Tower City Center | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Location | 230 West Huron Road, Cleveland, Ohio | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Coordinates | 41°29′52″N81°41′39″W / 41.49778°N 81.69417°W | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
History | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Opened | June 29, 1930 (Terminal) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Closed | January 14, 1977 (Terminal) | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Previous names | Cleveland Union Terminal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Union Terminal Group | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Architect | Graham, Anderson, Probst & White; Walker & Weeks | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Architectural style | Beaux-Arts, Art Deco | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Website | towercitycenter | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
NRHP reference No. | 76001405 [1] | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Added to NRHP | March 17, 1976 |
Tower City Center is a large mixed-use facility in Downtown Cleveland, Ohio, on its Public Square. The facility is composed of a number of interconnected office buildings, including Terminal Tower, the Skylight Park mixed-use shopping center, Jack Cleveland Casino, Hotel Cleveland, Chase Financial Plaza, and Tower City station, the main hub of Cleveland's four RTA Rapid Transit lines.
The structure was built in 1929 as Cleveland Union Terminal. On March 17, 1976, the complex was added to the National Register of Historic Places.
The building complex was originally commissioned by the Van Sweringen brothers, prominent local railroad moguls and real estate developers. The center of the complex was Cleveland Union Terminal (CUT), a terminal for all trains coming into Cleveland via the various railroad lines in a concept similar to Grand Central Terminal in New York City. [2]
When Cleveland Union Terminal was built, the train station allocated the northern set of tracks for interurban or rapid transit service and the southern set of tracks for inter-city rail service. The portion of the station above the interurban tracks was called the Traction Concourse and the portion above the intercity train tracks was called the Steam Concourse. The Van Sweringen brothers envisioned a network of interurban lines extending from the CUT in all directions. They even acquired right-of-way for some of the lines.
The complex was designed by the firm of Graham, Anderson, Probst & White. Site preparation began in 1922, and approximately 2,200 buildings were demolished. Construction began in 1926, and structural work was completed by 1927. At the time, it was the second-largest excavation project in the world after the Panama Canal. The Terminal Tower opened to its first tenants in 1928. From its completion until 1964, the Terminal Tower was the tallest building in North America outside of New York City. Three other office buildings, the Medical Arts Building, Builders Exchange Building, and Midland Building, were built in addition to the Terminal Tower. The three Art Deco buildings are collectively known as the Landmark Office Towers Complex and were completed in 1929. In addition to the new buildings, the 1918 Hotel Cleveland was connected to the complex. Cleveland Union Terminal was dedicated and officially opened in 1930.
The facility included a number of retail stores and restaurants. Original designs for the complex show that at first the brothers did not plan on building an office tower within the complex. However, they eventually decided to build the 52-story Terminal Tower on the northeast side of the complex facing Public Square.
In 1931, the Higbee Company moved its main store to a new building connected to Cleveland Union Terminal. In 1934, the U.S. Postal Service moved its main Cleveland office to Union Terminal in a new building designed by the firm of Walker and Weeks. It was known as M.K. Ferguson Plaza under the ownership of Forest City Enterprises. [3]
The Union Terminal served most rail lines: the Baltimore and Ohio Railroad, New York Central Railroad and Nickel Plate Road. [4] Exceptions were the Pennsylvania Railroad and initially the Erie Railroad.
Notable trains, particularly for their destinations included:
However, the station was never particularly popular with the railroads. It required deviating from the quicker route along Lake Erie. As the city would not allow trains to operate under steam power near the downtown area, trains were forced to switch from steam to electric power at a suburban rail yard when heading inbound and then reverse on the way out at another yard. As a result, some lines began to bypass the station entirely, heading along the lake route, and some trains stopped serving the city altogether (examples of the latter case: the New York Central Railroad's Lake Shore Limited and the New England States ).
Several east–west routes on the circuit of trains bound east from Chicago through northern Ohio bypassed the city, traveling slightly to the south, passing through Akron and Youngstown, as in the case of B&O and Erie mainlines. In addition, national passenger rail travel had already passed its peak and was starting its gradual decline in favor of the automobile and, later, the airplane. The Erie Railroad, owned by the Van Sweringens, could not afford the electric transfer and continued to use its own nearby station until 1948, when it replaced steam with diesel locomotives and was able to serve the Union Terminal under its own power.
By the end of 1965, the B&O and the Norfolk and Western (the successor to the Nickel Plate) had terminated their last trains that had served Cleveland. By the end of 1967, the New York Central had discontinued all named trains that had run through Cleveland. All that remained as passenger trains were unnamed successors to trains #51 (westbound Empire State Express), #90 (eastbound successor to the Chicagoan), #27/28 (successor to the New England States) and #63/#64 (Chicago–New York) trains. [12]
In the lead-up to the arrival of Amtrak, in 1970 the Erie Lackawanna ran an unnamed train to Youngstown. [13] The Penn Central (successor to the New York Central) Chicago-bound trains stopping at the terminal included an unnamed remnant of the Empire State Express and another unnamed train. East-bound, there was an unnamed successor to the New England States, as well as two other unnamed trains. Southwest-bound there was an Indianapolis-destined remnant of the Southwestern Limited and an Ohio State Limited remnant bound for Columbus. [14]
Amtrak's short-lived Lake Shore served Union Terminal for seven months in 1971, but the railroad found the rents prohibitive. When the new Lake Shore Limited began in 1975, Amtrak chose to construct a new station near Lake Erie adjacent to the Cleveland Memorial Shoreway. [15] The new Amtrak station is located near the former Cleveland Union Depot, once served by the Pennsylvania Railroad. The former Erie Railroad commuter service, ultimately inherited by Conrail, was discontinued on January 14, 1977, ending the facility's use as a railroad station. [16]
However, in 2021, a rail advocacy group by the name of All Aboard Ohio, voted in favor of returning Amtrak service to Union Terminal, in the anticipation of a proposed dramatic increase in rail service. [17]
Most of the platform area was demolished in the late 1980s renovation of the building. The station area itself was converted by Forest City Enterprises into a three-story, 367,000 square foot [18] shopping mall and food court known as The Avenue, which opened on March 26, 1990. As part of the renovation, RTA rebuilt its rapid transit station beneath the center. The rest of the platform area was turned into a parking garage for the new complex. When the already renamed Tower City Center reopened, the mall housed many high-end retailers, including Bally of Switzerland, Barneys New York, Fendi, Gucci, Versace, and even had a letter of intent from Neiman Marcus to build a 120,000-square foot anchor store in 1992. [19] [20] [21] Over the following 25 years, many of those shops were replaced by more-modest stores, some of them local retailers. [22]
In 1991, two new 11-story office towers, the Skylight Office Tower and the Chase Financial Plaza, were added. The Chase Building houses Cleveland's Ritz-Carlton Hotel and The Skylight Office Tower housed the former Hard Rock Cafe. After the completion of the nearby Gateway project in 1994, RTA built an indoor walkway connecting Tower City to the complex. A second walkway was built in 2002 to connect Tower City with the Carl B. Stokes U.S. Courthouse.
Higbee's (by then bought by Dillard's) closed its department store in the complex in January, 2002. Positively Cleveland (formerly the Convention and Visitors Bureau of Greater Cleveland) and the Greater Cleveland Partnership (the local chamber of commerce) opened offices in the Higbee Building in 2007. Until late 2010, the Cleveland Plus Visitors Center occupied the first floor. [23] [24] [25] The building was opened on May 14, 2012, as the Horseshoe Casino Cleveland. [26] After Rock Gaming LLC took over management of the Horseshoe, the casino was transformed into Jack Cleveland Casino and reopened on May 11, 2016. [27]
In 2001, Time Warner Cable Amphitheater opened as an outdoor stage along the Cuyahoga River near the Tower City Complex. A site on the Cuyahoga River side of the complex was proposed as a location for a new Cleveland convention center, but in January, 2009 the Cuyahoga County Commissioners decided to redevelop the existing facility. [28]
In July, 2021 businessman Dan Gilbert's company Bedrock announced plans to convert the mall into a "retail marketplace" with a blend of retail and entertainment. [29] After renovations were completed in 2022, the main atrium was renamed to "Skylight Park". [30]
Public Square | |||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||
Owned by | Greater Cleveland Regional Transit Authority | ||||||||||||
Construction | |||||||||||||
Structure type | Underground | ||||||||||||
History | |||||||||||||
Opened | March 15, 1955 | ||||||||||||
Closed | 1980s-1990s | ||||||||||||
Previous names | Cleveland Terminal | ||||||||||||
Original company | Cleveland Transit System | ||||||||||||
Key dates | |||||||||||||
Interurban platforms built | July 20, 1930 | ||||||||||||
Platforms rebuilt | 1955 | ||||||||||||
|
The Red Line took the place of a never-completed interurban line. An additional vault for that line was located at Mayfield Road, now the Little Italy–University Circle station.
The Shaker rapid transit remained the only service using the interurban portion of the CUT for 25 years. When the Cleveland Transit System built its rapid transit (later designated the Red Line) in 1955 (using much of the right-of-way previously developed by the Van Sweringens), another rapid transit station was built in the former interurban area of the CUT to serve it. Since the CTS Rapid Transit (Red Line) and the Shaker rapid transit (Green and Blue Lines) were owned by different entities at the time, there was no fare transfer between the trains, and the stations were entirely separate.
In 1968, the Cleveland Transit System line finished its extension through Cleveland's west side to Cleveland Hopkins International Airport and Cleveland became the first North American city with direct rapid transit access from downtown to an airport. [31]
Both lines became part of the Greater Cleveland Regional Transit Authority when it assumed control on September 5, 1975. The two stations remained separate until December 17, 1990, when an entirely new station was completed with the development of Tower City Center. [32]
Tower City | ||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||||||||||||||||||||||||||||||
Owned by | Greater Cleveland Regional Transit Authority | |||||||||||||||||||||||||||||||||||||||||||
Construction | ||||||||||||||||||||||||||||||||||||||||||||
Structure type | Underground | |||||||||||||||||||||||||||||||||||||||||||
History | ||||||||||||||||||||||||||||||||||||||||||||
Opened | July 20, 1930 July 31, 2016 March 20, 2017 December 28, 2020 March 5, 2024 | |||||||||||||||||||||||||||||||||||||||||||
Closed | 1980s-1990s November 26, 2016 April 2, 2017 2021 May 16, 2024 | |||||||||||||||||||||||||||||||||||||||||||
Previous names | Public Square, Downtown Terminal, Cleveland Terminal | |||||||||||||||||||||||||||||||||||||||||||
Original company | Cleveland Interurban Railroad | |||||||||||||||||||||||||||||||||||||||||||
|
These platforms opened with the extension of the Cleveland Interurban Railroad from just east of the ramp at East 34th Street and Broadway in 1930.
Since the Van Sweringens-owned Cleveland Interurban Railroad which served the suburb of Shaker Heights, the interurban portion of the CUT was immediately occupied by the Shaker trains upon completion on July 20, 1930. (Previously, the Shaker trains had used streetcar tracks to reach downtown from East 34th Street, which caused significantly slower service.) The Shaker rapid transit station was located along the northernmost tracks of the complex, and it included a small yard for the storage of a few trains and a loop to allow trains to reverse direction. Development of the other interurban services, however, was stalled by the Great Depression, which hit the Van Sweringens particularly hard. By 1944, ownership of the Shaker rapid transit passed to the city of Shaker Heights.
The Shaker and Van Aken lines became part of the Greater Cleveland Regional Transit Authority when it assumed control on September 5, 1975. The two stations remained separate until December 17, 1990, when a completely new station was completed with the development of Tower City Center. [33]
The platform was temporarily re-opened for westbound passengers in 2016, 2017, 2020, and 2024.
RTA Rapid Transit is a rapid transit and semi-metro system owned and operated by the Greater Cleveland Regional Transit Authority (GCRTA).
The Greater Cleveland Regional Transit Authority is the public transit agency for Cleveland, Ohio, United States and the surrounding suburbs of Cuyahoga County. RTA is the largest transit agency in Ohio, with a ridership of 22,431,500, or about 79,000 per weekday as of the second quarter of 2024.
The New York, Chicago and St. Louis Railroad, abbreviated NYC&St.L, was a railroad that operated in the mid-central United States. Commonly referred to as the "Nickel Plate Road", the railroad served parts of the states of New York, Pennsylvania, Ohio, Indiana, Illinois, and Missouri. Its primary connections occurred in Buffalo, Chicago, Cincinnati, Cleveland, Indianapolis, St. Louis, and Toledo.
Oris Paxton Van Sweringen and Mantis James Van Sweringen were American brothers who became railroad barons in order to develop Shaker Heights, Ohio. They are better known as O. P. Van Sweringen and M. J. Van Sweringen, or by their collective nickname, the Vans. The brothers came from a farming area near Wooster, Ohio. Their father was for a time an engineer in the oil fields of Pennsylvania, fought in the Civil War and was wounded at the Battle of Gettysburg. The family moved to Cleveland, Ohio, in about 1890.
The Blue Line is a light rail line of the RTA Rapid Transit system in Cleveland and Shaker Heights, Ohio, running from Tower City Center downtown, then east and southeast to Warrensville Center Blvd near Chagrin Blvd. 2.6 miles (4.2 km) of track, including two stations, are shared with the rapid transit Red Line, the stations have low platforms for the Blue Line and high platforms for the Red Line. The Blue Line shares the right-of-way with the Green Line in Cleveland, and splits off after passing through Shaker Square. All RTA light rail lines use overhead lines and pantographs to draw power.
The Green Line is a light rail line of the RTA Rapid Transit system in Cleveland and Shaker Heights, Ohio, running from Tower City Center downtown, then east to Green Road near Beachwood. 2.6 miles (4.2 km) of track, including two stations, are shared with the rapid transit Red Line; the stations have low platforms for the Green Line and high platforms for the Red Line. The Green Line shares the right-of-way with the Blue Line in Cleveland, and splits off after passing through Shaker Square. All RTA light rail lines use overhead lines and pantographs to draw power.
Cleveland Lakefront Station is an Amtrak train station at North Coast Harbor in Cleveland, Ohio. The current station was built in 1977 to provide service to the Lake Shore Limited route, which was reinstated by Amtrak via Cleveland and Toledo in 1975. It replaced service to Cleveland Union Terminal. Lakefront Station is located in downtown Cleveland near the Lake Erie waterfront, adjacent to the Cleveland Memorial Shoreway and in the immediate vicinity of the Rock and Roll Hall of Fame, the Great Lakes Science Center, the Steamship William G. Mather Museum and Cleveland Browns Stadium. The station has had little to no renovation since its opening.
Tower City station, known alternatively as Tower City–Public Square and Tower City Center is a rapid transit station in Cleveland, Ohio, part of Tower City Center. It is the central station of the RTA Rapid Transit system, served by all lines: Blue, Green, Red and Waterfront. The station is located directly beneath Prospect Avenue in the middle of the Avenue shopping mall. The station is only accessible through the Tower City Center shopping complex, and, for this reason, the public concourse of the shopping mall is open at all times that the RTA Rapid Transit is in operation.
Tri-C–Campus District station is a station on the RTA Rapid Transit system in Cleveland, Ohio, serving the Red, Blue, and Green Lines. It is located just east of East 34th Street near the intersection of East 34th and Broadway, on the north side of the CSX railway tracks, and below the bridge that carries East 34th Street over the railway tracks. Tri-C refers to Cuyahoga Community College.
Cleveland has been and continues to be deeply rooted in railroad history.
South Park station is a stop on the RTA Green Line in Shaker Heights, Ohio, located in the median of Shaker Boulevard at its intersection with South Park Boulevard, after which the station is named.
Southington station is a stop on the RTA light rail Green Line in Shaker Heights, Ohio, located in the median of Shaker Boulevard at its intersection with Southington Road, after which the station is named.
Lee–Shaker station is a station on the RTA Green Line in Shaker Heights, Ohio, located in the median of Shaker Boulevard at its intersection with Lee Road, after which the station is named.
Attleboro station is a stop on the RTA light rail Green Line in Shaker Heights, Ohio, located in the median of Shaker Boulevard at its intersection with Attleboro Road, after which the station is named.
Buckeye–Woodhill station is a station on the RTA Blue and Green Lines in Cleveland, Ohio. To the east of this station, the line enters the median of Shaker Boulevard. It is located below the intersection of Shaker Boulevard with Buckeye Road and Woodhill Road, after which the station is named.
Warrensville–Van Aken station is a station on the RTA light rail Blue Line in Shaker Heights, Ohio. It is the eastern terminus of the Blue Line. Unlike most of the stations in Shaker Heights, Warrensville–Van Aken is located off street, not in the median of Van Aken Boulevard. It is located in a block surrounded by Chagrin Boulevard, Van Aken Boulevard, and Northfield Road and Tuttle Road in the midst of a dense retail/commercial area. The station is located one block west of Warrensville Center Road, after which it named.
Courtland station is a stop on the RTA light rail Green Line in Shaker Heights, Ohio, located in the median of Shaker Boulevard at its intersection with Courtland Boulevard, after which the station is named.
Eaton station is a stop on the RTA light rail Green Line in Shaker Heights, Ohio, located in the median of Shaker Boulevard at its intersection with Eaton Road, after which the station is named.
Union Depot was the name given to two intercity railroad stations in Cleveland, Ohio. Union Depot was built as the first union station in Cleveland in 1853. After a large fire in 1864, a new structure was built, and was the largest train station in the United States until construction of Grand Central Depot in New York City in 1871. The depot was operated by multiple railroads until 1930, when all except the Pennsylvania Railroad dropped their services and utilized Cleveland Union Terminal, which opened that year. The Pennsylvania Railroad continued to use the depot until 1953, and the building was demolished in 1959.