Data | |
---|---|
Installed capacity (2017) | 4,086 MW |
Production (2017) | 14,671 GWh |
The electricity sector in Sri Lanka has a national grid which is primarily powered by hydroelectric power and thermal power, with sources such as photovoltaics and wind power in early stages of deployment. Although potential sites are being identified, other power sources such as geothermal, nuclear, solar thermal and wave power are not used in the power generation process for the national grid. [1]
The country is expected to achieve 75% electricity generation by renewable energy by 2025. [4]
Sri Lanka (then Ceylon) first witnessed electricity in 1882 when SS Helios docked in Colombo for a local electricity exhibition. [5]
In 1890, using a diesel generator the first electric bulb in Ceylon was lit with electricity in the Billiard Room of Bristol Hotel in Colombo, before electric lights became an established commercial product. [5]
In 1895, Messrs Boustead Bros established a small power station in Bristol Building, Fort. The power station was the first commercial power station in the country, serving a few mercantile offices, government buildings, and streets, in the Fort area. The company established Electricity Ordinance No. 5, the first Act pertaining to the supply of electricity in the country. [6]
Four years later in 1899, United Planters Company established the Colombo Electric Tramways, the first tram system in the country. In 1902, Colombo Electric Tramways and Lighting Co. Ltd. was formed, and the Pettah Power Station was established on Gas Works Street.
The Pettah Power Station served the tram network, and also served mostly mercantile offices, government buildings, and streets. Over the next three years, the electricity supply was extended to Galle Face and Kollupitiya, serving several houses.
In 1905, the Colombo Gas Company established a power station in Kandy, which was eventually taken over by the Kandy Municipal Council in 1922. In 1906, Electricity Ordinance No. 36 was passed as an amendment to Electricity Ordinance No. 5.
In 1912, the government commissioned a small hydroelectric power station at Black Pool, and inaugurated the Nuwara Eliya Electricity Scheme. In 1918, D. J. Wimalasurendra, submitted a report to the Engineering Association of Ceylon, outlining the economic viability of hydroelectricity in Ceylon.
From 1920, local authorities in at least Gampaha, Veyangoda, Ja-Ela, Peliyagoda, Kochchikade, Avissawella, and Minuwangoda started supplying electricity locally from diesel generators.
In 1927, the Department of Government Electrical Undertakings (DGEU) was established to take over and run the electricity supply business in Colombo, and extend the supply to other areas, and eventually the entire country. The three-megawatt Stanley Power Station - named after Herbert Stanley, was commissioned in 1929, supplying 16 towns by the end of the year.
In 1935, the State Council of Ceylon passed Electricity Board Establishment Ordinance No. 38 of 1935, only to be dissolved again 1937 with the re-establishment of the DGEU.
Sri Lankan gained independence on 4 February 1948.
On 30 October 1950, the Old Laxapana Power Station was finally completed, after being under development since 1924. [7] The same year, regional offices were opened in Norton Bridge, Nuwara Eliya, Diyathalawa, Panadura, Negombo, Avissawella, and Peradeniya, to decentralise the electricity works. The following year, electricity was purchased from the Kankesanthurai Cement Factory from distribution in Jaffna.[ clarification needed ]
On 1 November 1969, the current Ceylon Electricity Board (CEB) was established under Parliament Act No. 17 of 1969. To this day, the CEB oversees the development and coordination of the generation, supply, and distribution of electricity in the country. [8]
Electricity in Sri Lanka is generated using three primary sources — thermal power (which includes energy from biomass, coal, and fuel-oil), hydro power (including small hydro), and other non-conventional renewable energy sources (solar power and wind power):
Source | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Hydropower | 1,293 | 1,316 | 1,326 | 1,357 | 1,379 | 1,382 | 1,401 | 1,584 | 1,628 | 1,665 | 1,684 | 1,726 | 1,745 | 1,793 |
Fuel oil | 1,115 | 1,115 | 1,115 | 1,285 | 1,290 | 1,390 | 1,390 | 1,338 | 1,335 | 1,215 | 1,115 | 1,215 | 1,233 | 1,137 |
Coal | 0 | 0 | 0 | 0 | 0 | 0 | 300 | 300 | 300 | 900 | 900 | 900 | 900 | 900 |
Other renewables | 3 | 3 | 3 | 3 | 15 | 45 | 50 | 90 | 99 | 152 | 148 | 176 | 208 | 216 |
Total capacity | 2,411 | 2,434 | 2,444 | 2,645 | 2,684 | 2,817 | 3,141 | 3,312 | 3,362 | 3,932 | 3,847 | 4,017 | 4,086 | 4,046 |
Source | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015 | 2016 | 2017 | 2018 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Hydropower | 3,453 | 4,636 | 3,948 | 4,135 | 3,905 | 5,634 | 4,622 | 3,292 | 6,926 | 4,534 | 5,969 | 4,220 | 4,004 | 6,381 |
Fuel oil | 5,314 | 4,751 | 5,865 | 5,763 | 5,975 | 4,994 | 5,748 | 6,935 | 3,303 | 4,306 | 2,275 | 4,461 | 5,045 | 3,626 |
Coal | 0 | 0 | 0 | 0 | 0 | 0 | 1,038 | 1,404 | 1,469 | 3,202 | 4,443 | 5,047 | 5,103 | 4,764 |
Other renewables | 2 | 2 | 2 | 3 | 27 | 86 | 121 | 171 | 262 | 315 | 402 | 421 | 519 | 511 |
Total generation | 8,769 | 9,389 | 9,815 | 9,901 | 9,907 | 10,714 | 11,529 | 11,802 | 11,960 | 12,357 | 13,089 | 14,149 | 14,671 | 15,282 |
Hydroelectricity is the oldest and historically the principal source of electricity generation in Sri Lanka, holding a share of 48% of the total available grid capacity in December 2013 and 58% of the power generated in 2013. [9] [ needs update ] Hydroelectric power generation has been constantly under development since the introduction of the national grid itself, but its market share is declining because suitable new sites are scarce. Currently, ten large hydroelectric power stations are in operation, with the single largest hydroelectric source being the Victoria Dam. Although a large portion of the country's hydroelectric resources is tapped, the government continues to issue small hydro development permits to the private sector, for projects up to a total installed capacity of 10 MW per project. [10]
State-run hydroelectric developments are categorized into three main geographic sectors.
This section needs to be updated.(June 2020) |
Thermal power stations in Sri Lanka now roughly match the installed hydroelectric generation capacity, with a share of nearly 49% of the available capacity in December 2013 and 40% of power generated in 2013. [9] Thermal power stations in Sri Lanka runs on diesel, other fuel oils, naptha or coal. [9] The Norocholai Coal Power Station, the only coal-fired power station in the country, was commissioned in late 2011, adding a further 300 megawatts of electrical capacity to the grid. It is currently planned to add an additional 600 MW of capacity to Norocholai in the next half decade. The second and final coal power station, [11] the Sampur Coal Power Station, is under consideration in Trincomalee and is expected to be in-service by the end of 2017. [12] On 13 September 2016 the Attorney General's Department informed the Supreme Court that the Sampur Coal fired plant has been cancelled and will not be built. [13]
The use of wind energy was seen in the country even before 500 BC. The ancient Sinhalese used the monsoon winds to power furnaces as early as 300 BC, making Sri Lanka one of the first countries in the world to use wind power. Evidence of this has been found in Anuradhapura and in other cities. [14]
The development of modern wind farms was considered by local and international developers for many years. Such developments were largely hampered due to the many obstacles faced in such developments in economics and infrastructure. The first commercial grid-connected wind farm is the 3 MW Hambantota Wind Farm, northwest of Hambantota. The country has good off-shore wind potential to meet all its electricity requirements. [15]
Unlike other power sources, power developments from this source would face many challenges during its development timeline. Poor accessibility to potential sites is the first obstacle in the development of a wind farm. Most key transport routes around the country are too narrow or have turned too tight for transportation of turbines larger than 600 KW . Constructing wind farms with turbines smaller than the current commercial-scale megawatt-class turbines would prove to be uneconomical due to the high cost incurred during development.
The country is also in a long battle against its poor power grid. The grid, apart from being unstable in most provinces, is only capable of handling a small increase in load, typically limited to a few megawatts. Provinces with poor grids, such as the power grids in the Northern, North Central and North Western provinces need a complete upgrade to support further commercial-scale developments. This factor contributes to a large percentage in development costs for wind farms constructed at such locations. The government policy limit of 10 MW per wind project also significantly decreases economies of scale, further straining such developments.
This section needs to be updated.(June 2020) |
Despite the many technical obstacles, a few developments totalling 50 MW have been proposed till September 2009. [16] In October 2009, cases were filed over political interference connected with the approving of wind projects, leading to a complete halt in the wind power industry in Sri Lanka. [17] The Ministry made allegations of wrongdoing in allocating energy licences, including the structuring of the wind power tariff. [18] There were also allegations that energy licenses are being sold, similar to how car licenses have been sold. [18]
From December 2009 to March 2010, permits for another 50 MW of projects were issued by the Sri Lanka Sustainable Energy Authority, before concerns relating to the issuing of permits were raised again, [19] [20] leading to another deadlock in the industry. As of June 2010, issuing of permits for the development of private wind farms were stopped.
In July 2010, engineers at the Ceylon Electricity Board raised further concerns regarding the approval of private wind projects with extra high tariffs, presumably some of the highest in the world. [21] A review of the wind power tariff was expected to be carried out on 12 September 2010, [22] after an agreed postponement. [23]
As of 2017, Sri Lanka has more than 100 MW in installed capacity for solar power and intends to be able to generate 1 GW installed capacity by 2025. [24]
Grid-connected solar power has only recently been introduced. The only operational commercial-scale solar-powered facility is the Buruthakanda Solar Park of 1.2 MW, operated by the Sri Lanka Sustainable Energy Authority (SLSEA). [25]
Through the Ministry of Power and Renewable Energy, Ceylon Electricity Board, and the SLSEA, the country is implementing an accelerated solar rooftop program called Soorya Bala Sangramaya (Battle for Solar Energy). The program was launched on 6 September 2016. [24]
Geothermal power is under research, although no power stations of this type are operational. [26] [27] [28]
The CEB has included a 600 MWe nuclear power plant as an option in its plans for 2031. [29]
The Sri Lankan electric transmission network consists principally of 132 kV facilities, with a 220 kV backbone connecting major inland hydroelectric generation to the capital region.
Line | No. of Ground Wires | No. of circuits | Nominal Voltage |
---|---|---|---|
Biyagama-Pannipitiya | 2 | 2 | 220kV |
Biyagama-Kotmale | 2 | 2 | 220kV |
Kelanitissa-Biyagama | 2 | 2 | 220kV |
Norochcholai-Biyagama | 2 | 2 | 220kV |
Norochcholai-New Anuradhapura | 2 | 2 | 220kV |
Kotmale-New Anuradhapura | 2 | 2 | 220kV |
Kotmale-Rantambe | 2 | 2 | 220kV |
Kolonnawa-Athurugiriya | 2 | 2 | 132kV |
Pannipitiya-Ratmalana | 2 | 2 | 132kV |
Kothmale-Kiribathkumbura | 2 | 2 | 132kV |
Kiribathkumbura-Ukuwela | 2 | 2 | 132kV |
Kiribathkumbura-Kurunagala | 1 | 2 | 132kV |
Puttalam-Madampa | 1 | 2 | 132kV |
Ukuwela-Bowatanna | 1 | 1 | 132kV |
Ukuwela-Naula | 2 | 2 | 132kV |
Naula-Habarana | 2 | 2 | 132kV |
Habarana-Old Anuradhapura | 1 | 2 | 132kV |
Old Anuradhapura-Puttalam | 2 | 2 | 132kV |
New Laxapana-Bogawanthalawa Estate | 1 | 2 | 132kV |
New Anuradhapura-Vavuni | 1 | 2 | 132kV |
Embilipitiya-Thimbolketiya | 2 | 2 | 132kV |
New Laxapana-Canyon PS | 2 | 1 | 132kV |
Old Laxapana-Polpitiya | 2 | 2 | 132kV |
Kotmale-Polpitiya | 2 | 2 | 132kV |
Nuwara Eliya-Badulla | 2 | 2 | 132kV |
Old Laxapana-Nuwara Eliya | 2 | 2 | 132kV |
Badulla-Medagama | 2 | 1 | 132kV |
Polpitiya-Seethawake | 2 | 2 | 132kV |
Seethawake-Kosgama | 2 | 2 | 132kV |
Athurugiriya-Thulhiriya | 2 | 2 | 132kV |
Embilipitiya-Hambantota | 2 | 2 | 132kV |
Balangoda-Samanalawewa | 2 | 2 | 132kV |
Balangoda-Rathnapura | 2 | 2 | 132kV |
Balangoda-Deniyaya | 1 | 2 | 132kV |
Matara-Embilipitiya | 2 | 2 | 132kV |
Habarana-Valachchenai | 1 | 1 | 132kV |
The proposed connection involves the linking of the national grids of India and Sri Lanka via Rameshwaram in south India and Talaimannar in north-west Sri Lanka. The project involves the construction of a HVDC connection between Madurai in southern India and Anuradhapura in central Sri Lanka, through the Palk Strait. The link would measure approximately 285 kilometres (177 mi) in length, including 50 kilometres (31 mi) of submarine cables, and would take more than three years to construct. It would be implemented by the Power Grid Corporation of India Limited and Ceylon Electricity Board. [30] As Sri Lanka has good solar PV and offshore wind power potential, surplus renewable power generated in Sri Lanka can be exported to India in future.
The monthly end-user electricity tariffs are:
User | Class | Units (kWh) / Time-of-use | Tariff (Rs./kWh) | Fixed charge (Rs./month) | Max. demand charge (Rs./kVA) | |
---|---|---|---|---|---|---|
Domestic | D-1 | ≤60 kWh per month | 000-030 | 2.50 | 30.00 | N/A |
031-060 | 4.85 | 60.00 | ||||
≥60 kWh per month | 000-060 | 7.85 | N/A | |||
061-090 | 10.00 | 90.00 | ||||
091-120 | 27.75 | 480.00 | ||||
121-180 | 32.00 | |||||
≥181 | 45.00 | 540.00 | ||||
Time-of-use (optional) | Day (05:30-18:30) | 25.00 | 540.00 | N/A | ||
Peak (18:30-22:30) | 54.00 | |||||
Off-peak (22:30-05:30) | 13.00 | |||||
Religious | R-1 | ≤42kVA at 400/230V | 000-030 | 1.90 | 30.00 | N/A |
031-090 | 2.80 | 60.00 | ||||
091-120 | 6.75 | 180.00 | ||||
121-180 | 7.50 | |||||
≥181 | 9.40 | 240.00 | ||||
Industry | I-1 | ≤42 kVA at 400/230 V | ≤300 | 10.80 | 600.00 | N/A |
≥301 | 12.20 | |||||
≤42 kVA at 400/230 V (Time-of-use - optional) | Day (05:30-18:30) | 11.00 | 300.00 | N/A | ||
Peak (18:30-22:30) | 20.50 | |||||
Off-peak (22:30-05:30) | 6.85 | |||||
I-2 | ≥43 kVA at 400/230 V | Day (05:30-18:30) | 11.00 | 3,000.00 | 1,100.00 | |
Peak (18:30-22:30) | 20.50 | |||||
Off-peak (22:30-05:30) | 6.85 | |||||
I-3 | ≥11,000 V | Day (05:30-18:30) | 10.25 | 1,000.00 | ||
Peak (18:30-22:30) | 23.50 | |||||
Off-peak (22:30-05:30) | 5.90 | |||||
Hotel | H-1 | ≤42 kVA at 400/230 V | ∞ | 21.50 | 600.00 | N/A |
H-2 | ≥43 kVA at 400/230 V | Day (05:30-18:30) | 14.65 | 3,000.00 | 1,100.00 | |
Peak (18:30-22:30) | 23.50 | |||||
Off-peak (22:30-05:30) | 9.80 | |||||
H-3 | ≥11,000 V | Day (05:30-18:30) | 13.70 | 3,000.00 | 1,100.00 | |
Peak (18:30-22:30) | 22.50 | |||||
Off-peak (22:30-05:30) | 8.80 | |||||
Government | GV-1 | ≤42kVA at 400/230 V | ∞ | 14.65 | 600.00 | N/A |
GV-2 | ≥42kVA at 400/230 V | ∞ | 14.55 | 3,000.00 | 1,100.00 | |
GV-3 | ≥11,000 V | ∞ | 14.35 | 3,000.00 | 1,000.00 | |
CEB-owned EV charging stations | EV | DC Fast Charging | Day (05:30-18:30) | 50.00 | N/A | N/A |
Peak (18:30-22:30) | 70.00 | |||||
Off-peak (22:30-05:30) | 30.00 | |||||
AC Charging | Day (05:30-18:30) | 30.00 | ||||
Peak (18:30-22:30) | 55.00 | |||||
Off-peak (22:30-05:30) | 20.00 | |||||
Street lighting | SL | Public use | ∞ | 17.00 | N/A | N/A |
Private use | ||||||
General [Note 1] | G-1 | ≤42 kVA at 400/230 V | ≤300 | 18.30 | 240.00 | N/A |
≥301 | 22.85 | |||||
G-2 | ≥42 kVA at 400/230 V | Day (05:30-18:30) | 21.80 | 3,000.00 | 1,100.00 | |
Peak (18:30-22:30) | 26.60 | |||||
Off-peak (22:30-05:30) | 15.40 | |||||
G-3 | ≥11,000 V | Day (05:30-18:30) | 20.70 | 3,000.00 | 1,000.00 | |
Peak (18:30-22:30) | 25.50 | |||||
Off-peak (22:30-05:30) | 14.35 | |||||
In 2010, the Ministry of Power and Energy, with the Lanka Electricity Company and the Ceylon Electricity Board introduced net metering, where consumers could generate their own power from renewable sources and credit excess production back to the power utility. [34] While the power utility will not pay back in monetary values irrespective of how much credit a household generates, it allows the transferring of this credit between households. [35] The first solar power facility intended for net metering was commissioned in July 2010. [36]
Per Section 21-2 of the Sri Lanka Electricity Act No. 20 of 2009, [37] the Public Utilities Commission of Sri Lanka has granted the following entities exemptions in electricity usage:
Exemption No. | Person/Entity | Premises | Gazette No. & Date |
---|---|---|---|
EL/EX-D/11/001 | MAS Fabric Park (Private) Limited | MAS Fabric Park, Kurunegala Road, Thulhiriya | Extraordinary Gazette – No. 1725/14 28 September 2011 |
EL/EX-D/11/002 | Overseas Realty (Ceylon) PLC | World Trade Centre, Echelon Square, Colombo 1 | |
EL/EX-D/11/003 | Mireka Capital Land (Private) Limited | 324, Havelock Road, Colombo 6 | |
EL/EX-D/12/001 | Asian Hotels and Properties PLC | No. 89, Galle Road, Colombo 3 | General Gazette – No. 1744, 3 February 2012 |
EL/EX-D/12/002 | BOC Property Development & Management (Private) Limited | BOC Merchant Tower, 28, St. Michael's Road, Colombo 3 | |
EL/EX-D/12/003 | Millenium Development (Private) Limited | Excel World Entertainment Park, 338, T B Jayah Mawatha, Colombo – 10 | |
EL/EX-D/12/004 | Property Finance and Investments Kandy (Private) Limited | Kandy City Centre, 05, Dalada Vidiya, Kandy | |
EL/EX-D/12/005 | Whittall Boustead (Private) Limited | 148, Vauxhall Street, Colombo 2 | |
EL/EX-D/12/006 | Ceylon Carriers (Private) Limited | 104, Nawala Road, Narahenpita, Colombo 5 | Extraordinary Gazette – No. 1749/8, 12 March 2012 |
EL/EX-D/12/007 | JayKay Marketing Services (Private) Limited | K-Zone Shopping Mall, 340, Galle Road, Moratuwa | Extraordinary Gazette – No. 1757/19, 11 May 2012 |
EL/EX-D/12/008 | Platinum Realty Investments (Private) Limited | 01, Bagatale Road, Colombo 3 | |
EL/EX-D/12/009 | Union Residencies (Private) Limited | No. 200, Union Place, Colombo 2 | |
EL/EX-D/12/010 | Pelwatte Sugar Industries PLC | Pelwatte Sugar Industries Buttala | |
EL/EX-G/12/001 | Tokyo Cement Power (Lanka) Limited | 10 MW Biomass Power Plant, Cod Bay, China Bay, Trincomalee | Extraordinary Gazette – No. 1759/31, 23 May 2012 |
India is the third largest producer of electricity in the world. During the fiscal year (FY) 2019–20, the total electricity generation in the country was 1,598 TWh, of which 1,383.5 TWh generated by utilities. The gross electricity consumption per capita in FY2019 was 1,208 kWh.
For solar power, South Asia has the ideal combination of both high solar insolation and a high density of potential customers.
According to preliminary data from the US Energy Information Administration, renewable energy accounted for about 12.6% of total primary energy consumption and about 19.8% of the domestically produced electricity in the United States in 2020.
Renewable energy in the United Kingdom contributes to production for electricity, heat, and transport.
As of August 2020 Chile had diverse sources of electric power: for the National Electric System, providing over 99% of the county's electric power, hydropower represented around 26.7% of its installed capacity, biomass 1.8%, wind power 8.8%, solar 12.1%, geothermal 0.2%, natural gas 18.9%, coal 20.3%, and petroleum-based capacity 11.3%. Prior to that time, faced with natural gas shortages, Chile began in 2007 to build its first liquefied natural gas terminal and re-gasification plant at Quintero near the capital city of Santiago to secure supply for its existing and upcoming gas-fired thermal plants. In addition, it had engaged in the construction of several new hydropower and coal-fired thermal plants. But by July 2020 91% of the new capacity under construction was of renewable power, 46.8% of the total solar and 25.6% wind, with most of the remainder hydro.
The utility electricity sector in Bangladesh has one national grid with an installed capacity of 25,700 MW as of June 2022. Bangladesh's energy sector is not up to the mark. However, per capita energy consumption in Bangladesh is considered higher than the production. Electricity was introduced to the country on 7th of December, 1901 under British rule.
The Ceylon Electricity Board - CEB, is the largest electricity company in Sri Lanka. With a market share of nearly 100%, it controls all major functions of electricity generation, transmission, distribution and retailing in Sri Lanka. It is one of the only two on-grid electricity companies in the country; the other being Lanka Electricity Company (LECO). The company earned approximately Rs 204.7 billion in 2014, with a total of nearly 5.42 million consumer accounts. It is a government owned and controlled utility of Sri Lanka that takes care of the general energy facilities of the island. The Ministry of Power and Energy is the responsible ministry above the CEB. Ceylon Electricity Board (CEB), established by an CEB Act No. 17 of 1969, is under legal obligation to develop and maintain an efficient, coordinated and economical system of Electricity supply in accordance with any Licenses issue.
The Lakvijaya Power Station is the largest power station in Sri Lanka.
Renewable energy in Russia mainly consists of hydroelectric energy. In 2010, the country was the sixth largest producer of renewable energy in the world, although it was 56th when hydroelectric energy was not taken into account. Some 179 TWh of Russia's energy production came from renewable energy sources, out of a total economically feasible potential of 1823 TWh. 16% of Russia's electricity was generated from hydropower, and less than 1% was generated from all other renewable energy sources combined. Roughly 68% of Russia's electricity was generated from thermal power and 16% from nuclear power.
Renewable energy has developed rapidly in Italy over the past decade and provided the country a means of diversifying from its historical dependency on imported fuels. Solar power accounted for around 8% of the total electric production in the country in 2014, making Italy the country with the highest contribution from solar energy in the world that year. Rapid growth in the deployment of solar, wind and bio energy in recent years lead to Italy producing over 40% of its electricity from renewable sources in 2014.
As of 2018, hydroelectric power stations in the United Kingdom accounted for 1.87 GW of installed electrical generating capacity, being 2.2% of the UK's total generating capacity and 4.2% of UK's renewable energy generating capacity. This includes four conventional hydroelectric power stations and run-of-river schemes for which annual electricity production is approximately 5,000 GWh, being about 1.3% of the UK's total electricity production. There are also pumped-storage hydroelectric power stations providing a further 2.8 GW of installed electrical generating capacity, and contributing up to 4,075 GWh of peak demand electricity annually.
Renewable energy in Turkey is mostly hydroelectricity, geothermal energy and solar energy. Although sun and wind could supply plenty of energy in Turkey, hydropower is the only renewable energy which is fully exploited, averaging about a fifth of national electricity supply. However in drought years much less electricity is generated by hydro. Over half of capacity is renewables, and it is estimated that over half of generation could be from renewables by 2026, but Turkey has invested less in solar and wind power than similar Mediterranean countries. Turkey lacks a renewable energy plan beyond 2023 which includes transport, industry, heating and cooling as well as electricity generation. More renewable energy could be used to reduce the nation's greenhouse gas emissions, and thus avoid paying other countries' carbon tariffs. Turkey is a net exporter of wind power equipment, but a net importer of solar power equipment. Total non-hydro renewables overtook hydro in 2021. Solar is expected to overtake wind before 2030.
Chunnakam Power Station was a thermal power station in Chunnakam in northern Sri Lanka. Commissioned in 1958, the station is owned and operated by the state-owned Ceylon Electricity Board (CEB). It was decommissioned in 2013, and replaced by the Uthuru Janani Power Station, which is constructed less than 100m south of the Chunnakam Power Station.
The Thambapavani Wind Farm named after Thambapanni and Pavan meaning wing in Sinhalese. Also called Mannar Island Wind Farm or Mannar Wind Farm) is a 100-megawatt wind farm which was built on the southern coast of the Mannar Island, in Sri Lanka. The project would cost approximately US$200 million, 78% of which will be borne by the Asian Development Bank, while the remaining 22% will be borne by the developers, the Ceylon Electricity Board. Identification of land plots and ownership has already begun. It is currently regarded as the largest wind farm in Sri Lanka and it is also the first wind power plant to be owned by the Ceylon Electricity Board.
Renewable energy in South Africa is energy generated in South Africa from renewable resources, those that naturally replenish themselves—such as sunlight, wind, tides, waves, rain, biomass, and geothermal heat. Renewable energy focuses on four core areas: electricity generation, air and water heating/cooling, transportation, and rural energy services. The energy sector in South Africa is an important component of global energy regimes due to the country's innovation and advances in renewable energy. South Africa's greenhouse gas (GHG) emissions is ranked as moderate and its per capita emission rate is higher than the global average. Energy demand within the country is expected to rise steadily and double by 2025.
The Moragolla Dam is a planned hydroelectric dam in Moragolla, Sri Lanka. The dam is to be 35 m (115 ft) high and is planned to create the 1,980,000 m3 (70,000,000 cu ft) Moragolla Reservoir with a maximum supply level at 548 m (1,798 ft) MSL. Upon completion, the Moragolla Power Station would have a gross installed capacity of 30 megawatts from two francis turbines, capable of generating approximately 85 GWh annually.
Zambia is potentially self-sufficient in sources of electricity, coal, biomass and renewable energy. The only energy source where the country is not self-sufficient is petroleum energy. Many of the sources of energy where the country is self-sufficient are largely unexploited. As of 2017, the country's electricity generating capacity stood at 1,901 megawatts.
The 2019 Sri Lanka electricity crisis was a crisis which happened nearly a month from 18 March to 10 April 2019 faced by Sri Lanka caused by a severe drought that depleted water levels at hydroelectric plants. Sri Lanka experienced rolling blackouts for three to five hours per day except on Sundays in all parts of the island nation at different time schedules that started from 24 March 2019 to present. This is regarded as one of the worst blackouts confronted in Sri Lanka since 2016 and the longest ever blackout recorded in history of the country. However it was revealed that the main electricity providing institution Ceylon Electricity Board had restricted the power supply to almost all regions of the country without proper prior notice and implemented a time schedule unofficially from 24 March 2019. However the Ministry of Power and Renewable Energy revealed that it didn't grant and approve permission to CEB to impose power cuts.