugodu town in Nandyal district of Andhra Pradesh. This reservoir is part of Telugu Ganga project and mainly fed by gravity canal from back waters of Srisailam Dam through Pothireddypadu head / flow regulator located across the feeder canal. Velugodu Reservoir has gross storage capacity of 16.95Tmcft at 265 m MSL full reservoir level.

<span class="mw-page-title-main">K. C. Canal</span>

Kurnool Cuddappah Canal popularly known as K.C. Canal is an irrigation canal located in Kurnool and Kadapa districts in Andhra Pradesh, India.

Jeedipalli Reservoir is an irrigation project located in Anantapur district in Andhra Pradesh, India. It receives water from Handri-Neeva canal which draws water from Srisailam reservoir. It is located in Jeedipalli village of Beluguppa mandal.

<span class="mw-page-title-main">Nagarjuna Sagar tail pond</span> Reservoir in India

Nagarjuna Sagar tail pond is a multipurpose reservoir located 21 km downstream from the Nagarjuna Sagar Dam across the Krishna River near Satrasala in Nalgonda district, India. Its gross water storage capacity is 6 Tmcft. The reservoir water spread area extends up to the toe of the Nagarjuna Sagar dam. The project was completed by July 2014.

<span class="mw-page-title-main">Gandikota Reservoir</span> Irrigation project in Andhra Pradesh, India

Gandikota Reservoir is an irrigation project located across Penna River of Andhra Pradesh in the Indian state. It receives water from Galeru Nagari Sujala Sravanthi Project canal. It is located between Gandikota village and Kondapur village of Kadapa district.

<span class="mw-page-title-main">Pattiseema Lift Irrigation Project</span> Dam in Between Godavari River and Polavaram Project

Pattiseema Lift Irrigation Project is a river interlinking project which connects Godavari River to Krishna River. This project has thereby become the first of such irrigation type projects in the country to be completed in time without any budget enhancements. It also holds a record in Limca Book of Records. The project was Inaugurated by the Chief Minister of Andhra Pradesh Nara Chandrababu Naidu in March 2016 while the project was completed in one year record of time.

Vykuntapuram Barrage is an Indian barrage and water storage project. It is under construction on Krishna River 23 kilometers upstream of existing Prakasam Barrage with FRL 25M. It is designed to store 10 TMC of flood water coming from the Vyra and Munneru rivers. The backwater of this dam will extend beyond Pokkunuru to the toe of Pulichintala dam. Andhra Pradesh Chief Minister Nara chandrababu Naidu laid the foundation stone for this project on 13 February 2019.

Gollapalli Reservoir is an irrigation project located in Anantapur district of Andhra Pradesh, India. It receives water from Handri-Neeva canal which draws water from Srisailam reservoir. It is located at Gollapalli village in Penukonda Constituency.

Jogulamba Barrage is a proposed barrage across Krishna River with full pond level (FPL) 274m. It would be located at Veltoor village, Peddamandadi mandal, Wanaparthy district, Telangana, India. This barrage is proposed to divert 3 TMC of water via lift to Yedula Reservoir being built as part of Palamuru-Rangareddy Lift Irrigation Scheme. This would also provide water for Dindi Lift Irrigation Project and Mahatma Gandhi Kalwakurthy Lift Irrigation Scheme.

References

  1. 1 2 3 Govt. of Andhra Pradesh, Water Resources Department. "HANDRI NIVA SUJALA SRAVANTHI PROJECT- PHASE I". HANDRI NIVA SUJALA SRAVANTHI PROJECT- PHASE I. Retrieved 10 September 2016.
  2. "The Hindu : Andhra Pradesh / Hyderabad News : Handri-Neeva Sujala Sravanthi project to irrigate four lakh acres more". www.hindu.com. Archived from the original on 17 July 2009. Retrieved 17 January 2022.
  3. Hindu, The (27 May 2015). "Handri-Neeva project". The Hindu. Retrieved 10 September 2016 via www.google.com.
  4. "Jalayagnam can be fruitful only in unified State: JAC". The Hindu. 10 April 2010. ISSN   0971-751X . Retrieved 10 September 2016.
  5. "Hundri-Neeva: lifeline of parched Rayalaseema". The Hindu. 18 November 2012. ISSN   0971-751X . Retrieved 10 September 2016.
  6. "Handri-Neeva details".
  7. 1 2 Hindu, The (16 March 2016). "Handri Neeva, Galeru Phase I to be completed by June". The Hindu. Retrieved 10 September 2016 via www.google.com.
  8. 1 2 Indian Express, The New (9 December 2013). "Handri-Neeva, Galeru-Nagari Projects in Rayalaseema May Go Without Water". Archived from the original on 11 December 2013. Retrieved 10 September 2016 via www.google.com.
  9. Chronicle, Deccan (9 September 2014). "Water brings Telangana State and Andhra Pradesh close" . Retrieved 10 September 2016 via www.google.com.
  10. "Handri Neeva Sujala Sravanti (HNSS) JI00011". Archived from the original on 23 February 2016. Retrieved 9 May 2016.
  11. 1 2 "Handri Neeva Sujala Sravanti (Phase I) project" . Retrieved 22 September 2015.
  12. "Devineni inspects Muchumarri project works". 29 December 2015. Retrieved 29 December 2015.