Canceled Apollo missions

Last updated

Several planned missions of the Apollo crewed Moon landing program of the 1960s and 1970s were canceled, for reasons which included changes in technical direction, the Apollo 1 fire, hardware delays, and budget limitations. After the landing by Apollo 12, Apollo 20, which would have been the final crewed mission to the Moon, was canceled to allow Skylab to launch as a "dry workshop" (assembled on the ground in an unused S-IVB Saturn IB second stage). The next two missions, Apollos 18 and 19, were later canceled after the Apollo 13 incident and further budget cuts. Two Skylab missions also ended up being canceled. Two complete Saturn V rockets remained unused and were put on display in the United States. [1]

Contents

Planned missions prior to Apollo 1 fire

The prime crew for the second planned Apollo crewed flight prepares for mission simulator tests at the North American Aviation plant prior to the Apollo 1 fire. Left to right: Donn F. Eisele, senior pilot, Walter M. Schirra, command pilot, and Walter Cunningham, pilot. (September 1966). AS-205 crew.jpg
The prime crew for the second planned Apollo crewed flight prepares for mission simulator tests at the North American Aviation plant prior to the Apollo 1 fire. Left to right: Donn F. Eisele, senior pilot, Walter M. Schirra, command pilot, and Walter Cunningham, pilot. (September 1966).

In September 1962, NASA planned to make four crewed low-Earth-orbital test flights of partially equipped Block I Command/Service Modules (CSM) using the Saturn I launch vehicle, designated SA-11 through SA-14, in 1965 and 1966. However, the limited payload capacity of the Saturn I compared to the uprated Saturn IB would have severely limited the systems carried, and thus the testing value of these flights. Therefore, NASA canceled these flights in October 1963, [2] and replaced them with two crewed Saturn IB missions, designated AS-204 and AS-205. These would be followed by the first uncrewed flight of the Lunar Module (LM) on AS-206, then the third crewed mission, designated AS-207/208, would use AS-207 to launch the crew in an improved Block II CSM, which would rendezvous and dock with the LM launched uncrewed on AS-208.

The crew selected on March 21, 1966, for AS-204 consisted of Command Pilot Virgil "Gus" Grissom, Senior Pilot Ed White, and Pilot Roger Chaffee, who named their mission Apollo 1. AS-205 was to be named Apollo 2, and AS-207/208 would be Apollo 3. [3] The AS-205 crew were Wally Schirra, Donn Eisele and Walter Cunningham. However, AS-205 was later deemed unnecessary and officially canceled on December 22, 1966.

Schirra's crew then became the backup for Grissom's crew, and the crewed LM mission became the second crewed mission, redesignated AS-205/208 and crewed by the original backup for Grissom's crew: Command Pilot Jim McDivitt, CSM Pilot David Scott and LM Pilot Rusty Schweickart. They immediately began their training in the first Block II Command Module CM-101, as Grissom's crew were preparing for a February 1967 launch.

Then, on January 27, 1967, Grissom, White, and Chaffee were killed in a flash fire in their spacecraft cabin during a test on the launch pad, interrupting the program for 21 months to identify and fix the root causes of numerous safety problems. This forced cancellation of plans to fly any crewed Block I spacecraft, and effectively forced a "reboot" of all crewed mission plans.

Development missions after Apollo 1 fire

In September 1967, NASA created a list of remaining mission types necessary to achieve the first crewed lunar landing, each designated by a letter A through G, where G would be the first crewed landing. This list was later extended through letter J to cover follow-on lunar missions.

Two uncrewed Saturn V test launches (A missions) were flown as Apollo 4 and Apollo 6. A third test was planned but canceled as unnecessary.

The first development Lunar Module, LM-1 was flown uncrewed (B mission) as Apollo 5. A second uncrewed test was planned using LM-2 but was canceled as unnecessary. LM-2 was retrofitted to look like a production LM which would land men on the Moon and was donated to the Smithsonian National Air and Space Museum, where it is currently on display as a simulation of the Apollo 11 first landing.

Schirra's crew would fly the C mission, first crewed CSM (Block II CSM-101, retrofitted with the cabin safety improvements) as Apollo 7 in October 1968.

McDivitt's crew and mission were kept as the first crewed development LM flight (D mission); this was planned to be Apollo 8 in December 1968, now using a single Saturn V launch vehicle instead of two separate Saturn IB launches. The E mission was planned as an elliptical medium Earth orbit test of the operational LM with the CSM in a simulated lunar mission to an apogee of 4,600 miles (7,400 km), to be commanded by Frank Borman in March 1969.

Of all the components of the Apollo system, the LM had the most technical issues. It was behind schedule and when LM-3 was shipped to the Kennedy Space Center in June 1968, over 101 separate defects were discovered. Grumman Aircraft Engineering Corporation, which was the lead contractor for the LM predicted that the first man-rated LM, to be used for the D mission, would not be ready until at least February 1969, delaying the entire sequence.

George Low, the manager of the Apollo Spacecraft Program Office, proposed a solution in August 1968. Since the CSM would be ready three months before the Lunar Module, they could fly a CSM-only mission in December 1968. But instead of just repeating the C mission that would fly the CSM in Earth orbit, they could send the CSM all the way to the Moon and maybe even enter into orbit. This mission was dubbed "C-Prime" (an imaginary letter between C and D). This new mission would allow NASA to practice procedures for a lunar flight that would otherwise have to wait until Apollo 10, the F mission. There were also concerns from the Central Intelligence Agency that the Soviet Union was planning their own circumlunar flight for December to upstage the Americans once again (see Zond program). McDivitt's crew—who had grown accustomed to working with LM-3 and preparing for its flight—was kept on the D mission which now became Apollo 9, while Borman's crew would fly the CSM lunar orbit mission on Apollo 8, and the E mission was canceled.

The swap of crews was also decisive in who would be the first man to walk on the Moon. Pete Conrad was backup commander for McDivitt's crew, and by the process of crew rotation, would have been in line for commander of Apollo 11 three flights later. Neil Armstrong got this honor by virtue of being Borman's backup commander.

Follow-on lunar missions

NASA contracted to have 15 flight-worthy Saturn V rockets produced. Apollo 11 achieved the first landing with the sixth Saturn V, leaving nine for follow-on landings. The following landing sites were chosen (see clarification below) for these missions, planned to occur at intervals of approximately four months through July 1972. [4] [5] This list of landing sites was not compiled by the Apollo Site Selection Board (ASSB), or its various sub-groups, which made the actual landing site selections one to two flights in advance. This list was compiled by a consulting firm, and was only a set of planning tools and suggestions. The ASSB would have selected actual sites for the cancelled Apollo missions, and since these missions never went through the site selection process, the list presented here did not reflect actual planning of the Apollo Program Office or NASA HQ. As referenced in "To A Rocky Moon," by Donald Wilhelms.

The last five missions were J-class missions using the Extended Lunar Module, capable of three-day stays on the Moon and carrying the Lunar Roving Vehicle:

As the later missions were up to three years out, little detailed planning was made, and a variety of landing sites were given for some flights. According to "NASA OMSF, Manned Space Flight Weekly Report" dated July 28, 1969, Apollo 18 would have landed at Schröter's Valley in February 1972, Apollo 19 in the Hyginus rille region in July 1972, and Apollo 20 in Copernicus crater in December 1972.

Other proposed landing sites and schedules for the last three missions included Gassendi crater (Apollo 18, July 1973), Copernicus (Apollo 19, December 1973), and Marius Hills or Tycho crater (Apollo 20, July 1974). [6]

As a number of ambitious Apollo Applications Programs were planned, it was still hoped in 1969 that further Saturn V launch vehicles could be contracted, allowing for more ambitious lunar missions.

In the NASA report "Scientific Rationale Summaries for Apollo Candidate Lunar Exploration Landing Sites" from March 11, 1970, Apollo 18 is targeted for Copernicus, and Apollo 19 is assigned Hadley rille (the eventual landing site of Apollo 15). The Apollo 20 mission had been canceled two months before, but the report still suggested its target, Hyginus rille, possibly as an alternative Apollo 19 landing site. [7]

Cancellations

Harrison Schmitt was likely to be the first scientist to the Moon on Apollo 18 or 19, with Don L. Lind the second. [8] On January 4, 1970, NASA announced the cancellation of Apollo 20 so that its Saturn V launch rocket could be used to launch the Skylab space station as a "dry workshop" (assembled on the ground), instead of constructing it as a "wet workshop" from a spent S-IVB upper stage of a Saturn IB launch vehicle. Also, budget restrictions had limited the Saturn V production to the original 15. [9] After NASA Deputy Administrator George M. Low announced that the final three Moon landings were rescheduled for 1973 and 1974, following the three planned Skylab missions, [10] Chief Astronaut Deke Slayton moved Lind to Apollo Applications, stating that "with the cancellation of 20, I could see I just wasn't going to have a flight for him". [11]

Another lunar landing was lost in April 1970 when Apollo 13 had in-flight failure, and the Fra Mauro landing site was reassigned to Apollo 14. Then on September 2, 1970, NASA announced it was canceling the H4 and J4 missions after more budget cuts. Skylab was postponed to 1973, and the final landing schedule became:

At the time, 35 of NASA's 49 active astronauts were waiting for a mission. [12]

In the final days of the program, Apollo 17 LMP Schmitt aggressively lobbied for a crewed landing on the far side of the Moon, targeting the far side Tsiolkovskiy crater. Schmitt's ambitious proposal included the launch into lunar orbit of special communications satellites based on the existing TIROS satellites to allow contact with the astronauts during their powered descent and lunar surface operations. NASA administrators rejected these plans because of lack of funding and added risk.

In August 1971, President Richard Nixon proposed to cancel all remaining lunar landings (Apollo 16 and 17). His Office of Management and Budget Deputy Director Caspar Weinberger was opposed to this and persuaded Nixon to keep the remaining Moon missions, but recommended that if such cancellation did happen, it should be "on the ground that Apollo 15 was so successful in gathering needed data that we can now shift, sooner than previously expected, to the Space Shuttle, Grand Tour, NERVA, etc". [13]

John Young, who flew on Apollo 10 and 16, believed that fear of losing astronauts was a reason why NASA canceled Apollo 18, 19, and 20. [14]

Crew assignments

Slayton was the director of Flight Crew Operations and effectively chose the crews for the flights. He did not intend to give astronauts two lunar landing commands but, according to historian Michael Cassutt, as late as the summer of 1969when 10 landings were still scheduledSlayton planned to give Lunar Module pilots Fred Haise, Edgar Mitchell, and James Irwin the opportunity to walk again on the Moon as commanders. [15] During the early Apollo missions he used a rotation system of assigning a crew as backup and then, three missions later, as the prime crew; however, by the later Apollo flights, this system was used less frequently as astronauts left the program, Slayton wanted to give rookies a chance, and astronauts did not want to take backup positions that no longer could lead to prime-crew spots.

A Gantt chart showing how astronaut assignments were deeply affected by cancelled Apollo missions. AstronautAssignmentsChart.PNG
A Gantt chart showing how astronaut assignments were deeply affected by cancelled Apollo missions.

In the case of Apollo 18 the crew was probably the Apollo 15 backup crew: [5]

When Apollo 18 was canceled, Schmitt was moved up to Apollo 17 under pressure from the scientific community, replacing Joe Engle. Schmitt, a geologist, became the twelfth man and the only professional scientist to walk on the Moon.

Slayton's intention for the Apollo 19 crew was the original (prior to cancellation) Apollo 16 backup crew: [5] [16]

For Apollo 20 there is even more uncertainty. Based on normal crew rotation, the crew would likely have been: [5]

Another possibility would have been: [6]

Skylab

Vance Brand and Don Lind, the crew for the unflown Skylab Rescue mission. Skylab rescue crew.jpg
Vance Brand and Don Lind, the crew for the unflown Skylab Rescue mission.

Skylab Rescue

One of the surplus CSMs, CSM-119, was modified to carry two additional crew and kept on standby for a potential rescue mission in case of issues on-board Skylab. During Skylab 3, a malfunction on the Apollo CSM docked to the station caused fears that the crew would not be able to return safely. CSM-119 was rolled out to Launch Complex 39B on Saturn IB SA-209 during the mission and prepared for a possible launch. Two astronauts, Brand (commander) and Lind (Command Module pilot), would have flown the CSM to retrieve the three crew members. The problem was fixed without requiring a rescue flight. CSM-119 was returned to the Vehicle Assembly Building and remained on standby until the Skylab program ended.

CSM-119 was also held as a backup CSM for the Apollo–Soyuz Test Project.

Skylab 5

Skylab 5 would have been a short 20-day mission to conduct more scientific experiments and boost Skylab into a higher orbit. Brand, Lind, and William B. Lenoir (science pilot) would have been the crew. [17]

Surplus hardware

LM-2 on display at the National Air and Space Museum Lunar Module 2 at the National Air and Space Museum.jpg
LM-2 on display at the National Air and Space Museum
CSM-119 on display at the Apollo/Saturn V Center SaturnVcenterModule.JPG
CSM-119 on display at the Apollo/Saturn V Center
Saturn V at the Apollo/Saturn V Center SaturnVcenter.JPG
Saturn V at the Apollo/Saturn V Center
Rear view of Saturn V at the Apollo/Saturn V Center SaturnVCenterRearView.jpg
Rear view of Saturn V at the Apollo/Saturn V Center
Saturn IB SA-209 on display at the Kennedy Space Center Visitor Complex Saturn IB at KSC.jpg
Saturn IB SA-209 on display at the Kennedy Space Center Visitor Complex

Two complete Saturn V rockets went unused after the Apollo program, SA-514 and SA-515, as well as the third stage of the SA-513. SA-513 was the launch vehicle originally planned for the Apollo 18 mission, which was instead used (without its third stage) to launch Skylab.

Several Saturn IBs also remained unused and in storage at the end of the Apollo program. Three (SA-206, SA-207 and SA-208) were used for the crewed launches of the Skylab program, and SA-210 was used for the crewed ASTP flight. The second stage of SA-212 was rebuilt as the launched Skylab. Of the remaining vehicles, two are on display, and the rest were scrapped. [18] Any surplus Rocketdyne H-1 first stage engines were rebranded as the Rocketdyne RS-27 engine for usage on active launch vehicles of the time, such as those of the Delta 2000 Series in 1974. [19]

Likewise, the canceled flights' CSMs and LMs went either unused or were used for other missions:

Notes

  1. Times, Richard D. Lyons Special to The New York (1970-09-03). "2 MOON LANDINGS DROPPED BY NASA IN ECONOMY MOVE". The New York Times. ISSN   0362-4331 . Retrieved 2024-03-18.
  2. Wade, Mark. "Apollo SA-11". Encyclopedia Astronautica. Retrieved July 29, 2022.
  3. Teitel, Amy Shira (October 29, 2013). "What Happened to Apollos 2 and 3?". Popular Science .
  4. "Next Decade Challenges Man the Magnificent", Albuquerque Journal, November 23, 1969, pE-2
  5. 1 2 3 4 "Apollo 18 through 20 - The Cancelled Missions", Dr. David R. Williams, NASA, accessed July 19, 2006.
  6. 1 2 "Apollo 18". Archived from the original on 2012-05-07.
  7. "Scientific rationale summaries for Apollo candidate lunar exploration landing sites". NASA Report. Downloaded from NASA Technical Reports Server December 14, 2007.
  8. Shayler, David J. (2001). Skylab: America's Space Station. Berlin: Springer. p. 125. ISBN   1-85233-407-X.
  9. "Peril Point at NASA". Time . January 26, 1970. Archived from the original on October 30, 2010.
  10. "Budget Cuts, Revisions Could Delay Apollo Flights", Press-Telegram (Long Beach, CA), January 6, 1970, pA-7
  11. Slayton, D.K.; Cassutt, M. (1995). Deke! U.S. Manned Space From Mercury To the Shuttle. Tom Doherty Associates. p. 252. ISBN   978-1-4668-0214-8.
  12. "Waning Moon Program". Time. September 14, 1970.
  13. "Memorandum for the President" by Caspar Weinberger (via George Shultz), August 12, 1971, Page 32 (of 39)
  14. Little, Geoffrey (September 2005). "John Young, Spaceman". Air & Space .
  15. Cassutt, Michael (2007-05-09). "Re: Don Lind and Tony England". NASASpaceFlight.com. Retrieved April 17, 2011.
  16. Donald K. Slayton, Deke! (New York: Forge, 1994), 262
  17. Wade, Mark. "Skylab 5". Astronautix. Archived from the original on 2011-05-13. Retrieved 2011-02-04.
  18. "Saturn Vehicle History". Space Launch Report. 6 Dec 2012. Archived from the original on 14 March 2022.{{cite web}}: CS1 maint: unfit URL (link)
  19. "Delta 2000 series". Encyclopedia Astronautica. Archived from the original on 18 June 2012. Retrieved 8 June 2012.
  20. "Saturn Vehicle History". Space Launch Report. 6 Dec 2012. Archived from the original on 14 March 2022.{{cite web}}: CS1 maint: unfit URL (link)

Related Research Articles

<span class="mw-page-title-main">Apollo program</span> 1961–1972 American crewed lunar exploration program

The Apollo program, also known as Project Apollo, was the United States human spaceflight program carried out by the National Aeronautics and Space Administration (NASA), which succeeded in preparing and landing the first men on the Moon from 1968 to 1972. It was first conceived in 1960 during President Dwight D. Eisenhower's administration as a three-person spacecraft to follow the one-person Project Mercury, which put the first Americans in space. Apollo was later dedicated to President John F. Kennedy's national goal for the 1960s of "landing a man on the Moon and returning him safely to the Earth" in an address to Congress on May 25, 1961. It was the third US human spaceflight program to fly, preceded by the two-person Project Gemini conceived in 1961 to extend spaceflight capability in support of Apollo.

<span class="mw-page-title-main">Apollo 7</span> First crewed flight of the Apollo space program

Apollo 7 was the first crewed flight in NASA's Apollo program, and saw the resumption of human spaceflight by the agency after the fire that had killed the three Apollo 1 astronauts during a launch rehearsal test on January 27, 1967. The Apollo 7 crew was commanded by Walter M. Schirra, with command module pilot Donn F. Eisele and lunar module pilot R. Walter Cunningham.

<span class="mw-page-title-main">Apollo 9</span> 3rd crewed mission of the Apollo space program

Apollo 9 was the third human spaceflight in NASA's Apollo program. Flown in low Earth orbit, it was the second crewed Apollo mission that the United States launched via a Saturn V rocket, and was the first flight of the full Apollo spacecraft: the command and service module (CSM) with the Lunar Module (LM). The mission was flown to qualify the LM for lunar orbit operations in preparation for the first Moon landing by demonstrating its descent and ascent propulsion systems, showing that its crew could fly it independently, then rendezvous and dock with the CSM again, as would be required for the first crewed lunar landing. Other objectives of the flight included firing the LM descent engine to propel the spacecraft stack as a backup mode, and use of the portable life support system backpack outside the LM cabin.

<span class="mw-page-title-main">Apollo 10</span> Second crewed mission to orbit the Moon

Apollo 10 was the fourth human spaceflight in the United States' Apollo program and the second to orbit the Moon. NASA, the mission's operator, described it as a "dress rehearsal" for the first Moon landing. It was designated an "F" mission, intended to test all spacecraft components and procedures short of actual descent and landing.

<span class="mw-page-title-main">Apollo 12</span> Second crewed Moon landing

Apollo 12 was the sixth crewed flight in the United States Apollo program and the second to land on the Moon. It was launched on November 14, 1969, by NASA from the Kennedy Space Center, Florida. Commander Charles "Pete" Conrad and Lunar Module Pilot Alan L. Bean performed just over one day and seven hours of lunar surface activity while Command Module Pilot Richard F. Gordon remained in lunar orbit.

<span class="mw-page-title-main">Apollo 15</span> Fourth crewed Moon landing

Apollo 15 was the ninth crewed mission in the United States' Apollo program and the fourth to land on the Moon. It was the first J mission, with a longer stay on the Moon and a greater focus on science than earlier landings. Apollo 15 saw the first use of the Lunar Roving Vehicle.

<span class="mw-page-title-main">Apollo 16</span> Fifth crewed Moon landing

Apollo 16 was the tenth crewed mission in the United States Apollo space program, administered by NASA, and the fifth and penultimate to land on the Moon. It was the second of Apollo's "J missions", with an extended stay on the lunar surface, a focus on science, and the use of the Lunar Roving Vehicle (LRV). The landing and exploration were in the Descartes Highlands, a site chosen because some scientists expected it to be an area formed by volcanic action, though this proved not to be the case.

<span class="mw-page-title-main">Apollo 17</span> Sixth and latest crewed Moon landing

Apollo 17 was the eleventh and final mission of NASA's Apollo program, the sixth and most recent time humans have set foot on the Moon or traveled beyond low Earth orbit. Commander Gene Cernan and Lunar Module Pilot Harrison Schmitt walked on the Moon, while Command Module Pilot Ronald Evans orbited above. Schmitt was the only professional geologist to land on the Moon; he was selected in place of Joe Engle, as NASA had been under pressure to send a scientist to the Moon. The mission's heavy emphasis on science meant the inclusion of a number of new experiments, including a biological experiment containing five mice that was carried in the command module.

<span class="mw-page-title-main">Skylab</span> First space station launched and operated by NASA

Skylab was the United States' first space station, launched by NASA, occupied for about 24 weeks between May 1973 and February 1974. It was operated by three trios of astronaut crews: Skylab 2, Skylab 3, and Skylab 4. Operations included an orbital workshop, a solar observatory, Earth observation and hundreds of experiments. Skylab's orbit eventually decayed and it disintegrated in the atmosphere on July 11, 1979, scattering debris across the Indian Ocean and Western Australia.

<span class="mw-page-title-main">Apollo Lunar Module</span> NASA crewed Moon landing spacecraft (1969–1972)

The Apollo Lunar Module, originally designated the Lunar Excursion Module (LEM), was the lunar lander spacecraft that was flown between lunar orbit and the Moon's surface during the United States' Apollo program. It was the first crewed spacecraft to operate exclusively in the airless vacuum of space, and remains the only crewed vehicle to land anywhere beyond Earth.

<span class="mw-page-title-main">Apollo 4</span> First test flight of the Apollo Saturn V rocket

Apollo 4, also known as SA-501, was the uncrewed first test flight of the Saturn V launch vehicle, the rocket that eventually took astronauts to the Moon. The space vehicle was assembled in the Vehicle Assembly Building, and was the first to be launched from Kennedy Space Center (KSC) in Florida, ascending from Launch Complex 39, where facilities built specially for the Saturn V had been constructed.

<span class="mw-page-title-main">Apollo 5</span> Uncrewed first test flight of the Apollo Lunar Module

Apollo 5, also known as AS-204, was the uncrewed first flight of the Apollo Lunar Module (LM) that would later carry astronauts to the surface of the Moon. The Saturn IB rocket bearing the LM lifted off from Cape Kennedy on January 22, 1968. The mission was successful, though due to programming problems an alternate mission to that originally planned was executed.

<span class="mw-page-title-main">Apollo 6</span> Second test flight of the Apollo Saturn V rocket

Apollo 6, also known as AS-502, was the third and final uncrewed flight in the United States' Apollo Program and the second test of the Saturn V launch vehicle. It qualified the Saturn V for use on crewed missions, and it was used beginning with Apollo 8 in December 1968.

<span class="mw-page-title-main">Apollo (spacecraft)</span> Saturn V-launched payload that took men to the Moon

The Apollo spacecraft was composed of three parts designed to accomplish the American Apollo program's goal of landing astronauts on the Moon by the end of the 1960s and returning them safely to Earth. The expendable (single-use) spacecraft consisted of a combined command and service module (CSM) and an Apollo Lunar Module (LM). Two additional components complemented the spacecraft stack for space vehicle assembly: a spacecraft–LM adapter (SLA) designed to shield the LM from the aerodynamic stress of launch and to connect the CSM to the Saturn launch vehicle and a launch escape system (LES) to carry the crew in the command module safely away from the launch vehicle in the event of a launch emergency.

<span class="mw-page-title-main">Saturn IB</span> American rocket used in the Apollo program during the 1960s and 70s

The Saturn IB(also known as the uprated Saturn I) was an American launch vehicle commissioned by the National Aeronautics and Space Administration (NASA) for the Apollo program. It uprated the Saturn I by replacing the S-IV second stage, with the S-IVB. The S-IB first stage also increased the S-I baseline's thrust from 1,500,000 pounds-force (6,700,000 N) to 1,600,000 pounds-force (7,100,000 N) and propellant load by 3.1%. This increased the Saturn I's low Earth orbit payload capability from 20,000 pounds (9,100 kg) to 46,000 pounds (21,000 kg), enough for early flight tests of a half-fueled Apollo command and service module (CSM) or a fully fueled Apollo Lunar Module (LM), before the larger Saturn V needed for lunar flight was ready.

<span class="mw-page-title-main">Skylab Rescue</span> Unflown spaceflight contingency plan

The Skylab Rescue Mission was an unflown rescue mission, planned as a contingency in the event of astronauts being stranded aboard the American Skylab space station. If flown, it would have used a modified Apollo Command Module that could be launched with a crew of two and return a crew of five.

The Apollo Applications Program (AAP) was created as early as 1966 by NASA headquarters to develop science-based human spaceflight missions using hardware developed for the Apollo program. AAP was the ultimate development of a number of official and unofficial Apollo follow-on projects studied at various NASA labs. However, the AAP's ambitious initial plans became an early casualty when the Johnson Administration declined to support it adequately, partly in order to implement its Great Society set of domestic programs while remaining within a $100 billion budget. Thus, Fiscal Year 1967 ultimately allocated $80 million to the AAP, compared to NASA's preliminary estimates of $450 million necessary to fund a full-scale AAP program for that year, with over $1 billion being required for FY 1968. The AAP eventually led to Skylab, which absorbed much of what had been developed under Apollo Applications.

<span class="mw-page-title-main">Skylab B</span> Proposed second US space station similar to Skylab

Skylab B was a proposed second US space station similar to Skylab that was planned to be launched by NASA for different purposes, mostly involving the Apollo–Soyuz Test Project, but was canceled due to lack of funding. Two Skylab modules were built in 1970 by McDonnell Douglas for the Skylab program, originally the Apollo Applications Program. The first was launched in 1973 and the other put in storage, while NASA considered how to use the remaining assets from Apollo.

References

PD-icon.svg This article incorporates public domain material from websites or documents of the National Aeronautics and Space Administration .