Proposals for new tram lines in Edinburgh

Last updated

Various studies, from 1989 onwards, considered the reintroduction of trams to Edinburgh. [1] In 2001, a proposal for a new Edinburgh Trams network envisaged three routes across the city, Lines 1, 2 and 3. Line 1 was a circular route running around the northern suburbs, with the other two forming radial lines running out to Newbridge in the west and to Newcraighall in the south respectively. [2] All lines would run through the city centre.

Contents

Line 3 was later shelved due to lack of Scottish Parliament approval. Lines 1 and 2 were combined and split into three phases, with Phase 1 being further divided into Phase 1a and 1b. Phases 1b, 2 and 3 were not funded.

When the tramway opened to passengers in 2014, only a truncated section of the planned Phase 1a line (running from the airport to the city centre) had been constructed. Construction of the remainder of the Phase 1a line began in 2019, and it opened to passengers in 2023. [3]

In August 2025, a public consultation was launched for an additional extension serving the north–south axis of the city. This could link Granton in the north via either the Roseburn Path to Murrayfield or via Orchard Brae and Dean Bridge to the west end of Princes Street. There are also proposals to run trams over North Bridge and South Bridge to Cameron Toll then along Old Dalkeith Road to the Royal Infirmary and BioQuarter. The cost is estimated at between £2bn and £2.9bn. [4] [5] This comprises sections of the original Lines 1 and 3.

Line 1 (North Edinburgh)

Diagram of Line 1 proposed in 2001 Edinburgh Trams line 1.png
Diagram of Line 1 proposed in 2001
The planned route of the tram line along the waterfront at Granton Wardie Cottages, Lower Granton Road, Edinburgh - geograph.org.uk - 1269378.jpg
The planned route of the tram line along the waterfront at Granton

Line 1 was planned to be a 15.25-kilometre (9.48 mi) circular route with 22 stops running around the northern suburbs, following a route from the City Centre, St Andrew Square, York Place, Picardy Place, down Leith Walk to Leith and Newhaven. The line would then run along the waterfront to Granton, where it would then loop back, taking over the disused Caledonian Railway route between via Crewe Toll to Wester Coates and Haymarket. Upon reaching Haymarket, trams will return to on-street running mode and head back along Princes Street.

Line 1 comprised 2.3 kilometres (1.4 mi) of on-street track integrated with other traffic, 2.7 kilometres (1.7 mi) of segregated track running along existing roads, and 10.5 kilometres (6.5 mi) separate tramway. The on-street sections of track would be in the centre of the road in some locations and at the kerbside in others. On the disused line to Granton, the tram line would be integrated with cycle and pedestrian pathways along the Roseburn wildlife corridor. [6]

In the initial Phase 1a of the project, only the Newhaven-Leith Walk-Princes Street section of this route was included, with trams then continuing west to the airport (Line 2 route). Further construction of the Line 1 loop (Phase 1b of the project) was cancelled in 2009 due to financial constraints, postponing construction of the Haymarket-Granton section of this line indefinitely. [7] Phase 2, which would complete the loop with a line from Granton Square to Newhaven, also remains unfunded.

NamePhaseTransport InterchangeServes
Haymarket Phase 1a National Rail logo.svg Haymarket railway station
BSicon BUS.svg Lothian Buses
BSicon TRAM1.svg Line 2 (West Edinburgh)
Edinburgh International Conference Centre
St Mary's Music School
Shandwick Place Phase 1a
Princes Street Phase 1a Princes Street
National Gallery of Scotland
St Andrew Square Phase 1a BSicon BUS.svg Lothian Buses
Edinburgh Bus Station
National Rail logo.svg Waverley Station
St Andrew Square
St. James Centre
Picardy Place Phase 1a Omni Centre
Edinburgh Playhouse
McDonald Road Phase 1a Easter Road Stadium
Balfour Street Phase 1a Pilrig Park
Foot of the Walk Phase 1a BSicon BUS.svg Lothian Buses
Bernard Street Phase 1a
Port of Leith
(formerly Ocean Drive)
Phase 1a Scottish Government building
Ocean Terminal Phase 1a Ocean Terminal
Royal Yacht Britannia
Newhaven Phase 1a Newhaven
Lower GrantonPhase 2
Granton
(formerly Granton Square)
Phase 1b
Saltire Square
(formerly Granton Waterfront)
Phase 1b
Caroline ParkPhase 1b Edinburgh College (Granton Campus)
West Pilton
(formerly West Granton)
Phase 1b
Crewe TollPhase 1b BSicon BUS.svg Lothian Buses Fettes College
Leonardo S.p.A. (Edinburgh Site)
Telford roadPhase 1b Western General Hospital
CraigleithPhase 1b Craigleith Retail Park
Ravelston DykesPhase 1b Scottish National Gallery of Modern Art
Stewart's Melville College
The Mary Erskine School
St. George's School
RoseburnPhase 1b
The line continues to Haymarket to complete the loop

Line 2 (West Edinburgh)

Diagram of Line 2 proposed in 2001 Edinburgh Trams line 2.png
Diagram of Line 2 proposed in 2001
Construction of the new tram depot at Gogar Site of new Edinburgh tram depot - geograph.org.uk - 679567.jpg
Construction of the new tram depot at Gogar
The temporary Fastlink guided bus Guided Busway West Edinburgh.jpg
The temporary Fastlink guided bus

Line 2 would have been an 18-kilometre (11 mi) route from the City Centre out to Edinburgh Airport via Edinburgh Park, with a branch line to Newbridge and a total of 19 stops. The airport route was subsequently incorporated into Phase 1a of the project. The branch to Newbridge is dependent on funding becoming available for Phase 3 of the construction project.

In Phase 1a, from St Andrew Square to Haymarket, a 1.4-mile (2.3 km) line of on-street track integrates with other traffic along Princes Street and Shandwick Place. At Haymarket station, the tram line diverges from the road and runs down a segregated tramway via Haymarket Yards. The Line 1 branch north towards Granton (Phase 1b) would be located at the bridge over Russell Road. The Phase 1a line continues west, past the Haymarket rail depot and Murrayfield Stadium. Trams then move onto a dedicated track running parallel to the Edinburgh-Glasgow railway line, briefly crossing south of the railway to serve Sighthill and Edinburgh Park, before heading north, parallel to the City Bypass to the Gyle. The tramway then passes under the A8 road just the east of the Gogar Roundabout, turns west over green belt land, and then north behind the Hilton Hotel and alongside the Gogar Burn to a terminus within the existing airport bus station. [8]

The planned branch to Newbridge would begin at the Ingliston stop, continuing west past the Royal Highland Showground, before crossing onto the central reservation of the A8. It would then turn south via Ratho Station to rejoin the Glasgow main line. At Harvest Road trams would switch to street-running mode again, sharing the road with traffic to the Newbridge industrial estate before crossing the A89 road and terminating at the Newbridge roundabout. [8]

A preliminary guided bus service along part of the future route of Line 2, Fastlink, opened in December 2004. [9] This concrete track, which ran parallel to the Edinburgh-Glasgow railway line from Saughton to Edinburgh Park, was converted to a tram track, replacing the guided bus service with the tram line.

On 27 September 2007, the Scottish Government announced the cancellation of the Edinburgh Airport Rail Link, a separate project to link mainline rail services to Edinburgh Airport. As an alternative, the government plans that an additional stop is built adjacent to a proposed Gogar railway station be constructed.[ clarification needed ] This newly built rail station and tram stop would provide an interchange on the Fife Circle Line with airport tram services. Costs for this have not been stated and would be in addition to the currently budgeted-for amount. [10]

The station in the Gogar area, just prior to the Gogarburn tram depot when going westbound, was opened on 11 December 2016, linking the Fife Circle Line to the Edinburgh tram network. It is called Edinburgh Gateway station.

NamePhaseTransport InterchangeServes
Between the city centre and Haymarket, trams run along Line 1.
Haymarket Phase 1a National Rail logo.svg Haymarket
BSicon BUS.svg Lothian Buses
BSicon TRAM1.svg Line 1 (North Edinburgh)
Edinburgh International Conference Centre
Murrayfield Stadium Phase 1a Murrayfield Stadium
Balgreen Phase 1a Edinburgh Zoo
Saughton Phase 1a
Bankhead Phase 1a Stevenson College
Edinburgh Park Phase 1a National Rail logo.svg Edinburgh Park Hermiston Gait retail park
Edinburgh Park Central Phase 1a Edinburgh Park
Gyle Centre Phase 1a Gyle Shopping Centre
Gogarburn Phase 1a National Rail logo.svg Gogar Royal Bank of Scotland headquarters
Ingliston Park & Ride Phase 1a BSicon BUS.svg Lothian Buses
Line splits – Edinburgh Airport branch
Edinburgh Airport Phase 1a BSicon FLUG.svg Edinburgh Airport
Newbridge branch
Ingliston WestPhase 3 Royal Highland Showground
Ratho StationPhase 3
Newbridge SouthPhase 3
Newbridge NorthPhase 3

Line 3 (South East Edinburgh)

Diagram of Line 3 proposed in 2001 Edinburgh Trams line 3.png
Diagram of Line 3 proposed in 2001
Clerk Street, on the route of Line 3 The Queen's Hall - Clerk Street Panorama (credit Alastair Wight).jpg
Clerk Street, on the route of Line 3

The proposals also featured a third tram line, which would run from the City Centre to the southern suburbs. The route was not finalised, but proposals indicated a preferred route would cross North Bridge and the Royal Mile, heading south past the University of Edinburgh, along Nicolson Street. An alternative route suggested trams could bypass the congested Nicolson Street and Clerk Street section by turning right into Nicolson Square and heading south along Potterrow. Southbound trams would return to Newington Road via West Preston Street, and a northbound track would run along Causewayside. A segregated track was proposed to cross Cameron Toll, and after crossing the Inch Park, trams would then run down the Old Dalkeith Road towards the Royal Infirmary of Edinburgh, and finally terminating at Newcraighall railway station park and ride. An extension to Musselburgh was also considered. [11] City councillors also suggested that a route via London Road might be considered as an alternative extension to the network. [12]

Line 3 was not approved by the Scottish Parliament and was not funded. Funding for the line depended on Edinburgh voters agreeing to a congestion charge, which was rejected in the Edinburgh road tolls referendum in 2005. Following the referendum defeat, Edinburgh City Council applied to the Scottish Government for £198 million funding for the line, but this request was turned down. [13] As such, the proposal was put on hold indefinitely and does not form part of the approved phases, but the land needed for the line was protected until at least 2015. [14]

NamePhaseTransport InterchangeServes
Waverley stationN/A National Rail logo.svg Waverley Station
BSicon BUS.svg Lothian Buses
BSicon TRAM1.svg Line 1 (North Edinburgh)
High StreetN/A Royal Mile
South BridgeN/A
Nicolson SquareN/A University of Edinburgh George Square campus
St Patrick SquareN/A
The MeadowsN/A The Meadows
Newington RoadN/A Newington
Minto StreetN/A
Newington StationN/AInterchange with South Suburban Railway at Newington Station
Craigmillar ParkN/A University of Edinburgh King's Buildings campus (at some distance)
Cameron TollN/A Cameron Toll Shopping Centre
The InchN/A
MoredunN/A Moredun
RIE/Bio MediparkN/A Royal Infirmary of Edinburgh
GreendykesN/A Greendykes
CraigmillarN/A Craigmillar
NiddrieN/A Niddrie
The WispN/A
Fort KinnairdN/A Fort Kinnaird retail park
NewcraighallN/A National Rail logo.svg Newcraighall

Revised north–south proposal (Granton to BioQuarter)

During the early 2020s, plans were developed for a revised north–south tram line which would connect Granton in the north of the city with the Bioquarter in the south east, and possibly further onto either Dalkeith [15] or Queen Margaret University or Shawfair. [16] At a meeting on 1 February 2024, City of Edinburgh Council voted to put the proposed north–south extension to public consultation; by this point, it had an estimated construction cost of £2bn. [17]

In August 2025, a 12-week public consultation was launched for this extension serving the north–south axis of the city. This could link Granton in the north to Crewe Toll, then either via the Roseburn Path to Murrayfield or via Orchard Brae and Dean Bridge to the west end of Princes Street. To the south, the proposals would see trams run over North Bridge and South Bridge, through Newington to Cameron Toll along Lady Road, then along Old Dalkeith Road to the Royal Infirmary and BioQuarter at Little France. A lift connecting the North Bridge tram stop to Waverley railway station below is also proposed. [4] [5] [18]

The cost is estimated at between £2bn and £2.9bn depending on the option considered. The consultation will help inform a Strategic Business Case which will be presented to the council's Transport and Environment Committee in 2026. [18]

Future extensions beyond into the city region could link to Queen Margaret University and East Lothian or to Shawfair and Midlothian. [19] It is not proposed to connect Granton and Newhaven, which would complete the original Line 1 loop, although this may be reconsidered in future. [20]

Proposed routes and stops

The route via Orchard Brae connects to the existing line at the west end of Princes Street. Given the layout of this junction it would not be possible to run trams directly from Granton to the airport in future, instead passengers would have to change at the Princes Street stop. [20]

To minimise land take and impact on ecology along the Roseburn Path, it is proposed the section between Roseburn and Craigleith would be single track. The previously considered stop at Ravelston Dykes is also excluded for space reasons. [21]

Proposed route from Granton to city centre via Orchard Brae [5]
NameTransport InterchangeServes
Granton Square
Saltire Square
Caroline Park Edinburgh College (Granton Campus)
West Pilton
Crewe Toll BSicon BUS.svg Lothian Buses Fettes College
Leonardo S.p.A. (Edinburgh Site)
Western General Hospital Western General Hospital
Comely Bank
Queensferry Road Scottish National Gallery of Modern Art
Stewart's Melville College
The Mary Erskine School
St. George's School
Queensferry Street
Connects to existing line at the west end of Princes Street
Proposed route from Granton to city centre via Roseburn Path [5]
NameTransport InterchangeServes
Granton Square
Saltire Square
Caroline Park Edinburgh College (Granton Campus)
West Pilton
Crewe Toll BSicon BUS.svg Lothian Buses Fettes College
Leonardo S.p.A. (Edinburgh Site)
Telford Drive (for WGH) Western General Hospital
Craigleith Craigleith Retail Park
Single track section
Roseburn
Connects to existing line at Russel Road via delta junction
Proposed route from city centre to BioQuarter [5]
NameTransport InterchangeServes
Connects to existing line at the east end of Princes Street/South St Andrew Street via delta junction
North Bridge National Rail logo.svg Edinburgh Waverley railway station (via new lift) Royal Mile
Nicolson Street University of Edinburgh (central campus)
Newington
Mayfield Gardens
Cameron Toll Cameron Toll Shopping Centre
The Inch
Royal Infirmary Royal Infirmary of Edinburgh
BioQuarter Edinburgh BioQuarter

Other proposals

The Edinburgh South Suburban Railway (including hypothetically reopened stations) with tram interchanges shown Edinburgh trams and suburban railway 2023.svg
The Edinburgh South Suburban Railway (including hypothetically reopened stations) with tram interchanges shown

In addition to the three routes selected by transport planners, other proposals were put forward for inclusion in the tram network. Local campaigning groups have suggested that it would be possible to re-open the Edinburgh South Suburban Railway as an extension to Edinburgh trams. [22] This proposal was rejected by the Scottish Parliament on ground of cost and the line will not be re-opened for the foreseeable future. [23]

References

  1. "Scottish Light Rail : is it a "U" Turn?". Light Rail Transit Association. Archived from the original on 27 June 2009. Retrieved 13 January 2010.
  2. "Tram Facts 8" (PDF). 2006. Archived from the original (PDF) on 6 October 2011.
  3. "Edinburgh tram extension carries first passengers". BBC News. 6 June 2023. Retrieved 7 June 2023.
  4. 1 2 "Edinburgh trams: Public to be consulted over extension". BBC News. 25 August 2025. Retrieved 30 August 2025.
  5. 1 2 3 4 5 "Trams from Granton to Edinburgh BioQuarter and Royal Infirmary of Edinburgh and Beyond - City of Edinburgh Council - Citizen Space". consultationhub.edinburgh.gov.uk. Retrieved 30 August 2025.
  6. "Edinburgh Tram (Line One) Bill Environmental Statement" (PDF). City of Edinburgh Council/ Scottish Parliament. Archived from the original (PDF) on 23 April 2010. Retrieved 14 January 2010.
  7. "Funding concerns for tram project". BBC News. 24 April 2009. Retrieved 11 January 2010.
  8. 1 2 "Edinburgh Tram (Line Two) Bill Environmental Statement" (PDF). Archived from the original (PDF) on 17 December 2009. Retrieved 15 January 2010.
  9. Stevenson, Stewart (27 September 2007). "Edinburgh Airport Rail Link". Scottish Parliament. Archived from the original on 4 May 2007. Retrieved 12 January 2010.
  10. "Edinburgh Tram Project Line 3 report". City of Edinburgh Council. 24 February 2004. Retrieved 15 January 2010.
  11. "Transport chiefs 'want Edinburgh tram network'". BBC News. 4 March 2010. Retrieved 4 March 2010.
  12. Ferguson, Brian (24 March 2005). "Edinburgh's third tram line is dead". Edinburgh Evening News. Retrieved 12 January 2010.
  13. Roden, Alan (23 August 2005). "Scotsman.com News". The Scotsman. Edinburgh. Retrieved 21 May 2010.
  14. Swanson, Ian (9 December 2022). "Edinburgh tram expansion backed by Scottish Government in new transport blueprint". Edinburgh Evening News.
  15. "Huge tram extension planned for Edinburgh". BBC News. 12 February 2021.
  16. Pashby, Tom (2 February 2024). "New £2bn Edinburgh tramline to be put to public consultation". New Civil Engineer.
  17. 1 2 Hakimian, Rob (27 August 2025). "Edinburgh launches consultation on £2.9bn tram network expansion". New Civil Engineer. Retrieved 30 August 2025.
  18. "Edinburgh trams: Public to be consulted over extension". BBC News. 25 August 2025. Retrieved 30 August 2025.
  19. 1 2 McKenna, Catriona. "Trams from Granton to Edinburgh BioQuarter / Royal Infirmary of Edinburgh and beyond". The City of Edinburgh Council. Retrieved 31 August 2025.
  20. Jacobs (August 2025). Trams to Granton, BioQuarter and Beyond. Strategic Modelling Report (Report). The City of Edinburgh Council.
  21. "Reopening the South Sub" (PDF). Transform Scotland. March 2007. Archived from the original (PDF) on 11 August 2011. Retrieved 8 January 2010.
  22. "Public Petitions Committee Official Report". Scottish Parliament. 27 January 2009. Archived from the original on 5 June 2011. Retrieved 8 January 2010.