List of abbreviations in oil and gas exploration and production

Last updated

The oil and gas industry uses many acronyms and abbreviations. This list is meant for indicative purposes only and should not be relied upon for anything but general information.

Contents

#

Symbol

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

R

S

T

U

V

W

X

Y

Z

See also

Related Research Articles

<span class="mw-page-title-main">Oil well</span> Well drilled to extract crude oil and/or gas

An oil well is a drillhole boring in Earth that is designed to bring petroleum oil hydrocarbons to the surface. Usually some natural gas is released as associated petroleum gas along with the oil. A well that is designed to produce only gas may be termed a gas well. Wells are created by drilling down into an oil or gas reserve that is then mounted with an extraction device such as a pumpjack which allows extraction from the reserve. Creating the wells can be an expensive process, costing at least hundreds of thousands of dollars, and costing much more when in hard to reach areas, e.g., when creating offshore oil platforms. The process of modern drilling for wells first started in the 19th century, but was made more efficient with advances to oil drilling rigs during the 20th century.

<span class="mw-page-title-main">Wireline (cabling)</span> Technology used in oil and gas wells

In the oil and gas industry, the term wireline usually refers to the use of multi-conductor, single conductor or slickline cable, or "wireline", as a conveyance for the acquisition of subsurface petrophysical and geophysical data and the delivery of well construction services such as pipe recovery, perforating, plug setting and well cleaning and fishing. The subsurface geophysical and petrophysical information results in the description and analysis of subsurface geology, reservoir properties and production characteristics.

Well logging, also known as borehole logging is the practice of making a detailed record of the geologic formations penetrated by a borehole. The log may be based either on visual inspection of samples brought to the surface or on physical measurements made by instruments lowered into the hole. Some types of geophysical well logs can be done during any phase of a well's history: drilling, completing, producing, or abandoning. Well logging is performed in boreholes drilled for the oil and gas, groundwater, mineral and geothermal exploration, as well as part of environmental and geotechnical studies.

<span class="mw-page-title-main">Christmas tree (oil well)</span> Assembly of valves, spools, and fittings used to regulate the flow of fluids in an oil well

In petroleum and natural gas extraction, a Christmas tree, or tree, is an assembly of valves, casing spools, and fittings used to regulate the flow of pipes in an oil well, gas well, water injection well, water disposal well, gas injection well, condensate well, and other types of well.

Well control is the technique used in oil and gas operations such as drilling, well workover and well completion for maintaining the hydrostatic pressure and formation pressure to prevent the influx of formation fluids into the wellbore. This technique involves the estimation of formation fluid pressures, the strength of the subsurface formations and the use of casing and mud density to offset those pressures in a predictable fashion. Understanding pressure and pressure relationships is important in well control.

<span class="mw-page-title-main">NOV Inc.</span> U.S. energy company

NOV Inc., formerly National Oilwell Varco, is an American multinational corporation based in Houston, Texas. It is a worldwide provider of equipment and components used in oil and gas drilling and production operations, oilfield services, and supply chain integration services to the upstream oil and gas industry. The company conducts operations in more than 500 locations across six continents, operating through three reporting segments: Rig Technologies, Wellbore Technologies, and Completion & Production Solutions.

<span class="mw-page-title-main">Casing (borehole)</span>

Casing is a large diameter pipe that is assembled and inserted into a recently drilled section of a borehole. Similar to the bones of a spine protecting the spinal cord, casing is set inside the drilled borehole to protect and support the wellstream. The lower portion is typically held in place with cement. Deeper strings usually are not cemented all the way to the surface, so the weight of the pipe must be partially supported by a casing hanger in the wellhead.

<span class="mw-page-title-main">Wellhead</span> Component at the surface of a well that provides the structural and pressure-containing interface

A wellhead is the component at the surface of an oil or gas well that provides the structural and pressure-containing interface for the drilling and production equipment.

<span class="mw-page-title-main">Blowout (well drilling)</span> Uncontrolled release of crude oil and/or natural gas from a well

A blowout is the uncontrolled release of crude oil and/or natural gas from an oil well or gas well after pressure control systems have failed. Modern wells have blowout preventers intended to prevent such an occurrence. An accidental spark during a blowout can lead to a catastrophic oil or gas fire.

<span class="mw-page-title-main">Blowout preventer</span> Specialized valve

A blowout preventer (BOP) is a specialized valve or similar mechanical device, used to seal, control and monitor oil and gas wells to prevent blowouts, the uncontrolled release of crude oil or natural gas from a well. They are usually installed in stacks of other valves.

<span class="mw-page-title-main">Drill stem test</span>

A drill stem test (DST) is a procedure for isolating and testing the pressure, permeability and productive capacity of a geological formation during the drilling of a well. The test is an important measurement of pressure behaviour at the drill stem and is a valuable way of obtaining information on the formation fluid and establishing whether a well has found a commercial hydrocarbon reservoir.

Artificial lift refers to the use of artificial means to increase the flow of liquids, such as crude oil or water, from a production well. Generally this is achieved by the use of a mechanical device inside the well or by decreasing the weight of the hydrostatic column by injecting gas into the liquid some distance down the well. A newer method called Continuous Belt Transportation (CBT) uses an oil absorbing belt to extract from marginal and idle wells. Artificial lift is needed in wells when there is insufficient pressure in the reservoir to lift the produced fluids to the surface, but often used in naturally flowing wells to increase the flow rate above what would flow naturally. The produced fluid can be oil, water or a mix of oil and water, typically mixed with some amount of gas.

<span class="mw-page-title-main">Extraction of petroleum</span> Removal of petroleum from the earth

Petroleum is a fossil fuel that can be drawn from beneath the earth's surface. Reservoirs of petroleum are formed through the mixture of plants, algae, and sediments in shallow seas under high pressure. Petroleum is mostly recovered from oil drilling. Seismic surveys and other methods are used to locate oil reservoirs. Oil rigs and oil platforms are used to drill long holes into the earth to create an oil well and extract petroleum. After extraction, oil is refined to make gasoline and other products such as tires and refrigerators. Extraction of petroleum can be dangerous and have led to oil spills.

<span class="mw-page-title-main">Coiled tubing</span> Long metal pipe used in oil and gas wells

In the oil and gas industry, coiled tubing refers to a long metal pipe, normally 1 to 3.25 in in diameter which is supplied spooled on a large reel. It is used for interventions in oil and gas wells and sometimes as production tubing in depleted gas wells. Coiled tubing is often used to carry out operations similar to wirelining. The main benefits over wireline are the ability to pump chemicals through the coil and the ability to push it into the hole rather than relying on gravity. Pumping can be fairly self-contained, almost a closed system, since the tube is continuous instead of jointed pipe. For offshore operations, the 'footprint' for a coiled tubing operation is generally larger than a wireline spread, which can limit the number of installations where coiled tubing can be performed and make the operation more costly. A coiled tubing operation is normally performed through the drilling derrick on the oil platform, which is used to support the surface equipment, although on platforms with no drilling facilities a self-supporting tower can be used instead. For coiled tubing operations on sub-sea wells a mobile offshore drilling unit (MODU) e.g. semi-submersible, drillship etc. has to be utilized to support all the surface equipment and personnel, whereas wireline can be carried out from a smaller and cheaper intervention vessel. Onshore, they can be run using smaller service rigs, and for light operations a mobile self-contained coiled tubing rig can be used.

<span class="mw-page-title-main">Well intervention</span> Operation on a deteriorating oil well

A well intervention, or well work, is any operation carried out on an oil or gas well during, or at the end of, its productive life that alters the state of the well or well geometry, provides well diagnostics, or manages the production of the well.

Slickline refers to a single strand wire which is used to run a variety of tools down into the wellbore for several purposes. It is used during well drilling operations in the oil and gas industry. In general, it can also describe a niche of the industry that involves using a slickline truck or doing a slickline job. Slickline looks like a long, smooth, unbraided wire, often shiny, silver/chrome in appearance. It comes in varying lengths, according to the depth of wells in the area it is used up to 35,000 feet in length. It is used to lower and raise downhole tools used in oil and gas well maintenance to the appropriate depth of the drilled well.

A well kill is the operation of placing a column of special fluids of the required density into a well bore in order to prevent the flow of reservoir fluids without the need for pressure control equipment at the surface. It works on the principle that the hydrostatic head of the "kill fluid" or "kill mud" will be enough to suppress the pressure of the formation fluids. Well kills may be planned in the case of advanced interventions such as workovers, or be contingency operations. The situation calling for a well kill will dictate the method taken.

Well integrity, in regard to oil wells, is defined by NORSOK D-010 as the "“Application of technical, operational and organizational solutions to reduce risk of uncontrolled release of formation fluids throughout the life cycle of a well”. There are various facets to well integrity, including accountability/responsibility, well operating processes, well service processes, tubing/annulus integrity, tree/wellhead integrity and testing of safety systems.

<span class="mw-page-title-main">Completion (oil and gas wells)</span> Last operation for oil and gas wells

Well completion is the process of making a well ready for production after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the production tubing and its associated down hole tools as well as perforating and stimulating as required. Sometimes, the process of running in and cementing the casing is also included. After a well has been drilled, should the drilling fluids be removed, the well would eventually close in upon itself. Casing ensures that this will not happen while also protecting the wellstream from outside incumbents, like water or sand.

Oilfield terminology refers to the jargon used by those working in fields within and related to the upstream segment of the petroleum industry. It includes words and phrases describing professions, equipment, and procedures specific to the industry. It may also include slang terms used by oilfield workers to describe the same.

References

  1. "Home :: American Association of Drilling Engineers". Aade.org. Retrieved 12 April 2022.
  2. "Home". aapg.org.
  3. "BP names VP of offshore activities in AGT region". Offshore Energy Today. 4 December 2013. Retrieved 3 August 2018.
  4. 1 2 "NORSOK STANDARD" (PDF). www.standard.no.
  5. "arcVISION Array Resistivity Compensated Service | Schlumberger". www.slb.com. Retrieved 12 April 2022.
  6. "Home | Bureau of Safety and Environmental Enforcement". www.bsee.gov. Retrieved 15 March 2023.
  7. "Crain's Petrophysical Handbook | Login Page". Spec2000.net. 1 January 2015. Retrieved 12 April 2022.
  8. "Openhole Logging - Wireline Formation Evaluation | Schlumberger". www.slb.com. 16 July 1966. Retrieved 12 April 2022.
  9. "SlimPulse Retrievable MWD Service | Schlumberger". www.slb.com. Retrieved 12 April 2022.
  10. van Dijk, J.P. (1993); Three-dimensional quantitative restoration of central Mediterranean Neogene basins. In: Spencer, A.M. (Ed.). Generation, accumulation and production of Europe's hydrocarbons III. Special publication of the European Association of Petroleum Geologists No. 3, Springer-Verlag, Heidelberg, 267–280.
  11. "Eaeg.org". Archived from the original on 10 August 2018. Retrieved 11 July 2022.
  12. "Openhole Logging - Wireline Formation Evaluation | Schlumberger". www.slb.com. 16 July 1966. Retrieved 12 April 2022.
  13. Sreeparna Das. "energy company". Eni. Retrieved 12 April 2022.
  14. van Dijk, J.P. (1998); Analysis and modelling of fractured reservoirs. SPE paper 50570, Europec; European Petroleum Conference, Vol.1, 31–43.
  15. van Dijk, J.P. (1996); Fracture potential and domain mapping; a new technique applied to Maastrichtian-Danian chalk in Block 2/5 (Norway). In: Chalk Geoscience Workshop. PL006, 018, 067, 2–3 Dec 1996, NPD Stavanger, Extended Abstracts.
  16. "Downhole Measurements". Odp.tamu.edu. Retrieved 12 April 2022.
  17. "Resource Library | Schlumberger" (PDF). www.slb.com. Retrieved 12 April 2022.
  18. "Task Geoscience - the Borehole Image and Dipmeter Experts". Archived from the original on 16 October 2013. Retrieved 13 October 2013.
  19. "MRX Magnetic resonance expert". Archived from the original on 16 January 2014. Retrieved 16 January 2014.
  20. "MSCT Mechanical Sidewall Coring Tool | Schlumberger". www.slb.com. Retrieved 12 April 2022.
  21. "Resource Library | Schlumberger" (PDF). www.slb.com. Retrieved 12 April 2022.
  22. Archived 4 March 2016 at the Wayback Machine
  23. "OCTG (casing and tubing)". Network International Oilfield Glossary. Network International. Archived from the original on 15 May 2009. Retrieved 24 June 2011.
  24. Product sheet slb.com [ dead link ]
  25. Archived 21 June 2011 at the Wayback Machine
  26. Archived 18 July 2010 at the Wayback Machine
  27. "Snam home page". Snam.it. Retrieved 12 April 2022.
  28. "Society of Petroleum Engineers". Spe.org. Retrieved 12 April 2022.
  29. "Home". spwla.org.
  30. "Home". total.com.
  31. "USI Ultrasonic Imager | Schlumberger". slb.com. Retrieved 12 April 2022.
  32. "VSI Versatile Seismic Imager, Schlumberger". Archived from the original on 13 January 2014. Retrieved 13 January 2014.