Line 2 (Madurai Metro)

Last updated

Green Line (Line 2)
Overview
StatusProposed
Termini
Stations14
Service
Type Rapid transit
System Madurai Metro
Operator(s)CMRL
History
Planned openingDecember 2027
Technical
Line length20 km (12 mi)
Number of tracks2
Operating speed60 km/h (37 mph)
Route map

Contents

BSicon exhKBHFa green.svg
Kattapuli Nagar
BSicon exhBHF green.svg
Samayanallur
BSicon exhBHF green.svg
Athisiyam Park
BSicon exhBHF green.svg
Paravai
BSicon exhBHF green.svg
Vilangudi
BSicon exhBHF green.svg
Fatima College
BSicon exhBHF green.svg
Thathaneri
BSicon exhBHF green.svg
Sellur
BSicon exhINT green.svg
Madurai Junction BSicon BAHN.svg
BSicon exhINT green.svg
Therkuvasal Line 3
BSicon exhBHF green.svg
Villapuram
BSicon exhBHF green.svg
Avaniapuram
BSicon exhBHF green.svg
Perungudi
BSicon exhKBHFe green.svg
Airport BSicon FLUGg.svg

The Green Line (Line 2) is one of the three proposed lines of Madurai Metro which is to be implemented at the Phase 2 of Madurai Metro. The line stretches from Kattapuli Nagar to Madurai Airport. The line consists of 14 stations. [1]

Stations

The stations proposed in the Phase 2 of Madurai Metro in the Green Line (Line 2) are as follows:- [2] [3]

Green Line (Line 2)
S.NoStation NameInterchange connectionPlaces ConnectedLayoutOpenedDepot ConnectionDepot Layout
English Tamil
1Kattapuli Nagarகட்டப்புலி நகர்NoneNone(TBC)Proposed Phase 2Kattapuli Nagar DepotNone
2Samayanallurசமயநல்லூர்NoneNone(TBC)Proposed Phase 2NoneNone
3Athisayam Parkஅதிசயம் பூங்காNoneNone(TBC)Proposed Phase 2NoneNone
4ParavaiபரவைNoneNone(TBC)Proposed Phase 2NoneNone
5Vilangudiவிளாங்குடிNoneNone(TBC)Proposed Phase 2NoneNone
6Fatima Collegeபாத்திமா கல்லூரிNoneNone(TBC)Proposed Phase 2NoneNone
7Thathaneriதத்தனேரிNoneNone(TBC)Proposed Phase 2NoneNone
8Sellurசெல்லூர்NoneNone(TBC)Proposed Phase 2NoneNone
9Madurai Junctionமதுரை சந்திப்புAiga railtransportation 25.svg Madurai Junction, BSicon BUS2.svg Periyar Bus Terminus Meenakshi Amman Temple West Tower, Line 1 , Line 3 UndergroundProposed Phase 2NoneNone
10Therukuvasalதெற்குவாசல்None Meenakshi Amman Temple South Tower, Thirumalai Nayakkar Mahal, Line 3 UndergroundProposed Phase 2NoneNone
11Villapuramவில்லாபுரம்NoneNone(TBC)Proposed Phase 2NoneNone
12Avaniapuramஅவனியாபுரம்NoneNone(TBC)Proposed Phase 2NoneNone
13Perungudiபெருங்குடிNoneNone(TBC)Proposed Phase 2NoneNone
14 Madurai International Airport விமான நிலையம்None BSicon FLUGg.svg Madurai International Airport (TBC)Proposed Phase 2NoneNone

See also

References

  1. "Madurai Metro to link international airport under Phase 2". Housing News. 8 April 2023. Retrieved 29 March 2024.
  2. "Madurai metro to link airport in phase II; 5 km to be underground" . Retrieved 7 April 2023.
  3. Staff, T. N. M. (20 February 2023). "Madurai metro: CMRL submits feasibility report, three things to know". The News Minute. Retrieved 29 March 2024.