Mission type | Tracking test |
---|---|
Operator | NASA |
Mission duration | Failed to orbit |
Spacecraft properties | |
Launch mass | 67.5 kilograms (149 lb) |
Start of mission | |
Launch date | November 1, 1961, 15:32 UTC |
Rocket | Blue Scout II D-8 |
Launch site | Cape Canaveral LC-18B |
Orbital parameters | |
Reference system | Geocentric |
Regime | Low Earth |
Epoch | Planned |
|
Mercury-Scout 1, or MS-1, was a United States spacecraft intended to test tracking stations for Project Mercury flights. [1] [2] It grew out of a May 5, 1961 NASA proposal to use Scout rockets to launch small satellites to evaluate the worldwide Mercury Tracking Network in preparation for crewed orbital missions. The launch of Mercury-Scout 1 on November 1, 1961, was unsuccessful, and the satellite failed to reach orbit.
The Mercury Tracking Network was a series of U.S.-owned and operated ground stations and tracking ships, positioned around the world under the flightpath of Mercury spacecraft. When the spacecraft came within several hundred miles of a ground station, it could have line-of-sight voice and telemetry communications by HF (shortwave), VHF or UHF radio and C-band and S-band radar. These communications passes would only last a few minutes, until the ground station disappeared over the horizon. Between ground stations, Mercury spacecraft were out of communications, except for an occasional unreliable HF message. In the early 1960s there were no synchronous communications satellites. The ground stations were linked back to NASA's Mercury Control in Florida through land lines, undersea cables and in some cases HF radio.
The concept was approved on May 24. On June 13 the NASA Space Task Group issued requirements for a modified Scout rocket and small communications satellite that became known as Mercury-Scout. The satellite would simulate a Mercury spacecraft, allowing testing of and training with the Mercury Tracking Network.
The 67.5 kg MS-1 communications satellite was shaped like a small rectangular box. Within the box, electronics consisted of two command receivers, two minitrack beacons, two telemetry transmitters, an S- and C-band beacon, and antennas; all powered by a 1500 watt-hour battery. [3] Also attached was the fourth stage instrument package. The battery could power the electronics for 18½ hours before running down. To extend the satellite life, the equipment would be powered off by a ground command after the first three orbits (5 hours). During power-down, data results would be analyzed. The satellite would then be powered up for another three orbits (5 more hours). This process would then be repeated a third time. Mercury planners thought that by shutting down and powering up the satellite, the Mercury Tracking Network would get data and experience from the equivalent of three Mercury orbital missions.
NASA decided to modify a USAF Blue-Scout II, # D-8, for the first Mercury-Scout mission. The U.S. Air Force was already launching Blue Scout rockets from Cape Canaveral and launched this one as well.
Mercury-Scout 1 was readied for launch on October 31 from LC-18B. The prelaunch countdown proceeded normally, but the engine failed to ignite. Pad crews checked out and repaired the ignition circuits and the flight was reattempted the next day. Control started failing only seconds after liftoff and at T+28 seconds, the first stage started to disintegrate. Range Safety issued the destruct command at T+43 seconds. The failure was traced to a technician who had accidentally transposed two wiring connectors in the guidance system, causing pitch errors to be interpreted as yaw errors and vice versa. [1]
NASA canceled further Mercury-Scout missions. By the time Mercury-Scout 1 was launched, the MA-4 mission had already orbited. MA-5 followed MS-1 by 28 days. MA-4 and MA-5 checked out the Mercury Tracking Network making further Mercury-Scout missions unnecessary.
Parameter | 1st Stage | 2nd Stage | 3rd Stage | 4th Stage |
---|---|---|---|---|
Gross Mass | 10,705 kg | 4,424 kg | 1,225 kg | 238 kg |
Empty Mass | 1,900 kg | 695 kg | 294 kg | 30 kg |
Thrust | 470 kN | 259 kN | 60.5 kN | 12.4 kN |
Isp | 214 s (2.10 kNs/kg) | 262 s (2.57 kNs/kg) | 256 s (2.51 kNs/kg) | 256 s (2.51 kNs/kg) |
Burn time | 40 s | 37 s | 39 s | 38 s |
Length | 9.12 m | 6.04 m | 3.38 m | 1.83 m |
Diameter | 1.01 m | 0.79 m | 0.78 m | 0.46 m |
Engine: | Aerojet General Algol 1 | Thiokol XM33 (TX-354-3) Castor 2 | Allegany Ballistics Lab X-254 Antares 1A | Allegany Ballistics Lab X-248 Altair 1 |
Propellant | Solid Fuel | Solid Fuel | Solid Fuel | Solid fuel |
Project Mercury was the first human spaceflight program of the United States, running from 1958 through 1963. An early highlight of the Space Race, its goal was to put a man into Earth orbit and return him safely, ideally before the Soviet Union. Taken over from the US Air Force by the newly created civilian space agency NASA, it conducted 20 uncrewed developmental flights, and six successful flights by astronauts. The program, which took its name from Roman mythology, cost $2.68 billion. The astronauts were collectively known as the "Mercury Seven", and each spacecraft was given a name ending with a "7" by its pilot.
A spacecraft is a vehicle that is designed to fly and operate in outer space. Spacecraft are used for a variety of purposes, including communications, Earth observation, meteorology, navigation, space colonization, planetary exploration, and transportation of humans and cargo. All spacecraft except single-stage-to-orbit vehicles cannot get into space on their own, and require a launch vehicle.
Syncom started as a 1961 NASA program for active geosynchronous communication satellites, all of which were developed and manufactured by the Space and Communications division of Hughes Aircraft Company. Syncom 2, launched in 1963, was the world's first geosynchronous communications satellite. Syncom 3, launched in 1964, was the world's first geostationary satellite.
Mercury-Atlas 6 (MA-6) was the first crewed American orbital spaceflight, which took place on February 20, 1962. Piloted by astronaut John Glenn and operated by NASA as part of Project Mercury, it was the fifth human spaceflight, preceded by Soviet orbital flights Vostok 1 and 2 and American sub-orbital flights Mercury-Redstone 3 and 4.
Mercury-Atlas 8 (MA-8) was the fifth United States crewed space mission, part of NASA's Mercury program. Astronaut Walter M. Schirra Jr., orbited the Earth six times in the Sigma 7 spacecraft on October 3, 1962, in a nine-hour flight focused mainly on technical evaluation rather than on scientific experimentation. This was the longest U.S. crewed orbital flight yet achieved in the Space Race, though well behind the several-day record set by the Soviet Vostok 3 earlier in the year. It confirmed the Mercury spacecraft's durability ahead of the one-day Mercury-Atlas 9 mission that followed in 1963.
Mercury-Atlas 5 was an American spaceflight of the Mercury program. It was launched on November 29, 1961, with Enos, a chimpanzee, aboard. The craft orbited the Earth twice and splashed down about 200 miles (320 km) south of Bermuda, and Enos became the first primate from the United States and the third great ape to orbit the Earth.
The SAMOS or SAMOS-E program was a relatively short-lived series of reconnaissance satellites for the United States in the early 1960s, also used as a cover for the initial development of the KH-7 GAMBIT system. Reconnaissance was performed with film cameras and television surveillance from polar low Earth orbits with film canister returns and transmittals over the United States. SAMOS was first launched in 1960 from Vandenberg Air Force Base.
Mercury-Atlas 4 (MA-4) was an uncrewed test flight within NASA's Project Mercury program, launched on September 13, 1961, at 14:04:16 UTC from Cape Canaveral Air Force Station Launch Complex 14. The mission's primary purpose was to evaluate the Mercury spacecraft's performance in orbit and to test the Mercury Space Flight Network. Despite initial technical challenges, Mercury-Atlas 4 successfully met its goals. The mission involved testing the Mercury spacecraft, specifically Mercury #8A, which completed one orbit around Earth. This successful flight provided important data and insights for NASA's Project Mercury, supporting the planning and development of upcoming crewed missions in the program.
Wallops Flight Facility (WFF) is a rocket launch site on Wallops Island on the Eastern Shore of Virginia, United States, just east of the Delmarva Peninsula and approximately 100 miles (160 km) north-northeast of Norfolk. The facility is operated by the Goddard Space Flight Center in Greenbelt, Maryland, and primarily serves to support science and exploration missions for NASA and other federal agencies. WFF includes an extensively instrumented range to support launches of more than a dozen types of sounding rockets; small expendable suborbital and orbital rockets; high-altitude balloon flights carrying scientific instruments for atmospheric and astronomical research; and, using its Research Airport, flight tests of aeronautical research aircraft, including unmanned aerial vehicles.
A tracking and data relay satellite (TDRS) is a type of communications satellite that forms part of the Tracking and Data Relay Satellite System (TDRSS) used by NASA and other United States government agencies for communications to and from independent "User Platforms" such as satellites, balloons, aircraft, the International Space Station, and remote bases like the Amundsen-Scott South Pole Station. This system was designed to replace an existing worldwide network of ground stations that had supported all of NASA's crewed flight missions and uncrewed satellites in low-Earth orbits. The primary system design goal was to increase the amount of time that these spacecraft were in communication with the ground and improve the amount of data that could be transferred. These TDRSS satellites are all designed and built to be launched to and function in geosynchronous orbit, 35,786 km (22,236 mi) above the surface of the Earth.
The Manned Space Flight Network was a set of tracking stations built to support the American Mercury, Gemini, Apollo, and Skylab space programs.
Vanguard TV-3BU, also called Vanguard Test Vehicle-Three Backup, was the second flight of the American Vanguard rocket. An unsuccessful attempt to place an unnamed satellite, Vanguard 1B, into orbit, the rocket was launched on 5 February 1958. It was launched from LC-18A at the Cape Canaveral Air Force Station. Fifty-seven seconds after launch, control of the vehicle was lost, and it failed to achieve orbit. At 57 seconds, the booster suddenly pitched down. The skinny second stage broke in half from aerodynamic stress, causing the Vanguard to tumble end-over-end before a range safety officer sent the destruct command. The cause of the failure was attributed to a spurious guidance signal that caused the first stage to perform unintended pitch maneuvers. Vanguard TV-3BU only reached an altitude of 6.1 km (3.8 mi), the goal was 3,840 km (2,390 mi).
The RM-90 Blue Scout II was an American sounding rocket and expendable launch system which was flown three times during 1961. It was a member of the Scout family of rockets. Blue Scout II was a military version of the NASA-operated Scout X-1, with adjustments to the payload fairings, engine nozzles and fins.
The forerunner of the Deep Space Network was established in January 1958, when JPL, then under contract to the U.S. Army, deployed portable radio tracking stations in Nigeria, Singapore, and California to receive telemetry and plot the orbit of the Army-launched Explorer 1, the first successful U.S. satellite.
A ground segment consists of all the ground-based elements of a space system used by operators and support personnel, as opposed to the space segment and user segment. The ground segment enables management of a spacecraft, and distribution of payload data and telemetry among interested parties on the ground. The primary elements of a ground segment are:
Kosmos 159, E-6LS No.111, was one of many satellites designed during the Soviet space program given the designation Kosmos. This satellite was specifically designed to be a high orbit satellite used to gain information on trajectory anomalies caused by the Moon's gravitational pull. This data would have been vital to the Soviet space program and could have been key in successful crewed missions to the Moon. This mission was also used to test radio communications in space.
Progress MS-09, identified by NASA as Progress 70P, was a Progress spaceflight operated by Roscosmos to resupply the International Space Station (ISS). This was the 161st flight of a Progress spacecraft.
Explorer 22 was a small NASA ionospheric research satellite launched 9 October 1964, part of NASA's Explorer Program. It was instrumented with an electrostatic probe, four radio beacons for ionospheric research, a passive laser tracking reflector, and two radio beacons for Doppler navigation experiments. Its objective was to provide enhanced geodetic measurements of the Earth as well as data on the total electron content in the Earth's atmosphere and in the satellite's immediate vicinity.
The Environmental Research Satellite program was a series of small satellites initially operated by the United States Air Force Office of Aerospace Research. Designed to be launched "piggyback" to other satellites during launch, detaching once in orbit, they were the smallest satellites launched to date—what would today be classified as microsatellites. 33 ERS satellites in six different series were launched between 1962 and 1971, conducting scientific research and serving as test beds to investigate the reliability of new spacecraft components.
Tianlian also known as CTDRS, is a Chinese data relay communication satellite constellation. The constellation serves to relay data from ground stations to spacecraft and rockets, most significantly China's crewed spaceflight program. The system currently consists of seven satellites in two generations, with the first satellite being launched in 2008.
This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration .