Pasig River Expressway

Last updated

Pasig River Expressway
Route information
Length19.365 km [1]  (12.033 mi)
excluding the 2.70 km (1.68 mi) portion of Skyway Stage 3
StatusCancelled [2] [3] (2023)
Resumed (May 2024)
Major junctions
West endAH26 (N120) sign.svg AH 26 (N120) (Radial Road 10) in Manila [4]
East endE2 (Philippines).svg E2 (Southeast Metro Manila Expressway) in Taytay, Rizal [5]
Location
Country Philippines
Municipalities Taytay
Major cities Manila, Mandaluyong, Makati, Pasig, Taguig
Highway system
  • Roads in the Philippines

The Pasig River Expressway (PAREX) is a proposed elevated expressway in Metro Manila, Philippines that plans to skirt the banks of the Pasig River and connect the cities of Manila, Mandaluyong, Makati, Pasig, Taguig and the municipality of Taytay. The expressway is proposed to alleviate east-west traffic congestion in Metro Manila. It is visioned to be a joint venture between the Philippine National Construction Corporation and the San Miguel Corporation. [6] The project broke ground on September 24, 2021, while construction of the expressway was yet to start pending the approval of its Environmental Compliance Certificate (ECC). [7] The project was deemed cancelled in 2024 due to public uproar against the project. [2] [3] However, Ramon Ang announced renewed interest with the project, though citing the need to adjust it towards public sentiments. [8]

Contents

Route description

The expressway is planned to start from Radial Road 10 in Manila and is proposed to end at Southeast Metro Manila Expressway in the municipality of Taytay. Three segments are planned, in addition to utilizing the portion of the Skyway Stage 3 from Plaza Azul (Nagtahan) to San Juan River in Manila. [1] [4] [6] [9]

SegmentCoverageKilometers [10]
Segment 1Radial Road 10 to Plaza Azul5.74
MMSS3Plaza Azul to San Juan River 2.70
Segment 2San Juan River to C-5 Intersection7.32
Segment 3C-5 Intersection to C-6 Intersection6.30

From Manila at the west, the expressway is planned to run through the southern bank of Pasig River. It would turn to the land in Paco, where it is proposed to use the right-of-way of Paz Mendoza-Guazon Street and Quirino Avenue before meeting Skyway Stage 3's Nagtahan Exit at Plaza Azul. Its utilization of Skyway's segment starts at Plaza Dilao Exit and ends at the future San Juan Intersection with Skyway Stage 3 above San Juan River. From there, it would resume and cut through Punta, Santa Ana, Manila before retaking the Pasig River alignment at the southern bank up to the future Southeast Metro Manila Expressway/C-6 in Taytay, Rizal. [11] [10]

History

Plans of building an expressway over the Pasig River were revealed as early as 1993, when the Japan International Cooperation Agency (JICA) conducted a study on the proposed urban expressway system in Metro Manila. The proposed expressway over the river was called Expressway Route R-4, referring to the proposed new alignment of Radial Road 4 that would run from the proposed Inner Circumferential Expressway (Circumferential Road 3) in Santa Ana, Manila to Circumferential Road 6 in Taguig. [12] In the 1999 Metro Manila Urban Transport Integrated Study, the expressway was also proposed as the R-4 Expressway, with a 12.5-kilometer route from the Metro Manila Skyway, extending toward the southeast, and being connected to the C-6 to serve traffic demand between Manila CBD and northern Laguna de Bay. [13]

First proposed circa 2017 as the Manila–Taguig Expressway (MTEX), a project of Citra Group and PT Citra Persada Infrastruktur, [14] [15] the expressway is planned as a viaduct over the Pasig River and Laguna de Bay, and a network of bridges similar to the proposed Metro Manila Skybridge. The expressway would have had three segments and two- to six-lane viaducts and bridges. The overall length of the expressway would have been 19.365 kilometers (12.033 mi). [1] The project has an estimated cost of 95.413 billion and an estimated implementation period of 36 months. [1] The expressway is also said to undertake river dredging and cleanup works on the Pasig River before, during, and after construction.

In September 2021, the San Miguel Corporation has named Filipino green architect Felino "Jun" Palafox as a prospective consultant to introduce "green architectural and urban features" in the Pasig River Expressway system. Initially denying his involvement, Palafox later confirmed his involvement in the project, emphasizing the need for a "missing link for the eastern and western parts of Metro Manila”. [16]

The project's technical aspects and financial aspects were approved by the Toll Regulatory Board on July 14, and a public scoping was held by the Department of Environment and Natural Resources (DENR) the same day. The project scoping report indicated that 101 representatives were present at the scoping, most of which had raised concerns on the project's environmental impacts and a lack of information on the project's detailed engineering designs. The report stated that each of these concerns were responded to with a promise for a follow-up public scoping to take place in October 2021. [17]

On September 21, 2021, the Supplemental Toll Operations Agreement (STOA) was approved by the government, wherein a formal agreement was signed between the San Miguel Corporation, the Department of Transportation, and the Department of Public Works and Highways at a groundbreaking ceremony held on September 24, 2021. [7]

On March 14, 2022, the STOA was approved by the Office of the President. [18] A follow-up project scoping for the project was later held on March 25, 2022. [19]

Construction of the expressway was expected to begin in 2022 [20] and was to be complete by 2023, pending the signature of President Bongbong Marcos to start construction. [21] However, as of 2023, construction has not yet begun, pending regulatory requirements.

In December 2023, a column in The Philippine Star stated that Ramon Ang has decided to drop the proposed Pasig River Expressway project due to the criticism it received from the public. [3] This was confirmed when Ang stated in a press conference on March 18, 2024 that the project has been shelved, wishing to respect the opinion of the public. [2] Ang's cancellation is reported to have been rescinded, following renewed interest in the project.

The P81.53-billion Parex "is still on the table" for further evaluation in its final engineering design process according to the Toll Regulatory Board Executive Director Alvin A. Carullo. On May 27, 2024, in a PSE disclosure Ang announced the company is still conducting a viability study of the project. “We cannot [withdraw], We are addressing the concerns, but it is currently on hold,” he explained. [22] [23]

Criticism and concerns

Environmental and mobility concerns

Transport and environmental advocates in April and July 2021 opposed the project, citing environmental concerns that the concrete megastructure would hamper the river's role in controlling floods and contribute to the urban heat island effect, which would have worsened urban heat in Metro Manila. [24] [25] [26]

Concerns were raised that building the Pasig River Expressway would also introduce air and noise pollution in the area, as well as non-exhaust emissions, such as microplastics from car tires, road dust, and particulate matter that would have worsened the pollution in the Pasig River and in the communities around it. [24] Advocates also pointed out that the construction of more new roads would only worsen traffic congestion by attracting more vehicle use, thus decreasing mobility in a phenomenon known as induced demand. [27]

Among the figures that opposed the expressway's construction is Senator Manny Pacquiao, who envisioned to develop the sides of the Pasig River into a tourist spot if elected as President in the 2022 Philippine presidential elections. [28] Labor lawyer Luke Espiritu and environmentalist David D'Angelo, both under the senatorial slate of Partido Lakas ng Masa, have also called for the rejection of the project. [29] [30]

Heritage concerns

The Intramuros Administration and heritage advocates also opposed the project, noting that the alignment of the project, particularly Segment 1 from Radial Road 10 to Plaza Azul, would transverse multiple heritage sites and historical buildings such as the Intramuros fortifications, Fort Santiago, the Aduana Building, the Bureau of Immigrations building, the National Press Club building, and the Manila Central Post Office. [31] [32] Both parties raised concerns on the proximity of the project to these heritage sites, as advocates noted that the project would not only disrupt the visual integrity of these heritage sites, but also as the vibrations during the construction of the project could also damage the structural integrity of these landmarks. [33]

Issues during public scoping

Mobility advocates have urged the DENR to postpone the second public scoping that was held on March 25, 2022, citing concerns that the first project scoping held last July 14, 2021 was not carried out correctly and should be invalidated, noting several inaccuracies and deficiencies in the project briefing materials. Advocates also noted the absence of key agencies such as the National Commission for Culture and the Arts, the National Historical Commission of the Philippines, the Department of Tourism, the Department of Science and Technology, and the Philippine Institute of Volcanology and Seismology at the previous public scoping, declaring the need to hold a new public scoping meeting that would have included the inputs of the mentioned agencies. [34] In April 2022, the Intramuros Administration has also informed the Environmental Management Bureau under the DENR that it has not been consulted about the project prior to the public hearing. [32]

Discrepancies between the project alignment that was shown during the project scoping and on the environmental impact assessment (EIA) report were also raised, as 20 percent of the total alignment shown during the first project scoping has been modified in the EIA report. Advocates raised that these changes were not properly notified and informed to stakeholders along these areas, noting that the informed consent of these stakeholders are missing from the EIA report. [16]

Environmental impact assessment plagiarism

In April 2022, it was found out that the EIA report for the project contained entire sections that were plagiarized from the environmental impact assessments of the Makati Intra-city Subway in 2019 and a coal-fired power station expansion project in Misamis Oriental in 2017, and the project components section of the Cavite–Laguna Expressway. In response, advocates have petitioned the Environmental Management Bureau to investigate RHR Consulting Services, [35] the company responsible for the preparation of the report, for any findings of misconduct and irregular practice present in the drafting of the EIA report. [32]

Response

The issues with the expressway were responded to by San Miguel Corporation President Ramon Ang, who emphasized the fact that the project would be at no cost to the government, dispelled misinformation suggesting that the expressway would cover the whole Pasig River instead of being built along it, and mentioned parallel plans to rehabilitate the river by widening and dredging the river at certain points. In response to concerns of induced demand, Ang responded that the project would not be exclusive to private car owners as it would also have a bus rapid transit system, bike lanes, and pedestrian infrastructure [36]

Advocates indicated, however, that whether or not the project would be built along or above the river is irrelevant as the project itself would be inviting air pollution into a corridor that previously did not have any. [33] Mobility advocates also questioned Ang's mention of including a bus rapid transit system, bike lanes, and pedestrian infrastructure in response to criticism as these features were not mentioned in detail in the project's EIA report. [33] Environmental architect Paulo Alcazaren also weighed in that the elevated nature of the proposed bus rapid transit system, bike lanes, and pedestrian infrastructure would pose accessibility and connectivity issues. [37]

The project's "unusually fast" approval process was also criticized given the approval of the STOA despite the lack of an Environmental Compliance Certificate (ECC) from the DENR, which is needed before any construction can start. [38] On June 27, 2023, DENR secretary Toni Yulo-Loyzaga stated that the DENR is currently evaluating the community impact of the Pasig River Expressway project and stated that there is still no timeframe on the issuance of an ECC for the project. [39]

Green architect Jun Palafox, who initially denied involvement with the project in September 2021, has since been onboarded with the project, committing to develop it according to "his own vision of Pasig River development". Palafox has also responded to criticism, as he denied that the expressway would only cause additional congestion if built, believing that there is an "unmet demand" for an east-west transportation corridor. [16] Palafox's involvement with the project has also been seen as a complete reversal of his long-standing principles for revitalizing decades of urban decay in Metro Manila with sustainable practices. [40] [41]

Exits

Exits and intersections are proposed to be numbered by kilometer posts and station, starting from the R-10 intersection designated as Kilometer 0. However, station markers of Segment 2 from San Juan to C-5 Intersection apparently designates Rizal Park as Kilometer 0. [11]  

RegionProvinceCity/Municipalitykm [10] miExitNameDestinationsNotes
Metro Manila Manila 0.0000.000R-10AH26 (N120) sign.svg AH 26 (N120) (Mel Lopez Boulevard) T-interchange; western terminus and start of Segment 1
U-BeltN180 (Philippines).svg N180 (Circumferential Road 1) Half diamond interchange; westbound-only entrance and exit
5.7403.567Plaza Azul Skyway Y-interchange with Metro Manila Skyway; end of Segment 1
Metro Manila Skyway alignment from Plaza Dilao to San Juan River
5.360–
8.440
3.331–
5.244
San JuanN141 (Philippines).svg N141 (Tomas Claudio Street) / Skyway Y-interchange with Metro Manila Skyway; start of Segment 2
Makati MakatiF. Zobel StreetEastbound-only entrance
Mandaluyong MandaluyongCoronado Street / Makati–Mandaluyong Bridge Westbound-only entrance
Makati Rockwell J.P. Rizal Avenue Half diamond interchange; westbound-only entrance and eastbound-only exit
TaguigPasig boundary11.3107.028BGCLawton Avenue / J.P. Rizal Avenue – BGC Half diamond interchange; eastbound-only exit and westbound-only entrance
15.7659.796C-5N11 (Philippines).svg N11 (Circumferential Road 5)Eastbound-only half diamond interchange with elevated u-turn slots; end of Segment 2 and start of Segment 3;
Calabarzon Rizal Taytay 22.06513.711SEMME (C-6)E2 (Philippines).svg E2 (Southeast Metro Manila Expressway) Y-interchange with the Southeast Metro Manila Expressway; end of Segment 3; eastern terminus
1.000 mi = 1.609 km; 1.000 km = 0.621 mi
  •       Unopened

See also

Related Research Articles

<span class="mw-page-title-main">Laguna de Bay</span> Largest lake in the Philippines

Laguna de Bay, also known as Laguna Lake and alternatively spelled "Laguna de Bae", is the largest lake in the Philippines. It is located southeast of Metro Manila, between the provinces of Laguna to the south and Rizal to the north. A freshwater lake, it has a surface area of 911–949 km2, with an average depth of about 2.8 meters and an elevation of about one meter above sea level. The lake is shaped like a crow's foot, with two peninsulas jutting out from the northern shore and filling the large volcanic Laguna Caldera. In the middle of the lake is the large island of Talim.

<span class="mw-page-title-main">Pasig River</span> Estuary in Metro Manila, Philippines

The Pasig River is a water body in the Philippines that connects Laguna de Bay to Manila Bay. Stretching for 25.2 kilometers (15.7 mi), it bisects the Philippine capital of Manila and its surrounding urban area into northern and southern halves. Its major tributaries are the Marikina River and San Juan River. The total drainage basin of the Pasig River, including the basin of Laguna de Bay, covers 4,678 square kilometers (1,806 sq mi).

<span class="mw-page-title-main">San Miguel Corporation</span> Philippine multinational conglomerate

San Miguel Corporation, abbreviated as SMC, is a Philippine multinational conglomerate with headquarters in Mandaluyong, Metro Manila. The company is one of the largest and most diversified conglomerates in the Philippines. Originally founded in 1890 as a brewery, San Miguel has ventured beyond its core business, with investments in various sectors such as food and drink, finance, infrastructure, oil and energy, transportation, and real estate.

<span class="mw-page-title-main">South Luzon Expressway</span> Major controlled-access highway in the Philippines

The South Luzon Expressway (SLEX), signed as E2 of the Philippine expressway network and R-3 of the Metro Manila arterial road network, is a controlled-access highway that connects Metro Manila to the provinces in the Calabarzon, Mimaropa and Bicol Region on the island of Luzon in the Philippines. The expressway has a length of 49.56 km, traveling from its northern terminus at the Magallanes Interchange in Makati to its southern terminus at Santo Tomas, Batangas, connecting it to the Southern Tagalog Arterial Road. A portion of the expressway from the Magallanes Interchange to the Calamba Exit is part of Asian Highway 26 of the Asian highway network. It will be the longest expressway in the Philippines starting with the completion of Toll Road 4 surpassing the Subic–Clark–Tarlac Expressway (SCTEX) as well as providing a gateway to Visayas upon the completion of Toll Road 5.

<span class="mw-page-title-main">Metro Manila Skyway</span> Elevated expressway in Metro Manila, Philippines

The Metro Manila Skyway, officially the Metro Manila Skyway System (MMSS) or simply the Skyway, is an elevated highway serving as the main expressway of Metro Manila, Philippines. It connects the North and South Luzon Expressways with access to Ninoy Aquino International Airport via the NAIA Expressway (NAIAX). It is the first fully grade-separated highway in the Philippines and one of the longest elevated highways in the world, with a total length of approximately 39.2 kilometers (24.4 mi).

<span class="mw-page-title-main">Tarlac–Pangasinan–La Union Expressway</span> Expressway in the Philippines

The Tarlac–Pangasinan–La Union Expressway (TPLEX), signed as E1 of the Philippine expressway network and R-8 of the Metro Manila arterial road network, is a controlled-access toll expressway that connects the Central Luzon region with the Ilocos Region. From its northern terminus at Rosario in La Union to its southern terminus at Tarlac City, the expressway has a length of 89.21-kilometer (55.43 mi), cutting through the various provinces in northern Central Luzon. The expressway also passes Nueva Ecija between Tarlac and Pangasinan, only that it is not included on the expressway's name because there are no exits to directly serve the province although the exits indirectly serving it are Victoria, Pura, and Anao which are located in Tarlac.

<span class="mw-page-title-main">Circumferential Road 3</span> Third beltway of Metro Manilas highways

Circumferential Road 3 (C-3), informally known as the C-3 Road, is a network of roads and bridges that all together form the third beltway of Metro Manila in the Philippines. Spanning some 10.8 kilometers (6.7 mi), it connects the cities of Caloocan, Navotas, Quezon City, and San Juan.

<span class="mw-page-title-main">Transportation in Metro Manila</span> Overview of Metro Manilas transportation system

The transportation system in Metro Manila covers the road network, rail network, ferries, ports and airports located within the metropolitan Manila area. Road transportation in Metro Manila is diverse, composed of many types of private and public transport vehicles. These include taxis, buses, jeepneys, tricycles and pedicabs. In some areas, especially in Divisoria and large public markets, two-stroke motors are fitted in the pedicabs and are used for goods transport. Regardless of modernity, horse-drawn kalesas are still used in the streets of Binondo and Intramuros. Ridesharing services such as Grab also operate within Metro Manila.

<span class="mw-page-title-main">NAIA Expressway</span> Expressway in the Philippines

The Ninoy Aquino International Airport Expressway (NAIAX), signed as E6 of the Philippine expressway network, is an 12.65-kilometer (7.86 mi) elevated highway in Metro Manila, Philippines, which links the Skyway to Ninoy Aquino International Airport and Entertainment City. Traversing the cities of Pasay, and Parañaque, the NAIAX runs along Andrews Avenue, Electrical Road, and NAIA Road connecting the Skyway to Ninoy Aquino Avenue, Macapagal Boulevard, New Seaside Drive and the Manila–Cavite Expressway.

<span class="mw-page-title-main">Cavite–Laguna Expressway</span> Expressway in the Philippines

The Cavite–Laguna Expressway, signed as E3 of the Philippine expressway network, is a partially operational controlled-access toll expressway in the provinces of Cavite and Laguna, Philippines. The construction of the 44.63-kilometer-long (27.73 mi) expressway, which began in June 2017, costs an estimated ₱35.43 billion. Once completed, it will connect the Manila–Cavite Expressway in Kawit to the South Luzon Expressway in Biñan and is expected to ease the traffic congestion in the Cavite–Laguna area, particularly along the Aguinaldo Highway, Governor's Drive, and the Santa Rosa–Tagaytay Road.

<span class="mw-page-title-main">Muntinlupa–Cavite Expressway</span> Road in the Philippines

The Muntinlupa–Cavite Expressway (MCX), signed as E2 of the Philippine expressway network, is a 4-kilometer-long (2.5 mi) controlled-access toll expressway linking the southern province of Cavite to Muntinlupa in the Philippines.

<span class="mw-page-title-main">Philippine expressway network</span>

The Philippine expressway network, also known as the High Standard Highway Network, is a controlled-access highway network managed by the Department of Public Works and Highways (DPWH) which consists of all expressways and regional high standard highways in the Philippines.

<span class="mw-page-title-main">Osmeña Highway</span> Major road in Metro Manila, Philippines

The President Sergio Osmeña Sr. Highway, also known as the South Superhighway, is a 4.595-kilometer (2.855 mi) major highway that links Quirino Avenue in Paco, Manila to Epifanio de los Santos Avenue (EDSA) and South Luzon Expressway (SLEX) at the Magallanes Interchange in Makati.

<span class="mw-page-title-main">MRT Line 7 (Metro Manila)</span> Manila Metro line

The Metro Rail Transit Line 7, also known as MRT Line 7 or MRT-7, is a rapid transit line under construction in the Philippines. When completed, the line will be 22.8 kilometers (14.2 mi) long, with 14 stations, and the first line to have a third rail electrification. The line runs in a northeast–southwest direction, beginning at San Jose del Monte, Bulacan up to the North Triangle Common Station in North Avenue, Quezon City.

<span class="mw-page-title-main">Southeast Metro Manila Expressway</span> Highway under construction in the Philippines

The Southeast Metro Manila Expressway (SEMME), also known as Skyway Stage 4, C-6 Expressway and formerly as Metro Manila Expressway, is an on-hold 32.664-kilometer (20.296 mi) tolled expressway running across eastern Metro Manila and western Rizal. The expressway will help decongest the existing roadways across Metro Manila, such as EDSA and Circumferential Road 5. The expressway is part of the larger Circumferential Road 6 project. Which it's expansion from original C-6 length currently passing from General Santos Avenue in Taguig up to Highway 2000 in Taytay, will expand to Cainta, Pasig, Marikina, San Mateo, and in Quezon City.

<span class="mw-page-title-main">New Manila International Airport</span> Future airport in Bulacan, Philippines

New Manila International Airport, also known as Bulacan International Airport, is an international airport under construction on the coastal areas of Bulakan, Bulacan, 35 km (22 mi) north of Manila, the capital of the Philippines. The project was proposed by the San Miguel Corporation (SMC) and is set to help decongest Ninoy Aquino International Airport (NAIA), the main gateway to the capital for air travelers.

<span class="mw-page-title-main">Manuel Bonoan</span> Filipino businessman

Manuel Manligas Bonoan is a Filipino businessman and engineer who was the president and chief executive officer of SMC Tollways. He has served as the secretary of public works and highways since June 30, 2022, and had previously served as secretary in an acting capacity in 2007.

<span class="mw-page-title-main">NLEX Connector</span> Elevated highway in the Philippines

NLEX Connector, also known as the NLEX–SLEX Connector Road, NLEX Connector Road, and NLEX Segment 11 during the planning stages, is a 7.7-kilometer (4.8 mi), four-lane elevated expressway in Metro Manila, Philippines. It connects the NLEX Harbor Link to the Metro Manila Skyway, which in turn connect to the North and South Luzon Expressways, respectively, while traversing parallel to the PNR Metro Commuter Line. The highway has five interchanges, four of which is currently operational. Alongside NLEX Harbor Link, trucks are allowed to use it.

References

  1. 1 2 3 4 "TRB Declares South Luzon Expressway (SLEX) Toll Road 5 And Pasig River Expressway Projects As Toll Road Projects". DOTr. August 5, 2020. Archived from the original on June 18, 2021. Retrieved August 28, 2020.
  2. 1 2 3 Cordero, Ted (March 18, 2024). "San Miguel drops plan to build Pasig River Expressway". GMA Integrated News . Retrieved March 18, 2024.
  3. 1 2 3 Chanco, Boo (December 11, 2023). "From Tondo boy to Forbes philanthropist". The Philippine Star . Retrieved December 30, 2023. But RSA [Ramon S. Ang] expressed irritation at criticisms of his projects. So, he is dropping the Pasig River Expressway proposal. He said he only wanted to help make commuting from the eastern part of Metro Manila to the western part easier.
  4. 1 2 "SMC LINES UP NEXT GAME-CHANGERS: SLEX TR5, PASIG RIVER EXPRESSWAY". San Miguel Corporation. August 25, 2020. Retrieved August 28, 2020.
  5. Cordero, Ted (August 25, 2020). "San Miguel investing P122B for SLEX Toll Road 5, Pasig River Expressway projects". GMA News. Retrieved August 28, 2020.
  6. 1 2 "Pasig River Expressway (PAREX) Project". Department of Public Works and Highways. Retrieved February 14, 2021.
  7. 1 2 Grecia, Leandre (September 24, 2021). "SMC, DOTr, DPWH break ground for Pasig River Expressway". Top Gear Philippines. Retrieved September 24, 2021.
  8. https://www.facebook.com/PhilippineSTAR/posts/pfbid02A32RurztBkumLpo94AmY3nd7m7v5gmZPfhCBwgwRpPJ4AXd35TvoZCFcmfE7qjfVl [ bare URL ]
  9. Rodriguez, Mia (August 26, 2020). "In the Works: A Six-Lane Elevated Expressway Crossing the "Entirety" of Pasig River". Spot.ph.
  10. 1 2 3 SMC Infrastructure (September 6, 2022). Environmental Impact Assessment - Pasig River Expressway Project (PDF). Environmental Management Bureau.
  11. 1 2 SMC Infrastructure (July 14, 2022). Project Description for Scoping - Pasig River Expressway Project (PDF). Environmental Management Bureau.
  12. Katahira & Engineers International (October 29, 1993). "Metro Manila Urban Expressway System Study" (PDF). Japan International Cooperation Agency. Retrieved July 3, 2023.
  13. "MMUTIS Appendices" (PDF). Retrieved May 13, 2024.
  14. "Manila-Taguig expressway under evaluation by DPWH". AutoIndustriya. February 6, 2017. Retrieved October 13, 2021.
  15. Camus, Miguel (February 2, 2017). "P100-B tollroad projects proposed". Philippine Daily Inquirer. Retrieved October 13, 2021.
  16. 1 2 3 "Months after denial, Palafox onboarded for San Miguel's PAREX". RAPPLER. March 26, 2022. Retrieved March 27, 2022.
  17. "Mobility advocates question 'unusually fast' gov't approval of PAREX". Rappler. September 29, 2021. Retrieved October 8, 2021.
  18. Carullo, Alvin (April 25, 2022). "Pasig River Expressway (PAREX): Status of STOA Approval". Letter to Robert Siy Jr. Toll Regulatory Board . Retrieved May 1, 2022.
  19. "NOTICE OF PUBLIC HEARING" (PDF). March 4, 2022.
  20. "SMC breaks ground for ₱95B Pasig River Expressway project". CNN Philippines. September 24, 2021. Archived from the original on September 24, 2021. Retrieved September 24, 2021.
  21. "After Skyway 3, San Miguel aims to start work on Pasig River Expressway in Feb". ABS-CBN News. January 14, 2021.
  22. Jose, Ashley Erika (May 28, 2024). "P95-billion Pasig River Expressway project to proceed, San Miguel chief says". BusinessWorld . Retrieved May 28, 2024.
  23. Piad, Tyrone Jasper (May 28, 2024). "Pasig River tollway still on the table, says An". Philippine Daily Inquirer . Retrieved May 28, 2024.
  24. 1 2 "PAREX would bring more heat, more flooding in NCR, various groups warn". Manila Bulletin. Retrieved March 24, 2022.
  25. Madarang, Catalina S. (April 23, 2021). "Critics of Pasig River expressway project ask gov't to prioritize people over cars". InterAksyon. Retrieved April 24, 2021.
  26. Cabico, Gaea Katreena (July 19, 2021). "Planned Pasig River expressway may just make traffic, pollution worse — groups". The Philippine Star. Retrieved September 24, 2021.
  27. Siy, Robert (April 17, 2021). "Do we really need a Pasig River expressway?". The Manila Times . Retrieved May 14, 2021.
  28. Galvez, Daphne (April 1, 2022). "Pacquiao thumbs down Pasig River Expressway, wants to turn it into a tourism site instead". Philippine Daily Inquirer. Retrieved April 1, 2022.
  29. "It is time for the Philippines to abandon profit-driven and debt-driven infrastructure, and prioritize the needs of people and the planet in our blueprint for economic development. We must reject the Pasig River Expressway project". Twitter. Retrieved April 5, 2022.
  30. "This coming March 25, there will be a public hearing regarding the SMC's Pasig River Expressway (PAREX), and on behalf of GPP Kalikasan Muna - Green Party of the Philippines, I am against this elephant project". Twitter. Retrieved April 5, 2022.
  31. "'A problem, not a solution': Groups slam proposed Pasig River expressway". Rappler. July 16, 2021. Retrieved October 8, 2021.
  32. 1 2 3 Piad, Tyrone Jasper C. (April 5, 2022). "PAREx environmental study suspected to have been copied". Philippine Daily Inquirer. Retrieved April 5, 2022.
  33. 1 2 3 De La Cruz, Christa I. (October 1, 2021). "Here's Why PAREX Might Be a Bad Idea, According to an Urban Planner". SPOT.PH. Retrieved October 8, 2021.
  34. Cabico, Gaea Katreena. "DENR urged to postpone public hearing on planned Pasig River expressway". Philstar.com. Retrieved March 24, 2022.
  35. "RHR CONSULT SERVICES, INC. - Environmental Impact Assessment and Management Division" . Retrieved April 5, 2022.
  36. Cordero, Ted (September 24, 2021). "Ramon Ang addresses criticisms vs. Pasig River Expressway project". GMA News. Retrieved September 24, 2021.
  37. Bagsit, Jezzah Mae; Medalla, Tia Mozelle (November 14, 2021). "Cars, buses, and PAREX: Solving Metro Manila traffic woes". The LaSallian . Retrieved October 13, 2021.
  38. Camus, Miguel R. (September 29, 2021). "Ramon Ang responds to firestorm of criticism over planned Pasig River Expressway". INQUIRER.net. Retrieved October 8, 2021.
  39. Bajo, Anna Felicia (June 27, 2023). "DENR evaluating impact of PAREX". GMA Integrated News and Public Affairs . Retrieved July 31, 2023.
  40. "Take a look at a few of our "Postcards from the Future" for waterfronts". Facebook. Retrieved March 27, 2022.
  41. Jose, F. Sionil. "Felino A. Palafox Jr.: Visionary architect". Philstar.com. Retrieved March 27, 2022.