Railways in South East Queensland

Last updated

Railways in South East Queensland
NewGeneration710.jpg
NGR 710 at Yeronga in 2018.
Overview
Owner Queensland Rail
Area served South East Queensland
LocaleBrisbane
Transit type Suburban rail
Number of lines12
Number of stations154 plus 3 under construction
Annual ridership42.86 million (FY22/23)
Chief executiveKatarzyna Stapleton
Headquarters Brisbane
Website queenslandrail.com.au
Operation
Began operation1865 (1865)
Operator(s) Queensland Rail
Technical
System length689 km (428 mi)
Track gauge 1,067 mm (3 ft 6 in)
Electrification 25 kV 50 Hz AC overhead lines
Top speed140 km/h (87 mph)
Queensland Rail's Electric Multiple Units have been operating in South East Queensland since electrification commenced in 1979 EMU01 at the opening of Queensland rail electrification.jpg
Queensland Rail's Electric Multiple Units have been operating in South East Queensland since electrification commenced in 1979

Railways in South East Queensland consist of a large passenger and freight rail network centred on Brisbane, the capital city of the Australian state of Queensland. Suburban and interurban passenger rail services are operated by Queensland Rail, which also operates long-distance services connecting Brisbane to the rest of the state. Aurizon and Pacific National are private companies which operate freight services. The passenger rail network in South East Queensland is known as the Citytrain network. [1]

Contents

Queensland Rail operates ten suburban and two interurban lines in South East Queensland, all of which are electrified. Centred in the Brisbane central business district, the network extends as far as Gympie in the north, Varsity Lakes in the south, Rosewood in the west, and Cleveland in the east to Moreton Bay. [2]

Each line is ascribed a colour and name on all Queensland Rail signage and marketing collateral including timetables, posters and maps. There are 153 stations on the South East Queensland rail network. Queensland Rail refers to the network by two different names, either as the 'South East Queensland (SEQ) network' [3] or the 'Citytrain network'. [4] [5] Rail services and ticketing are co-ordinated by the Queensland government agency Translink.

Queensland Rail’s trains had 42.86 million boardings in the 2022–23 financial year, giving the SEQ rail network the fourth highest patronage out of Australia's suburban rail networks, behind that of Sydney, Melbourne and Perth. [6] [7]

History

Construction

Official opening of the first section from Ipswich to Grandchester, 1865 StateLibQld 1 167623 Official opening of the first section of the Ipswich to Grandchester railway, Ipswich, 1865.jpg
Official opening of the first section from Ipswich to Grandchester, 1865

The first railway in Queensland did not actually run to Brisbane, but ran from Ipswich to Grandchester. Opened in July 1865, [8] the line into Brisbane was not completed until the opening of the Albert Bridge in July 1875. [9] Branch lines in the city itself did not start until the next decade, with the branch line to Sandgate opened in May 1882, and the branch from Eagle Junction to Racecourse in September the same year.

Lines were opened from Brisbane to Sandgate and Ascot in 1882. The first section of the North Coast line opened to Petrie in 1888. [10] In 1891 this line was connected to the Maryborough line at Gympie, creating a through line to Mount Perry. A branch line was built from Caboolture to Woodford in 1909 and Kilcoy in 1913, now closed. A branch line was opened from Monkland (south of Gympie) to Brooloo in 1915. A line was opened from the first South Brisbane station at Stanley Street, Woolloongabba to Beenleigh in 1885, and extended to Southport in 1889 and Tweed Heads, New South Wales in 1903. This line was closed beyond Beenleigh in 1964. [11]

A branch line was completed between Park Road station and Cleveland in 1889, although the section beyond Lota station was closed and since reconstructed. A new South Brisbane station was built on Melbourne Street in 1891. This became the terminus of the standard gauge line from Grafton in 1930 and Sydney in 1932. A dual gauge line was built from South Brisbane over the Brisbane River to Roma Street in 1978. A line was opened in 1980 from a junction near Lindum station on the Cleveland line to the Port of Brisbane at Fisherman's Island. This was converted to dual 1435/1067 mm gauge and extended in parallel with the duplicated passenger line to Dutton Park in about 1995 under the Keating government's One Nation program.

The Beaudesert line was opened between Bethania and Beaudesert in 1888, and closed in 1996. The Canungra line was completed to Canungra in 1915, now closed. The line from extended from Roma Street to Central stations in 1889, and to Brunswick Street station in 1890. The Ferny Grove line was opened from a junction at Mayne to Enoggera in 1899. The short Laidley Valley railway lines opened on 19 April 1911 but was never profitable.

Electrification

A start on electrification of the suburban network was approved in 1950 but a change of state government in 1957 saw the scheme abandoned in 1959. [12] It was not until the 1970s that electrification was again brought up, with contracts let in 1975. [13] The first part of the new electric system from Darra to Ferny Grove opened on 17 November 1979. [14] [15] The network was completed by 1988, with a number of extensions made since and additional rolling stock purchased. Services were initially operated under the Queensland Rail brand, with the Citytrain name established in 1995. [16]

Duplication

Oxley station's new platform and track (left) Oxley railway station.jpg
Oxley station's new platform and track (left)

To increase the capacity on a number of lines, the rail network in Brisbane has required some tracks to be duplicated. In June 2004, Queensland Government announced rail duplication of the Gold Coast line between Ormeau and Coomera stations. [17] Between 2008 and 2010, work was carried out to duplicate the tracks between Darra and Corinda stations. Work included a link to the Springfield line and upgrades to Oxley and Darra stations. [18] In 2010, funding was allocated for the duplication of the rail line between Keperra to Ferny Grove. [19]

Increased capacity

Beenleigh line

A third track was laid between Salisbury and Kuraby stations, a length of 9.5 km (5.9 mi). Previously two tracks, the added capacity allows Gold Coast line services to operate with less chance of delays. Seven railway stations along the section were significantly upgraded. The project was commissioned on 2 March 2008. [20]

Ferny Grove line

A second track was laid between Mitchelton and Keperra railway station, including an upgrade to the intermediate stations, Oxford Park and Grovely. Upgraded with two platforms, this upgrade allows additional services to operate on the line during peak hour, and will also remove waiting times outbound from Mitchelton and inbound from Keperra. Other improvements include lifts and footbridges, to meet the Disability Standards for Accessible Public Transport, and new, modern station buildings. [21] The further duplication of the railway between Keperra and Ferny Grove stations, plus an additional platform and parking at Ferny Grove has been completed.

Gold Coast line

The line between Ormeau and Coomera stations, 6.7 km (4.2 mi) in length, was duplicated in October 2006, allowing for additional capacity. [22] Similarly, the 16.6 km (10.3 mi) length between Helensvale and Robina stations was duplicated in July 2008, removing the need for a four-minute layover at Helensvale for Robina services to wait for the Brisbane service due to the single track either side of the station. [23]

Ipswich line

5.2 km (3.2 mi) of track between Corinda and Darra stations was quadruplicated. Previously four tracks to Corinda then two to Ipswich, the quadruplication allowed for greater capacity, especially with the Springfield railway line branching from Darra station.

Sunshine Coast line

13.7 km (8.5 mi) of track north of Caboolture station to Beerburrum station has been duplicated and re-aligned, along with the construction of stations at Elimbah and Beerburrum. Construction work began in 2007, and the project was commissioned on 14 April 2009. [24]

From Beerburrum station, 17 km (11 mi) of track to Landsborough is proposed to be similarly duplicated and re-aligned. This project started being built in 2020. [25]

Recent extensions

Airport line

Queensland Rail IMU109 at International Terminal station QRIMU109airint.jpg
Queensland Rail IMU109 at International Terminal station

The Airport rail line opened to passengers in May 2001. [26] Under a BOOT scheme – build, own, operate and transfer – the Queensland Government licensed Airtrain Citylink to build the rail line, to own and operate it, and hand the entire infrastructure over to the Queensland Government after 35 years when the company will then cease to exist. [26] [27] Airtrain Citylink contracted Transfield Services to build, operate and maintain the line [26] and finally Airtrain Citylink contracted Queensland Rail to provide rolling stock for the rail line. [28]

Gold Coast line

Varsity Lakes station 20091211 - Varsity Lakes 01.JPG
Varsity Lakes station

In July 2007, Queensland Government announced the rail extension for the Gold Coast line. [29] The first stage was completed in 2009 [30] which took the line to Varsity Lakes. [29] It was later proposed to take the line to Tallebudgera but it didn't happen. [29] This is the first stage of the proposed progressive extension of the line to the Gold Coast Airport. Further extension of the line including proposed stations at Tallebudgera, Elanora and Tugun is expected to be constructed after the completion of the Cross River Rail project. [31]

A light rail line, G:link, on the Gold Coast opened in July 2014.

Springfield line

The Springfield railway line is a line extending from Darra railway station on the Ipswich line to the Springfield area. The 26 km (16 mi) extension of the network had a total cost of $475 million and was completed in December 2013. [32] [33]

Redcliffe Peninsula line

The Redcliffe Peninsula railway line (previously known as the Moreton Bay Rail link) is a suburban railway line extending 27.5 km (17.1 mi) north-northwest from Brisbane central business district (approximately 40.1 km (24.9 mi) from Central station. The line is part of the QR Citytrain network, branching from the existing Caboolture line immediately after Petrie railway station, and extend to the Redcliffe peninsula. It was more seriously identified and anticipated in the 1970s, and the land was purchased in the 1980s although the line was not built. Construction commenced in 2013 and the line was opened to passengers on 4 October 2016.

Future

A number of upgrades and extensions are planned or under construction for the rail network in South East Queensland. The Maroochydore railway line is proposed to branch off the North Coast line at Beerwah and operate via Caloundra to Maroochydore.

In 2011, the Queensland Government released a major transport plan Connecting SEQ 2031, which aimed to double public transport usage in South East Queensland. [34] [35] It proposed a number of service upgrades and rail extensions, including Cross River Rail, the Gold Coast light rail, a new high frequency Brisbane subway in the central city from Toowong to Bowen Hills, and a new North-west rail line branching from Cross River Rail at Alderley to Strathpine. [35]

Cross River Rail

Construction site of Cross River Rail at Roma Street station in central Brisbane in 2021 Construction site of new underground Roma Street railway station for Cross River Rail, April 2021 in Brisbane, 02.jpg
Construction site of Cross River Rail at Roma Street station in central Brisbane in 2021

On 26 August 2007, the then-Minister for Transport and Main Roads, Paul Lucas, announced the Inner City Rail Capacity Study to look at underground rail access under the Brisbane central business district. Dismissing a City Loop-style scenario similar to Melbourne, citing the relatively small size of the CBD and "technical and operational constraints", Lucas imagined an underground line from Park Road station to Woolloongabba, then across the Brisbane River to connect with the Exhibition railway line, with major new stations at Woolloongabba, Gardens Point/QUT, and in the CBD. The study also investigated the feasibility of the Exhibition line operating all year with new stations, and the upgrading of existing lines with additional tracks. Lucas allocated A$5 million to the study and appointed AECOM and Parsons Brinckerhoff as consultants to "look at options for boosting rail capacity in the city centre, including potential for an underground tunnel". [36]

This project, Cross River Rail, is now under construction and scheduled to open to the public in early 2026. [37]

In 2017, work began on a second rail river crossing for Brisbane as the Merivale Bridge nears capacity. The project includes just under six kilometres of new underground rail, three new underground stations at Boggo Road, Woolloongabba and Albert Street, new underground platforms at Roma Street station, and an upgrade to the existing Exhibition station. The new inner-city route will be used by the New Generation Rollingstock.
BSicon CONTg.svg
BSicon STRc2.svg
BSicon xABZg3.svg
BSicon STRc2.svg
BSicon STR3+1.svg
BSicon STRc4.svg
BSicon exACC.svg
Bowen Hills
BSicon STR+1.svg
BSicon STRc4.svg
BSicon exSTR.svg
Exhibition
BSicon ACC.svg
BSicon exACC.svg
Fortitude Valley
BSicon exSTRc2.svg
BSicon eABZg3.svg
BSicon extSTRa.svg
BSicon exSTR+1.svg
BSicon exSTRc4.svg
BSicon tSTRa.svg
BSicon extACC.svg
Ipswich/Springfield lines
to Ipswich/Springfield
BSicon exCONTgq.svg
BSicon exABZq+l.svg
BSicon exSHI4gl+lq.svg
BSicon tTINTACCxh.svg
BSicon extSTRaq.svg
BSicon extSTRr.svg
Roma Street
BSicon WCONTgq.svg
BSicon exhKRZWae.svg
BSicon WASSER+r.svg
BSicon tSTR.svg
South Brisbane
BSicon exACC.svg
BSicon WASSER.svg
BSicon tSTR.svg
BSicon exSTR.svg
BSicon WASSER.svg
BSicon tACC.svg
Albert Street
South Bank
BSicon exACC.svg
BSicon WASSERl.svg
BSicon tKRZW.svg
BSicon WCONTfq.svg
Brisbane River
BSicon exSTR2.svg
BSicon exSTRc3.svg
BSicon tINTACC.svg
Woolloongabba
BSicon exSTRc1.svg
BSicon exSTRl+4.svg
BSicon tTINTACCxh.svg
BSicon exSTR+r.svg
Boggo Road
BSicon exSTRc2.svg
BSicon tSTRe.svg
BSicon exABZ3l.svg
BSicon exCONTfq.svg
BSicon eABZg+1.svg
BSicon exSTRc4.svg
BSicon ACC.svg
Dutton Park
BSicon CONTf.svg

Logan and Gold Coast Faster Rail

Logan and Gold Coast Faster Rail is a corridor upgrade project for the Beenleigh and Gold Coast Lines. The project will quadruplicate the tracks between Kuraby and Beenleigh, upgrade six stations, relocate three others, make the entire area grade-separated, and implement ETCS Level 2 from Salisbury to Varsity Lakes. [38]
Logan and Gold Coast Faster Rail
BSicon exCONTg.svg
BSicon exCONTg.svg
BSicon exCONTg.svg
continue to Brisbane
BSicon exXACC-L.svg
BSicon exXACC-M.svg
BSicon exXACC-R.svg
Fruitgrove
BSicon RBq.svg
BSicon RBq.svg
BSicon exSKRZ-Bhl.svg
BSicon exSKRZ-Bh.svg
BSicon exSKRZ-Bhr.svg
BSicon RBq.svg
AUS Alphanumeric Route M2 toll.svg
Gateway Motorway
BSicon STR+l.svg
BSicon ABZgr.svg
BSicon exSTR.svg
BSicon exSTR.svg
BSicon STRg.svg
BSicon XACC-L.svg
BSicon XACC-M.svg
BSicon XACC-R.svg
Kuraby
BSicon RP4q.svg
BSicon SKRZ-G4hl.svg
BSicon SKRZ-G4h.svg
BSicon SKRZ-G4h.svg
BSicon SKRZ-G4hr.svg
BSicon RP4q.svg
Australian state route 57.svg
Beenleigh Road
BSicon STRg.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STRf.svg
BSicon RP4q.svg
BSicon SKRZ-G4o(Rr).svg
BSicon STR.svg
BSicon STR.svg
BSicon SKRZ-G4o(Ll).svg
BSicon RP4q.svg
Australian state route 30.svg
Compton Road
BSicon STR.svg
BSicon XACC-L.svg
BSicon XACC-R.svg
BSicon STR.svg
Trinder Park (relocated)
BSicon RP1q.svg
BSicon SKRZ-G1hl.svg
BSicon SKRZ-G1h.svg
BSicon SKRZ-G1h.svg
BSicon SKRZ-G1hr.svg
BSicon RP1q.svg
Acacia Road
BSicon STRg.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STRf.svg
BSicon STR.svg
BSicon XACC-L.svg
BSicon XACC-R.svg
BSicon STR.svg
Woodridge
BSicon RP4q.svg
BSicon SKRZ-G4o(Rr).svg
BSicon STR.svg
BSicon STR.svg
BSicon SKRZ-G4o(Ll).svg
BSicon RP4q.svg
Australian state route 50.svg
Wembley Road
BSicon STRg.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STRf.svg
BSicon RP4q.svg
BSicon SKRZ-G4hl.svg
BSicon SKRZ-G4h.svg
BSicon SKRZ-G4h.svg
BSicon SKRZ-G4hr.svg
BSicon RP4q.svg
Australian state route 95.svg
Kingston Road
BSicon STR.svg
BSicon XACC-L.svg
BSicon XACC-R.svg
BSicon STR.svg
Kingston
BSicon STRg.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STRf.svg
BSicon RBq.svg
BSicon SKRZ-Bhl.svg
BSicon SKRZ-Bh.svg
BSicon SKRZ-Bh.svg
BSicon SKRZ-Bhr.svg
BSicon RBq.svg
AUS Alphanumeric Route M6 toll.svg
Logan Motorway
BSicon STRg.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STRf.svg
BSicon RP4q.svg
BSicon SKRZ-G4hl.svg
BSicon SKRZ-G4h.svg
BSicon SKRZ-G4h.svg
BSicon SKRZ-G4hr.svg
BSicon RP4q.svg
Loganlea Road
BSicon XACC-L.svg
BSicon XACC-M.svg
BSicon XACC-M.svg
BSicon XACC-R.svg
Loganlea
BSicon WASSERq.svg
BSicon hKRZWae.svg
BSicon hKRZWae.svg
BSicon hKRZWae(Rr).svg
BSicon hKRZWae(Ll).svg
BSicon WASSERq.svg
Logan River
BSicon RP1q.svg
BSicon SKRZ-G1hl.svg
BSicon SKRZ-G1h.svg
BSicon SKRZ-G1h.svg
BSicon SKRZ-G1hr.svg
BSicon RP1q.svg
Station Road
BSicon STR.svg
BSicon XACC-L.svg
BSicon XACC-R.svg
BSicon STR.svg
Bethania
BSicon STRg.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STRf.svg
BSicon STR.svg
BSicon XACC-L.svg
BSicon XACC-R.svg
BSicon STR.svg
Edens Landing
BSicon STR+l.svg
BSicon ABZgr.svg
BSicon STRg.svg
BSicon STRf.svg
BSicon STR.svg
BSicon BST.svg
BSicon STRg.svg
BSicon XACC-L.svg
BSicon XACC-R.svg
BSicon STRf.svg
Holmview (incl. Cattle Siding)
BSicon STRl.svg
BSicon ABZg+r.svg
BSicon STR.svg
BSicon STR.svg
BSicon STR.svg
BSicon RP4q.svg
BSicon SKRZ-G4o(Rr).svg
BSicon STR.svg
BSicon STR.svg
BSicon SKRZ-G4o(Ll).svg
BSicon RP4q.svg
Australian state route 94.svg
Logan River Road
BSicon RP4q.svg
BSicon SKRZ-G4o(Rr).svg
BSicon STR.svg
BSicon STR.svg
BSicon SKRZ-G4o(Ll).svg
BSicon RP4q.svg
Australian state route 92.svgAustralian state route 94.svg
Hammel Street
BSicon RP2q.svg
BSicon SKRZ-G2o(Rr).svg
BSicon STR.svg
BSicon STR.svg
BSicon SKRZ-G2o(Ll).svg
BSicon RP2q.svg
Zander Street
BSicon XACC-L.svg
BSicon XACC-M.svg
BSicon XACC-M.svg
BSicon XACC-R.svg
Beenleigh (relocated)
BSicon STRl.svg
BSicon ABZg+r.svg
BSicon ABZg+l.svg
BSicon STRr.svg
BSicon TUNNEL1l.svg
BSicon TUNNEL1r.svg
BSicon eXACC-L.svg
BSicon eXACC-R.svg
Beenleigh (closed)
BSicon exSTR.svg
BSicon xABZgl.svg
BSicon KDSTeq.svg
Beenleigh Yard
BSicon exSTRg.svg
BSicon exSTRf.svg
BSicon exCONTf.svg
BSicon exCONTf.svg
continue to Varsity Lakes

Direct Sunshine Coast Rail Line

Direct Sunshine Coast Rail (DSC) is a new rail line from Beerwah to Maroochydore, servicing the growing southern Sunshine Coast communities of Birtinya, Caloundra, Nirimba, Aroona and Kawana. [39] The corridor shares the proposed Kawana Motorway corridor from Birtinya to Maroochydore, intertwined along its route. North of Maroochydore there is allowance for a future extension to the Sunshine Coast Airport. In the south, the corridor is predominantly flat with minimal curves to provide the fastest speeds possible through open grass floodplains and the glasshouse plantation forests.
Direct Sunshine Coast Rail Line
BSicon exKBHFa.svg
Sunshine Coast Airport
(proposed future extension)
BSicon RMCONTgq.svg
BSicon RMuq.svg
BSicon exSTR.svg
BSicon RM+r.svg
Australian state route 70.svg
Sunshine Motorway
BSicon exhKRZWae.svg
BSicon RMoW.svg
Maroochy River
BSicon xABZg+l.svg
BSicon exSTRl.svg
BSicon SKRZ-Moq.svg
BSicon hKINTACCeq.svg
37.0 km
Maroochydore
BSicon ACC.svg
BSicon RM.svg
32.8 km
Mountain Creek
BSicon RMCONTgq.svg
BSicon SKRZ-Mu.svg
BSicon MWCLOu.svg
Australian state route 70.svg
Sunshine Motorway
BSicon hKRZWae.svg
BSicon RMoW.svg
Mooloolah River
BSicon RM+l.svg
BSicon SKRZ-Mu.svg
BSicon RMr.svg
Future Kawana Motorway
BSicon RMCONTf.svg
BSicon INTACC.svg
26.3 km
Birtinya
BSicon hACCa.svg
22.1 km
Aroona
BSicon htSTRae.svg
BSicon hSKRZ-G4.svg
Australian state route 6.svg
Caloundra Road
BSicon hINTACCe.svg
18.9 km
Caloundra
BSicon ACC.svg
11.0 km
Nirimba
BSicon SKRZ-Bo.svg
AUS Alphanumeric Route M1.svg
Bruce Highway
BSicon STR.svg
BSicon SKRZ-G2o.svg
Australian state route 6.svg
Australian Tourist Drive 24.svgSteve Irwin Way
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon hINTACCae.svg
0.0 km
Beerwah
BSicon CONTf.svg
Sunshine Coast Line
to Brisbane

Lines and services

Queensland Rail operates twelve rail lines across South East Queensland, centred on the Brisbane central business district. Lines that share a colour connect through the central city. The Exhibition line is a special events service connecting the Brisbane Showgrounds. Note that some stations are counted multiple times on this list. Railways in South East Queensland

South East Queensland rail lines
LineFirst ServiceImageLengthStationsRolling stock
Airport line 2001 Brisbane airport Domestic Station.jpg 15.9 km (9.9 mi)2 (branch)
Beenleigh line 1881 (electrified 1982-4) QR SMU 239 South Brisbane, 2017 (01).jpg 41.5 km (25.8 mi)22
Caboolture line 1888 (electrified 1982-6) Caboolture Railway Station, Queensland, Aug 2012.JPG 49.6 km (30.8 mi)13
Cleveland line 1888 (electrified 1982-8) Cleveland station partial inside view.jpg 37.3 km (23.2 mi)25
Doomben line 1882 (electrified 1988) Doomben Railway Station, Queensland, June 2012.JPG 8 km (5.0 mi)11
Exhibition line 1882 (electrified 1982) Exhibition Railway Station, Queensland, Aug 2012.JPG 3.4 km (2.1 mi)1 (branch)
Ferny Grove line 1899 (electrified 1979) Grovely station platform.jpg 13.5 km (8.4 mi)11
Gold Coast line 1996 VarsityLakes2016.jpg 20
  • New Generation Rollingstock
Ipswich and Rosewood line 1876 (electrified 1979-93) East Ipswich Railway Station, Queensland, Sep 2012.JPG 57 km (35 mi)32
Redcliffe Peninsula line 2016 Mango Hill railway station, Brisbane, Jan 2017.jpg 12 km (7.5 mi)6 (branch)
Shorncliffe line 1882 (electrified 1982) Shorncliffe station platform.JPG 11 km (6.8 mi)18
Springfield line 2013 Springfield Central Railway Station, Queensland, December 2013.JPG 13.6 km (8.5 mi)4 (Branch)
Sunshine Coast line 1881 (Electrified 1988) Landsborough Railway Station, Queensland, Sep 2012.JPG 180 km (110 mi)29

RailBus services

Translink operates several bus routes along corridors on behalf of QR where the railway line has been closed to passenger traffic or supplements low-patronage lines at specific times of the day. [40]

To relieve congestion on the single track North Coast line north of Beerburrum, the rail service is supplemented by a bus service operated by Kangaroo Bus Lines on weekdays between Caboolture and Nambour as route 649. [41]

Stations

Platforms at Roma Street railway station in central Brisbane Roma Street railway station seen from upper Albert Street, Brisbane.jpg
Platforms at Roma Street railway station in central Brisbane

There are 153 stations on the South East Queensland rail network. [2] The four Brisbane city stations — Roma Street, Brisbane Central, Fortitude Valley and Bowen Hills — are served by all suburban and interurban lines and together form the core of the network.

Operators

Passenger

Suburban and interurban passenger services are operated under the Citytrain brand of Queensland Rail, and are co-ordinated by Translink. Long-distance passenger services operate from Roma Street around the state under the Traveltrain brand, while an interstate service to Sydney is operated by New South Wales operator NSW TrainLink using its XPT fleet.

In a city with a population of 2 million, passenger traffic on the suburban network doubled in the 10 years from 1979 to 1989 to reach 50 million journeys a year in 1989, and by 1992 it had increased by another 10%. [42]

Ipswich line between Taringa and Toowong Brisbane City Train Lines.jpg
Ipswich line between Taringa and Toowong

In June 2009 as part the split of Queensland Rail's commuter rail and the freight business, [43] The Citytrain brand was dropped in favour of using the redesigned Queensland Rail brand. Since then most traces of the Citytrain brand have been removed from rolling stock and station signage.

On 8 March 2017, the Queensland Government released a report called "Fixing the trains: a high-level implementation plan to transform rail in Queensland" This report officially resurrected the Citytrain network naming for the first time since the split. Since this report, the Citytrain brand has slowly made its way back into reports. This brand re-emergence does not seem to be a controlled and deliberate action, but rather appeared in the report due to the Citytrain brand being well known amongst many within the Brisbane area. The report unofficially initiated a return of the Citytrain branding, and established the Citytrain Response Unit to respond to the plan.

The station announcements on passenger trains are voiced by voiceover artist Ross Newth. [44]

Freight

2300 class on a freight service at Redbank station 2303 - Redbank - 2000.jpeg
2300 class on a freight service at Redbank station

Aurizon operates the majority of freight services on both the 1,435 mm (4 ft 8+12 in) standard and 1,067 mm (3 ft 6 in) narrow gauges, with Pacific National on the standard gauge and their narrow gauge Pacific National Queensland division also operating services.

The main rail freight terminal is in the southern Brisbane suburb of Acacia Ridge, located off the Beenleigh suburban line at the northern end of the line from New South Wales. A freight line was opened from Acacia Ridge to Fishermans Island and the Port of Brisbane in 1980, [14] running alongside the Beenleigh line from Salisbury to Dutton Park, then follows the Cleveland line to Lindum. Dual gauge access on the line was promised by the Federal Fraser government in 1983, but it was not until 1997 that the work was carried out, eliminating the break-of-gauge and enabling trains to run direct from the port across the New South Wales border. [45]

Approximately four million tonnes of freight is moved from outside South East Queensland to points within it; 1.1 million tonnes was to interstate destinations. One of the largest internal traffic flows is the movement of coal along the Western Line to the Swanbank Power Station and the Port of Brisbane. [46]

The Fisherman Islands intermodal terminal was opened in 1994. [14] Other rail freight terminals have been located at South Brisbane, Park Road, Yeerongpilly, Clapham, and Salisbury. [47]

Fares and ticketing

The South East Queensland rail network structures its fares according to Translink's eight pricing zones. The system has integrated ticketing with public transport throughout South East Queensland using the contactless fare payment card called go card. [48] The card requires passengers to touch the card on a card reader at the start and end of each journey, and when transferring between services.

Fleet

All of the Queensland Rail City Network rolling stock is electric and air conditioned.

New Generation Rollingstock EMU set 753 at Sherwood Station, on a Redcliffe (Kippa Ring) service NGR753 approaching Sherwood railway station, Brisbane.jpg
New Generation Rollingstock EMU set 753 at Sherwood Station, on a Redcliffe (Kippa Ring) service

All trains are electric multiple units with a driver cabin at both ends, with the exception of EMU60 through EMU79 having a cab at one end. These units also had only 3 powered bogies (per 3 car set) compared to the 4 powered bogie arrangement for the remaining EMUs. The last of these units, EMU78, was scrapped in August 2020. All EMU, SMU and IMU units consist of 3 cars, giving a fleet total of 621 cars, plus the 20 ICE cars. The ICE units are usually configured as five car trains.

Suburban trains are occasionally scheduled on interurban lines if other toilet equipped rolling stock is not available. While using suburban trains on interurban lines increases operational flexibility, the trains are not provided with the facilities of the IMU, ICE or NGR units, such as toilets or high-backed seats.

The 260 Series SMU, 160 Series IMU and the NGR all come with free Wi-Fi on board. [52] The Wi-Fi usage is limited to 20MB. [53]

75 new six-car New Generation Rollingstock trains were ordered in January 2014 and were delivered between late 2015 and late 2019. [54] A new maintenance facility for these trains was built at Wulkuraka. The first NGR entered service on 11 December 2017.

To keep up with projected passenger increases, the procurement of 20 new electric trains was announced in 2020, with TMR considering the option of ordering an additional 45 electric trains, potentially adding up to 65 new electric trains in the next decade. [51]

Closed lines

Further reading

Related Research Articles

<span class="mw-page-title-main">Queensland Rail</span> Railway operator in Queensland, Australia

Queensland Rail (QR) is a railway operator in Queensland, Australia. Queensland Rail is owned by the Queensland Government, and operates both suburban and interurban rail services in South East Queensland, as well as long-distance passenger train services connecting Brisbane to regional Queensland. QR also owns and maintains rolling stock, in addition to approximately 6,600 kilometres (4,101 mi) of track and related infrastructure.

<span class="mw-page-title-main">Ferny Grove railway line</span> Australian railway line

The Ferny Grove railway line is a 13-kilometre (8 mi) suburban railway line in Brisbane, the state capital of Queensland, Australia. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Airport railway line, Brisbane</span> Commuter railway line, Brisbane, Australia

Airtrain is the privately owned commuter railway line that extends 13.0 km (8.1 mi) northeast from Brisbane, the state capital of Queensland, to Brisbane Airport (BNE) at both its separate International and Domestic terminals. It was opened in 2001.

<span class="mw-page-title-main">Doomben railway line</span> Railway line in Brisbane, Australia

The Doomben railway line is a railway line in the City of Brisbane, Queensland, Australia. It is the part of the Pinkenba railway line that still operates a regular passenger service. Doomben, or dumben, is the Indigenous Yuggera name for a tree fern which was prolific in the area. The railway line branches from the North Coast line at Eagle Junction, extending 8 kilometres (5.0 mi) to the industrial suburb of Pinkenba, situated on the northern bank at the mouth of the Brisbane River. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Shorncliffe railway line</span> Suburban railway line in Queensland, Australia

The Shorncliffe railway line is an 11 kilometres (6.8 mi) suburban railway line situated north of Brisbane, the state capital of Queensland, Australia. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Ipswich and Rosewood railway line</span> Railway line in Australia

The Ipswich and Rosewood line refers to the section of the Main Line to Toowoomba that has a regular suburban rail service, extending southwest from the Brisbane central business district. It is part of the Queensland Rail City network.

<span class="mw-page-title-main">Beenleigh railway line</span> Suburban railway line in Brisbane, Australia

The Beenleigh railway line is a suburban railway line extending 40.1 km from Park Road railway station to Beenleigh railway station. It is part of the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Darra railway station</span> Railway station in Brisbane, Queensland, Australia

Darra railway station is located on the Main line in Queensland, Australia. It serves the Brisbane suburb of Darra.

<span class="mw-page-title-main">Landsborough railway station</span> Train station in Queensland, Australia

Landsborough railway station is located on the North Coast line in Queensland, Australia. It serves the town of Landsborough in the Sunshine Coast Region.

<span class="mw-page-title-main">Beerwah railway station</span> Railway station in Queensland, Australia

Beerwah railway station is a heritage-listed railway station on the North Coast line in Queensland, Australia. It serves the town of Beerwah in the Sunshine Coast Region. It is listed on the Sunshine Coast Region Heritage Register.

<span class="mw-page-title-main">Beerburrum railway station</span> Railway station in Queensland, Australia

Beerburrum railway station is located on the North Coast line in Queensland, Australia. It serves the town of Beerburrum in the Sunshine Coast Region.

<span class="mw-page-title-main">Elimbah railway station</span> Railway station in Queensland, Australia

Elimbah railway station is located on the North Coast line in Queensland, Australia. It serves the town of Elimbah in the City of Moreton Bay.

<span class="mw-page-title-main">Corinda–Yeerongpilly railway line</span> Railway line in Brisbane, Australia

The Corinda–Yeerongpilly line is a railway line in Brisbane, the state capital of Queensland, Australia. It connects the Beenleigh and Ipswich lines for freight trains, but is no longer used for revenue passenger services in normal operation.

<span class="mw-page-title-main">Sunshine Coast railway line</span> Section of Queenslands North Coast line

The Sunshine Coast railway line refers to the section of Queensland's North Coast line that has regular interurban passenger services, which connect Brisbane with the Sunshine Coast and as far north as Gympie. It is the longest line on the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Rail transport in Queensland</span>

The rail network in Queensland, Australia, was the first in the world to adopt 1,067 mm narrow gauge for a main line, and, in 2013, was claimed to the second largest narrow gauge network in the world, consists of:

<span class="mw-page-title-main">Electric multiple unit (Queensland Rail)</span>

The Electric multiple unit (EMU) is a class of electric multiple units manufactured by Walkers at Maryborough for Queensland Rail between 1979 and 1986. They were the first EMUs in Queensland and are progressively being retired from the Queensland Rail Citytrain network.

<span class="mw-page-title-main">Interurban multiple unit</span>

The Interurban multiple units (IMU) are a class of electric multiple units manufactured by Walkers Limited/Downer EDI Rail, Maryborough for Queensland Rail's Citytrain division between 1996 and 2011. The IMU is divided into in three subclasses, units 101-110 as the 100 series, units 121-124 as the 120 series, and units 161-188, as the 160 series.

<span class="mw-page-title-main">Beaudesert railway line</span> Former branch railway in South East Queensland, Australia

The Beaudesert railway line is a disused branch railway in South East Queensland, Australia. The first section opened in 1885, the line was completed in 1888 and operated as a Queensland Government Railways (QGR) line until 1996. A heritage operation was undertaken for a short period in 2003. The Canungra railway line connected at Logan Village between 1915 and 1955, and the Beaudesert Shire Tramway connected with the terminal between 1903 and 1944. A study was undertaken in 2010 by the Queensland government concerning a potential Salisbury-to-Beaudesert rail corridor as a long-term potential proposal.

<span class="mw-page-title-main">Redcliffe Peninsula railway line</span> Railway line in Australia

The Redcliffe Peninsula line is a 12 km (7.5 mi) stretch of heavy gauge dual-track railway between Petrie and Kippa-Ring on the Redcliffe peninsula in Queensland, Australia. The new line is part of Queensland Rail's City suburban network, branching from the North Coast line. It starts 200 metres (656 ft) north of Petrie railway station, extending from.

In the late 1970s and 1980s, a significant rail electrification program was completed in the Australian state of Queensland. The electrified Queensland network is the largest in Australia with over 2,000 kilometres electrified, the next biggest is New South Wales with 640 kilometres, that is served mainly as passenger operations.

References

  1. "Our services". Queensland Rail. n.d. Retrieved 11 October 2024.
  2. 1 2 "QR Citytrain Network Map". Archived from the original on 16 June 2004. Retrieved 25 March 2010.
  3. Network map Archived 26 September 2022 at the Wayback Machine Queensland Rail 26 September 2022
  4. Plan your journey Archived 26 September 2022 at the Wayback Machine Queensland Rail 26 September 2022
  5. Queensland Rail on Twitter: "Citytrain network update" Queensland Rail 26 September 2022
  6. Queensland Rail (20 September 2023). "Queensland Rail Annual and Financial Report FY2022-2023. Page 40" (PDF). Queensland Rail. Retrieved 27 October 2023.
  7. Public Transport Authority of WA (27 October 2023). "Transport Performance". Public Transport Authority of WA. Retrieved 27 October 2023.
  8. "QR Corporate – QR History – Beginnings". QR Limited. Archived from the original on 15 January 2010. Retrieved 16 August 2008.
  9. "QR Corporate – QR History – Building to the bush". QR Limited. Archived from the original on 22 July 2008. Retrieved 16 August 2008.
  10. "QR Corporate – QR History – The common carrier". QR Limited. Archived from the original on 22 July 2008. Retrieved 16 August 2008.
  11. The Old South Coast Line Revisited Marggraf, E.W. Australian Railway Historical Society Bulletin November 2003 pp422-427
  12. Geoffrey B. Churchman (1995). Railway Electrification in Australia and New Zealand. IPL Books. p. 131. ISBN   0-646-06893-8.
  13. Geoffrey B. Churchman (1995). Railway Electrification in Australia and New Zealand. IPL Books. p. 132. ISBN   0-646-06893-8.
  14. 1 2 3 "QR Corporate - Modern competitive railway". corporate.qr.com.au. Archived from the original on 22 July 2008. Retrieved 16 August 2008.
  15. "Brisbane Rail Electrification Stages 1 and 2" Armstrong, J Australian Railway Historical Society Bulletin August 1982 pp165-192
  16. "Annual Report Summaries" Railway Digest February 1996 page 26
  17. "OPTIMISM SPURS MAJOR QR INVESTMENT". Archived from the original on 10 June 2011. Retrieved 25 March 2010.
  18. "Corinda to Darra Rail Upgrade: Overview". QR Network. Archived from the original on 26 October 2009. Retrieved 25 March 2010.
  19. Tony Moore (8 June 2010). "Station upgrades for SEQ". The Sydney Morning Herald . Fairfax Media. Archived from the original on 9 June 2010. Retrieved 4 July 2010.
  20. "Salisbury to Kuraby Third Track". SEQIPRail. QR Limited. 11 January 2008. Retrieved 15 January 2008.[ permanent dead link ]
  21. "Mitchelton to Keperra Duplication". SEQIPRail. QR Limited. 30 November 2007. Retrieved 13 January 2008.[ permanent dead link ]
  22. "Ormeau to Coomera Duplication". SEQIPRail. QR Limited. 29 November 2007. Retrieved 15 January 2008.[ permanent dead link ]
  23. "Helensvale to Robina Duplication". SEQIPRail. QR Limited. 30 November 2007. Retrieved 15 January 2008.[ permanent dead link ]
  24. "Caboolture to Beerburrum Doubling". SEQIPRail. QR Limited. 14 January 2008. Archived from the original on 24 October 2009. Retrieved 15 January 2008.
  25. "Beerburrum to Landsborough Track Doubling". SEQIPRail. QR Limited. 29 December 2007. Archived from the original on 24 October 2009. Retrieved 15 January 2008.
  26. 1 2 3 "Transfield – Current Activities – Brisbane Airtrain". Archived from the original on 3 November 2009. Retrieved 25 March 2010.
  27. "Extra Rollingstock for Airtrain Services". Archived from the original on 10 June 2011. Retrieved 25 March 2010.
  28. 1 2 3 "State Government makes tracks from Robina to Varsity Lake". Archived from the original on 27 September 2007. Retrieved 25 March 2010.
  29. "Gold Coast rail extension opens six months ahead of schedule". Archived from the original on 27 September 2007. Retrieved 25 March 2010.
  30. Department of Transport and Main Roads (5 February 2019). "Robina to Tugun Rail Impact Assessment Study". www.tmr.qld.gov.au. Archived from the original on 13 April 2020. Retrieved 24 March 2019.
  31. "SEQIPRAIL - Darra to Springfield Transport Corridor - Overview". SEQIPRail. QR Limited. 10 November 2007. Archived from the original on 17 June 2007. Retrieved 13 January 2008.
  32. "Fast track to growth: Springfield train line is opened". The Queensland Times. Archived from the original on 3 May 2018. Retrieved 2 May 2018.
  33. Queensland Government (2011). "Connecting SEQ 2031" (PDF). Archived (PDF) from the original on 2 May 2022. Retrieved 31 May 2023.
  34. 1 2 Queensland Government (2011). "Connecting SEQ 2031: Part C Detailed network strategies for 2031" (PDF).
  35. "Future rail connection in study's sights" (Press release). Government of Queensland. 26 August 2007. Retrieved 15 January 2008.
  36. "'Absolutely unavoidable' $960m cost blowout for Brisbane's Cross River Rail revealed". ABC News. 31 March 2023. Archived from the original on 31 March 2023. Retrieved 8 April 2023.
  37. "Logan and Gold Coast Faster Rail". Department of Transport and Main Roads. Queensland Government. Archived from the original on 29 December 2023. Retrieved 3 January 2024.
  38. "Direct Sunshine Coast Rail Line". TMR Projects. Queensland Government. Retrieved 8 January 2024.
  39. "Route 649 timetable". Translink .
  40. Geoffrey B. Churchman (1995). Railway Electrification in Australia and New Zealand. IPL Books. p. 136. ISBN   0-646-06893-8.
  41. Queensland asset sales to reap $15 billion Archived 19 October 2009 at the Wayback Machine Brisbane Times 2 June 2009
  42. http://www.rossnewth.com.au/ [ bare URL ]
  43. Philip Laird (2001). "Australia's gauge muddle and prospects". Back on Track: Rethinking Transport Policy in Australia and New Zealand. UNSW Press. p. 191. ISBN   0-86840-411-X. Archived from the original on 11 August 2023. Retrieved 16 August 2008.
  44. "4.3 SEQ Rail Freight Task". South East Queensland Intermodal Freight Terminal Study. Queensland Transport. Archived from the original on 26 July 2008. Retrieved 16 August 2008.
  45. Bureau of Transport Economics (February 1974). "Development of a Rail Freight Terminal at Acacia Ridge". Bureau of Infrastructure, Transport and Regional Economics. Archived from the original on 27 July 2008. Retrieved 16 August 2008.
  46. "About go card". Translink. Retrieved 20 August 2023.
  47. 1 2 3 4 5 6 7 "Citytrain fleet". queenslandrail.com.au. Archived from the original on 3 July 2016. Retrieved 15 July 2016.
  48. Beckhaus, John; Clark, Peter (1 January 2024). Belbin, Bruce (ed.). "Rolling Stock contracts and deliveries" . Railway Digest . Vol. 62. Sydney, Australia: Australian Railway Historical Society. p. 51. ISSN   0157-2431.
  49. 1 2 "Queensland Train Manufacturing Project". tmr.qld.gov.au. Archived from the original on 28 September 2023. Retrieved 3 January 2024.
  50. "QUEENSLAND RAIL COMPLETES ROLL-OUT OF WIFI TRAINS". Archived from the original on 20 May 2013. Retrieved 5 October 2012.
  51. "Transport Priority in State Budget 2008-09" (PDF). SEQIPRail. QLD Treasury Department. 3 June 2008. Archived (PDF) from the original on 20 July 2008. Retrieved 20 June 2008.
  52. "New Generation Rollingstock". Department of Transport and Main Roads. Archived from the original on 5 November 2014. Retrieved 5 November 2014.