Sealdah South section

Last updated

Indian Railways Suburban Railway Logo.svg Sealdah South section
Overview
StatusOperational
Owner Indian Railways
Locale
Termini
Stations
  • Total stations: 67
  • Interchange stations: 5
Website Eastern Railway
Service
Type Commuter rail
System Kolkata Suburban Railway
Services
  • SealdahDiamond Harbour
  • BallygungeMajerhatBudge Budge
  • SonarpurCanning
  • BaruipurLakshmikantapurNamkhana
Operator(s) Eastern Railway
Depot(s)
  1. Sonarpur EMU Carshed (with 32 rake strength)
History
Opened2 January 1862;163 years ago (1862-01-02)
Technical
Line length238 km (148 mi)
Number of tracks1/2/3
Character At-grade
Track gauge 5 ft 6 in (1,676 mm) broad gauge
Electrification 25 kV AC overhead line
Operating speedup to 110 km/h (68 mph)
Route map

Contents

km
BSicon CONTg.svg
Arrow Blue Up 001.svg
BSicon SBHF.svg
5
Bidhannagar Road
BSicon eABZgl.svg
BSicon exKBSTeq.svg
Press House siding
BSicon SKRZ-G4u.svg
Kankurgachi Road
BSicon pHST.svg
2
Kankurgachi Road
Junction
BSicon STR~L.svg
BSicon STR2+4h.svg
BSicon STR~R.svg
BSicon STRc3.svg
Narkeldanga
EMU Carshed
BSicon DST.svg
BSicon dSTRc1.svg
BSicon lHST white.svg
BSicon lpHST2+4.svg
BSicon v-STR+4.svg
3
Sir Gurudas
Banerjee Halt
BSicon STR2~F.svg
BSicon mKRZo +cerulean.svg
BSicon STRq cerulean.svg
BSicon mKRZo +cerulean.svg
Circular Canal
Sealdah North
0
BSicon HUB2.svg
BSicon KSBHFaq.svg
BSicon STR2~G.svg
BSicon HUBc3.svg
BSicon ABZgr.svg
BSicon STR+4~F.svg
BSicon POINTERg@fq.svg
BSicon STR.svg
Kankurgachi
Chord line
Sealdah Main
0
BSicon HUBc1.svg
BSicon HUBf+4.svg
BSicon KBHFe.svg
BSicon STR+4~G.svg
BSicon dSTR.svg
Kolkata Metro Rail Corporation Logo.svg Sealdah
BSicon ftCONTgq.svg
BSicon HUB.svg
BSicon ftBHFq.svg
BSicon STR.svg
BSicon ftSTRq.svg
BSicon dSTR.svg
BSicon ftdSTRq.svg
BSicon ftdCONTfq.svg
Arrow Blue Left 001.svg
Sealdah South
0
BSicon KSBHFa.svg
BSicon HUBe.svg
BSicon lDST.svg
BSicon STR3~F.svg
BSicon dSTR.svg
Beliaghata Diesel
Loco Shed
BSicon ABZg+1~F.svg
BSicon STR3~G.svg
BSicon dSTRc2.svg
BSicon lHST white.svg
BSicon lpHST3+1.svg
BSicon v-STR3.svg
6
Kamardanga Halt
BSicon MASKe.svg
BSicon KRZ3+1u~F.svg
BSicon STR+1~G.svg
BSicon dSTR3+1-.svg
BSicon dSTRc4.svg
BSicon vSTR+1o-STR.svg
BSicon exSTR+l.svg
BSicon exKBSTeq.svg
Beruck & Comens
siding
3
BSicon lSHST.svg
BSicon vHST.svg
7
Park Circus
BSicon v-SHI2g+r.svg
BSicon SKRZ-G4u.svg
BSicon BST2.svg
BSicon STRc3.svg
Hindusthan Engineering
& Industrial Ltd. siding
BSicon STRc1.svg
BSicon BST+4.svg
BESCO siding
BSicon SKRZ-G4u.svg
BSicon SHST.svg
5
Ballygunge Junction
BSicon STRc2.svg
BSicon ABZg3.svg
Lake Gardens
7
BSicon STRc2.svg
BSicon SHST3+1.svg
BSicon STRc4.svg
BSicon SHST.svg
6
Dhakuria
Kolkata Metro Logo Blue Line.svg Tollygunge
8
BSicon HUBa@F.svg
BSicon cSTRc2.svg
BSicon lvSHST@F-.svg
BSicon STR3+1.svg
BSicon STRc4.svg
BSicon SHST.svg
8
Jadabpur
Arrow Blue Down 001.svg
BSicon utdCONTgq.svg
BSicon STR+1.svg
BSicon utcdSTRq.svg
BSicon utSTR+r.svg
BSicon HUB.svg
BSicon cSTRc4.svg
BSicon dSHST.svg
10
Bagha Jatin
Indian Railways Suburban Railway Logo.svg Rabindra Sarobar
BSicon dSTR.svg
BSicon HUBe.svg
BSicon utBHF.svg
BSicon SHI4c1.svg
BSicon uhkSTRc2.svg
BSicon kMSTR3+l.svg
BSicon uhkSTR3+l.svg
BSicon STR2+4h.svg
BSicon dSTRc3.svg
BSicon uhdCONTfq.svg
Tollygunge Bridge
BSicon SKRZ-G2o.svg
BSicon utdLSTR.svg
BSicon uhkSTR+1.svg
BSicon STRc1.svg
BSicon hkSTR-c4.svg
BSicon uKDSTa.svg
BSicon dSTR+4.svg
BSicon hKRZWae.svg
BSicon uexhLSTR+l.svg
BSicon uehABZg+r.svg
BSicon uSTR.svg
BSicon dSTR.svg
Arrow Blue Down 001.svg
New Garia–Baruipur
Metro (planned)
New Alipore
9
BSicon dSHST.svg
BSicon uhKRWg+l.svg
BSicon lhSTRe@gq.svg
BSicon HUBc2.svg
BSicon uKRWgr.svg
BSicon ld-SHST.svg
BSicon HUB3@3.svg
BSicon dSTR.svg
11
New Garia Kolkata Metro Logo Blue Line.svg Kolkata Metro Orange Line.svg
BSicon SKRZ-G4u.svg
BSicon uhkLLSTR2.svg
BSicon hkSTR-c3.svg
BSicon HUBaq.svg
BSicon uhKBHFe.svg
BSicon ulBHF.svg
BSicon HUBr+1.svg
BSicon ucSTRc2.svg
BSicon udSTR3.svg
BSicon HUBc4.svg
BSicon dSTR.svg
Kavi Subhash Indian Railways Suburban Railway Logo.svg
BSicon STR2.svg
BSicon uhkSTRc1.svg
BSicon cdSTRc3.svg
BSicon uhkSTRl+4.svg
BSicon uhSTRr+1.svg
BSicon uhSTRc4a.svg
BSicon dSTR.svg
Arrow Blue UpperLeft 001.svg
Arrow Blue Right 001.svg
BSicon STRc1.svg
BSicon STR+4.svg
BSicon exSTR+l brown.svg
BSicon exCONTfq brown.svg
BSicon dSTR.svg
Indian Railways Suburban Railway Logo.svg Kolkata Metro Purple Line.svg Majerhat
10
BSicon uexhCONT4+l.svg
BSicon SHST.svg
BSicon HUBaq.svg
BSicon uexhSTRq.svg
BSicon HUBeq.svg
BSicon uhKBHFxaq.svg
BSicon STRc2.svg
BSicon uhCONTfq.svg
BSicon v-STR3.svg
Arrow Blue UpperLeft 001.svg
Arrow Blue Up 001.svg
BSicon lCONTg@G.svg
BSicon -STRl.svg
BSicon -ABZgr.svg
BSicon SHST+1.svg
BSicon STRc4.svg
12
Garia
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon HST.svg
14
Narendrapur
Brace Bridge
12
BSicon SHST.svg
BSicon SBHF.svg
16
Sonarpur Junction
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon dSTR~L.svg
BSicon KDSTa.svg
BSicon STR~R.svg
Sonarpur EMU Carshed
Santoshpur
15
BSicon SHST.svg
BSicon dSTR~L.svg
BSicon BS2r.svg
BSicon STR2~FR.svg
Clive jute mill siding
BSicon exKBSTa.svg
BSicon STR.svg
BSicon ABZg2~G.svg
BSicon STR+4~F.svg
BSicon exABZl+l.svg
BSicon eABZgr.svg
BSicon STR3~F.svg
BSicon lSHST.svg
BSicon STR+4~G.svg
19
Bidyadharpur
Union jute mill siding
BSicon exKBSTe.svg
BSicon STR.svg
BSicon STR+1~F.svg
BSicon STRc2.svg
BSicon STR3~G.svg
BSicon SHST3.svg
22
Kalikapur
Akra
18
BSicon SHST.svg
BSicon STR+1~G.svg
BSicon ABZ1+fx2.svg
BSicon STRc4x3.svg
Arrow Blue Down 001.svg
planned branch
Nangi
21
BSicon SHST.svg
BSicon STR.svg
BSicon eSTR+c1.svg
BSicon exHST+4.svg
46
Ghatakpukur
Batanagar factory siding
BSicon exKBSTaq.svg
BSicon eABZgr.svg
BSicon STR.svg
BSicon STR2~F.svg
BSicon exKHSTe.svg
60
Minakhan
Caledonian jute mill siding
BSicon exKBSTaq.svg
BSicon eABZg+r.svg
BSicon STR2.svg
BSicon STR2~G.svg
BSicon lSHST~L.svg
BSicon STRc3.svg
BSicon lSHST~R.svg
BSicon STR+4~F.svg
24
Champahati
K.M. Budge Budge
24
BSicon SHST.svg
BSicon STRc1.svg
BSicon STR+4.svg
BSicon lSHST.svg
BSicon STR+4~G.svg
27
Piali
IBP/IOCL Depot
BSicon KBSTaq.svg
BSicon ABZg+r.svg
BSicon STR.svg
BSicon HST.svg
29
Gourdaha
Budge Budge Rail Yard
BSicon YRD.svg
BSicon STR.svg
BSicon SHST.svg
31
Ghutiari Shariff
HPCL siding
BSicon KBSTaq.svg
BSicon ABZgr.svg
BSicon STR.svg
BSicon SHST.svg
34
Betberia Ghola
Budge Budge
jute mill siding
BSicon exKBSTaq.svg
BSicon eABZgr.svg
BSicon STR.svg
BSicon SHST.svg
38
Taldi
BPCL siding
BSicon ABZgl.svg
BSicon KBSTeq.svg
BSicon STR.svg
BSicon pHST.svg
41
Matla Halt
IOCL siding
BSicon DST.svg
BSicon STR.svg
BSicon KSHSTe.svg
BSicon exSTR.svg
45
Canning
Charial Canal
BSicon hKRZWae.svg
BSicon STR.svg
BSicon exSTR.svg
Arrow Blue Down 001.svg
planned extension
Lothian jute mill siding
BSicon exKBSTaq.svg
BSicon eABZgr.svg
BSicon STR.svg
BSicon exhKRZWae.svg
(planned)
Kalipur
29
BSicon eHST.svg
BSicon STR.svg
BSicon exHST.svg
50
Bhangankhali
Magadi Soda factory siding
BSicon exKBSTaq.svg
BSicon eABZgr.svg
BSicon STR.svg
BSicon exHST.svg
60
Sonakhali
Orient jute mill siding
BSicon exKBSTaq.svg
BSicon eABZgr.svg
BSicon STR.svg
BSicon exHST.svg
65
Basanti
Albion jute mill siding
BSicon exKBSTaq.svg
BSicon eABZgr.svg
BSicon STR.svg
BSicon exKHSTe.svg
87
Jharkhali
FCI siding
BSicon ABZgl.svg
BSicon KBSTeq.svg
BSicon STR.svg
Charial Extension Canal
BSicon hKRZWae.svg
BSicon STR.svg
CESC siding
BSicon KDSTe.svg
BSicon POINTERg@fq~F.svg
BSicon exSTR.svg
BSicon STR.svg
planned extension
Pujali
31
BSicon exlHST.svg
BSicon POINTERg@fq~G.svg
BSicon exABZg2~F.svg
BSicon STR.svg
Arrow Blue Up 001.svg
BSicon CONTg.svg
BSicon exABZg2~G.svg
BSicon exSTR+4~F.svg
BSicon STR.svg
BSicon STR.svg
BSicon exlHST~F white.svg
BSicon exSTR3~F.svg
BSicon exhKRZWae.svg
BSicon exSTR+4~G.svg
BSicon STR.svg
BSicon eABZg+1~F.svg
BSicon exSTR3~G.svg
BSicon exSTR.svg
BSicon SBHF.svg
19
Subhasgram
Bir Shibpur
41
BSicon lSHST.svg
BSicon eABZg+1~G.svg
BSicon exSTR3~F.svg
BSicon SHST.svg
22
Mallikpur
Arrow Blue Down 001.svg
BSicon CONTf.svg
BSicon exdSTRc2.svg
BSicon exd-STR3+1.svg
BSicon exSTR3~G.svg
BSicon ABZg+l.svg
BSicon KBSTeq.svg
BESCO siding
BSicon exSTR+1~F.svg
BSicon exdSTR3+1-.svg
BSicon exdSTRc4.svg
BSicon uexLSTR.svg
BSicon STR.svg
Arrow Blue Up 001.svg
New Garia–Baruipur
Metro (proposed)
Pujali–Bankrahat
line (planned)
BSicon POINTERf@gq.svg
BSicon exSTR+1~G.svg
BSicon HUB2.svg
BSicon uexBHF.svg
BSicon HUBc3.svg
BSicon STR.svg
Kolkata Metro Logo.svg Baruipur
(proposed)
Bankrahat
42
BSicon exHST.svg
BSicon HUBc1.svg
BSicon uexSTR.svg
BSicon HUB4.svg
BSicon SBHF.svg
25
Baruipur Junction
Gurudasnagar–Bankrahat
line (planned)
BSicon POINTERf@gq.svg
BSicon exSTR.svg
BSicon STRc2.svg
BSicon uexKDSTe.svg
BSicon ABZg3.svg
Baruipur Metro Depot
Kalyanpur
28
BSicon exLSTR.svg
BSicon STRc2.svg
BSicon SHST3+1.svg
BSicon STRc4.svg
BSicon SHST.svg
27
Shasan Road
Dakshin Durgapur
30
BSicon SHST+1.svg
BSicon STRc4.svg
BSicon HST.svg
29
Krishna Mohan
Hotar
32
BSicon SHST.svg
BSicon SHST.svg
31
Dhapdhapi
Dhamua
34
BSicon SHST.svg
BSicon SHST.svg
33
Surjyapur
Uttar Radhanagar
37
BSicon HST.svg
BSicon SHST.svg
35
Gocharan
Magra Hat
40
BSicon SHST.svg
BSicon HST.svg
38
Hogla
Bahirpuya
43
BSicon HST.svg
BSicon SHST.svg
41
Dakshin Barasat
Sangrampur
45
BSicon SHST.svg
BSicon SHST.svg
44
Baharu
(planned) Sangrampur–
Krishnachandrapur line
Arrow Blue LowerRight 001.svg
BSicon eABZg2.svg
BSicon exSTRc3.svg
BSicon SHST.svg
49
Jaynagar Majilpur
Deula
50
BSicon exSTRc1.svg
BSicon SHST.svg
BSicon exLSTR2+4.svg
BSicon excSTRc3.svg
BSicon edABZg2.svg
BSicon edABZgl-.svg
BSicon exSTRc3.svg
BSicon excSTRq-.svg
BSicon exKHSTeq-.svg
87
Durgapur (planned)
Netra
53
BSicon SHST.svg
BSicon exSTRc1.svg
BSicon eKRZ2+4u.svg
BSicon excdSTRc1.svg
BSicon exv-STR+4.svg
BSicon exSTRc3.svg
Arrow Blue Down 001.svg
planned branch
Basuldanga
55
BSicon SHST.svg
BSicon eSTR+c1.svg
BSicon exABZg+4.svg
Gurudas Nagar
63
57
BSicon exLSTR.svg
BSicon SHST.svg
BSicon STR.svg
BSicon exHST.svg
70
57
Krishnachandrapur
Gurudasnagar–Bankrahat
line (planned)
Arrow Blue Up 001.svg
BSicon exSTRl.svg
BSicon STR.svg
BSicon exABZ2r.svg
BSicon exSTRc3.svg
BSicon STR.svg
BSicon exHST.svg
61
Uttar Kashinagar
BSicon STRc2.svg
BSicon exSTRc1.svg
BSicon ABZg3.svg
BSicon exSTR+4.svg
BSicon STR.svg
BSicon exHST.svg
66
Companirthek
Diamond Harbour
60
BSicon lSHST.svg
BSicon KHST1.svg
BSicon STR+c4.svg
BSicon exSTR.svg
BSicon STR.svg
BSicon exKHSTe.svg
70
Raidighi
Hara Fort goods siding
BSicon KBSTe.svg
BSicon exSTR.svg
BSicon SHST.svg
54
Mathurapur Road
BSicon exSTR.svg
BSicon HST.svg
59
Madhabpur
Gurudasnagar–Kulpi
line (planned)
BSicon POINTERf@gq.svg
BSicon exSTR.svg
BSicon SHST.svg
62
Lakshmikantapur
BSicon exSTR2.svg
BSicon exSTRc3.svg
BSicon HST.svg
67
Udairampur
BSicon exSTRc1.svg
BSicon eABZg+4.svg
BSicon HST.svg
75
71
Kulpi
BSicon HST.svg
76
Karanjali
BSicon HST.svg
82
Nischintapur Market
BSicon HST.svg
84
Nischintapur
BSicon HST.svg
88
Madhabnagar
BSicon SHST.svg
92
Kashinagar
BSicon SHST.svg
95
Kakdwip
planned extension
Arrow Blue LowerLeft 001.svg
BSicon exSTRc2.svg
BSicon eABZg3.svg
Budhakhali
103
BSicon exSTRc2.svg
BSicon exHST3+1.svg
BSicon exSTRc4.svg
BSicon HST.svg
103
Ukilerhat
BSicon exSTRc2.svg
BSicon exhKRXWaeq.svg
BSicon exSTRc4.svg
BSicon KSHSTe.svg
BSicon exSTR.svg
110
Namkhana
Sagar Island
108
BSicon exKHST1.svg
BSicon exSTRc4.svg
BSicon exHST.svg
112
Namkhana Ghat
BSicon exHST.svg
124
Chandranagar
BSicon exKHSTe.svg
141
Bakkhali
Arrow Blue Up 001.svg
planned
extension
km
Key
BSicon STRq.svg
BSicon exSTRq.svg
BSicon tSTRq.svg
Indian Railways broad gauge (1676 mm)
BSicon uSTRq.svg
BSicon uexSTRq.svg
BSicon utSTRq.svg
Kolkata Metro (KM) broad gauge (1676 mm)
BSicon fSTRq.svg
BSicon fexSTRq.svg
BSicon ftSTRq.svg
Kolkata Metro (KM) standard gauge (1435 mm)
BSicon STRq brown.svg
BSicon exSTRq brown.svg
BSicon tSTRq brown.svg
narrow gauge (762 mm)

in use
BSicon exSTRq black.svg
out of use, planned, or
under construction (u/c)
BSicon STRq- grey.svg
tunnel
BSicon extSTRq black.svg

Sealdah South section consists of a set of four lines which connect Sealdah in Kolkata with its southern suburbs and with the entire South 24 Parganas district of West Bengal, India. It is a part of the Kolkata Suburban Railway and is under the jurisdiction of the Sealdah railway division of the Eastern Railway zone of Indian Railways. [1]

It is linked to the Sealdah Main and North section via the Kankurgachi Chord line at Park Circus and via the Kolkata Circular Railway at Majerhat Junction. [1]

It also connects to the Kolkata Dock System Railway (KDS Railway) at Majerhat and Brace Bridge respectively. [2]

Services

The Sealdah South section consists of four lines or four sub-sections: [3]

The section is primarily a suburban section with a total of 334 daily services and 288 Sunday services serving the four lines of the section. [4] A majority of the services are served by 12-car EMU rakes from the Sonarpur EMU Carshed. [5] There are many "Galloping local" services which only stop at the important stations of a line. [6] [7]

The Gangasagar mela, which attracts thousands of pilgrims during Makar Sankranti in mid-January, and is held in Sagar Island is approached through the Namkhana branch line of this section. Kakdwip and Namkhana railway stations serve as handy rail heads for travel to the 'mela'. Eastern Railway runs a lot of special trains for the 'mela' to cope with the increase in passenger traffic. [8] [9] [10] There also are special trains from New Delhi to Namkhana via Lucknow Junction and Allahabad Junction during 'mela'. [11]

Kolkata metro blue line station New Garia from rail station New garia metro & train station.jpg
Kolkata metro blue line station New Garia from rail station

Interchanges with the Circular line are available at stations at Park Circus, Ballygunge Junction, Lake Gardens, Tollygunge, New Alipore and Majerhat stations respectively. The New Garia Station serve as major interchange with the Blue Line and Orange Line of the Kolkata Metro [12] while Tollygunge, Sealdah and Majerhat serve as interchanges with Blue Line, Green Line and Purple Line respectively. [13] [14] A new metro line from New Garia to Baruipur has been proposed as well. [15] [16]

This section connects to the Kolkata Port, via the KDS Railway, from where major freight commodities like containers, coal and fertilizers are loaded and transferred throughout the Indian Railways network. [4]

History

Sealdah–Canning line

The Calcutta and South-Eastern Railway ( reporting mark :CSER) was formed in 1859 to connect Calcutta with Port Canning on the Matla River. It constructed and completed the 45 km (28 mi) long line on 15 May 1863. [17] [18] It was the first railway track on the eastern bank of the Hooghly River and ran from what was then the Beliaghata railway station (presently Sealdah South railway terminus) to Port Canning on the Matla River via Jadavpur and Sonarpur. [19] [20]

In 1868, CSER having suffered extensive losses due to floods and other problems, sold the line to the Indian government (management then being leased to the Eastern Bengal Railway ( reporting mark :EBR)) and the company was dissolved in March 1870. [19] [20] [21] Thus the line became a part of the Southern section of the Eastern Bengal Railway. [17] [18]

Post partition of India in 1947 and re-organisation of railway zones in 1952, the entire Southern section of Eastern Bengal Railway was amalgamated under the Sealdah division of Eastern Railway. [1]

Sonarpur–Diamond Harbour line

While multiple feasibility reports and proposals, beginning from 1839, were made for the construction of a railway line between Calcutta and Diamond Harbour, no action were taken on these. [22] [23] [24] [25] [26]

Finally in 1883, a 44 km (27 mi) branch line to Diamond Harbour via Baruipur and Magrahat was constructed from Sonarpur on the Sealdah–Canning line of the Eastern Bengal Railway. This line, from Sealdah to Diamond Harbour, then became the main line of the Southern section of the Eastern Bengal Railway. [17] [18] [19] [20]

A small 0.81 km (0.50 mi) branch line was constructed in 1883, from Diamond Harbour to Hara Fort near the Hooghly River to transport goods and military supplies as well. [17] [18] [27]

Ballygunge–Budge Budge line

The Budge Budge branch line was initially sanctioned in 1886 as a line to connect Ballygunge with the Kidderpore Docks. Sanction to an extension to Budge Budge was given in 1888 and the whole of 21 km (13 mi) long line from Ballygunge to Budge Budge via Majerhat was opened on 1890 by the Eastern Bengal Railway. [17] [18] [27]

The Calcutta Port Commissioners' Railway ( reporting mark :CPCR) built a branch line from Kidderpore Docks to Majerhat on 1893. It further constructed a branch line from the subsidiary marshaling yard at Brace Bridge to King George's Dock (renamed to Netaji Subhas Dock in 1973 [28] ) in 1928. [17] [18]

Baruipur–Lakshmikantapur–Namkhana line

British era wooden building of Baruipur station is still standing Brp station wooden building.jpg
British era wooden building of Baruipur station is still standing
The mosaic decoration at Baruipur stations shows invention of wheel and its usage at railway. Invention of wheel to railway.jpg
The mosaic decoration at Baruipur stations shows invention of wheel and its usage at railway.

In 1928, a 37 km (23 mi) long line from Baruipur on the Diamond Harbour branch line to Lakshmikantapur via Jaynagar Majilpur was constructed by the Eastern Bengal Railway and became a branch line of its Southern section. [17] [18]

In an effort to give access to remote areas and promote new growth areas, the 47 km (29 mi) long Lakshmikantapur–Namkhana line project was sanctioned in 1987-88 amongst other projects. [29] The line was extended up to Kulpi by 1992 and was completed till Kakdwip by 2001. [29] [30] [31] The Kakdwip–Namkhana section was completed by 2004. [32]

Kalighat–Falta Railway

The Kalighat–Falta Railway ( reporting mark :KFR) was a 40 km (25 mi) long narrow gauge (762 mm) railway line constructed by the Kalighat–Falta Railway Company, and operated as a part of McLeod's Light Railways, opening to traffic on 28 May 1917 from Gholeshapur (near Kalighat) to Falta. [17] [18] Gholeshapur was connected to Majerhat junction on the Eastern Bengal Railway on 1920. [17] [18] The railway line was closed on 1955 due to ever increasing losses. The tracks were dismantled and the land was reclaimed to build a road, now called James Long Sarani, in Behala. [19] [20]

Electrification

The Sealdah South section lines are fully electrified with 25 kV AC overhead system. The electrification process was started in 1965 from Sealdah to Lakshmikantapur line and the other lines in this division with the different phases and completed up to 1966 from that time the whole division is also fully electrified. [33]

EMU Carshed

The Sealdah South section is primarily served by all 12 Coach EMU rakes from the Sonarpur (SPR) EMU Carshed. [5] They are also served with a few 12 Coach EMU rakes from the Narkeldanga (NKG), Barasat (BT) and Ranaghat (RHA) EMU Carshed which comes to Sealdah South as North/Main to South Link Trains via Kolkata Circular Railway. [5]

While the section was initially served by the Narkeldanga EMU carshed which opened on 1963, a need for a dedicated EMU carshed for the section led to the construction of the Sonarpur EMU carshed in 1978. [5] This reduced the inconvenience faced by the overburdened Narkeldanga EMU Carshed. [5]

As of November 2021, the Sonarpur Carshed had 32 12 Coach EMU rakes which exclusively served the Sealdah South section. [5]

Routes and stations

Stations

Names in bold indicate that the station is a galloping train stop as well as important terminal station.

Sealdah–Diamond Harbour line

Sealdah–Diamond Harbour line
Sl No.Distance from
Sealdah South (km)
Station nameStation codeConnections Station category [34] District
10 Sealdah South SDAH Sealdah Main and North section / Kolkata Metro Green Line (Sealdah metro station)NSG-1 Kolkata
23 Park Circus PQS Circular line SG-3
36 Ballygunge Junction BLN Circular line / Budge Budge branch line SG-3
47 Dhakuria DHKSG-3
58 Jadabpur JDPSG-3
610 Baghajatin BGJTSG-3
712 New Garia NGRI Kolkata Metro Blue Line & Kolkata Metro Orange Line (Kavi Subhash)SG-3
813 Garia GIASG-3 South 24 Parganas
915 Narendrapur NRPRHG-3
1017 Sonarpur Junction SPR Canning branch line SG-2
1120 Subhasgram SBGRSG-2
1222 Mallikpur MAKSG-3
1325 Baruipur Junction BRP Namkhana branch line SG-2
1428 Kalyanpur KYPSG-3
1530 Dakshin Durgapur DKDPSG-3
1632 Hotar HTSG-3
1734 Dhamua DMUSG-3
1837 Uttar Radhanagar UTNHG-3
1940 Magra Hat MGTSG-3
2043 Bahirpuya Halt BHPAHG-3
2145 Sangrampur SNUSG-3
2250 Deula DSG-3
2353 Netra NTASG-3
2455 Basuldanga BSDSG-3
2557 Gurudas Nagar GURNSG-3
2660 Diamond Harbour DHSG-3

Budge Budge branch line

Budge Budge branch line
#Distance from
Ballygunge (km)
Station nameStation codeConnections Station category [34] District
10 Ballygunge Junction BLN Sealdah–Diamond Harbour line / Circular line SG-3 Kolkata
22 Lake Gardens LKF Circular line SG-3
33 Tollygunge TLG Circular line / Kolkata Metro Blue Line (Rabindra Sarobar)SG-3
44 New Alipore NACC Circular line SG-3
56 Majerhat MJT Circular line / Kolkata Metro Purple Line (Majerhat metro station)SG-3
68 Brace Bridge BRJSG-3
711 Santoshpur SSPSG-3 South 24 Parganas
813 Akra AKRASG-3
917 Nangi NAISG-3
1019 Komagata Maru Budge Budge KBGBSG-3
† – Branch line starts at Ballygunge Junction

Canning branch line

Canning branch line
#Distance from
Sonarpur (km)
Station nameStation codeConnections Station category [34] District
10 Sonarpur Junction SPR Sealdah–Diamond Harbour line SG-2 South 24 Parganas
23 Bidyadharpur BDYPSG-3
36 Kalikapur KLKRSG-3
47 Champahati CHTSG-3
510 Piali PLFSG-3
612 Gourdaha GQDHG-3
715 Ghutiari Sharif GOFSG-3
818 Betberia Ghola BTPGHG-3
922 Taldi TLXSG-3
1025 Matla Halt MATLHG-3
1128 Canning CGSG-3
† – Branch line starts at Sonarpur Junction

Namkhana branch line

Namkhana branch line
#Distance from
Baruipur (km)
Station nameStation codeConnections Station category [34] District
10 Baruipur Junction BRP Sealdah–Diamond Harbour line SG-2 South 24 Parganas
22 Shasan Road SSRDSG-3
35 Krishna Mohan KRXMHG-3
47 Dhapdhapi DPDPSG-3
59 Surjyapur SJPRSG-3
611 Gocharan GCNSG-3
714 Hogla HGAHG-3
817 Dakshin Barasat DBTSG-3
920 Baharu BARUSG-3
1025 Jaynagar Majilpur JNMSG-3
1129 Mathurapur Road MPRDSG-3
1234 Madhabpur MDBPHG-3
1337 Lakshmikantapur LKPRSG-3
1442 Udairampur URPHG-3
1546 Kulpi KLWHG-3
1651 Karanjali KNJIHG-3
1757 Nischintapur Market NCPMHG-3
1859 Nischintapur NCPHG-3
1963 Madhabnagar MDGBHG-3
2067 Kashinagar KHGRSG-3
2170 Kakdwip KWDPSG-3
2278 Ukilerhat UKLRHG-3
2385 Namkhana NMKASG-3
† – Branch line starts at Baruipur Junction

Planned extensions

Multiple new lines and extensions on this section have been planned by the Eastern Railway; however, most remain blocked due to land issues. [35] [36]

Budge Budge–Pujali–Uluberia (Birshibpur) line

The 11 km (6.8 mi) long Budge Budge–Pujali line was sanctioned in the railway budget on 2009-10 while a 10.25 km (6.37 mi) extension from Pujali to Birshibpur near Uluberia on the Howrah–Kharagpur line was sanctioned in 2011-12. [35] [37] Once completed this will connect the South Eastern Railway network under Kharagpur division directly with the Majerhat station in the Sealdah South section of the Eastern Railway via a bridge over the Hooghly river. [38] As of 2021, work could not be started on this extension due to non-availability of land and as such the project had been kept under abeyance. [35]

Kalikapur–Ghatakpukur–Minakhan line

In the 2011-12 railway budget, a 38 km (24 mi) long line from Kalikapur on the Canning branch line to Minakhan via Ghatakpukur was sanctioned. [36] [37] However, work could not be started on this extension due to non-availability of land and as such the project had been kept under abeyance as of 2021. [36]

Canning–Jharkhali extension

A 4.84 km (3.01 mi) extension from Canning to Bhangankhali was sanctioned in the 2009-10 railway budget with a railway bridge proposed over the Matla river. [39] [40] [37] In 2011-12 this line was further proposed to be extended by 14.3 km (8.9 mi) to Basanti from where another extension of 23 km (14 mi) to Jharkhali was planned to be taken up. [39] However, work could not be started on this extension due to non-availability of land and as such the project had been kept under abeyance as of 2021. [36]

Planned branches to Raidighi and Durgapur

The 20 km (12 mi) long Jaynagar MajilpurRaidighi line via Krishnachandrapur was sanctioned in 2009-10. [37] [40] In 2011-12 railway budget, a 25 km (16 mi) long new line from Sangrampur on the Sealdah–Diamond Harbour line to Krishnachandrapur was sanctioned along with a 32 km (20 mi) new line from Jaynagar Majilpur to Durgapur. [37] However, work could not be started on this extension due to non-availability of land and as such the project had been kept under abeyance as of 2021. [36]

Namkhana–Chandranagar–Bakkhali extension

The Namkhana branch line was sanctioned to be extended by 14 km (8.7 mi) to Chandranagar in 2009-10 and then by 17.2 km (10.7 mi) km to Bakkhali in 2011-12. [37] [40] However, work could not be started on this extension due to non-availability of land and as such the project had been kept under abeyance as of 2021. [36] [41]

Dankuni–Sagar Island rail line

While there have been multiple proposals to build a railway line to Sagar Island, none have been constructed yet. In 2017, a preliminary survey for a 138 km (86 mi) long line was sanctioned by the Indian Railways in order to boost connectivity between Dankuni and the proposed deep sea port at Sagar Island. [42] The below sections are supposed to be a part of the line if built: [42] [43]

References

  1. 1 2 3 Brief Detail of Sealdah Division Archived 25 June 2018 at the Wayback Machine , Eastern Railway
  2. "Railway Facilities - Syama Prasad Mookherjee Port Trust, Kolkata" . Retrieved 9 November 2021.
  3. "Sealdah Division System map" (PDF). Retrieved 1 December 2021.
  4. 1 2 "Details of Operating Department: Sealdah Division, Eastern Railway" . Retrieved 30 November 2021.
  5. 1 2 3 4 5 6 "Highlights of TRS Organisation, Sealdah division, Eastern Railway" . Retrieved 30 November 2021.
  6. "West Bengal local train services to resume from Nov 11". The Economic Times. Retrieved 30 November 2021.
  7. "Indian Railways suburban train services in West Bengal to resume from November 11". Financial Express. Retrieved 30 November 2021.
  8. "ER TO RUN SPECIAL TRAINS FOR GANGASAGAR MELA, 2015". Eastern Railway. Retrieved 30 November 2021.
  9. "GM/ER INSPECTED SPECIAL ARRANGEMENTS FOR THE PILGRIMS OF GANGASAGAR MELA AT SEALDAH STATION". Eastern Railway. Retrieved 30 November 2021.
  10. "गंगा सागर मेला के लिए 7 जनवरी से 15 जनवरी तक चलेगी स्पेशल ट्रेन". Prabhat Khabar (in Hindi). Retrieved 30 November 2021.
  11. "Sagar trains". Calcutta, India: The Telegraph, 30 November 2009. 30 November 2009. Archived from the original on 3 December 2009. Retrieved 10 February 2012.
  12. "SEALDAH DIVISION – AN OVERVIEW". Eastern Railway. Retrieved 1 December 2021.
  13. "One stn joins 3 railway modes to make Majerhat the latest boom zone in Kol". The Times of India. 6 March 2024. ISSN   0971-8257 . Retrieved 9 May 2024.
  14. Service, Statesman News (17 July 2022). "E-W Metro sees 10-fold increase in footfall in 2 days". The Statesman. Retrieved 9 May 2024.
  15. "Metro links may go the extra mile". The Telegraph. 4 December 2017. Retrieved 1 December 2021.
  16. "Kolkata: Rs 103 crore tender boost for New Garia Metro". The Times of India. Retrieved 1 December 2021.
  17. 1 2 3 4 5 6 7 8 9 "History Of Indian Railways, constructed and in progress', 31 March 1937 by 'The Government of India - Railway Department'" . Retrieved 28 November 2021.
  18. 1 2 3 4 5 6 7 8 9 "Administration Report on Railways 1918" . Retrieved 28 November 2021.
  19. 1 2 3 4 "Indian Railway History Time line". Indian Railways. Archived from the original on 14 July 2012. Retrieved 10 February 2012.
  20. 1 2 3 4 "The Chronology of Railway development in Eastern Indian". railindia. Archived from the original on 2 August 2012. Retrieved 10 February 2012.
  21. "H.M. Government "Statute Law Repeals: Nineteenth Report : Draft Statute Law (Repeals) Bill; April 2012" (PDF). Retrieved 28 November 2021.
  22. Google Books ‘Herapath's Railway Journal’, Volume 6 March 1839, pages 169-172;Retrieved 5 March 2018
  23. “Allen's Indian Mail” Vol 3 Jan-Dec 1945 Page 608 ; Retrieved 12 November 2016
  24. British Library ‘India Office Records’ IOR/E/4/819 Page 227
  25. Google Books ‘The Calcutta Review, no XIV, Volume 7’ Jan-June 1847. "OUR INDIAN RAILWAYS” Article II, pages 362 to 366; by the Editors of the ‘Calcutta Review’, Calcutta 1847; Retrieved 25 March 2018
  26. British Library ‘India Office Records’ IOR/E/4/819, pp229-231 “Docks and Harbours, Diamond Harbour, Scheme for railway communication with Calcutta”, 1852,53
  27. 1 2 "Bengal District Gazetteers: 24-Parganas" – page 168 by Lewis Sydney Steward O'Malley,I.C.S;Retrieved 10 December 2015
  28. "Explained: The significance of the Kolkata port, renamed by PM Modi". The Indian Express. 13 January 2020. Retrieved 16 June 2020.
  29. 1 2 "STANDING COMMIlTEE ON RAILWAYS (1993-94) TENTH LOK SABHA MINISTRY OF RAILWAYS FOURTH REPORT" (PDF). Retrieved 29 November 2021.
  30. "Travel: A Great Escape". The Statesman, 13 June 2006. Archived from the original on 14 June 2012. Retrieved 29 November 2021.
  31. "Speech of Kumari Mamata Banerjee Introducing the Railway Budget for 2001-02, on 26th February 2001" (PDF). Retrieved 29 November 2021.
  32. "Speech of Shri Lalu Prasad Introducing the Railway Budget, for 2004-05, on 6th July, 2004" (PDF). Retrieved 29 November 2021.
  33. "History of Electrification". IRFCA. Archived from the original on 19 October 2013. Retrieved 4 May 2013.
  34. 1 2 3 4 "Category of stations - Eastern Railway" (PDF). Retrieved 24 December 2021.
  35. 1 2 3 4 5 "Project Summary - EASTERN RAILWAYS, NEW ALIPUR TO AKRA, MM FOR BUDGE BUDGE-PUJALI NL, PUJALI-ULUBERIA(BIRSHIVPUR) AND PUJALI-BAKRAHAT NL". Ministry of Statistic and Programme Implementation. Retrieved 1 December 2021.
  36. 1 2 3 4 5 6 7 8 9 "Project Summary - Eastern Railway, SONARPUR-CANNING WITH NEW MM FOR KALIKAPUR-MINAKHAN VIA GHATAKPUR NL". Ministry of Statistics and Implementation. Retrieved 1 December 2021.
  37. 1 2 3 4 5 6 "EASTERN RAILWAY (CONSTRUCTION ORGANISATION) ONGOING PROJECTS ON NEW LINES, GAUGE CONVERSION AND DOUBLING, POSITION AS ON 01.04.2020" (PDF). Eastern Railway. Retrieved 1 December 2021.
  38. "Rs 12K-cr projects to improve city railway". The Times of India. Retrieved 1 December 2021.
  39. 1 2 "Rail link to tiger territory". Kolkata, India: The Telegraph. 15 November 2009. Archived from the original on 19 December 2009. Retrieved 30 November 2021.
  40. 1 2 3 "Sunderbans rail link on track". The Times of India. 15 November 2009. Retrieved 1 December 2021.
  41. New Projects, Eastern Railway, 29 November 2018
  42. 1 2 "Railway ministry sanctions preliminary survey for rail line". The Economic Times. Retrieved 1 December 2021.
  43. 1 2 Gupta, Jayanta (23 June 2011). "Land reclaim for Sagar port soon". The Times of India. Retrieved 10 August 2020.