This article includes a list of references, related reading, or external links, but its sources remain unclear because it lacks inline citations .(February 2011) |
Mission type | Suborbital test flight |
---|---|
Operator | NASA |
Mission duration | 37 minutes, 19.7 seconds |
Range | 8,477 kilometers (4,577 nautical miles) |
Apogee | 492.1 kilometers (265.7 nautical miles) |
Spacecraft properties | |
Spacecraft | Apollo CSM-009 |
Manufacturer | North American Aviation |
Launch mass | 15,294 kilograms (33,718 lb) |
Start of mission | |
Launch date | February 26, 1966, 16:12:01 UTC |
Rocket | Saturn IB SA-201 |
Launch site | Cape Kennedy LC-34 |
End of mission | |
Recovered by | USS Boxer |
Landing date | February 26, 1966, 16:49:21 UTC |
Landing site | South Atlantic Ocean 8°56′S10°43′W / 8.933°S 10.717°W |
AS-201 (Also known as SA-201, Apollo 1-A, or Apollo 1 prior to the 1967 pad fire), flown February 26, 1966, was the first uncrewed test flight of an entire production Block I Apollo command and service module and the Saturn IB launch vehicle. The spacecraft consisted of the second Block I command module and the first Block I service module. The suborbital flight was a partially successful demonstration of the service propulsion system and the reaction control systems of both modules, and successfully demonstrated the capability of the command module's heat shield to survive re-entry from low Earth orbit.
The command and service module CSM-009 was a Block I version, designed before the lunar orbit rendezvous method was chosen for the Apollo lunar landing; therefore it lacked capability to dock with a lunar module. Block I also employed preliminary designs of certain subsystems, and was heavier than the Block II version with lunar mission capability. All previous command and service modules flown (with one exception) were boilerplate versions.
CM-009 was the second production Block I command module to fly, the first being CM-002 flown on a Little Joe II rocket for the final launch escape system abort test, designated A-004. CM-009 varied from the production configuration by the omission of the guidance and navigation system; crew couches, displays, and associated equipment; and by the addition of a control programmer and open-loop emergency detection system.
SM-009 was the first production Block I service module to fly. It varied from the production configuration by replacement of the electrical power-generating fuel cells with batteries, and omission of the S-band communication equipment.
The launch also included a Block I launch escape system (LES), and the first flight of the Spacecraft–LM adapter (SLA) which connected the spacecraft to the launch vehicle.
The Saturn IB was the uprated version of the Saturn I rocket flown in ten earlier Apollo missions. It featured an upgrade of the first stage engines to increase total thrust from 1,500,000 lbf (6,700 kN) of thrust to 1,600,000 lbf (7,100 kN), and replacement of the second stage with the S-IVB. This stage used a new liquid hydrogen-burning J-2 engine which would also be used on the S-II second stage of the Saturn V lunar launch vehicle. A modified version of the S-IVB, with an in-space restartable J-2, would also be used as the third stage of the Saturn V. It also used a new model of the guidance and control system known as the Instrument Unit, which would also be used on the Saturn V.
The objectives of the mission were to:
The mission profile called for the Saturn IB to launch the spacecraft on an east-by-southeast heading into a high ballistic trajectory; then the CSM would separate from the SLA. The service module engine would be fired twice, then the command module would re-enter and land in the south Atlantic Ocean.
The first piece of the rocket to arrive at the Cape was the S-IB stage on August 14, 1965, by the barge Promise. It was built by Chrysler and featured eight H-1 engines built by Rocketdyne. The S-IVB second stage arrived next on September 18. The Instrument Unit that would control the launch vehicle arrived October 22, the command module arrived three days later and the service module on October 27.
The first stage was erected at the pad soon after arriving at Cape Kennedy. The second stage joined it on October 1. After fixing some problems in the Instrument Unit it was mated to the S-IVB on October 25. The CSM was mated on December 26.
The first problem encountered by NASA came on October 7. The RCA 110A computer which would test the rocket and thus, automating the process, was ten days behind schedule meaning that it would not be at the Cape before November 1. This meant that by the middle of October little could be done at the pad. When the computer finally did arrive it continued to have problems with the punch cards and also the capacitors that did not operate well under a protective coating. In the end however the testing of the launch vehicle was still on schedule.
Testing was running around the clock during December. Technicians were testing the CSM's fuel systems during the day and the testing was running on the rocket at night.
There was even an instance of a variant of the Y2K bug in the computer. As it ran past midnight, when the time changed from 2400 to 0001 the computer could not handle it and "turned into a pumpkin" according to an interview with Frank Bryan, a Kennedy Space Center Launch Vehicle Operations Engineering staff member.[ citation needed ]
In the end the testing regimen slowly completed and the plugs-out tests were completed proving that the rocket could function by itself.
The first launch attempt was scheduled for February 26, 1966. There were several small delays, but when the pressure in one of the fuel tanks in the S-IVB fell below the allowed limits, the onboard computer aborted the launch four seconds before launch.
Though the problem could be fixed easily, it was thought that it could not be done within the launch window. After running a simulated launch and 150 seconds of flight to show that the rocket could operate with the lower pressure in the fuel tank, the launch was reinstated.
Finally, after months of delays and problems, the first flight of the Saturn IB lifted off from Pad 34. The first stage worked perfectly, lifting the rocket to 57 kilometers (31 nmi), when the S-IVB took over and lifted the spacecraft to 425 kilometers (229 nmi). The CSM separated and continued upwards to 488 kilometers (263 nmi).[ citation needed ]
The CSM then fired its own rocket to accelerate the spacecraft towards Earth. The first burn lasted for 184 seconds. It then fired later for ten seconds. This proved that the engine could restart in space, a crucial part of any crewed flight to the Moon.
It entered the atmosphere traveling 8,300 meters per second (27,000 ft/s). It splashed down 37 minutes after launch, 72 kilometers (39 nmi) from the planned touch down point, and was on board the aircraft carrier USS Boxer two hours later.
There were three problems encountered on the flight. The service module engine worked properly for only 80 seconds, interrupted by the presence of helium pressurant gas in the combustion chamber. Helium was used to pressurize the fuel tanks but should not have been in the combustion chamber. This was caused by a break in an oxidizer line that allowed helium to mix with the oxidizer.
The second problem was an electrical system failure which caused the command module to lose steering control during reentry. Last, measurements that were intended to be taken during reentry, failed due to a short circuit. Both of these problems were found to be due to incorrect wiring, and were easily fixed.
After the flight the capsule was also used for drop tests at White Sands Missile Range. It is now on display at the Strategic Air and Space Museum, Ashland, Nebraska.
This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration .
The Apollo program, also known as Project Apollo, was the United States human spaceflight program carried out by the National Aeronautics and Space Administration (NASA), which succeeded in preparing and landing the first men on the Moon in 1969. It was first conceived in 1960 during President Dwight D. Eisenhower's administration as a three-person spacecraft to follow the one-person Project Mercury, which put the first Americans in space. Apollo was later dedicated to President John F. Kennedy's national goal for the 1960s of "landing a man on the Moon and returning him safely to the Earth" in an address to Congress on May 25, 1961. It was the third US human spaceflight program to fly, preceded by the two-person Project Gemini conceived in 1961 to extend spaceflight capability in support of Apollo.
Apollo 7 was the first crewed flight in NASA's Apollo program, and saw the resumption of human spaceflight by the agency after the fire that had killed the three Apollo 1 astronauts during a launch rehearsal test on January 27, 1967. The Apollo 7 crew was commanded by Walter M. Schirra, with command module pilot Donn F. Eisele and Lunar Module pilot R. Walter Cunningham.
Apollo 9 was the third human spaceflight in NASA's Apollo program. Flown in low Earth orbit, it was the second crewed Apollo mission that the United States launched via a Saturn V rocket, and was the first flight of the full Apollo spacecraft: the command and service module (CSM) with the Lunar Module (LM). The mission was flown to qualify the LM for lunar orbit operations in preparation for the first Moon landing by demonstrating its descent and ascent propulsion systems, showing that its crew could fly it independently, then rendezvous and dock with the CSM again, as would be required for the first crewed lunar landing. Other objectives of the flight included firing the LM descent engine to propel the spacecraft stack as a backup mode, and use of the portable life support system backpack outside the LM cabin.
Apollo 10 was the fourth human spaceflight in the United States' Apollo program and the second to orbit the Moon. NASA, the mission's operator, described it as a "dress rehearsal" for the first Moon landing. It was designated an "F" mission, intended to test all spacecraft components and procedures short of actual descent and landing.
The Apollo Lunar Module, originally designated the Lunar Excursion Module (LEM), was the lunar lander spacecraft that was flown between lunar orbit and the Moon's surface during the United States' Apollo program. It was the first crewed spacecraft to operate exclusively in the airless vacuum of space, and remains the only crewed vehicle to land anywhere beyond Earth.
Apollo 4, also known as SA-501, was the uncrewed first test flight of the Saturn V launch vehicle, the rocket that eventually took astronauts to the Moon. The space vehicle was assembled in the Vehicle Assembly Building, and was the first to be launched from Kennedy Space Center (KSC) in Florida, ascending from Launch Complex 39, where facilities built specially for the Saturn V had been constructed.
Apollo 5, also known as AS-204, was the uncrewed first flight of the Apollo Lunar Module (LM) that would later carry astronauts to the surface of the Moon. The Saturn IB rocket bearing the LM lifted off from Cape Kennedy on January 22, 1968. The mission was successful, though due to programming problems an alternate mission to that originally planned was executed.
Apollo 6, also known as AS-502, was the third and final uncrewed flight in the United States' Apollo Program and the second test of the Saturn V launch vehicle. It qualified the Saturn V for use on crewed missions, and it was used beginning with Apollo 8 in December 1968.
The S-IVB was the third stage on the Saturn V and second stage on the Saturn IB launch vehicles. Built by the Douglas Aircraft Company, it had one J-2 rocket engine. For lunar missions it was fired twice: first for Earth orbit insertion after second stage cutoff, and then for translunar injection (TLI).
AS-203 was an uncrewed flight of the Saturn IB rocket on July 5, 1966. It carried no command and service module, as its purpose was to verify the design of the S-IVB rocket stage restart capability that would later be used in the Apollo program to boost astronauts from Earth orbit to a trajectory towards the Moon. It achieved its objectives, but the S-IVB was inadvertently destroyed after four orbits during a differential pressure test that exceeded the design limits.
AS-202 was the second uncrewed, suborbital test flight of a production Block I Apollo command and service module launched with the Saturn IB launch vehicle. It was launched on August 25, 1966, and was the first flight which included the spacecraft guidance, navigation control system and fuel cells. The success of this flight enabled the Apollo program to judge the Block I spacecraft and Saturn IB ready to carry men into orbit on the next mission, AS-204.
The Apollo spacecraft was composed of three parts designed to accomplish the American Apollo program's goal of landing astronauts on the Moon by the end of the 1960s and returning them safely to Earth. The expendable (single-use) spacecraft consisted of a combined command and service module (CSM) and an Apollo Lunar Module (LM). Two additional components complemented the spacecraft stack for space vehicle assembly: a spacecraft–LM adapter (SLA) designed to shield the LM from the aerodynamic stress of launch and to connect the CSM to the Saturn launch vehicle and a launch escape system (LES) to carry the crew in the command module safely away from the launch vehicle in the event of a launch emergency.
The Saturn IB was an American launch vehicle commissioned by the National Aeronautics and Space Administration (NASA) for the Apollo program. It uprated the Saturn I by replacing the S-IV second stage, with the S-IVB. The S-IB first stage also increased the S-I baseline's thrust from 1,500,000 pounds-force (6,700,000 N) to 1,600,000 pounds-force (7,100,000 N) and propellant load by 3.1%. This increased the Saturn I's low Earth orbit payload capability from 20,000 pounds (9,100 kg) to 46,000 pounds (21,000 kg), enough for early flight tests of a half-fueled Apollo command and service module (CSM) or a fully fueled Apollo Lunar Module (LM), before the larger Saturn V needed for lunar flight was ready.
Apollo abort modes were procedures by which the nominal launch of an Apollo spacecraft, either the Saturn IB or Saturn V rocket, could be terminated. The abort of the flight allowed for the rescue of the crew if the rocket failed catastrophically. Depending on how far the flight had progressed, different procedure or modes would be used. In the history of the Apollo Program, none of the abort modes were ever used on any of the fifteen crewed Apollo spacecraft flights.
The Apollo Applications Program (AAP) was created as early as 1966 by NASA headquarters to develop science-based human spaceflight missions using hardware developed for the Apollo program. AAP was the ultimate development of a number of official and unofficial Apollo follow-on projects studied at various NASA labs. However, the AAP's ambitious initial plans became an early casualty when the Johnson Administration declined to support it adequately, partly in order to implement its Great Society set of domestic programs while remaining within a $100 billion budget. Thus, Fiscal Year 1967 ultimately allocated $80 million to the AAP, compared to NASA's preliminary estimates of $450 million necessary to fund a full-scale AAP program for that year, with over $1 billion being required for FY 1968. The AAP eventually led to Skylab, which absorbed much of what had been developed under Apollo Applications.
Several planned missions of the Apollo crewed Moon landing program of the 1960s and 1970s were canceled, for reasons which included changes in technical direction, the Apollo 1 fire, hardware delays, and budget limitations. After the landing by Apollo 12, Apollo 20, which would have been the final crewed mission to the Moon, was canceled to allow Skylab to launch as a "dry workshop". The next two missions, Apollos 18 and 19, were later canceled after the Apollo 13 incident and further budget cuts. Two Skylab missions also ended up being canceled. Two complete Saturn V rockets remained unused and were put on display in the United States.
The Saturn V dynamic test vehicle, designated SA-500D, is a prototype Saturn V rocket used by NASA to test the performance of the rocket when vibrated to simulate the shaking which subsequent rockets would experience during launch. It was the first full-scale Saturn V completed by the Marshall Space Flight Center (MSFC). Though SA-500D never flew, it was instrumental in the development of the Saturn V rocket which propelled the first men to the Moon as part of the Apollo program. Built under the direction of Dr. Wernher von Braun, it served as the test vehicle for all of the Saturn support facilities at MSFC.
Transposition, docking, and extraction was a maneuver performed during Apollo lunar landing missions from 1969 to 1972, to withdraw the Apollo Lunar Module (LM) from its adapter housing which secured it to the Saturn V launch vehicle upper stage and protected it from the aerodynamic stresses of launch. The maneuver involved the command module pilot separating the Apollo Command and Service Module (CSM) from the adapter, turning the CSM around, and docking its nose to the Lunar Module, then pulling the combined spacecraft away from the upper stage. It was performed shortly after the trans-lunar injection maneuver that placed the Apollo spacecraft on a three-day trajectory to the Moon. The docking created a continuous, pressurized tunnel which permitted the astronauts to transfer internally between the CSM and the LM.
The Saturn V is a retired American super heavy-lift launch vehicle developed by NASA under the Apollo program for human exploration of the Moon. The rocket was human-rated, had three stages, and was powered by liquid fuel. Flown from 1967 to 1973, it was used for nine crewed flights to the Moon, and to launch Skylab, the first American space station.