V250 / ETR.700 | |
---|---|
In service | 29 July 2012-17 January 2013 (High Speed Alliance) 9 June 2019- (Trenitalia) |
Manufacturer | AnsaldoBreda |
Built at | Pistoia |
Constructed | 2004-2011 |
Refurbished | 2019 (into ETR 700) |
Number built | 19 |
Number in service | 4 (June 2019) |
Formation | mAk+AD+mAB+B+ B+mB+B+mBk |
Fleet numbers | 4801-4816, 4881-4883 |
Capacity | 546 [1] 127 first, 419 second class [2] |
Operator(s) | High Speed Alliance Trenitalia |
Depot(s) | Amsterdam Watergraafsmeer |
Line(s) served | HSL-Zuid HSL 4 SNCB line 25 Adriatic railway |
Specifications | |
Train length | 200,900 mm (659 ft 1 in) [1] |
Car length | driving cars 26,950 mm (88 ft 5 in) [3] intermediate cars24,500 mm (80 ft 4+5⁄8 in) [3] |
Width | 2,870 mm (9 ft 5 in) [1] |
Height | 4,080 mm (13 ft 4+5⁄8 in) [1] |
Floor height | 1,260 mm (4 ft 1+5⁄8 in) [1] |
Doors | 24 |
Articulated sections | 8 |
Maximum speed | 250 km/h (160 mph) [1] |
Weight | 423 t (416 long tons; 466 short tons) [2] full loaded service weight 485 t (477 long tons; 535 short tons) [1] |
Power output | 5,500 kW (7,400 hp) [1] |
Acceleration | 0.58 m/s2 (2.1 km/(h⋅s); 1.9 ft/s2) max [1] |
Deceleration | 1.2 m/s2 (4.3 km/(h⋅s); 3.9 ft/s2) max [1] |
Electric system(s) | 25 kV AC, 3 kV DC, 1.5 kV DC [1] Catenary |
Safety system(s) | TVM , BAcc/SCM[ citation needed ] ETCS Level 2 [1] |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge |
The Transitalia ETR 700, originally NS Hispeed V250, is a high-speed train designed by Pininfarina and built by AnsaldoBreda originally for NS International and NMBS/SNCB to operate on the Fyra-service, a high speed train between Amsterdam and Brussels with a branch to Breda on the newly built HSL-Zuid in the Netherlands and its extension HSL 4 in Belgium.
V250s were delivered with a significant delay. Full commercial services with V250 started on 9 December 2012 but stopped only 39 days later on 17 January 2013, after the Belgian Railway Inspection Agency had suspended the operating license. This happened because of safety and structural problems with the construction and maintenance of V250. All were removed from service and sent back to AnsaldoBreda in Italy.
In August 2017, Trenitalia purchased all 19 V250 sets to expand its high speed fleet and rebranded them as ETR700s. After being refurbished, they entered service on Frecciargento services, on the Adriatic railway, between Milan and Lecce in 2019. Seventeen sets will be used for services, with the remaining two used as sources of spares.
NS International and NMBS/SNCB ordered 19 sets in 2004 [2] for operations between Amsterdam and Brussels and Breda on the HSL-Zuid and HSL 4 high speed railway lines. [3] Initially delivery was foreseen for 2007. [4] In 2008 expectations were for deliveries by 2009 and an introduction into service by the middle of 2009. [5]
The first sets had been manufactured by March 2009, and initial tests on the Velim test circuit in the Czech Republic took place in early 2009, [2] In April 2009 the first unit arrived in Arnhem in the Netherlands, and was towed to Amsterdam for tests. [6]
The NS International had claimed that the delay of introduction of any trains was due to the lack of a formal ETCS level 2 specification; by March HSA was close to financial ruin due to lack of any income, and a re-organisation of track access charges for the unused HSL-Zuid line had to be arranged with the Dutch government. [7]
The service, branded Fyra , was introduced along with the formal presentation of the prototype V250 train at the high speed train depot at Watergraafsmeer in the Netherlands on 7 July 2009. [3] The unfurnished prototype underwent testing on both high speed lines, with the ordered trains' expected in-service date of Autumn 2010; [3] [8] introduction of any service on the HSL-Zuid had been delayed due to problems with the introduction of the ETCS signalling system; the line had been built without any legacy safety system. [5] Services on the line began in September 2009 with conventional locomotive haulage, but the introduction of level 2 ETCS on the whole line was not in place, and expected by June 2010. [8]
In 2010, the Dutch transport minister Camiel Eurlings stated that any introduction of a commercial V250 service on Dutch high speed lines would not take place until December 2011. [9] Driver training on high-speed lines in the Netherlands began in March 2012, [10] with commercial use of the V250 planned for September 2012. [11]
A limited service of one return train per 3 hours in the Netherlands began in September 2012 between Amsterdam and Rotterdam. [12] [13]
The trains were provisionally certified for use in Belgium in September 2012. [13] [14]
Regular Fyra service between Amsterdam and Brussels with V250 trains began on 9 December 2012.
Following their introduction, the V250 trains experienced numerous technical problems. All V250s were suspended from commercial service on 16 January 2013, after only one month of service, due to reliability and safety concerns in snowy weather. [15] Two days later the certification for the V250 in Belgium was revoked after a floor plate that had fallen off a V250 was found along the tracks. [16]
The continuous problems with the V250 trains caused a public outcry in both Belgium and the Netherlands, including accusations in the Belgian and Dutch media that only financial considerations were behind the decision to grant the contract to AnsaldoBreda. Initially, the maximum speed requirements were fixed at 220 km/h, which would have reduced the purchase cost per seat drastically. However, after comparing offers by Alstom (manufacturers of the French TGV) and Siemens (who manufacture the German ICE trains) with that of AnsaldoBreda, it transpired that the Italian producer was able to offer a cheaper train with a higher speed of 250 km/h, which ultimately gave the Italian company the edge. [17]
On 31 May 2013, the Belgian railway company NMBS/SNCB decided to stop the Fyra project, due to the many technical issues, and safety concerns. No trains had been delivered and the company refused delivery of the trains it had ordered, on grounds that the manufacturer was unable to resolve any of the numerous issues in the contractually foreseen 3 months. [18]
On 3 June 2013, the Dutch national railway company NS announced that it had made a similar evaluation, and expressed its desire to stop with the V250 project. [19] [20] The Dutch department of finance agreed, and recommended that NS do "everything in its power" to get a refund from AnsaldoBreda. [21] At a press conference on 6 June 2013, the manufacturer claimed that the trains had been handled poorly by running the trains too fast (i.e. at maximum commercial speed of 250 km/h) under snow conditions. AnsaldoBreda has also threatened to sue the railways for the damage to its reputation. [22] [23]
On 17 March 2014, NS announced a settlement with AnsaldoBreda had been reached. The 9 NS trains would be returned to AnsaldoBreda for a refund of €125 million, €88m less than originally paid. NS would receive an additional compensation for each resold unit to a maximum of €21m, [24] although no units have been sold by the NS.
Similarly, in May 2014 NMBS/SNCB, AnsaldoBreda and its controlling company Finmeccanica announced that they reached a settlement that confirms the cancellation of the train orders and included a payment of €2.5m to NMBS/SNCB. [25]
In August 2017, Trenitalia purchased all 19 V250 sets to expand its high speed fleet and rebranded them as ETR700s. Seventeen sets will be used for services, with the remaining two used as sources of spares. [26] [27] [28] Testing began in February 2019. [29] The first four entered on 9 June 2019 on Frecciargento services on the Adriatic railway between Milan and Ancona with all to be in service by early 2020 with services extended to Lecce. [30]
The 8-car sets are designed to operate on 3 kV DC, 1.5 kV DC and 25 kV 50 Hz AC overhead power supply, allowing operations on both Dutch and Belgian electrified networks. Traction is distributed with alternating powered and trailer vehicles in MTMTTMTM formation. [n 1] Electric traction power is controlled by water-cooled IGBT inverters powering asynchronous motors. They are fitted with ETCS Level 2 and local train safety systems. [1]
The carbodies are constructed of aluminium, except the driving cab which is of steel. [1] Three of the coaches are used for first class accommodation, giving 127 first class seats out of a total seated capacity of 546. [2] First class seating is in [2+1] formation, second in [2+2] formation. [1] The design company Pininfarina also contributed to the design. [31]
Thalys is a French-Belgian high-speed train operator originally built around the LGV Nord high-speed line between Paris and Brussels. This track is shared with Eurostar trains that go from Paris, Brussels or Amsterdam to London via Lille and the Channel Tunnel and with French domestic TGV trains. Thalys also serves Amsterdam and Cologne.
Nederlandse Spoorwegen is a Dutch company, the principal passenger railway operator in the Netherlands. Founded in 1938, NS provides rail services on the Dutch main rail network. The Dutch rail network is the busiest in the European Union, and third busiest in the world after Switzerland and Japan.
The National Railway Company of Belgium is the national railway company of Belgium. The company formally styles itself using the Dutch and French abbreviations NMBS/SNCB. The corporate logo designed in 1936 by Henry van de Velde consists of the linguistically neutral letter B in a horizontal oval.
Trenitalia is the primary train operator in Italy. A subsidiary of Ferrovie dello Stato Italiane, itself owned by the Italian government, the company was established in 2000 following a European Union directive on the deregulation of rail transport.
Hitachi Rail Italy S.p.A. is a multinational rolling stock manufacturer company based in Pistoia, Italy. Formerly AnsaldoBreda S.p.A., a subsidiary of state-owned Finmeccanica, the company was sold in 2015 to Hitachi Rail of Japan. After the deal was finalized, the current name was adapted in November 2015 to reflect the new ownership.
The HSL-Zuid, is a 125 kilometre-long Dutch high-speed railway line running between the Amsterdam metropolitan area and the Belgian border, with a branch to Breda, North Brabant. Together with the Belgian HSL 4 it forms the Schiphol–Antwerp high-speed railway. Originally scheduled to be in service by 2007, the first public operations began on 7 September 2009, after a ceremony on 6 September.
NS International, formerly NS Hispeed, is the rail operator in the Netherlands that operates international inter-city and high-speed train connections to Belgium, France (Thalys), Germany and Switzerland.
Belgium's high-speed rail network provides mostly international connections from Brussels to France, Germany and The Netherlands. The high-speed network began with the opening of the HSL 1 to France in 1997, and since then high-speed lines have been extended towards Germany with HSL 2 in 2002, HSL 3 from Liège to the German border in 2009, and HSL 4 from Antwerp to the Dutch border in 2009.
Rail transport in the Netherlands uses a dense railway network which connects nearly all major towns and cities. There are as many train stations as there are municipalities in the Netherlands. The network totals 3,223 route km on 6,830 kilometres of track; a line may run both ways, or two lines may run on major routes. Three-quarters of the lines have been electrified.
Roosendaal is a railway station in the city of Roosendaal, Netherlands. The station opened on 3 July 1854 on the Antwerp–Lage Zwaluwe railway and is the beginning of the Roosendaal–Vlissingen railway. Roosendaal was the first station in North Brabant to be built. Roosendaal is also a border station between the Netherlands and Belgium. Trains in Belgium run on the left side of double-track whereas in the Netherlands right-hand running is the norm. At some borders, the changeover is achieved by using a flyover, but at Roosendaal trains stop and await a signal to allow them to proceed to the opposite track.
Breda railway station is a railway station in Breda in North Brabant, Netherlands. It is situated on the Breda–Rotterdam railway, the Roosendaal–Breda railway and the Breda–Eindhoven railway.
Fyra was an international high-speed rail service between the Netherlands and Belgium using the AnsaldoBreda V250 train. The service used the HSL-Zuid and HSL 4 railway lines to connect Amsterdam, Schiphol Airport, Rotterdam, Antwerp and Brussels. Continuous technical difficulties suspended the service, and it was eventually permanently halted due to reliability and safety concerns.
High-speed rail service in the Netherlands started at 13 December 2009 with the dedicated HSL-Zuid line that connects the Randstad via Brussels to the European high-speed rail network. In later years improved traditional rail sections were added to the high-speed network. Proposals for more dedicated high-speed lines were deemed too costly; plans for the HSL-Oost to Germany were mothballed and instead of the Zuiderzeelijn the less ambitious Hanzelijn was built to enable future high-speed service between the northern provinces and the Randstad.
Bombardier Zefiro is a family of high-speed passenger trains designed by Bombardier Transportation whose variants have top operating speeds of between 250 km/h (160 mph) ; 380 km/h (240 mph) and 400 km/h (250 mph).
Infraspeed is the builder and infrastructure maintenance company of the HSL-Zuid high-speed line in the Netherlands.
The Frecciarossa 1000, also known as the ETR 1000, is a high-speed train operated by Italian state railway operator Trenitalia. It was co-developed as a joint venture between Italian rail manufacturer Hitachi Rail Italy and multinational conglomerate Alstom. Both design and production work were divided between the two partner companies.
The Lage Landen Lijn was a proposed international rail service between The Hague and Brussels, which was to be introduced on 15 December 2013.
Intercity Direct is a Dutch higher-speed train service operating on the HSL-Zuid, connecting Amsterdam Centraal to Schiphol Airport, Rotterdam Centraal and Breda. Intercity Direct replaced the Fyra brand as of December 2013; it is part of NS International.
The NS Class 186 is a type of B-B electric locomotive built by Bombardier Transportation between 2006 and 2014. It is a member of the Bombardier TRAXX family of locomotives, the Bombardier TRAXX F140 MS2 variant.
The Intercity Nieuwe Generatie, or ICNG is an electric multiple unit trainset planned to be operated by Nederlandse Spoorwegen for high-speed intercity services in the Netherlands and Belgium. It is built by Alstom based on their Coradia Stream platform.
Wikimedia Commons has media related to V250 . |