Hammersmith Bridge

Last updated

Hammersmith Bridge
Hammersmith Bridge 2008 06 19.jpg
Coordinates 51°29′18″N0°13′49″W / 51.48833°N 0.23028°W / 51.48833; -0.23028
Carries A306 road
Crosses River Thames
Locale London, England
Maintained by Hammersmith and Fulham London Borough Council
Preceded by Barnes Railway Bridge
Followed by Putney Bridge
Characteristics
Design Suspension bridge
MaterialSteel, wrought iron, cast iron, plywood
Pier constructionStone
Total length700 ft (210 m)
Width43 ft (13 m)
Longest span400 ft (120 m) [1]
No. of spans3
Piers in water2
Clearance below 3.5 metres (11 ft) MHWS [2]
No. of lanes 2 (motor vehicles)
History
Designer William Tierney Clark (first bridge)
Joseph Bazalgette (current bridge)
Constructed byDixon, Appleby & Thorne (current bridge)
Construction start1825 (first bridge)
1884 (current bridge)
Construction end1827 (first bridge)
1887 (current bridge)
Construction cost£80,000 (first bridge)
£82,117 (current bridge)
Opened6 October 1827;196 years ago (1827-10-06) (first bridge)
11 June 1887;136 years ago (1887-06-11) (current bridge)
Inaugurated6 October 1827 (first bridge)
11 June 1887 (current bridge)
Rebuilt1884–1887
Closed10 April 2019;4 years ago (2019-04-10) (motor vehicles)
Statistics
Listed Building – Grade II*
Official nameHammersmith Bridge
Designated12 May 1970;53 years ago (1970-05-12)
Reference no.1079819
Location
Hammersmith Bridge

Hammersmith Bridge is a suspension bridge that crosses the River Thames in west London. It links the southern part of Hammersmith in the London Borough of Hammersmith and Fulham, on the north side of the river, and Barnes in the London Borough of Richmond upon Thames, on the south side of the river. The current bridge, which is Grade II* listed and was designed by civil engineer Sir Joseph Bazalgette, is the second permanent bridge on the site, [3] and has been attacked three times by Irish republicans.

Contents

The bridge was closed indefinitely to all motor traffic in April 2019 after cracks were discovered in the bridge's pedestals. [4] The closure was extended to pedestrians and cyclists between August 2020 [5] and July 2021 when limited use resumed. In October 2022, Hammersmith and Fulham Council agreed to lodge a planning application to temporarily double-deck the bridge to speed up its restoration, with the council's construction and ongoing operation and maintenance costs set to be eventually funded by tolls.

History

Origins

A group of local people proposed a new bridge at Hammersmith rather than detouring to either Kew Bridge or Putney Bridge to cross the river. [6] The construction of the bridge was first sanctioned by an Act of Parliament on 9 June 1824, [7] which established the Hammersmith Bridge Company. [8] Work began on site the following year, and the bridge was opened on 6 October 1827. [9] Construction of the bridge cost some £80,000 (equivalent to £7.5 million in 2021). [10]

It was the first suspension bridge over the River Thames and was designed by William Tierney Clark. [11] [12] A further Act of Parliament was obtained in 1828. [13] The acts also included powers to acquire land by compulsory purchase in order to build approach roads, and required the company to purchase the entire Barn Elms estate (the surplus land was subsequently sold). [8]

Hammersmith Bridge Road in Hammersmith was also constructed with the bridge, together with Upper Bridge Road (now Castelnau) and Lower Bridge Road (now Lonsdale Road) in Barnes. It was operated as a toll bridge, with the toll house located at the Hammersmith end of the bridge.

The bridge had a clear water-way of 688 feet 8 inches (209.91 m). Its suspension towers were 48 feet (15 m) above the level of the roadway, where they were 22 feet (6.7 m) thick. The roadway was slightly curved upwards, 16 feet (4.9 m) above high water, and the extreme length from the back of the piers on shore was 822 feet 8 inches (250.75 m), supporting 688 feet (210 m) of roadway. There were eight chains, composed of wrought-iron bars, each five inches deep and one thick. Four of these had six bars in each chain; and four had only three, making thirty-six bars, which form a dip in the centre of about 29 feet (8.8 m). [14] From these, vertical rods were suspended, which supported the roadway, formed of strong timbers covered with granite. The width of the carriageway was 20 feet (6.1 m), with two footways of 5 feet (1.5 m). The chains passed over the suspension towers, and were secured to the piers on each shore. The suspension towers were built of stone, and designed as archways of the Tuscan order. The approaches were provided with octagonal lodges, or toll-houses, with appropriate lamps and parapet walls, terminating with stone pillars, surmounted with ornamental caps.

In order to increase profits, the company built a floating steamboat pier to the downstream side of the suspension pier closest to Barnes. [8]

By the 1870s, the bridge was no longer strong enough to support the weight of heavy traffic and the owners were alarmed in 1870 when 11,000 to 12,000 people crowded onto the bridge to watch the University Boat Race, [3] which passes underneath just before the halfway point of its 4+14-mile (7 km) course.

The Metropolitan Board of Works purchased the bridge from the Hammersmith Bridge Company in 1880 under the Metropolis Toll Bridges Act 1877, [15] [8] and transferred the approach roads to the local authorities (Fulham District Board of Works and the Parish of Barnes). The tolls were removed from the bridge on 26 June 1880. [8]

There were no immediate plans to replace the bridge, which remained sound, until a boat collided with it in 1882 causing damage, and leading to an Act of Parliament[ which? ] in 1883 authorising the construction of a replacement. [16] In 1884 a temporary bridge was put up to allow a more limited cross-river traffic while a replacement was constructed. [3]

Engraving of the first Hammersmith Bridge, completed 1827 Hammersmith Bridge 1827 - Project Gutenberg etext 12595.png
Engraving of the first Hammersmith Bridge, completed 1827

1880s construction

Joseph Bazalgette, circa 1870 Joseph Bazalgette by Lock & Whitfield.jpg
Joseph Bazalgette, circa 1870

The current Hammersmith Bridge was designed by Sir Joseph Bazalgette and rests on the same pier foundations constructed for Tierney Clark's original structure. The new bridge was built by Dixon, Appleby & Thorne and was opened by the Prince of Wales on 11 June 1887. [17] With much of the supporting structure built of wrought iron, it is 700 feet (210 m) long and 43 feet (13 m) wide and cost £82,117 to build (equivalent to £9.7 million in 2021). [10]

With the abolition of the Metropolitan Board of Works on 21 March 1889, ownership of Hammersmith Bridge passed to the new London County Council. [18]

20th century

Near midnight on 27 December 1919, Lieutenant Charles Campbell Wood, a South African serving as an airman in the Royal Air Force, dived from the upstream footway of the bridge into the Thames to rescue a drowning woman. Although Wood saved her life, he later died from tetanus as a consequence of his injuries. His act of bravery is commemorated by a plaque on the handrail, which reads:

Lieutenant Charles Campbell Wood RAF
of Bloemfontein, South Africa dived from this spot into
the Thames at midnight 27 Dec. 1919 and saved a woman's life.
He died from the injuries received following the rescue.

The first attempt by Irish republicans to destroy Hammersmith Bridge occurred on Wednesday 29 March 1939, when it was attacked by the IRA (of 1922–1969) as part of their S-Plan. [19] [20] Maurice Childs, a women's hairdresser from nearby Chiswick, was walking home across the bridge at one o'clock in the morning when he noticed smoke and sparks coming from a suitcase that was lying on the walkway. [19] He opened it to find a bomb and quickly threw the bag into the river. The resulting explosion sent up a 60-foot (18 m) column of water. Moments later, a second device exploded causing some girders on the west side of the bridge to collapse and windows in nearby houses to shatter. Childs was later awarded an MBE for his quick-thinking. Eddie Connell and William Browne were subsequently jailed for 20 and 10 years respectively for their involvement in the attack. [20]

On 1 April 1965, the bridge was transferred to the Greater London Council (GLC) when it took over from London County Council. [18]

In 1986 the GLC was abolished. The Local Government Act 1985 transferred non-trunk road bridges in their entirety to one of the two London boroughs that each bridge lay within – the choice of borough to be decided between the two councils, or failing agreement, by the Secretary of State for Transport. In addition to the bridge, the London borough taking responsibility also gained 100 yards of approach road from the other borough. For Hammersmith Bridge, on 31 March 1986 the London Borough of Hammersmith and Fulham took responsibility. [18]

On 26 April 1996, the Provisional IRA attempted to destroy the bridge after installing two large Semtex devices on the south bank of the Thames. Though the detonators were activated, the bomb, the largest Semtex bomb ever found in Britain at the time, [20] failed to ignite. [12] [18]

At 4:30 am on 1 June 2000, the bridge was damaged by a Real IRA bomb planted underneath the Barnes span. [18] Following two years of closure for repairs the bridge was reopened with further weight restrictions in place. [21]

Structural problems

Hammersmith Bridge and riverside, seen from the Hammersmith bank Hammersmith Bridge 1, London, UK - April 2012.jpg
Hammersmith Bridge and riverside, seen from the Hammersmith bank
Hammersmith Bridge, seen from the Westminster to Kew tourist boat Hammersmith.bridge.arp.jpg
Hammersmith Bridge, seen from the Westminster to Kew tourist boat
Rowing crews racing under Hammersmith Bridge HORR 05.jpg
Rowing crews racing under Hammersmith Bridge
End details Hammersmith Bridge, London 12.JPG
End details
Tower Hammersmith Bridge, London 08.JPG
Tower

Hammersmith Bridge has long suffered structural problems and has been closed for lengthy periods on several occasions, due to the weight and volume of road traffic now common in inner London, which the bridge was not originally designed to support.

The bridge was refurbished in 1973 with replacement steel trusses, improvements to the mid-span hangers and new deck expansion joints. New deck timbers were installed and surfacing was changed from wooden blocks to coated plywood panels. These panels were subsequently replaced in 1987.

In 1984, the Barnes-side tower bearings failed under a heavy load and had to be replaced.

In February 1997, the bridge was closed to all traffic except buses, bicycles, motorcycles, emergency vehicles and pedestrians to allow further essential repair works. Structural elements of the bridge had been found to be corroded or worn, in particular cross girders and deck surfacing, as well as some areas of masonry. [22]

The bridge re-opened in July 1998 to all road users, subject to a 7.5-tonne (7.4-long-ton; 8.3-short-ton) weight restriction and with a priority measure in place for buses. Local bus flow was controlled by traffic lights, and routes (such as the number 72) were required to convert from double-decker buses to smaller single-deckers to reduce the load on the bridge.

As part of the renovations following the 2000 bomb attack, the bridge received a complete new paint job restoring it to the original colour scheme of 1887, and new lighting was installed.

The bridge was declared a Grade II* listed structure in 2008, providing protection to preserve its special character from unsympathetic development. [23]

The bridge was temporarily closed to traffic to allow repairs in early 2014. [24] Further repairs and strengthening works were delayed in November 2016 in a wrangle over funding between Hammersmith and Fulham Council and Transport for London. LBHF leader Steven Cowan said: "There's no way that this council is going to spend anything like that money, the majority of this issue is the responsibility of TfL and we will work with them to make sure the bridge is fit for public purpose". [25]

2019–24 closure

With funding for a major refurbishment still not resolved, on 10 April 2019, Hammersmith and Fulham Council announced that the bridge would be closed indefinitely to motor vehicular traffic due to safety concerns. Pedestrians and cyclists could continue to use the bridge. [26] [27] [18] It was later (24 May 2019) reported that the closure was due to cracks in the bridge's pedestals, the footings which support the structure. [28]

On 10 October 2019, Planning in London magazine published the results of its competition for a quick fix to Hammersmith Bridge's closure. The winning entry, by marine civil engineers Beckett Rankine, consisted of a prefabricated temporary road and foot bridge downstream of Hammersmith bridge and connecting in to Queen Caroline Street on the Hammersmith side. Beckett Rankine claimed that the bridge's cost could be recouped by charging a toll on vehicles. [29] [30]

The bridge's closure was extended to pedestrians and cyclists on 13 August 2020 after the structural issues worsened due to a heatwave. [18] River traffic and pedestrian routes under the bridge were also stopped. [5] [31] [32] The New York Times reported an estimate of £141 million (US$187 million) to fully repair the bridge and £46 million (US$65 million) to stabilise it adequately for use by cyclists and pedestrians. Neither the council nor the transportation authority had the funds to proceed. Deficits incurred due to the COVID-19 pandemic made it unlikely that the bridge would be repaired in the near future. [31]

On 9 September 2020, the Secretary of State for Transport, Grant Shapps appointed a Department for Transport task force to investigate the bridge's condition, and work towards reopening the bridge for cyclists and pedestrians, and later enabling the return of motor traffic. [33] [18] In October 2020, it was announced that Hammersmith Bridge would not re-open to vehicles until at least 2027. [34] In November 2020, engineers proposed a temporary double-decked steel structure fitted within the existing bridge crossing to allow elements of the damaged bridge to be removed for repair. The scheme, designed by Foster and Partners with bridge engineers COWI, was backed by the local council and presented to Shapps. [35]

The Fosters scheme, costed at around £100 million, would potentially allow the bridge to reopen for pedestrians and cyclists in the summer of 2021, with cars and vans able to cross two months later, and full restoration completed in 2023. The proposals were discussed on 19 March 2021 at a meeting of the government's Hammersmith Bridge taskforce, and plans for the work to be funded through a £3 toll scheme were accepted. [36] [37]

In December 2020, reports from AECOM and University of Cambridge professor Norman Fleck suggested that the full closure may have been overly cautious, and that, after minimal work, the bridge could be reopened to cyclists and pedestrians. [38]

On 14 February 2021, local residents illuminated the bridge scarlet with a Valentine's Day message reading Broken Hearts. Broken Promises. Broken Lives. Broken Bridge, to highlight the ongoing delays to its repair. [39]

2021: partial reopening

On 1 June 2021, Transport for London, Hammersmith and Fulham Borough Council and central government came to a cost-sharing agreement that would reopen the bridge in the near future. [40] The following month, Stephen Cowan, leader of the Council, announced that the bridge would partially re-open to pedestrians and cyclists from 17 July 2021, [41] but local MP Sarah Olney said there was still a lot of work to be done to the bridge. [42]

A £6 million, 46-week stabilisation plan designed by consultants Mott MacDonald was approved by Hammersmith and Fulham Council in August 2021. This initial pedestrian stabilisation plan is the first phase of works on the bridge. A second phase, involving extensive strengthening and full restoration, will allow the bridge to eventually reopen to motor vehicles. [43]

2022: repairs

In February 2022, highways contractor FM Conway and subcontractors Freyssinet and Taziker Industrial started work on a planned 10-month first phase of the restoration. The council approved the full £8.9 million investment in expectation that DfT and TfL will subsequently reimburse the council for their one-third shares. [44] Completion of this work was put back to February 2023 following delays in procuring steel due to the war in Ukraine. [45]

In May 2022, Hammersmith and Fulham Council alerted contractors to the £130 million phase 2 contract ahead of formal procurement later in the year. It was considering delivery options including a design, build, finance and maintain model, a design-and-build contract, [46] or other "concession-style models", which could involve motor vehicles paying a toll to use the crossing. A council spokesman said: "The government has decreed that Hammersmith and Fulham must pay an unprecedentedly high 33% of the total cost. The only way that can be met is with a toll and this has been agreed by all parties." [47]

In July 2022, the chains were wrapped in foil and cooled with air-conditioning to 13°C during a heatwave to prevent further cracking. [48] [49]

In October 2022, Hammersmith and Fulham Council agreed to lodge a planning application to temporarily double-deck the bridge to speed up its restoration (as recommended by Foster/COWI). Consultation would be required with stakeholders including Historic England, the Environment Agency, Port of London Authority, Richmond Council and the Marine Management Organisation, while preparations would also require gas main diversions. [45] The council intended to appoint a private sector contractor to design, renovate, finance and maintain the bridge, with the council's construction and ongoing operation and maintenance costs funded by tolls. [45]

2024: partial reopening

In February 2024, Hammersmith & Fulham Council announced the temporary reopening to cyclists of the central vehicle lane for a 10-week period from 13 February 2024. [50]

This decision was due to a pause in construction works necessary for repairing a 130 m (430 ft) steel gantry damaged in a collision with a boat, MV Emerald of London, carrying West Ham FC football fans to a match against Fulham FC in December 2023. [51]

The final stage of the stabilisation works is the replacement of the bridge's bearings on the four corner pedestals, following which H&F announced they will "review e-mobility options to shuttle residents across the bridge, notably the elderly or disabled". [50]

Alternatives to reopening to motor vehicles

On 18 January 2024, the BBC reported the cost of repairing the bridge had increased to £250 million (US$316 million). [52] A day later, London Mayor Sadiq Khan told the Evening Standard that "I do want that bridge fit for purpose for vehicles" but neither Hammersmith & Fulham Council nor TfL had the money to do so. [53] The Evening Standard noted that TfL's 2024 Business Plan did not include funding for the bridge. [53] While the bridge remains closed to motor vehicles, alternative transport options have been proposed.

In May 2023, the BBC reported climate charity Possible's proposal for a fleet of 10 autonomous pods to operate on the bridge and ferry people with mobility difficulties, alongside a two-way protected cycle lane and the existing pedestrian footways at a cost of £10 million (US$13 million). [54]

In 2021, a plan to launch a community pedicab service, proposed by Barnes Community Association using vehicles owned and operated by CityShuttle, was abandoned due to issues raised by TfL relating to the licensing status of pedicabs. [55]

However, The Pedicabs (London) Bill will make TfL responsible for regulating pedicabs [56] and in a House of Commons debate in November 2023 Richmond Park MP Sarah Olney welcomed the bill and proposed rickshaws "as an interim transport solution across Hammersmith bridge". [57] During debate of the bill on 11 December 2023, Baroness Stowell backed introducing pedicabs to the bridge: "The problems associated with the closure of Hammersmith Bridge, which have gone on for years, are very serious for local residents. Let us turn a negative into a positive: pedicabs offer an opportunity for local residents to hire one to cross the bridge, which would be really useful." [58]

Heraldry

Heraldic shields on Hammersmith Bridge Detail, Hammersmith Bridge - geograph.org.uk - 2623088.jpg
Heraldic shields on Hammersmith Bridge

At both the Hammersmith and Barnes ends of the bridge, there is a heraldic composition made up of seven coats of arms. These were formerly painted in their "correct" heraldic colours but have now been painted in the standard colour scheme. In the centre is the royal coat of arms of Queen Victoria which is surrounded by six others, representing the area of the Metropolitan Board of Works, from top clockwise: [59]

See also

Related Research Articles

<span class="mw-page-title-main">Tower Bridge</span> Bascule and suspension bridge in England

Tower Bridge is a Grade I listed combined bascule and suspension bridge in London, built between 1886 and 1894, designed by Horace Jones and engineered by John Wolfe Barry with the help of Henry Marc Brunel. It crosses the River Thames close to the Tower of London and is one of five London bridges owned and maintained by the City Bridge Foundation, a charitable trust founded in 1282. The bridge was constructed to give better access to the East End of London, which had expanded its commercial potential in the 19th century. The bridge was opened by Edward, Prince of Wales and Alexandra, Princess of Wales in 1894.

<span class="mw-page-title-main">Millennium Bridge, London</span> Bridge over the River Thames in England

The Millennium Bridge, officially known as the London Millennium Footbridge, is a steel suspension bridge for pedestrians crossing the River Thames in London, England, linking Bankside with the City of London. It is owned and maintained by Bridge House Estates, a charitable trust overseen by the City of London Corporation. Construction began in 1998, and it initially opened on 10 June 2000.

<span class="mw-page-title-main">Barnes, London</span> Area of south-west London, England

Barnes is a district in south London, England, part of the London Borough of Richmond upon Thames. It takes up the extreme north-east of the borough, and as such is the closest part of the borough to central London. It is centred 5.8 miles (9.3 km) west south-west of Charing Cross in a bend of the River Thames.

<span class="mw-page-title-main">London Borough of Hammersmith and Fulham</span> London borough in United Kingdom

The London Borough of Hammersmith and Fulham is a London borough in West London and which also forms part of Inner London. The borough was formed in 1965 from the merger of the former Metropolitan Boroughs of Hammersmith and Fulham. The borough borders Brent to the north, the Royal Borough of Kensington and Chelsea to the east, Wandsworth to the south, Richmond upon Thames to the south west, and Hounslow and Ealing to the west.

<span class="mw-page-title-main">Hammersmith</span> District of London

Hammersmith is a district of West London, England, 4.3 miles (6.9 km) southwest of Charing Cross. It is the administrative centre of the London Borough of Hammersmith and Fulham, and identified in the London Plan as one of 35 major centres in Greater London.

<span class="mw-page-title-main">Woolwich Ferry</span> Ferry across the River Thames in east London

The Woolwich Ferry is a free vehicle and pedestrian ferry across the River Thames in East London, connecting Woolwich on the south bank with North Woolwich on the north. It is licensed and financed by London River Services, the maritime arm of Transport for London (TfL). Around two million passengers use the ferry each year.

<span class="mw-page-title-main">Putney Bridge</span> Bridge in London, England

Putney Bridge is a Grade II listed bridge over the River Thames in west London, linking Putney on the south side with Fulham to the north. Before the first bridge was built in 1729, a ferry had shuttled between the two banks.

<span class="mw-page-title-main">Battersea Bridge</span> Bridge over the River Thames in London

Battersea Bridge is a five-span arch bridge with cast-iron girders and granite piers crossing the River Thames in London, England. It is situated on a sharp bend in the river, and links Battersea south of the river with Chelsea to the north. The bridge replaced a ferry service that had operated near the site since at least the middle of the 16th century.

<span class="mw-page-title-main">Metropolitan Borough of Fulham</span>

The Metropolitan Borough of Fulham was a metropolitan borough in the County of London between 1900 and 1965, when it was merged with the Metropolitan Borough of Hammersmith to form the London Borough of Hammersmith and Fulham. It was a riverside borough, and comprised the many centuries-long definition of Fulham so included parts often considered of independent character today Walham Green, Parsons Green, Hurlingham, Sands End and that part of Chelsea Harbour west of Counter's Creek. The SW6 postal district approximately follows this as does the direct, though less empowered, predecessor Fulham civil parish.

<span class="mw-page-title-main">Metropolitan Borough of Hammersmith</span>

Hammersmith was a civil parish and metropolitan borough in London, England. It was formed as a civil parish in 1834 from the chapelry of Hammersmith that had existed in the ancient parish of Fulham, Middlesex since 1631. The parish was grouped with Fulham as the Fulham District from 1855 until 1886, when separate parish administration was restored. In 1889 it became part of the County of London and in 1900 it became a metropolitan borough. It included Hammersmith, Wormwood Scrubs, Old Oak Common and Shepherd's Bush. In 1965 it was abolished and became the northern part of the London Borough of Hammersmith, since 1979 renamed the London Borough of Hammersmith and Fulham.

<span class="mw-page-title-main">Albert Bridge, London</span> Bridge over the River Thames

Albert Bridge is a road bridge over the River Thames connecting Chelsea in Central London on the north bank to Battersea on the south. Designed and built by Rowland Mason Ordish in 1873 as an Ordish–Lefeuvre system modified cable-stayed bridge, it proved to be structurally unsound, so between 1884 and 1887 Sir Joseph Bazalgette incorporated some of the design elements of a suspension bridge. In 1973 the Greater London Council added two concrete piers, which transformed the central span into a simple beam bridge. As a result, today the bridge is an unusual hybrid of three different design styles. It is an English Heritage Grade II* listed building.

<span class="mw-page-title-main">Barmouth Bridge</span> Railway bridge across the Mawddach estuary

Barmouth Bridge, or Barmouth Viaduct is a Grade II* listed single-track wooden railway viaduct across the estuary of the River Mawddach near Barmouth, Wales. It is 900 yards (820 m) long and carries the Cambrian Line. It is the longest timber viaduct in Wales and one of the oldest in regular use in Britain.

<span class="mw-page-title-main">Battersea Railway Bridge</span> Bridge across the River Thames in London

The Battersea Railway Bridge is a bridge across the River Thames in London, between Battersea and Fulham. Owned by Network Rail Infrastructure Ltd, it links Battersea to the extreme north-east part of Fulham, known as Chelsea Harbour or Imperial Wharf, a 21st-century-rebuilt area on the south side of Chelsea Creek. The bridge is used by the West London Line of the London Overground from Clapham Junction to Willesden Junction.

<span class="mw-page-title-main">Wandsworth Bridge</span> Bridge in London, England

Wandsworth Bridge crosses the River Thames in west London. It carries the A217 road between the area of Battersea, near Wandsworth Town Station, in the London Borough of Wandsworth on the south of the river, and the areas of Sands End and Parsons Green, in the London Borough of Hammersmith and Fulham, on the north side.

<span class="mw-page-title-main">Barnes Railway Bridge</span> Bridge in London, England

Barnes Railway Bridge is a Grade II listed railway bridge in the London Borough of Richmond upon Thames and the London Borough of Hounslow. It crosses the River Thames in London in a northwest to southeast direction at Barnes. It carries the South Western Railway's Hounslow Loop Line, and lies between Barnes Bridge and Chiswick stations. It can also be crossed on foot, and is one of only three bridges in London to combine pedestrian and rail use; the others being Hungerford Bridge and Golden Jubilee Bridges and Fulham Railway Bridge.

<span class="mw-page-title-main">Hammersmith flyover</span> Elevated roadway in west London

The Hammersmith flyover is an elevated roadway in West London which carries the A4 arterial road over and to one side of the central Hammersmith gyratory system, and it links together the Cromwell Road extension with the start of the Great West Road. It is one of the first examples of an elevated road using reinforced concrete.

<span class="mw-page-title-main">Hammersmith and Fulham London Borough Council elections</span> English local election

Hammersmith and Fulham London Borough Council is the local authority for the London Borough of Hammersmith and Fulham in London, England. The council is elected every four years.

<span class="mw-page-title-main">Coat of arms of the London Borough of Hammersmith and Fulham</span>

The coat of arms of the London Borough of Hammersmith and Fulham was granted to the then London Borough of Hammersmith on 1 March 1965, but the motto changed languages in 1969. The subsequent change of names to Hammersmith and Fulham on 1 January 1980 did not affect the arms.

The Cremorne Footbridge is a proposed foot and cycle bridge over the Thames in London, England. It was originally promoted as the Diamond Jubilee Footbridge, designed by One World Design Architects with structural engineers Expedition Engineering and maritime engineers Beckett Rankine. The longer name commemorates the 2012 jubilee celebrations for Queen Elizabeth II, marking where she boarded her royal barge for the start of the Diamond Jubilee river pageant.

<span class="mw-page-title-main">Sandwich Toll Bridge</span> United Kingdom legislation

Sandwich Toll Bridge is a Grade II listed road swing bridge over the River Stour in Sandwich, Kent. It opened in 1755 on a site that had been a crossing for centuries, and has had several iterations; the current is a swing bridge that opened in 1892. Tolls were abolished in 1977.

References

Citations

  1. "Hammersmith Bridge". Historic Bridges. Retrieved 19 June 2021.
  2. "Thames Bridges Heights". Port of London Authority.
  3. 1 2 3 Historic England (12 May 1970). "Hammersmith Bridge (1079819)". National Heritage List for England . Retrieved 26 May 2015.
  4. "Hammersmith Bridge 'closed indefinitely'". BBC News . 11 April 2019. Retrieved 12 April 2019.
  5. 1 2 O'Mahony, Daniel (13 August 2020). "Hammersmith Bridge fully closed following fresh safety concerns". Evening Standard. Retrieved 13 August 2020.
  6. Cookson, Brian (August 2014). "Hammersmith: London's Prettiest Bridge". London Historians Members' Newsletter via London Historians' Blog.
  7. 5 Geo. 4. c.cxii
  8. 1 2 3 4 5 "Hammersmith Bridge Company". London Metropolitan Archives. City of London Corporation. DD/0478.
  9. "The Hammersmith Suspension Bridge". The Times . No. 13405. 9 October 1827. p. 2. Retrieved 22 August 2017.
  10. 1 2 UK Retail Price Index inflation figures are based on data from Clark, Gregory (2017). "The Annual RPI and Average Earnings for Britain, 1209 to Present (New Series)". MeasuringWorth. Retrieved 11 June 2022.
  11. "William Tierney Clark". London Remembers.
  12. 1 2 Weinreb et al. 2008, p. 373.
  13. 9 Geo. 4. c.lii
  14. Drewry, Charles Stewart (1832). A Memoir of Suspension Bridges: Comprising The History Of Their Origin And Progress. London: Longman, Rees, Orme, Brown, Green & Longman. pp. 82–88, and endplates . Retrieved 13 June 2009.
  15. 40 & 41 Vict. c.xcix
  16. Paterson, Mike (18 June 2011). "Birthday Greetings: A Bridge Most Fair". London Historians' Blog. Retrieved 12 October 2021.
  17. "Where Thames Smooth Waters Glide".
  18. 1 2 3 4 5 6 7 8 "Hammersmith Bridge timeline". London Borough of Hammersmith and Fulham. 7 December 2020.
  19. 1 2 Diary of London resident Norah Margaret Morris
  20. 1 2 3 "'The windows started shaking'". BBC News . 1 June 2000. Retrieved 28 April 2013.
  21. Tran, Mark (1 June 2000). "Dissident republicans suspected in Hammersmith bombing". The Guardian .
  22. "Hammersmith Bridge". hammersmithbridge.co.uk. Archived from the original on 9 December 2007.
  23. "London bridges get listed status", BBC News , 26 November 2008. Retrieved 26 November 2008.
  24. "Hammersmith Bridge closed for urgent repairs". BBC News . 25 January 2014. Retrieved 4 May 2020.
  25. "Hammersmith Bridge repair works delayed amid funding gap". BBC News . 30 November 2016. Retrieved 11 April 2019.
  26. "Hammersmith Bridge Closed". London Borough of Hammersmith and Fulham. 10 April 2019. Retrieved 10 April 2019.
  27. Prior, Grant (11 April 2019). "Critical faults force sudden closure of Hammersmith Bridge". Construction Enquirer. Retrieved 11 April 2019.
  28. "Hammersmith Bridge closed because cracks in pedestals". BBC News . 24 May 2019. Retrieved 25 May 2019.
  29. "A quick fix for Hammersmith Bridges" (PDF). Retrieved 11 February 2021.
  30. Horgan, Rob (16 October 2019). "Hammersmith Bridge: Temporary bridge mooted to speed up repairs". New Civil Engineer. Retrieved 11 February 2021.
  31. 1 2 "London's bridges really are falling down". BD News 24. 8 September 2020. Retrieved 13 September 2020.
  32. Moore, Rowan (14 February 2021). "London's bridges are falling down: how politics has failed the capital's crossings". The Observer . Retrieved 14 February 2021.
  33. Morby, Aaron (10 September 2020). "Government task force to reopen Hammersmith Bridge". Construction Enquirer. Retrieved 10 September 2020.
  34. "Hammersmith Bridge 'will not reopen to traffic until 2027'". BBC News . 29 October 2020. Retrieved 29 October 2020.
  35. Morby, Aaron (30 November 2020). "Double-decker temporary fix for Hammersmith Bridge". Construction Enquirer. Retrieved 30 November 2020.
  36. Marshall, Jordan (22 March 2021). "Fosters' plan for Hammersmith Bridge could slash £40m from repair bill". Building. Retrieved 22 March 2021.
  37. "Double deck bridge is going ahead", hammersmithbridge.org.uk via BBC tweet
  38. Horgan, Rob (10 December 2020). "Hammersmith Bridge could reopen after Aecom rules cracks 'may not be as serious as previously thought'". New Civil Engineer. Retrieved 11 December 2020.
  39. Dawson, Bethany (14 February 2021). "Hammersmith Bridge lights up red to get government's attention on Valentine's Day". Independent. Retrieved 14 February 2021.
  40. Prynn, Jonathan; Lydall, Ross (1 June 2021). "Hammersmith Bridge 'set to reopen' as Govt proposes cost-sharing deal". standard.co.uk. Retrieved 1 June 2021.
  41. "Hammersmith Bridge to reopen to pedestrians and cyclists". BBC News. 15 July 2021. Retrieved 1 June 2022.
  42. "Hammersmith Bridge to reopen for cyclists and pedestrians this weekend". SWLondoner. 15 July 2021. Retrieved 15 July 2021.
  43. "Mott's £6m plan approved for Hammersmith Bridge". The Construction Index. 17 August 2021. Retrieved 17 August 2021.
  44. "Conway team to start Hammersmith Bridge stabilisation this month". The Construction Index. 14 February 2022. Retrieved 14 February 2022.
  45. 1 2 3 "Hammersmith council backs double-deck bridge plan". The Construction Index. 13 October 2022. Retrieved 20 October 2022.
  46. Pitcher, Greg (27 May 2022). "Hammersmith Bridge: Contractors alerted to £130M strengthening job". New Civil Engineer. Retrieved 1 June 2022.
  47. "Hammersmith Bridge: Charges could be introduced under private investor plan". BBC News. 27 May 2022. Retrieved 1 June 2022.
  48. Neary, Hannah (14 July 2022). "Protective Heat Cover for Hammersmith Bridge To Avoid Closure: Structure swaddled in foil due to extreme temperatures". Chiswick W4. Retrieved 14 July 2022.
  49. "Hammersmith Bridge wrapped in foil during heatwave". BBC News. 14 July 2022. Retrieved 15 July 2022.
  50. 1 2 "Temporary cycle lanes across Hammersmith Bridge open". London Borough of Hammersmith & Fulham. 7 February 2024. Retrieved 7 February 2024.
  51. "Boat carrying football fans gets stuck under Hammersmith Bridge in London". BBC News. 11 December 2023. Retrieved 7 February 2024.
  52. "Hammersmith Bridge: Cost of repairs more than doubles". BBC News. 18 January 2024. Retrieved 3 February 2024.
  53. 1 2 "Sadiq Khan intervenes in Hammersmith bridge saga: 'I want it reopened for cars'". Evening Standard. 19 January 2024. Retrieved 3 February 2024.
  54. "Hammersmith Bridge should remain closed to cars, charity says". BBC News. 5 May 2023. Retrieved 3 February 2024.
  55. Reid, James (26 November 2021). "Brakes put on launch of community shuttle scheme". South West Londoner. Retrieved 3 February 2024.
  56. "Pedicabs (London) Bill, Second Reading, House of Lords, 22 November 2023". Local Government Association. 22 November 2023. Retrieved 3 February 2024.
  57. "Economic Growth". Hansard. 14 November 2023. Retrieved 3 February 2024.
  58. "Pedicabs (London) Bill [HL]". Hansard. 11 December 2023. Retrieved 3 February 2024.
  59. "Hammersmith Bridge – Part Four". skydive.ru. Retrieved 22 July 2014.
  60. "Guildford - Coat of arms (Crest) of Guildford".
  61. "Westminster (London) - Coat of arms (Crest) of Westminster (London)".