425 Park Avenue | |
---|---|
General information | |
Status | Completed |
Type | Office |
Address | 425 Park Avenue |
Town or city | Manhattan, New York City |
Country | United States |
Coordinates | 40°45′38″N73°58′16″W / 40.760542°N 73.971157°W |
Construction started | 2016 |
Topped-out | December 4, 2018 [1] |
Completed | October 2022 |
Cost | $1 billion |
Height | 860 feet (262.1 m) [2] |
Technical details | |
Floor area | 670,000 square feet (62,000 m2) |
Design and construction | |
Architect(s) | Foster + Partners |
425 Park Avenue is an office building in New York City redeveloped by L&L Holding and GreenOak Real Estate, with a design by architectural firm Foster + Partners. Work on the new structure began in 2016, and the building was completed in October 2022.
The original 388-foot (118 m) building was designed by Kahn & Jacobs. Modernist in style, it replaced a row of sixteen four-story townhouses built by Robert Goelet in 1871. The construction of the building began in 1954, [3] [4] on land leased from the Robert Walton Goelet estate, who died in 1941. [5] At the time of the construction, it was one of the tallest buildings that utilized bolted connections. [6] The 32-story building was open in 1957 with National Biscuit Company, [5] Kaye Scholer, Chemical Corn Exchange Bank as major tenants. [7] [8]
Since 2004, L&L Holding, which was founded in 2000, had been trying to redevelop 425 Park Avenue when the Goelet family intended to sell a 33% stake of the property. After an extended negotiation, L&L, in partnership with Lehman Brothers, entered into a 84-year ground lease deal with the Goelet family in 2006 that was valued at $320 million with a large upfront payment. [8] The lease allowed L&L to redevelop the easterly block of Park Avenue between 55th street and 56th street after the existing leases with the building tenants expired in 2015. [9] During the predevelopment phase, Lehman Brothers went into bankruptcy in 2008. L&L attempted to buy Lehman Brothers out at a steep discount, but Lehman Brothers opted to continue funding the project through its bankruptcy with the original financial obligations. However, in 2013, L&L, GreenOak Real Estate, and other investors bought 90% of Lehman Brothers’ stake in the project, allowing L&L to have full control of the redevelopment. [8]
L&L designed the new building under the assumption that it would keep 25% of its former structure in order to keep the total floor area of 670,000 sq ft (62,000 m2). [10] L&L chose Foster + Partners to design the building after a competition to choose an architect. [11] L&L solicited bids from 11 architectural firms. These entries were narrowed to four final proposals, from Zaha Hadid Architects, Rogers Stirk Harbour + Partners, OMA, and Foster + Partners. Each incorporated a portion of the original structure. Real estate news site YIMBY noted that, due to its three roughly 200 ft (61 m) concrete fins, the Foster plan would have "[...] the most pronounced skyline effect" compared to the other proposals. [11] Another key element of Foster + Partners design was the three tiers of very high ceiling and virtually column-free floor space. [12]
425 Park Avenue is located in the eastern part of Midtown Manhattan. The area, from approximately East 34th Street to East 59th Street, and from Second Avenue to Fifth Avenue, is one of the main business districts in Manhattan with more than 400 office buildings. [13]
The 1961 Zoning Resolution restricted the size of buildings based on floor area ratio (FAR), not height. As many as 300 office buildings in the area were built before 1961 with an average age of 73 years. The older building stock made the area less competitive in the modern office space market due to low ceilings and less open floor space by the obstruction of many columns in those buildings. The 1961 zoning was more restrictive than prior rules with low allowable FAR to make the area less dense. Many of those pre-1961 office buildings were considered overbuilt as the floor area amounts exceeded the allowable amounts per the 1961 zoning, but they were grandfathered. If the owners of those buildings would have demolished an existing building to build a new one on the site, the new building would have less floor space than the original one. This caused a deterrent for redevelopment of those older office buildings. The concern was the reason for the city's East Midtown rezoning plan, which added more air rights in the neighborhood immediately around Grand Central Terminal, thereby encouraging redevelopment. [13]
For 425 Park Avenue, without the redevelopment, the building could only generate revenue of about $50 to $70 per square foot. With a more modern building, the revenue could be boosted to more than $100 per square foot. [14] The 1961 zoning was a major obstacle for its redevelopment. If L&L would have demolished the building, it could only construct a building with the maximum of 580,000 sq ft (54,000 m2) instead of the original 670,000 sq ft (62,000 m2). [15] However, there was an exception to the 1961 zoning rules. If a redevelopment of a pre-1961 building could retain at least 25% of its original structure, the new building would be permitted to have up to the original square footage. This was an option that L&L explored, but the rezoning occurred only after L&L had already commissioned a design. [8]
A $556 million construction loan is secured by the property. [8]
Preserving the original structure led to difficulties during construction, requiring the developer to hire a third engineering firm to help orchestrate the sequence of demolition and construction. The first step was to completely demolish floor by floor from the top floor to the 18th floor. Temporary steel structures were then installed to support the remaining 17 floors before further demolition. [15] As much as 750 tons of wind bracings, crane-bracing systems, shoring systems and temporary trusses were put in place. Installing these large temporary steel structures in the middle of a partially demolished building proven to be a challenging and time-consuming process. [16] After the installation, the rear side of the building was demolished. Twelve new jumbo columns were erected, six as exterior columns at the front of the building and the other six at the center of the building. The new building core was also built at the rear to connect to every other floor that would be remained in the new building. The rest of the unconnected floor slabs were demolished creating high ceiling floors at the base. The work continued on the building core at the rear, and new floors were built atop the old structure. There was a waiting period of many months when more floors were built upward before the removal of the original columns and the temporary steel structures at the base, leaving those floors to be supported by 12 jumbo columns and the new building core only. [17] [12]
The building reached half its full height in April 2018. [18] Facade installation began in June 2018; at the time, the superstructure was 22 stories from topping out. [19] The building topped out on December 4, 2018, in a ceremony attended by lead architect Lord Norman Foster. [1] The building received a temporary Certificate of occupancy in January 2021. [20] [21] [22] The renovation was completed in October 2022. [22] [23]
L&L intended not to pre-lease the building, but in early 2016, hedge fund Citadel signed a lease for 200,000 sq ft (19,000 m2) across several floors, including the penthouse floor. [24] [11] At the time it was signed, it was the most expensive lease in the city's history. Delays in construction have led some to speculate that Citadel may back out of the lease, or that it was seeking temporary offices due to the delays. [25] L&L has asserted that the tenant will move in as planned. These concerns were officially allayed in January 2019 when Citadel executed a lease expansion for another 124,000 sq ft (11,500 m2) of space, bringing their total occupancy to 16 floors of the building. [26] The expansion will see Citadel occupy a total of 335,400 sq ft (31,160 m2), or 48% of the building's space.
Daniel Humm, a founder of restaurant Eleven Madison Park, was originally contracted to open two restaurants in the building. One was to be two stories tall, in the building's base, totaling roughly 14,000 sq ft (1,300 m2). According to L&L's founder, David Levinson, the intention was for the restaurant to be "[...] a Four Seasons on steroids for the 21st century". [27] The other restaurant would have been open only to tenants, and would have been located on the 27th floor. [28] In 2018, it was reported that despite construction delays, both venues were still expected to open upon the completion of construction. [29] However, the plans for Humm's restaurant were cancelled in 2022 due to his pivot to serving exclusively vegan food at his restaurants. [30] In August 2022, it was reported by the New York Post that Jean-Georges Vongerichten would replace Humm, opening a large restaurant in the building's base and a tenant-only restaurant. [31] Four Twenty Five, a restaurant by Jean-Georges Vongerichten, opened in the building in December 2023. [32]
4 Times Square is a 48-story skyscraper at Times Square in the Midtown Manhattan neighborhood of New York City. Located at 1472 Broadway, between 42nd and 43rd Streets, the building measures 809 ft (247 m) tall to its roof and 1,118 ft (341 m) tall to its antenna. The building was designed by Fox & Fowle and developed by the Durst Organization. 4 Times Square, and the Bank of America Tower to the east, occupy an entire city block.
Hudson Yards is a neighborhood on the West Side of Midtown Manhattan in New York City, bounded roughly by 30th Street in the south, 41st Street in the north, the West Side Highway in the west, and Eighth Avenue in the east. The area is the site of a large-scale redevelopment program that is being planned, funded, and constructed under a set of agreements among the State of New York, City of New York, and Metropolitan Transportation Authority (MTA), with the aim of expanding the Midtown Manhattan business district westward to the Hudson River. The program includes a major rezoning of the Far West Side, an extension of the New York City Subway's 7 and <7> trains to a new subway station at 34th Street and 11th Avenue, a renovation and expansion of the Javits Center, and a financing plan to fund the various components. The various components are being planned by New York City Department of City Planning and New York City Economic Development Corporation.
270 Park Avenue, also known as the JPMorgan Chase Tower and the Union Carbide Building, was a skyscraper in the Midtown Manhattan neighborhood of New York City. Built in 1960 for chemical company Union Carbide, it was designed by the architects Gordon Bunshaft and Natalie de Blois of Skidmore, Owings & Merrill (SOM). The 52-story, 707 ft (215 m) skyscraper later became the global headquarters for JPMorgan Chase. It was demolished in 2021 to make way for a taller skyscraper at the same address. At the time of its destruction, the Union Carbide Building was the tallest voluntarily demolished building in the world.
277 Park Avenue is an office building in the Midtown Manhattan neighborhood of New York City. It stands on the east side of Park Avenue between East 47th and 48th Streets, and is 687 feet (209 m) tall, with 50 floors. It is tied with two other buildings, 55 Water Street and 5 Beekman Street, as the 73rd tallest building in New York. The building is assigned its own ZIP Code, 10172; it was one of 41 buildings in Manhattan that had their own ZIP Codes as of 2019.
Selene is a residential skyscraper at the southwest corner of 53rd Street and Lexington Avenue in Midtown Manhattan, New York City. The 64-story tower, completed in 2019, was designed by Norman Foster. At 711 feet (217 m) tall, it is the 77th tallest building in New York.
Robert Walton Goelet was an American financier and real estate developer in New York City. He was one of the largest property owners in the city by the time of his death.
432 Park Avenue is a residential skyscraper at 57th Street and Park Avenue in Midtown Manhattan in New York City, overlooking Central Park. The 1,396-foot-tall (425.5 m) tower was developed by CIM Group and Harry B. Macklowe and designed by Rafael Viñoly. A part of Billionaires' Row, 432 Park Avenue has some of the most expensive residences in the city, with the median unit selling for tens of millions of dollars. At the time of its completion in 2015, 432 Park Avenue was the third-tallest building in the United States and the tallest residential building in the world. As of 2023, it is the sixth-tallest building in the United States, the fifth-tallest building in New York City, and the third-tallest residential building in the world.
2 World Trade Center is a skyscraper being developed as part of the rebuilt World Trade Center complex in Manhattan, New York City. It will replace the original 2 World Trade Center, which was completed as part of the first World Trade Center in 1973 and subsequently destroyed during the September 11 attacks in 2001, and it will occupy the position of the original 5 World Trade Center. The foundation work was completed in 2013, though no construction has taken place since.
50 Hudson Yards is a 58-story, 981-foot (299 m)-tall building that was developed as part of the Hudson Yards Redevelopment Project in Hudson Yards, Manhattan, New York City. The building is located to the north of 30 Hudson Yards, and on the east side of the Hudson Park and Boulevard, adjacent to 55 Hudson Yards. The building opened on October 19, 2022.
Abington House is a residential building in Chelsea, in Manhattan, New York City just outside the Hudson Yards Redevelopment Project. There are 386 rental apartments at the building, located at the southwest corner of 30th Street and Tenth Avenue. Robert A.M. Stern Architects designed the building, and The Related Companies developed the building. There is about 7,200 square feet (670 m2) of rental space on the ground floor of the 33-story, 325 feet (99 m)-tall building; the building also has a pre-fabricated red brick facade. The building, the first to open in the area under the zoning of the Hudson Yards Redevelopment Project, has 78 permanent units. It started leasing in April 2014, two years after beginning construction in 2012.
One Vanderbilt is a 73-story supertall skyscraper at the corner of 42nd Street and Vanderbilt Avenue in the Midtown Manhattan neighborhood of New York City. Designed by Kohn Pedersen Fox for developer SL Green Realty, the skyscraper opened in 2020. Its roof is 1,301 feet (397 m) high and its spire is 1,401 feet (427 m) above ground, making it the city's fourth-tallest building after One World Trade Center, Central Park Tower, and 111 West 57th Street.
The Graybar Building, also known as 420 Lexington Avenue, is a 30-story office building in Midtown Manhattan, New York City. Designed by Sloan & Robertson in the Art Deco style, the Graybar Building is at 420–430 Lexington Avenue between 43rd and 44th Streets, adjacent to Grand Central Terminal.
200 Amsterdam is a residential skyscraper at the intersection of Amsterdam Avenue and 69th Street on the Upper West Side in Manhattan, New York City. The lot was formerly occupied by the Lincoln Square Synagogue. The tower contains 112 condominiums.
138 East 50th Street, officially named The Centrale, is a residential building in Midtown Manhattan, New York City. The building consists of 124 condominium residences and 7,500 square feet (700 m2) of ground-floor retail between Third Avenue and Lexington Avenue in Midtown East. The developers planned to sell the condominiums for a total of $535.7 million, or an average of $4.3 million per unit.
Tower Fifth is a skyscraper proposed for Midtown Manhattan in New York City. The developer, Macklowe Properties, has completed other projects including the redevelopment of the General Motors Building and construction of 432 Park Avenue. Plans for the structure were first revealed in January 2019, and the developer continued purchasing buildings to create an assemblage in 2019, closing on a building in March 2020, and continuing to eye buildings in June 2020. Demolition permits were first filed in April 2020.
608 Fifth Avenue, also known as the Goelet Building or Swiss Center Building, is an office building at Fifth Avenue and West 49th Street in the Midtown Manhattan neighborhood of New York City, adjacent to Rockefeller Center. It was designed by Victor L. S. Hafner for the Goelet family, with Edward Hall Faile as structural engineer. The facade uses elements of both the Art Deco and International styles, while the lobby is designed exclusively in the Art Deco style.
270 Park Avenue, also known as the JPMorgan Chase Building, is a supertall skyscraper under construction on the East Side of the Midtown neighborhood of Manhattan in New York City. Designed by the firm of Foster + Partners, the skyscraper is expected to rise 1,388 feet (423 m) when completed in 2025.
262 Fifth Avenue is a residential skyscraper under construction in Manhattan, New York City. Five Points Development is developing the building, which is being designed by architectural firm Meganom. SLCE Architects is the executive architect.
175 Park Avenue, formerly known as Project Commodore, is a mixed-use supertall designed by Skidmore, Owings, & Merrill and developed by RXR Realty and TF Cornerstone that is proposed to be built on the former site of the Commodore Hotel, currently the Hyatt Grand Central New York. As currently proposed, the structure would rise to a pinnacle height of 1,581 feet (482 m), with the tower containing office space, a Hyatt hotel, and ground-level and underground retail.
{{cite web}}
: CS1 maint: unfit URL (link)