Line 2 (Madurai Metro)

Last updated

Green Line (Line 2)
Overview
StatusProposed
Termini
Stations14
Service
Type Rapid transit
System Madurai Metro
Operator(s)CMRL
History
Planned openingDecember 2027
Technical
Line length20 km (12 mi)
Number of tracks2
Operating speed60 km/h (37 mph)
Route map

Contents

BSicon exhKBHFa green.svg
Kattapuli Nagar
BSicon exhBHF green.svg
Samayanallur
BSicon exhBHF green.svg
Athisiyam Park
BSicon exhBHF green.svg
Paravai
BSicon exhBHF green.svg
Vilangudi
BSicon exhBHF green.svg
Fatima College
BSicon exhBHF green.svg
Thathaneri
BSicon exhBHF green.svg
Sellur
BSicon exhINT green.svg
Madurai Junction BSicon BAHN.svg
BSicon exhINT green.svg
Therkuvasal Line 3
BSicon exhBHF green.svg
Villapuram
BSicon exhBHF green.svg
Avaniapuram
BSicon exhBHF green.svg
Perungudi
BSicon exhKBHFe green.svg
Airport BSicon FLUGg.svg

The Green Line (Line 2) is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Kattapuli Nagar to Madurai Airport. The line consists of 14 stations. [1] [2]

Stations

The stations proposed in the Phase 2 of Madurai Metro in the Green Line (Line 2) are as follows:- [3] [4]

Green Line (Line 2)
S.NoStation NameInterchange connectionPlaces ConnectedLayoutOpenedDepot ConnectionDepot Layout
English Tamil
1Kattapuli Nagarகட்டப்புலி நகர்NoneNone(TBC)Proposed Phase 2Kattapuli Nagar DepotNone
2Samayanallurசமயநல்லூர்NoneNone(TBC)Proposed Phase 2NoneNone
3Athisiyam Parkஅதிசயம் பூங்காNoneNone(TBC)Proposed Phase 2NoneNone
4ParavaiபரவைNoneNone(TBC)Proposed Phase 2NoneNone
5Vilangudiவிளாங்குடிNoneNone(TBC)Proposed Phase 2NoneNone
6Fatima Collegeபாத்திமா கல்லூரிNoneNone(TBC)Proposed Phase 2NoneNone
7Thathaneriதத்தனேரிNoneNone(TBC)Proposed Phase 2NoneNone
8Sellurசெல்லூர்NoneNone(TBC)Proposed Phase 2NoneNone
9Madurai Junctionமதுரை சந்திப்புAiga railtransportation 25.svg Madurai Junction, BSicon BUS2.svg Periyar Bus Terminus Meenakshi Amman Temple West Tower, Line 1 , Line 3 UndergroundProposed Phase 2NoneNone
10Therkuvasalதெற்குவாசல்None Meenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal, Line 3 UndergroundProposed Phase 2NoneNone
11Villapuramவில்லாபுரம்NoneNone(TBC)Proposed Phase 2NoneNone
12Avaniapuramஅவனியாபுரம்NoneNone(TBC)Proposed Phase 2NoneNone
13Perungudiபெருங்குடிNoneNone(TBC)Proposed Phase 2NoneNone
14Airportவிமான நிலையம்None BSicon FLUGg.svg Madurai International Airport (TBC)Proposed Phase 2NoneNone

See also

Related Research Articles

<span class="mw-page-title-main">Mumbai Metro</span> Rapid transit system in Mumbai, India

The Mumbai Metro is a rapid transit (MRT) system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.

<span class="mw-page-title-main">MetroLink (St. Louis)</span> Light rail system in Missouri, US

MetroLink is a light rail system that serves the Greater St. Louis area. Operated by Metro Transit in a shared fare system with MetroBus, the two-line, 38-station system runs from St. Louis Lambert International Airport and Shrewsbury in Missouri to Scott Air Force Base in Illinois. Intermediate destinations include downtown Clayton, Forest Park, and downtown St. Louis. It is the only U.S. light rail system to cross state lines.

<span class="mw-page-title-main">Kolkata Metro</span> Rapid transit system in Kolkata, India

The Kolkata Metro is a rapid transit system serving the city of Kolkata and the wider Kolkata Metropolitan Region in West Bengal, India. Opening in 1984, it was the first operational rapid transit system in India, beside being the second busiest and fourth-longest metro network in India. As of March 2024, it has four operational lines: the 32.33 km (20.09 mi) Line 1 from Dakshineswar to Kavi Subhash, 13.9 km (8.6 mi) Line 2 from Salt Lake Sector V to Howrah Maidan, 7.75 km (4.82 mi) Line 3 from Joka to Majerhat and 5.4 km (3.4 mi) Line 6 from Kavi Subhash to Hemanta Mukherjee for a total of 59.38 km (36.90 mi). Two other lines are in various phases of construction and planning. The system has a mix of underground, at-grade and elevated stations using both broad-gauge and standard-gauge tracks. Trains operate between 06:55 and 22:30 IST and the fares range from ₹5 to ₹50.

<span class="mw-page-title-main">Namma Metro</span> Rapid transit system in Bengaluru, Karnataka, India

Namma Metro, also known as Bengaluru Metro, is a rapid transit system serving the city of Bengaluru, India. It is the second longest operational metro network in India with an operational length of 73.75 kilometers just behind Delhi Metro. Upon its inauguration, it became the first underground metro system in South India. Namma Metro has a mix of underground, at grade, and elevated stations. Out of the 66 operational metro stations of Namma Metro as of October 2023, there are 57 elevated stations, eight underground stations and one at-grade station. The system runs on standard-gauge tracks.

<span class="mw-page-title-main">Chennai Metro</span> Rapid transit system in Chennai, India

Chennai Metro is a rapid transit system serving the city of Chennai, India. As of March 2024, the operational network consists of two colour-coded lines covering a length of 54 kilometres (33.55 mi) making it the fifth longest metro system in India. Chennai Metro Rail Limited (CMRL), a joint venture between Government of India and the Government of Tamil Nadu built and operates the Chennai Metro. The system uses standard gauge and has a mix of underground and elevated stations.

MetroLink is a proposed metro line for the city of Dublin. It replaces an earlier proposal called Metro North which was first recommended in the then Irish Government's 2005 Transport 21 transport plan.

<span class="mw-page-title-main">Hyderabad Metro</span> Rapid transit system in Hyderabad, India

The Hyderabad Metro is a rapid transit system, serving the city of Hyderabad, Telangana, India. It is the third longest operational metro network in India after Delhi Metro and Namma Metro (Bengaluru), and the lines are arranged in a secant model. It is funded by a public–private partnership (PPP), with the state government holding a minority equity stake. Hyderabad Metro is the world's largest elevated Metro Rail system based on DBFOT basis. A special purpose vehicle company, L&T Metro Rail Hyderabad Ltd (L&TMRHL), was established by the construction company L&T to develop the Hyderabad metro rail project.

<span class="mw-page-title-main">Urban rail transit in India</span> Overview of the urban rail transit system in India

Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail, and tram systems.

<span class="mw-page-title-main">Delhi Metro</span> Rapid transit system in India serving Delhi NCR

The Delhi Metro is a mass rapid transit system which serves Delhi and its adjoining satellite cities, such as Ghaziabad, Faridabad, Gurugram, Noida and Bahadurgarh, in the National Capital Region of India. The system consists of 10 colour-coded lines serving 256 stations, with a total length of 350.42 kilometres (217.74 mi). It is India's largest and busiest metro rail system and the second-oldest, after the Kolkata Metro. The metro has a mix of underground, at-grade, and elevated stations using broad-gauge and standard-gauge tracks. The metro makes over 4,300 trips daily.

<span class="mw-page-title-main">LAX/Metro Transit Center station</span> Future light rail transport hub

LAX/Metro Transit Center station is an under construction light rail transport hub in the Los Angeles Metro Rail system, located near Aviation Boulevard and 96th Street in the Westchester district of Los Angeles. The station was designed as a station for the C and K lines. It will serve as the transfer point between Metro Rail and the LAX Automated People Mover (APM) serving the Los Angeles International Airport terminals and facilities. Additionally, the station will have connections to Metro Bus, other municipal bus lines, a customer service center, and a Metro Bike Share hub. Metro is scheduled to start serving the station in late 2024 before the APM connection opens on October 30, 2025.

<span class="mw-page-title-main">Kolkata Metro Line 4</span> Transit line in Kolkata, India

The Kolkata Metro Line 4 or the Yellow Line, also known as the Noapara - Barasat Line of the Kolkata Metro in India is a 16.876 km (10.486 mi) long metro route from Noapara to Barasat in North 24 Parganas, which is under construction. It is being built by RVNL, Senbo & ITD. It will run mostly underground viaducts. The track will be elevated until Jessore Road Station and then go underground towards Barasat metro station. It will have an interchange station at the NSCBI Airport with Kolkata Metro Line 6.

<span class="mw-page-title-main">Kolkata Metro Line 6</span> Transit line in Kolkata, India

Kolkata Metro Line 6 or the Orange Line of the Kolkata Metro, in the Indian state of West Bengal, is a rapid transit line that will connect New Garia with Netaji Subhas Chandra Bose International Airport via two satellite towns Salt Lake and New Town. It currently operates between Kavi Subhash and Hemanta Mukhopadhyay. This stretch will be one of the most important stretches of the metro because it will connect the southern and the eastern parts of the city with Kolkata Airport. The total distance of this route will be 29.87 km (18.56 mi).

Coimbatore Metro, also known as Kovai Metro, is a proposed rapid transit system for Coimbatore, Tamil Nadu.

<span class="mw-page-title-main">Urban rail transit in Canada</span> List of Canadian passenger rail systems confined to urban areas

Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems.

The Blue Line or ORR-Airport Metro Line is part of the Namma Metro rail network for the city of Bangalore, Karnataka, India. It consists of two sections - Phase-2A and Phase-2B. Construction of Phase-2A began in August 2021. Construction of Phase-2B began in February 2022. The 58.19 km line connects Central Silk Board with the Kempegowda International Airport. The Line is mostly elevated but also has an at-grade (surface) section close to the Airport and 2 short underground sections where it passes the Jakkur Aerodrome and Yelahanka AFB. There are 30 stations on the line of which the two station/s at the Airport may be at surface level or underground. Blue Line will have interchanges with the Yellow Line at Central Silk Board, Purple Line at KR Pura, Pink Line at Nagawara and with the future /proposed Orange Line at Hebbal.

The Golden Line(Line 10) is an under-construction rapid transit line of the Delhi Metro. It will connect southern Delhi directly with Indira Gandhi International Airport to relieve the increasing traffic, congestion and pollution on roads. It will start from Terminal 1-IGI Airport, which was previously planned from Delhi Aerocity, and end in Tughlakabad. It will be 25.82 km (16.04 mi) long with 16 stations, out of which four will be elevated and 12 will be underground. Construction began on the line in June 2022, as part of the fourth phase of the Delhi Metro's development, and is expected to be completed by March 2026.

Madurai Metro, is a proposed rapid transit system for Madurai, Tamil Nadu. It arose from a Madurai Metrolite system, part of a major expansion of public transport in the city and one of the projects devised by the former Chief Minister of Tamil Nadu J.Jayalalithaa.

The Red Line or Line 1 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Green line. The line stretches from Ukkadam Bus Terminus to Neelambur. The line consists of 18 stations, out of which the Coimbatore Airport station has a spill off line.

The Red Line is one of the three proposed lines of Madurai Metro and the only line which is to be implemented at the Phase 1 of Madurai Metro. The line stretches from Tirumangalam to Chittampatti Junction. The line consists of 22 stations.

The Purple Line is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Manalur to Chekanurani. The line consists of 19 stations.

References

  1. "Instagram". www.instagram.com. Retrieved 29 March 2024.
  2. Balasubramanian, Harini (8 April 2023). "Madurai Metro to link international airport under Phase 2". Housing News. Retrieved 29 March 2024.
  3. "Madurai metro to link airport in phase II; 5 km to be underground" . Retrieved 7 April 2023.
  4. Staff, T. N. M. (20 February 2023). "Madurai metro: CMRL submits feasibility report, three things to know". The News Minute. Retrieved 29 March 2024.