Omkareshwar Dam | |
---|---|
Location | Mandhata, Khandwa, Madhya Pradesh, India |
Coordinates | 22°14′37.26″N76°9′46.83″E / 22.2436833°N 76.1630083°E |
Status | Operational |
Construction began | 30 August 2003 |
Opening date | November 2007 |
Owner(s) | Government of Madhya Pradesh |
Operator(s) | Narmada Hydroelectric Development Corporation (NHDC) (Joint Venture of NHPC and Government of Madhya Pradesh) |
Dam and spillways | |
Type of dam | Concrete Gravity dam |
Impounds | Narmada River |
Height | 53 m (174 ft) |
Length | 949 m (3,114 ft) |
Spillways | 23 radial gates (20 m x 18.037 m) |
Spillway type | Ogee |
Spillway capacity | 88,315 m3/s (3,118,800 cu ft/s) |
Reservoir | |
Creates | Omkareshwar Reservoir |
Total capacity | 987,000,000 m3 (800,000 acre⋅ft) (34.84 tmcft) |
Active capacity | 299,000,000 m3 (242,000 acre⋅ft) (10.54 tmcft) |
Inactive capacity | 688,000,000 m3 (558,000 acre⋅ft) |
Catchment area | 64,880 km2 (25,050 sq mi) |
Surface area | 93.36 km2 (36.05 sq mi) |
Power Station | |
Operator(s) | NHDC |
Turbines | Dam: 8 × 65 MW Francis pump-turbine Canal: 5 MW Kaplan-type |
Installed capacity | 525 MW |
Website nhdcindia |
The Omkareshwar Dam is a gravity dam on the Narmada River just upstream of Mandhata in Khandwa district, Madhya Pradesh, India. It is named after the Omkareshwar temple located just downstream. The dam was constructed between 2003 and 2007 with the purpose of providing water for irrigation of 132,500 ha (327,000 acres). An associated hydroelectric power station located at the base of the dam has an installed capacity of 520 MW. [1] [2]
Omkareshwar Temple is a Hindu temple dedicated to Shiva, located in Mandhata, nearby Khandwa city in Khandwa district of the Indian state of Madhya Pradesh. It is one of the 12 revered Jyotirlinga shrines of Shiva. It is on an island called Mandhata, near Khandwa city in the Narmada River at Khandwa district in Madhya Pradesh, India; the shape of the island is said to be like the Devanagari ॐ symbol.
The Indira Sagar Dam is the largest dam in India, in terms of volume of water stored in the reservoir. It is located on the Narmada River at the town of Narmada Nagar, Punasa in the Khandwa district of Madhya Pradesh in India. The foundation stone of the project was laid by the prime minister of India Indira Gandhi on 23 October 1984. The construction of the main dam started in 1992. The downstream projects of ISP are Omkareshwar, Maheshwar, and Sardar Sarovar Project. To build it, a town of 22,000 people and 100 villages was displaced.
The Bastyan Power Station is a conventional hydroelectric power station located in Western Tasmania, Australia.
The Mackintosh Power Station is a conventional hydroelectric power station located in Western Tasmania, Australia.
The Reece Power Station is a conventional hydroelectric power station located in the West Coast region of Tasmania, Australia.
The Tribute Power Station is a conventional hydroelectric power station located in Western Tasmania, Australia.
The Tarraleah Power Station is a hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is part of the Upper Derwent hydro scheme and is operated by Hydro Tasmania.
The Tungatinah Power Station is a conventional hydroelectric power station located in the Central Highlands region of Tasmania, Australia. The power station is situated on the Upper River Derwent catchment and is owned and operated by Hydro Tasmania.
The Gordon Dam, also known as the Gordon River Dam, is a major gated double curvature concrete arch dam with a controlled spillway across the Gordon River, located in Southwest National Park, Tasmania, Australia. The impounded reservoir is called Lake Gordon.
The Mingachevir Dam is an earth-fill embankment dam on the Kura River just north of Mingachevir in Azerbaijan. It serves several purposes, including hydroelectric power production and water storage for irrigation. The Mingachevir reservoir, behind the dam, supplies water to the Upper Qarabag and Upper Sirvan channels which help irrigate about 1,000,000 ha of farmland in the country. Its six Francis turbine-generators were overhauled or replaced with 70 megawatts (94,000 hp) sets in 2000. Mingachevir reservoir has a storage capacity of 15.730 cubic kilometres (12,753,000 acre⋅ft), covering 605 km2 (234 sq mi). The length of the dam is 1,550 metres (5,090 ft), its width is 16 metres (52 ft) and height is 80 m (260 ft). It is the largest hydroelectric power station in the South Caucasus, and is located on Kura river, not far from Mingachevir city.
The Kamburu Hydroelectric Power Station, also Kamburu Dam is a rock-filled embankment dam on the Tana River in Kenya which straddles the border of Embu and Machakos Counties in Eastern Province. The primary purpose of the dam is hydroelectric power generation and it supports a 93 MW power station. Construction on the dam began in 1971 and it was completed in 1975, with the power station getting commissioned the same year. US$23 million of the US$47 million project cost was provided by the World Bank. The power station is operated by the Kenya Electricity Generating Company and is part of the Seven Forks Scheme.
Kiğı Dam is a rock-fill embankment dam on the Peri River in Bingöl Province, Turkey. Its primary purpose is hydroelectric power generation and is the first dam in the Peri River cascade, serving as the headwaters. Construction began in 1998 and is backed by the Turkish State Hydraulic Works. When commissioned, it will support a 180 MW power station. Water from the reservoir will be diverted to an underground power station downstream via an 8.5 km (5.3 mi) long tunnel. In August 2015, suspected Kurdistan Workers' Party militants set fire to three cement trucks associated with the dam construction site. In January 2016, the dam was completed and the reservoir began to impound water.
The Kürtün Dam is a concrete-face rock-fill dam on the Harşit River located 5 kilometres (3 mi) east of Kürtün in Gümüşhane Province, Turkey. The development was backed by the Turkish State Hydraulic Works. Construction began in 1986 and the reservoir started to fill in 2002. The dam was completed in 2003 and its underground power station became operational in 2004. The dam is connected with 5.6 km long (3.5 mi) road tunnel, constructed to link the dam site to Kürtün. The hydroelectric power station, located below and just downstream of the right abutment of the dam, has an installed capacity of 80 MW.
The Kouhrang 2 Hydroelectric Power Station is located just south of Chelgard and about 69 km (43 mi) northwest of Shahrekord in Chaharmahal and Bakhtiari Province, Iran. The power station has an installed capacity of 33.3 MW and uses water diverted to the east from the Kouhrang River, via a small dam and the 2 km (1.2 mi) long Kouhrang 2 Tunnel, to produce power. Water from the Kouhrang is stored in a circular dam before being sent to the power station. The power station's three generators were commissioned between 2002 and 2004, the power plant were inaugurated in February 2005. Water discharged from the power station enters the Zayandeh River as part of a larger project to provide water to major cities like Isfahan. The intake for the power plant is located on the Kouhrang River just downstream of the Kouhrang 1 Dam which also diverts water, via the 2,800 m (9,200 ft) long Kouhrang 2 Tunnel, to near Chelgard and was completed in 1953. The Kouhrang 3 Dam is planned downstream to regulate river flows and divert more water to the Zayandeh via the Kouhrang 3 Tunnel.
The Siah Bisheh Pumped Storage Power Plant, also spelled Siyāhbisheh and Siah Bishe, is located in the Alborz Mountain range near the village of Siah Bisheh and 48 km (30 mi) south of Chalus in Mazandaran Province, Iran. The power plant uses the pumped-storage hydroelectric method to generate electricity during periods of high energy demand, making it a peaking power plant, intended to fulfill peak electricity demand in Tehran 60 km (37 mi) to the south. When complete it will have an installed generating capacity of 1,040 megawatts (1,390,000 hp) and a pumping capacity of 940 megawatts (1,260,000 hp). Planning for the project began in the 1970s and construction began in 1985. It was delayed from 1992 until 2001 and the first generator went online in May 2013. The remaining generators were commissioned by 1 September 2015. The power plant is the first pumped-storage type in Iran and will also use the country's first concrete-face rock-fill dam – two of them.
The Kukule Ganga Dam is a 110 m (360 ft) gravity dam built across the Kukule River in Kalawana, Sri Lanka. The run-of-river dam feeds an underground hydroelectric power station located approximately 5 kilometres (3.1 mi) away, via tunnel.
The Gal Oya Dam is an embankment dam in the Uva Province of Sri Lanka. The dam creates one of the largest reservoirs in the country, the Gal Oya Reservoir. Water from the reservoir is used primarily for irrigation in the Uva and Eastern provinces, in addition to powering a small hydroelectric power station. Construction of the dam and reservoir began in August 24, 1949, completing four years later in 1953.
The Meander Dam is a concrete gravity dam across the Upper Meander River, located in northern Tasmania, Australia. The impounded reservoir is called Lake Huntsman.
The Saucelle Dam is a gravity dam on the Douro River. It is located about 4 km (2.5 mi) west of Saucelle in the province of Salamanca, Castile and León, Spain. The dam straddles the border of Spain and Portugal but is owned and operated by Spain's Iberdrola. Construction on the dam began in 1950 and was completed in 1956. The primary purpose of the dam is hydroelectric power production and it has an installed capacity of 520 MW. The power is produced by two power stations, both located just downstream. Saucelle I was commissioned in 1956 and contains four 62.5 MW Francis turbine-generators for an installed capacity of 251 MW. Saucelle II is located underground and was commissioned in 1985. It contains two 134.5 MW Francis turbine-generators for an installed capacity of 269 MW.
The Seyrantepe Dam is an earth-fill embankment dam on the Peri River, located 15 km (9 mi) northwest of Karakoçan on the border of Elazığ and Tunceli Provinces, Turkey. Its primary purpose is hydroelectric power generation and is the fifth dam in the Peri River cascade. Construction on the dam began in 2003 and its power station was commissioned in 2008. It contains two 29.39 MW Francis turbine-generators for a total installed capacity of 58.78 MW. It is owned and operated by Limak Energy and Bilgin Energy. The sand and gravel-fill dam is 48.5 m (159 ft) tall.