La Verne/Fairplex station

Last updated

La Verne/Fairplex
LACMTA Circle A Line.svg
La Verne Fairplex station platform, opening day.jpg
La Verne/Fairplex station platform on opening day, September 19, 2025
General information
Coordinates 34°05′51″N117°46′08″W / 34.0974°N 117.7688°W / 34.0974; -117.7688
Owned by Los Angeles Metro
Platforms1 island platform
Tracks2
Connections Foothill Transit
Construction
Parking299 spaces
AccessibleYes
History
OpenedSeptember 19, 2025;4 days ago (2025-09-19)
Services
Preceding station LAMetroLogo.svg Metro Rail Following station
San Dimas
toward Long Beach
A Line Pomona North
Terminus
Former services (at AT&SF station)
Preceding station Atchison, Topeka and Santa Fe Railway Following station
San Dimas
toward Los Angeles
Main Line Pomona
toward Chicago
Location
La Verne/Fairplex station

La Verne/Fairplex station is an at-grade light rail station in the Los Angeles Metro Rail system. [1] As the third station on the Foothill Extension Phase 2B to Pomona project, it was officially dedicated with a ceremony on June 21, 2025, featuring regional politicians and a celebration for the general public. [2] It opened on September 19, 2025. [3]

Contents

The station is located near the intersection of Arrow Highway and E Street along the Pasadena Subdivision right of way in La Verne, California. The University of La Verne is northwest of the station, and Fairplex is one block to the south.

The city of La Verne, in partnership with the San Gabriel Valley Council of Governments, intends to construct a pedestrian overpass connecting the A Line station with the Fairplex and its Metrolink station that's only used for the L.A. County Fair. The overpass will cross Arrow Highway and the San Bernardino Line railroad right-of-way. [4]

Service

Hours and frequency

A Line service hours are from approximately 4:30 a.m. and 11:45 p.m daily. Trains operate every 8 minutes during peak hours, Monday to Friday. Trains run every 10 minutes, during midday on weekdays and weekends, from 9:00 a.m. to 7:00 p.m. Night and early morning service is approximately every 20 minutes every day. [5]

Connections

The following connections are available: [6]

References

  1. Broverman, Neal (August 21, 2012). "Plans Released for Gold Line Train to San Bernardino County". Curbed Los Angeles. Vox Media Inc. Archived from the original on August 28, 2012. Retrieved January 7, 2015.
  2. Linton, Joe (June 21, 2025). "La Verne Celebrates Metro A Line Station, Foothill Extension to Open Soon". Streetsblog LA . OpenPlans . Retrieved September 19, 2025.
  3. Schlepp, Travis (September 19, 2025). "LA Metro's long-awaited Pomona extension welcomes first riders". KTLA . Nexstar Media Group . Retrieved September 19, 2025.
  4. Streetsblog LA. La Verne Pedestrian Bridge Will Connect Metro A Line, Metrolink, and Fairplex.
  5. "A Line Timetable" (PDF). Los Angeles County Metropolitan Transportation Authority. December 15, 2024. Retrieved January 1, 2025.
  6. "A Line Extension to Pomona". Los Angeles Metro. July 24, 2025. Retrieved July 24, 2025.