Vijayapura Airport ವಿಜಯಪುರ ವಿಮಾನ ನಿಲ್ದಾಣ | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Summary | |||||||||||
Airport type | domestic airport | ||||||||||
Owner | Infrastructure Development Department, Government of Karnataka | ||||||||||
Serves | Vijayapura | ||||||||||
Location | Madabhavi, Bijapur | ||||||||||
Coordinates | 16°50′50.3″N75°48′42.9″E / 16.847306°N 75.811917°E | ||||||||||
Map | |||||||||||
Runways | |||||||||||
|
Vijayapura Airport, proposed to be named as Jagajyoti Shri Basaveshwar Airport [1] , is an under-construction greenfield airport that will serve the city of Vijayapura in Karnataka, India. The airport is being built by the Karnataka State Industrial and Infrastructure Development Corporation (KSIIDC) at a cost of Rs 220 crore. The project site is located 15 km from the city on 727-acre (2.94 km2) of land in Madhabavi, located outside the city premises. The airport was expected to be ready by early 2023, but this has been postponed to Dec 2024. [2]
In March 2007, the State government Cabinet approved construction of greenfield airports in Bijapur, Gulbarga and Shimoga to give a boost to the tourism industry. Nineteen companies had responded when the Government called for an Expression of Interest (EoI) in 2007 to develop the airports. [3] [4] In January 2010, the Karnataka government signed a Memorandum of Understanding (MoU) with infrastructure development company MARG Limited for developing a green field airport at Bijapur under a public-private partnership agreement to cater to ATR 72 aircraft. [5] The airside development was to include a 2,500 square metre terminal building, a 1,700 m long runway, aprons, taxiways, hangars, isolated parking bay, a 15 m air traffic control tower, ground support equipment, fuel storage facilities and a fire station. [6]
The project came to a halt in 2012, when MARG demanded an additional 1,000 acres of land to build commercial complexes near the airport to make the project economically viable. According to the government, this amounted to a breach of contract signed through the MoU. [7] In 2013, the Government decided to abandon the PPP model and instead sought to partner with the Airports Authority of India (AAI) to complete the project. [8] AAI agreed to build Bijapur airport but sought Rs. 50 crore from the State government to start site levelling work, [9] but the State government failed to reply. In February 2019, the KSIIDC sought to develop a ‘no-frills airport’ at the site to boost tourism and business activities. [10]
On 9 July 2020, the state cabinet gave approval for the project to be completed by the State Public Works Department. The first Phase would cost Rs 95 crore and was given a deadline of 18 months.
The first phase of development includes a 1900-metre runway, along with the associated taxiways and apron. A terminal building to handle 200 passengers during peak hours will also be built to handle ATR 72 type aircraft.
The second phase, costing Rs 125 crore, will be implemented after operations commence. The airport would be expanded to handle larger aircraft like the Boeing 737 and Airbus A320 based on demand. [11]
Bijapur is the district headquarters of Bijapur district of the Karnataka state of India. It is also the headquarters for Bijapur Taluk. Bijapur city is well known for its historical monuments of architectural importance built during the rule of the Adil Shahi dynasty. It is also well known for the popular Karnataka premier league team, the Bijapur Bulls. Bijapur is located 519 km (322 mi) northwest of the state capital Bangalore and about 550 km (340 mi) from Mumbai and 210 km (130 mi) north east of the city of Belgaum.
Kempegowda International Airport is an international airport serving Bangalore, the capital of the Indian state of Karnataka. Spread over 4,000 acres (1,600 ha), it is located about 35 km (22 mi) north of the city near the suburb of Devanahalli. It is owned and operated by Bengaluru International Airport Limited (BIAL), a public–private consortium. The airport opened in May 2008 as an alternative to increased congestion at HAL Airport, the original primary commercial airport serving the city. It is named after Kempe Gowda I, the founder of Bangalore. Kempegowda International Airport became Karnataka's first fully solar powered airport, developed by CleanMax Solar.
Mangalore International Airport is an international airport serving the coastal city of Mangalore, India. It is one of only two international airports in Karnataka, the other being Kempegowda International Airport, Bangalore. Mangalore International Airport is the second busiest airport in Karnataka. In addition to domestic destinations, flights depart daily for major cities in the Middle East. The airport was named Bajpe Aerodrome, when it opened on 25 December 1951 by former Prime Minister Jawaharlal Nehru who arrived on a Douglas DC-3 aircraft.
Kadapa Airport is a domestic airport serving Kadapa in Andhra Pradesh, India. It is located 12 km (7.5 mi) from the city, and is spread over 669.5 acres (270.9 ha) of land. It has been upgraded at a cost of ₹ 42 crore. The upgraded airport was inaugurated on 7 June 2015 by the then Minister of Civil Aviation, Ashok Gajapathi Raju. The terminal building has a capacity to handle 100 peak hour passengers at a time and the apron can accommodate seven ATR-72 type aircraft.
Tezu Airport is a domestic airport serving the city of Tezu and adjoining Lohit district of Arunachal Pradesh, India. It is India's easternmost airport, operated by the Airports Authority of India (AAI), which upgraded it to handle ATR-72 aircraft with night-landing facility. Prime Minister Narendra Modi inaugurated the upgraded airport on 9 February 2019. Scheduled commercial flights commenced from 19 August 2021.
Hubli Airport is a domestic airport serving the twin cities of Hubballi and Dharwad in the state of Karnataka, India. It is situated in Gandhi Nagar, 8 km (5.0 mi) from Hubballi and 20 km (12 mi) from Dharwad. It is connected with 10 destinations throughout the country. The airport has been made self-reliant in terms of electricity generation, with the commissioning of an 8 megawatt (MW) ground-mounted grid-connected photovoltaic solar plant in April 2021.
Belgaum Airport, also known as Belagavi Airport, is a domestic airport serving Belgaum, Karnataka. The current integrated terminal building was inaugurated by the then Minister of Civil Aviation, Ashok Gajapathi Raju on 14 September 2017. Near the airport, there is an Indian Air Force station, where new recruits receive basic training.
Tuticorin Airport is a domestic airport serving Thoothukudi and its adjoining districts of Thoothukkudi, Tirunelveli, Tenkasi, and Kanniyakumari in Tamil Nadu. It is located at Vagaikulam, 15.6 km (9.7 mi) west of the city centre, on National Highway 7A. The airport was ISO 9001:2015 quality certified on 13 April 2018. It is the fifth busiest airport in Tamil Nadu after Chennai, Coimbatore, Tiruchirappalli, and Madurai airports.
Dholera International Airport is an under-construction international airport and a greenfield airport, which will serve the Dholera Special Investment Region (DSIR) in Gujarat, India. It is being built near Navagam in the Dholera taluka of Ahmedabad district. The project site is spread over 1,426 hectares about 80 km (50 mi) from Ahmedabad and around 20 km (12 mi) from the Dholera Special Investment Region (DSIR). 75 hectares of government land has been allocated for commercial development.
Shivamogga Airport, officially renamed as Rashtrakavi Kuvempu Airport, is a domestic airport serving the city of Shimoga, Karnataka, India. It is located at Sogane, 8.8 km (5.5 mi) from Shimoga and 8.2 km (5.1 mi) from Bhadravathi. The airport was to be built under Public–Private Partnership (PPP) with the Government of Karnataka. However, due to delays in project execution, the contract was terminated in January 2015. On 15 June 2020, the Chief Minister of Karnataka, B. S. Yediyurappa, laid the foundation stone to start the construction of the airport at a cost of ₹ 4.5 billion. The airport is to be constructed in two phases, out of which the first phase was inaugurated on 27 February 2023 by Prime Minister, Narendra Modi. It is named after Kuvempu, who is regarded as the greatest Kannada poet of the 20th century.
Kalaburagi Airport is a domestic airport serving the city of Kalaburagi in Karnataka, India. It is located 12 km (7.5 mi) east from the city centre. It was built by the Karnataka State Public Works Department (PWD) with technical assistance from RITES Limited and is operated by the Airports Authority of India (AAI).
Hassan Airport is a greenfield airport project under construction at Boovanahalli village, 6 km from Hassan, Karnataka, India. The State government had initially found the project financially un-viable and decided to revise the project plan in 2012. The project was revived in 2021 and the airport development will be taken up the UDAN scheme at a cost of Rs 175 crore.
Amravati Airport,is an upcoming airport in Amravati, Maharashtra. It is located in Belora, Amravati, 15 km south of Amravati city and Amravati railway station. Once operational, it will be the third commercial airport under the Maharashtra Airport Development Company.
Hisar Airport, officially known as Maharaja Agrasen International Airport is a DGCA-licensed public airport serving Hisar in Haryana state of India. It is located 5 kilometres (3.1 mi) northeast of the city center on NH-9. The airport is planned to be upgraded to an international airport by 2030. It will eventually see the development of a new MRO, aerospace university, aerospace and defense manufacturing industrial zone, logistics and food parks, etc. over an area spread across 10,000 acres (4,000 ha). In 2021, the total cost of planned upgrade in 3 phases, including the actual spend and future approved allocations, is nearly ₹5,200 crore.
Nellore Airport is a proposed greenfield airport project near Dagadarthi, India, intended to serve the Nellore district in Andhra Pradesh. The airport is to be developed on 1,352 acres (5.47 km2) of land with an estimated cost of ₹368 crore.
Donyi Polo Airport, also known as Hollongi Airport, is a domestic airport serving Itanagar, the capital city of Arunachal Pradesh, India. It is located at Hollongi, situated 14 km (8.7 mi) south from the city centre, in the Papum Pare district. It is built by the Airports Authority of India, over an area of 320 hectares. The airport is the 16th airport of Northeast India. Prime Minister Narendra Modi laid the foundation stone for the airport on 9 February 2019. Construction was started on 15 December 2020, and was inaugurated on 19 November 2022, with flight services started by IndiGo to Kolkata and Mumbai from 28 November 2022.
New Bellary Airport is a proposed greenfield airport, which will serve the city of Bellary in Karnataka, India. It will be built by the Karnataka State Industrial and Infrastructure Development Corporation Ltd (KSIIDC). With the Public-Private Partnership project for developing the airport failing to take off, the State department has decided to take up the project on its own on engineering, procurement and construction (EPC) basis. The new airport site is located roughly 12 kilometres (7.5 mi) northeast of Bellary, near the villages of Chaganur and Sirivaram.
Rajkot International Airport is an international airport and a greenfield airport at Hirasar, Gujarat, India, serving the city of Rajkot and the Saurashtra region. It is located near the National Highway 8B (NH-8B) connecting Ahmedabad and Rajkot. It has a single runway for the operation of ‘C’ category aircraft. The airport was developed by the Airports Authority of India (AAI) at a cost of ₹2,654 crore (US$320 million). The foundation stone for the construction of the airport was laid on 7 October 2017, and was inaugurated by Prime Minister Narendra Modi on 27 July 2023, which was previously expected to be done on 31 December 2023.
Mandi Airport is a proposed greenfield airport to be built at Nag Chala in Mandi District in the Indian state of Himachal Pradesh. The airport will be built on a total of 698 acres. The Airports Authority of India (AAI) gave its clearance for the airport after visiting the site in May 2018. In August 2019, Himachal Pradesh Chief Minister Jai Ram Thakur requested the Fifteenth Finance Commission for a special purpose grant of Rs 2,000 crore towards construction of the airport for operation of wide-body aircraft. The AAI completed its Obstacle Limitation Surfaces survey for the project site in August 2019. The Ministry of Civil Aviation gave in-principle approval for the execution of the project with the help of the AAI in October 2019. In January 2020, AAI signed a Memorandum of Understanding (MoU) with the Himachal Pradesh Government to build and operate the airport through a Joint Venture Company. The airport will have a unidirectional runway, suitable for operation of aircraft up to ATR 72 initially. WAPCOS has been appointed as project consultant and has floated tenders for environmental impact assessment for the project following a site visit in July 2020.
Kota Greenfield Airport is a proposed airport, planned to be built at Shambupura village in Bundi district, approximately 15 kilometres from Kota, 20 kilometres from Bundi and 50 kilometres from Rawatbhata, in Rajasthan, India. The airport will be built by the Airports Authority of India (AAI). The airport site is within 10 kilometres of the Chambal Ghariyal wildlife sanctuary and within 10 kilometres of the Mukundara Hills National Park. The proposed airport falls in the notified buffer area of Ramgarh Vishdhari Wildlife Sanctuary and will use 466 hectares of forest land.