Fairford | |
---|---|
General information | |
Location | Fairford, Cotswold England |
Coordinates | 51°42′25″N1°45′38″W / 51.70706°N 1.76059°W Coordinates: 51°42′25″N1°45′38″W / 51.70706°N 1.76059°W |
Grid reference | SP165009 |
Platforms | 1 |
Other information | |
Status | Disused |
History | |
Original company | East Gloucestershire Railway |
Pre-grouping | Great Western Railway |
Post-grouping | Great Western Railway |
Key dates | |
15 January 1873 | Station opens |
18 June 1962 | Station closes |
Oxford, Witney and Fairford Railway | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Fairford railway station served the town of Fairford in Gloucestershire. It was the western terminus of the Oxford, Witney and Fairford Railway between Oxford and Fairford. [1] It had one platform, and a stone-built station building.
The station was opened on 15 January 1873 by the East Gloucestershire Railway (EGR). [2] [3] It was built in open fields beside the road to Lechlade, 1 mile (1.6 km) east of Fairford. [4] [5] As with the stations at Lechlade and Alvescot, Fairford was a simple, single-platform structure, built of honey-coloured local Cotswold stone which reflected the architecture of the nearby villages. [6] There was also a standard Great Western Railway signalbox, a Pagoda Platform Shelter and a small permanent way shed which housed a motorised trolley. [7] Near the engine shed was a water tank and an old horsebox used as a mess hut, while a spur led to a 45-foot (14 m) turntable and a coaling stage. [8] [9] The tank was driven by a steam supplied from locomotive injectors. [10] [11]
The station was not designed as a terminus: the line continued a further 500 yards (460 m) west of the station and doubled to form a run-around loop, finally ending at a buffer stop with a carriage siding on one side and a timber engine shed on the other. [12] There were several attempts at extending the line beyond Fairford. The original scheme would have seen the line run from Cheltenham via Andoversford and the Coln Valley to Fairford and Lechlade where it would divide into two routes: an eastern branch to Witney and a southern line to join up with the Faringdon Railway. [13] This was opposed by the Great Western Railway whose Cheltenham to Swindon line provided a shorter route to London and which was wary of proposals which might allow the London and North Western Railway to compete for its South Wales traffic. [13] Agreement was reached with the Great Western for a modified route via Bourton-on-the-Water on the Banbury and Cheltenham Direct Railway but the Great Western withdrew its support following objections from shareholders who felt that the scheme was a risky and unnecessary proposition. [14] Although the East Gloucestershire Railway obtained Parliamentary approval for its initial proposal via Andoversford, it could not finance it and decided to concentrate on the section between Fairford and Witney. [15] The next attempt was made in 1890 when the Great Western offered to purchase the East Gloucestershire and Witney Railways, leading the directors of the East Gloucestershire to enquire with the Witney directors as to whether they would support an approach to the Midland and South Western Junction Railway for an extension to Cirencester. [16] The Witney directors declined as they had received a good offer from the Great Western for their shares. [16] In 1895, the Midland Railway, London and North Western Railway and Manchester, Sheffield and Lincolnshire Railway proposed a trunk route to South Wales via Fairford and Oxford. [17] This was defeated by the Great Western by buying off the support of the Manchester company through certain concessions. [18] Another proposal came in 1899 when a group of local businessmen and landowners put forward a scheme under the Light Railways Act 1896 for a line parallel to the A40 road which was backed by the Oxfordshire and Gloucestershire County Councils but did not secure the support of the government and was abandoned in 1903. [18] Finally, during the Second World War, thought was given to connecting the Fairford branch with the Highworth Branch Line using a 6-mile (9.7 km) spur between Lechlade and Hannington. [19] The upturn in fortunes meant that the proposal was not taken further. [19]
As Fairford had not been conceived as a terminus, its layout created a number of problems. The 246-foot (75 m) platform was inconveniently sited across the station throat which prevented the yard from being easily shunted if there was a train at the platform. [5] In the event, this defect did not need to be remedied as the station was never particularly busy; [5] receipts from 1903, 1913 and 1923 show that on average 6,500 tickets were issued whilst goods traffic handled never exceeded 10,000 tons and around 400 parcels were dispatched, [20] although there was at one time a substantial milk traffic with 15,000 gallons being sent daily to London. [21] In addition, there was insufficient space for the engine to run around the train for the return journey, meaning that the train had to be pulled forward to the goods loop where the engine was detached and positioned on the adjacent track to haul the coaches to the buffers using a cable until the points were cleared and the engine could regain its position. [11] [22]
During the Second World War, Fairford station was busy with traffic for RAF Fairford and a second goods siding was added to the station in 1944. [23] [21] [24] The station was closed along with the East Gloucestershire Railway on 18 June 1962. [2] [3] [25] [26] [27] In its last days, the station had no more than a dozen regular users. [28]
Preceding station | Disused railways | Following station | ||
---|---|---|---|---|
Terminus | Great Western Railway East Gloucestershire Railway | Lechlade Line and station closed |
After closure, the station building was adapted as offices by Antocks Lairn and survived among the industrial units which were constructed on the former goods yard. [29] [30] At some point after 1991, the structure was demolished and replaced by a modern industrial unit. [31] [32] The outline of the infilled turntable pit was still visible in 1991. [33]
Winchcombe railway station serves Winchcombe in Gloucestershire, England, although it is actually located in the village of Greet. It is located on the Honeybourne Line which linked Cheltenham and Stratford-upon-Avon and which was opened by the Great Western Railway in 1906. The station closed to passengers in 1960, although the line itself remained open for freight and diversionary use until 1976, when a freight train derailed near Winchcombe and damaged the track.
Toddington railway station serves the village of Toddington in Gloucestershire, England. Since 1984 it has been the main base of operations for the heritage Gloucestershire Warwickshire Railway.
Alvescot railway station was a railway station between the Oxfordshire villages of Alvescot and Black Bourton, in England. It was Oxford, Witney and Fairford Railway between Oxford and Fairford.
The Oxford, Witney and Fairford Railway was a single track railway branch line, 22 miles (35 km) long, in Oxfordshire and Gloucestershire. It was opened in succession by two companies, the first in 1861 to connect the important woollen town of Witney to the main line network, and the second in 1873 as the rump of an ambitious scheme to connect to Cheltenham, but which ran only between Witney and Fairford. The junction with the main line was at Yarnton, north of Oxford.
Olney was a railway station on the former Bedford to Northampton Line and Stratford-upon-Avon and Midland Junction Railway which served the town of Olney in Buckinghamshire, England. It was situated on a busy section of line between Towcester and Ravenstone Wood junction which saw heavy use by freight services running between Wales and north-east England. The station closed for passengers in 1962 and completely in 1964, the various connecting routes to the line having closed one by one from the 1950s onwards.
Cassington Halt was a single platform halt opened by the Great Western Railway on 9 March 1936 on the Oxford, Witney and Fairford Railway to serve the village of Cassington, Oxfordshire, just south of the A40.
Yarnton Junction was a three-platform station serving the village of Yarnton, Oxfordshire. It was built in 1861 at the junction of the Oxford, Worcester and Wolverhampton Railway and Witney Railway, north of Oxford. British Railways closed the station to passengers in 1962 and it was demolished c. 1965.
South Leigh railway station was a single-platform station that served the Oxfordshire village of South Leigh on the Oxford, Witney and Fairford Railway between Oxford and Witney. The Witney Railway opened the station in 1861. British Railways closed the station to passengers in 1962 and to goods in 1965.
Witney railway station served the Oxfordshire town of Witney on the Oxford, Witney and Fairford Railway line. It consisted of two stone-built platforms, a station building, a signal box, and a shed in the form of a pagoda.
Eynsham railway station served the Oxfordshire town of Eynsham and the Eynsham Sugar Beet Factory on the Oxford, Witney and Fairford Railway between Oxford and Witney.
Witney goods station served the Oxfordshire town of Witney on the Oxford, Witney and Fairford Railway. It consisted of seven sidings, a goods shed, a wooden parcel office and a cattle dock. It also had an engine shed, which was demolished early in the twentieth century. Following the opening of the East Gloucestershire Railway in 1873, the station became a goods depot, with passengers using the second station situated to the south. The original station remained open to goods traffic until 1970.
Brize Norton and Bampton railway station was a railway station 1 mile (1.6 km) south of the village of Brize Norton on the Oxford, Witney and Fairford Railway between Oxford and Fairford. The station had two stone-built platforms, a station building and a goods shed.
Carterton railway station was a railway station just north of the village of Black Bourton on the Oxford, Witney and Fairford Railway between Oxford and Fairford. The station had two stone-built platforms, a passing loop, and a concrete station building.
Kelmscott and Langford railway station was a railway station south of the village of Langford on the Oxford, Witney and Fairford Railway, between Oxford and Fairford.
Lechlade railway station served the small town of Lechlade in Gloucestershire, England. The station was on the Oxford, Witney and Fairford Railway, between Oxford and Fairford, it was built where the line crossed the road to Burford, 0.5 miles (0.80 km) north of Lechlade.
Wappenham was a railway station on the Stratford-upon-Avon and Midland Junction Railway (SMJ) which served the Northamptonshire village of Wappenham between 1872 and 1951. Serving a relatively rural area, the station saw considerable goods traffic generated by local farming communities, but passenger traffic was low which ultimately led to its closure.
Cheltenham Spa St. James railway station was a station in the town of Cheltenham.
Hayles Abbey Halt railway station is a halt opened by the Great Western Railway on the Honeybourne Line from Honeybourne to Cheltenham which served the hamlet of Hailes in Gloucestershire, as well as the nearby Hailes Abbey, between 1928 and 1960. The line through the site of the station was reinstated in 1985 and opened in 1987 by the Gloucestershire Warwickshire Railway, although for many years no new halt was provided. The halt was eventually reopened on 5 June 2017 after being rebuilt by volunteers. Unlike the original, however, it only has a single platform. It lies between Toddington and Winchcombe stations.
Gretton Halt railway station was a halt opened by the Great Western Railway on the Honeybourne Line from Honeybourne to Cheltenham which served the small village of Gretton in Gloucestershire between 1906 and 1960. The line through the site of the station was reinstated in 1997 by the Gloucestershire Warwickshire Railway, although no new halt was provided.
Willersey Halt railway station served the village of Willersey, Gloucestershire, England between 1904 and 1960.