Framingham station

Last updated

Framingham
Framingham Station overview.jpg
Framingham station in September 2024
General information
Location417 Waverly Street
Framingham, Massachusetts
United States
Coordinates 42°16′35″N71°25′6″W / 42.27639°N 71.41833°W / 42.27639; -71.41833
Owned by Massachusetts Bay Transportation Authority
Line(s) Worcester Main Line
Platforms2 side platforms
Tracks2
ConnectionsAiga bus trans.svg MWRTA: 2, 3, 4, 5, 6, 7, 9
Aiga bus trans.svg Greyhound
Construction
Parking166 spaces
Bicycle facilities10 spaces
AccessibleYes
Other information
Station code Amtrak: FRA
Fare zone5 (MBTA)
History
Opened1834
Rebuilt1848, 1885, 2001
Previous namesSouth Framingham (until January 8, 1915) [1]
Passengers
FY 20232,144 annual boardings and alightings [2] (Amtrak)
Preceding station BSicon LOGO Amtrak2.svg Amtrak Following station
Worcester
toward Chicago
Lake Shore Limited Boston Back Bay
toward Boston South
Preceding station MBTA.svg MBTA Following station
Ashland
toward Worcester
Framingham/​Worcester Line West Natick
Former services
Preceding station New York Central Railroad Following station
Ashland
toward Albany
Boston and Albany Railroad
Main Line
Natick
toward Boston
Whitneys
toward Milford
Milford Branch Terminus
Preceding station New York, New Haven and Hartford Railroad Following station
Montwait
toward Fitchburg
Agricultural Branch Terminus
Montwait
toward Lowell
Framingham–Lowell
Terminus Framingham–Mansfield Sherborn
toward Mansfield
Framingham Railroad Station
U.S. National Register of Historic Places
FraminghamRailroadStation.jpg
Framingham station in 1959
Framingham station Built1885Architect H. H. Richardson Architectural style Richardsonian Romanesque NRHP reference No. 75000258 [4] Added to NRHPJanuary 17, 1975

Framingham station is a historic Boston and Albany Railroad station located in downtown Framingham, Massachusetts. Designed by noted American architect H. H. Richardson, it was one of the last of the railroad stations he designed in the northeastern United States to be built. The station, built in 1884–85, served as a major stop on the B&A Main Line as well as a hub for branch lines to Milford, Mansfield, Fitchburg, and Lowell. After years of deterioration, the station was listed on the National Register of Historic Places in 1975 as the Framingham Railroad Station, and restored a decade later. [4]

Contents

In 2001, MBTA Framingham/Worcester Line and Amtrak operations were shifted to a new set of platforms nearby, which have high-level sections for handicapped-accessible boarding and a footbridge for crossing the tracks. This new station is among the busiest on the MBTA system, with 41 daily MBTA and 2 Amtrak trains on weekdays. The H. H. Richardson-designed station building remains largely intact and is currently used as a restaurant.

History

Boston and Worcester Railroad

The 1848-built station seen in 1861 South Framingham station circa 1861.jpg
The 1848-built station seen in 1861

The Boston and Worcester Railroad, which had opened from Boston to Newton in April 1834, opened to South Framingham in August 1834. [5] The village's first major station, a 2-story wooden Dutch Colonial structure, was constructed in 1848. [6] After being replaced, it was moved slightly west and converted to a freight house – a function it served until it was demolished in the 1960s. [6]

Over the next several decades, South Framingham became an important regional rail hub. The Boston and Worcester built its 12-mile Milford Branch from South Framingham to Milford via Holliston in 1848. [5] The next year, the B&W built a short branch to Framingham Center, which the B&W mainline had bypassed. This line, later called the Agricultural Branch Railroad, was realigned near Framingham Center and extended to Pratts Junction in Sterling in 1855. Franklin Street was built on the former branch right of way. The Agricultural branch and the Framingham & Lowell (which branched off it at Framingham Center) were the northernmost section of the Old Colony Railroad, which took over the lines in 1879. [5] The Old Colony built a new freight house in 1883. [7]

The Old Colony's access to South Framingham was the Mansfield & Framingham, which opened in 1870 and was also acquired in 1879. [5] By the time of the Old Colony takeover, South Framingham featured the 1848-built station, a freight house, a car house, and three separate engine houses serving the various branch lines. Through service on the mainline operated as far as Albany; the B&W had joined with the Western Railroad in 1867 to become the Boston and Albany Railroad. [5] Framingham began to be used occasionally as a short turn terminus for Boston-bound commuter trains in the early 1860s and continuously as such after 1864. [8] As of August 2015, a small number of Framingham/Worcester Line trains are short-turned at Framingham. [9]

H. H. Richardson depot

The new station under construction in 1885 Framingham Railroad Station under construction.jpg
The new station under construction in 1885

Beginning in 1881, the Boston & Albany began a massive improvement program that included the building of over 30 new stations along its main line as well as the Highland branch, which it bought in 1883. Famed architect H. H. Richardson was hired to design nine of these stations, including South Framingham which was commissioned in October 1883. [10] The $62,718 station, built in 1884–85 by the Norcross Brothers company, was the largest and costliest of the nine. [6] The station is a prime example of the Richardsonian Romanesque style, built of rough-hewn granite with contrasting details. The dominant roofline, dormers, arched bow window, and wooden interior are typical of the style. Like many of Richardson's designs, the station was well-praised; Henry-Russell Hitchcock called it a "better and somewhat more personal work" in The Architecture of H. H. Richardson and His Time. [10] A small square baggage room was built in the same style just east of the station, near the Concord Street (Route 126) grade crossing. [6]

The station's importance remained through the first half of the 20th century. After the Boston & Albany was acquired by the New York Central Railroad in 1900, third and fourth tracks were extended in 1907 to South Framingham from Lake Crossing station in Wellesley. [5] In 1911, the NYC considered laying third rail on the main line as far as South Framingham, as well as on the Highland branch, to allow more frequent electric service on the lines. This would have been the only electrified commuter service directly into Boston, as neither the later-electrified Boston, Revere Beach and Lynn Railroad nor experimental electric service on the South Shore Railroad went directly to downtown. However, the plan was abandoned because the infrastructure cost would have exceeded the annual savings on fuel. [11] (In 1959, the Highland branch received catenary wire and was turned into the Green Line D branch).

Due in no small part to the presence of the station, South Framingham eclipsed Framingham Center in size; on January 8, 1915, the station was renamed Framingham. [1] Traffic on the B&A and its various branch lines, though, decreased after World War I. In 1919, Agricultural branch trains were cut to Framingham, requiring a transfer to continue Boston or Mansfield. The line was cut back to Marlborough in 1931, and passenger service ended in 1937. [8] Passenger service on the Mansfield & Framingham ended in 1933. [5] The Milford Branch lasted the longest of the Boston & Albany branch lines; it was cut to one daily trip in 1953 and terminated in April 1959. [8]

MBTA era

An MBTA train at Framingham in 1977 MBTA train at Framingham 1977.jpg
An MBTA train at Framingham in 1977

In January 1960, the New York Central planned to end all service on the line, due to the opening of the Green Line D branch to Riverside in July 1959. However, that April, following public outcry over the planned discontinuation of service, the railroad was ordered to continue limited service, leaving Framingham with 8 daily round trips. [8] When the extension of the Massachusetts Turnpike to downtown Boston began in 1961, the third and fourth tracks were removed. The NYC merged into Penn Central in 1968; by 1969, Framingham saw just 4 daily round trips. [8]

The MBTA began subsidizing service as far as Framingham in January 1973; the last Worcester round trip ended on October 27, 1975, leaving Framingham as the terminus of the line. [12] [8] The modern Amtrak Lake Shore Limited was established 4 days later, and has provided intercity service via Framingham ever since. [8] From 1996 until their 2004 discontinuation, Amtrak Inland Route trains also stopped at Framingham. [13] [14]

By the 1970s, the station had fallen into disrepair; part of the roof collapsed in 1978. [6] On January 17, 1975, the building was added to the National Register of Historic Places as Framingham Railroad Station. [4] The building was restored in 1985, and has been occupied by various restaurants since. [6] The original interior is no longer extant, but the exterior is mostly complete. The small baggage office east of the station building has been converted into a bank ATM. [6]

When the Needham Line was closed in October 1979 for Southwest Corridor construction, service on the Framingham line was increased considerably as partial compensation. [12] [8] By April 1984, the MBTA operated 12.5 daily round trips from Framingham. [8] Service was restored to Worcester on September 26, 1994, as mitigation for delays in reopening the Old Colony Lines (the first two of which finally opened in September 1997) – the first time in 19 years that commuter rail service extended beyond Framingham.

New station

2001-built accessible mini-high platforms and fence to prevent pedestrians from crossing the tracks Framingham station outbound mini-high platform, January 2015.JPG
2001-built accessible mini-high platforms and fence to prevent pedestrians from crossing the tracks

The Americans with Disabilities Act of 1990 mandated that all new construction on transit stations including making the stations handicapped accessible. Because the 1885 depot is very close to the tracks, such upgrades at the old station location would have been difficult. Construction of accessible platforms and expanded parking was originally approved by the MBTA Board in May 1992. [15] New platforms, with mini-high platforms on their west ends for level boarding, were built just west of the former station. A footbridge with two elevators was built to allow passengers to reach the outbound platform without crossing the tracks, which carry slow-moving CSX freight service as well as MBTA and Amtrak trains. [16] The new platforms opened in early 2001, but the elevators were not yet open by that July. [17]

Framingham currently sees 21 weekday MBTA round trips to Boston, with 8 to 9 round trips on weekends. [9] [18] On weekdays, Framingham is the only station west of Lansdowne station at which all trains stop. Most trains run to/from Worcester, but some terminate at Framingham instead. [9] Average weekday ridership is 1,130 passengers, making Framingham the second-busiest station on the line outside Boston (after Worcester). [3] Framingham also has Amtrak intercity service via the daily Lake Shore Limited , which runs to Chicago's Union Station via Albany–Rensselaer.

In October 2016, the MetroWest Regional Transit Authority (MWRTA) took over management of the station from the MBTA under a lease agreement. The agreement relieves the MBTA from the cost of maintaining the station, while allowing the MWRTA to use parking revenue to construct bus shelters and additional parking areas. [18] An additional parking lot was opened inside the wye on the north side of the station in August 2017. [19]

Other Framingham stations

Map of current and former railroad stations in and around Framingham Framingham stations map.svg
Map of current and former railroad stations in and around Framingham

Besides the main depot at the South Framingham junction, six other stations have been located in Framingham. The Agricultural Branch included three of these stations. One, variously known as Montwait, Mt. Wayte, and Lakeview, was located just north of Mt. Wayte Avenue at the north end of Farm Pond. [5] [20] The station served the Montwait neighborhood as well as the Montwait Camp Ground, a worship camp used by Methodist, Chautaqua, and later Pentecostal groups from the 1870s to the 1910s. [21] [22] Montwait station was closed in 1928. [23] The Framingham Centre station – at times known simply as Framingham – located at Maynard Street adjacent to Route 9. It was opened in 1849 when the branch to Framingham Center was completed. A new station was built in 1855 when the branch was realigned and extended. It also served the Framingham & Lowell after that line opened in 1871. The station was rebuilt in 1883. [7] A freight house and coal shed were located nearby to the north. [24] Fayville station was located just over the Southborough border in the Fayville village and also served the western reaches of Framingham. The station was placed at Central Street between Route 9 and Route 30 at or after the 1855 opening of the line. [25] Passenger service on the branch ended in 1937; none of the buildings remain. [8]

The Framingham & Lowell shared the South Framingham and Framingham Centre stations after its 1871 opening. An additional station, variously known as North Framingham and Nobscot, was located between Water Street and Edgell road, near the modern Nobscot Shopping Center. [26] The station closed with the end of passenger service in the 1930s and was later destroyed. The former Nobscot post office and library building, which also served as a railroad ticket sales office, has been restored near its original site. [27]

The Saxonville branch – the only line in Framingham not connected to South Framingham – opened from Natick to Saxonville in July 1846. [5] Two stations on the branch line were in Framingham. Cochituate station was at Commonwealth Road (Route 30) on Framingham's eastern border with Natick. [28] The terminus station at Saxonville was a "typical B&A granite station" located off Concord Street north of School Street (Route 126). [11] [29] The lightly-used line never saw more than three daily round trips; in 1936, passenger service was discontinued. A "bus" – in reality, a car driven by the Saxonville station agent – ran to Natick station until 1943. [11] Neither station is extant; despite local rumors, a building in the Saxonville Historic District on Elm Street is unlikely to be the former Saxonville station. [30]

Station layout

Framingham station
Location
to Boston
BSicon CONTg@G.svg
BSicon STRc2.svg
BSicon CONT1+3.svg
BSicon gexvSTR-.svg
BSicon STR+c2.svg
BSicon ABZ3+1xl.svg
BSicon exCONTf@Fq.svg
BSicon STRc4.svg
BSicon gexvSTR-.svg
Industrial spur
BSicon numN300.svg
BSicon ABZg+1.svg
BSicon STRc4.svg
BSicon gexvSTR-.svg
BSicon kABZg3.svg
BSicon POINTERf@gq.svg
BSicon gexvSTR-.svg
BSicon lCONTg@Gq.svg
BSicon kABZr+12.svg
BSicon eABZgl.svg
BSicon kSTRc2.svg
BSicon kSTRc3.svg
BSicon kSTRc4.svg
BSicon BHF.svg
BSicon xkABZq+3.svg
BSicon CONTf@Fq.svg
BSicon gexvSTR-.svg
BSicon kABZg+14.svg
to Worcester
BSicon CONTf.svg
Detail
BSicon vCONTg.svg
BSicon MFADEg.svg
BSicon v-RP2.svg
to West Natick
BSicon vSTRfg.svg
BSicon v-RP2.svg
BSicon MFADEgq.svg
BSicon RP2q.svg
BSicon vSTR.svg
BSicon lBUE-us.svg
BSicon RP2q.svg
BSicon cRP2q.svg
BSicon RP2xRP2.svg
BSicon MFADEfq.svg
BSicon RP2q.svg
Beaver Street
BSicon vUSTl.svg
BSicon kSTRc2.svg
BSicon kSTR3+l.svg
BSicon RP2.svg
BSicon CONTfq.svg
Framingham Secondary
BSicon numN300.svg
BSicon STR~L.svg
BSicon kABZg+1.svg
BSicon STR~R.svg
BSicon RP2.svg
BSicon vUSTr.svg
BSicon v-RP2.svg
BSicon MFADEgq.svg
BSicon RP2q.svg
BSicon vSTR.svg
BSicon lBUE-us.svg
BSicon RP2q.svg
BSicon cRP2q.svg
BSicon RP2xRP2.svg
BSicon MFADEfq.svg
BSicon RP2q.svg
MA Route 126.svg
Route 126
Hollis Street
BSicon dSTRc2.svg
BSicon v-ABZg3.svg
BSicon dSTR.svg
BSicon v-RP2.svg
BSicon STRc2.svg
BSicon STR3+1.svg
BSicon cSTRc4.svg
BSicon PSTR(R).svg
BSicon evABZg2-.svg
BSicon exdSTRc3.svg
BSicon vRP2-.svg
BSicon dCONTgq.svg
BSicon ABZr+12.svg
BSicon cSTRc34.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon excSTRc1.svg
BSicon dRP2.svg
BSicon exSTR2+4.svg
BSicon exdSTRc3.svg
Fitchburg Subdivision
BSicon dSTRc1.svg
BSicon STR2+4.svg
BSicon cSTRc3.svg
BSicon cPLT.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon RP2.svg
BSicon excSTRc1.svg
BSicon cSTRc2.svg
BSicon ABZl+3x4.svg
BSicon dCONTfq.svg
Milford Branch
BSicon STRc1.svg
BSicon dSTR+4.svg
BSicon vSTR.svg
BSicon cPLT.svg
BSicon lBUE-us.svg
BSicon cSTRc2.svg
BSicon dRP2.svg
BSicon STR3+1.svg
BSicon STRc4.svg
BSicon vSTR.svg
BSicon vABZg+1-.svg
BSicon POINTERg@fq.svg
BSicon dSTRc4.svg
BSicon dRP2.svg
MA Route 135.svg
Route 135
Waverly Street
BSicon dSTR.svg
BSicon vSTRfg.svg
BSicon v-RP2.svg
BSicon dCONTf.svg
BSicon vCONTf.svg
BSicon MFADEf.svg
BSicon v-RP2.svg
to Ashland

The station consists of two high level side platforms serving the two tracks. A footbridge near the end of the platform allows for commuters to easily switch between the platforms while still staying within the station site. A medium-sized parking lot is adjacent to the station, offering a total of 170 parking spaces.

Grade crossings

Unlike most other mid-sized cities in Massachusetts, Framingham still has significant level crossings in the downtown area. The crossings at Beaver Street and Concord Street (Route 126) near the station are the first grade crossings on the Worcester Line heading westbound; there are only three others on the largely grade-separated line east of Worcester. The Concord Street crossing was one of the last in the state with a crossing guard; he was replaced by an automated system with grade crossing signals and road gates as warning devices in 1986. [31]

The crossing is problematic because passing freight trains often result in delays both on Route 126, as well as Route 135 (Waverly Street) which crosses it just south of the tracks. The frequent blockage of the crossing by passing trains reduces capacity in the intersection by 21% during the morning rush and 16% in the afternoon, resulting in delays and traffic jams in the downtown area. Increased service levels planned by the MBTA would result in morning capacity reduction of 34% and afternoon reduction of 28%. [32]

The first discussion of improving the intersection and grade crossing was a study in 1898, since which there have been about three dozen more. [32] The most recent, a 2009 study of the downtown area, examined the possibility of depressing Route 126 under the grade crossing and intersection as well as several other alternatives including bypasses. The Route 126 depression was deemed to create barriers to walkability downtown, and the recommended alternative was to depress Route 135 under the intersection to prevent it from being affected by trains passing through the grade crossing. [32] Funds have not yet become available for final design and construction.

South of the station platforms, the remaining rarely-used stub of the Milford Branch crosses Waverly Street (Route 135) at grade. East of Concord Street, the Framingham Secondary also crosses Waverly Street at grade. Both crossings are only used by slow-moving freight trains; they have flashing signals but no gates.

See also

Related Research Articles

<span class="mw-page-title-main">MBTA Commuter Rail</span> Greater Boston commuter rail system

The MBTA Commuter Rail system serves as the commuter rail arm of the Massachusetts Bay Transportation Authority's (MBTA's) transportation coverage of Greater Boston in the United States. Trains run over 394 mi (634 km) of track to 135 stations. It is operated under contract by Keolis, which took over operations on July 1, 2014, from the Massachusetts Bay Commuter Railroad Company (MBCR).

<span class="mw-page-title-main">North–South Rail Link</span> Proposed rail tunnel connecting Bostons North and South Stations

The North–South Rail Link (NSRL) is a proposed rail tunnel, or pair of tunnels, that would connect North Station and South Station in downtown Boston, Massachusetts, linking rail networks that serve the city's northern suburbs, New Hampshire, and Maine with the rest of the country. The project would build new underground stations near the existing stations, connect them with about 1.5 miles (2.4 km) of tunnels, and add other tunnels to link up with existing surface tracks.

<span class="mw-page-title-main">Boston and Albany Railroad</span> American railroad line (1867-1961)

The Boston and Albany Railroad was a railroad connecting Boston, Massachusetts to Albany, New York, later becoming part of the New York Central Railroad system, Conrail, and CSX Transportation. The mainline is currently used by CSX for freight as the Berkshire Subdivision and Boston Subdivision. Passenger service is provided on the line by Amtrak, as part of their Lake Shore Limited service, and by the MBTA Commuter Rail system, which owns the section east of Worcester and operates it as its Framingham/Worcester Line.

The Grand Junction Railroad is an 8.55-mile (13.76 km) long railroad in the Boston, Massachusetts, area, connecting the railroads heading west and north from Boston. The line is notable for its railroad bridge over the Charles River that passes under the Boston University Bridge between Boston and Cambridge, Massachusetts.

<span class="mw-page-title-main">Boston and Providence Railroad</span> Former railroad company operating in Massachusetts and Rhode Island

The Boston and Providence Railroad was a railroad company in the states of Massachusetts and Rhode Island which connected its namesake cities. It opened in two sections in 1834 and 1835 - one of the first rail lines in the United States - with a more direct route into Providence built in 1847. Branches were built to Dedham in 1834, Stoughton in 1845, and North Attleboro in 1871. It was acquired by the Old Colony Railroad in 1888, which in turn was leased by the New Haven Railroad in 1893. The line became the New Haven's primary mainline to Boston; it was realigned in Boston in 1899 during the construction of South Station, and in Pawtucket and Central Falls in 1916 for grade crossing elimination.

<span class="mw-page-title-main">Framingham/Worcester Line</span> MBTA commuter railroad line

The Framingham/Worcester Line of the MBTA Commuter Rail system runs west from Boston, Massachusetts to Worcester, Massachusetts through the MetroWest region, serving 17 station stops in Boston, Newton, Wellesley, Natick, Framingham, Ashland, Southborough, Westborough, Grafton, and Worcester. It is the third longest and third busiest line in the MBTA Commuter Rail system. Service on the line is a mix of local and express trains serving Worcester plus short-turn Framingham locals.

<span class="mw-page-title-main">Providence station</span> Railway station in Providence, Rhode Island, US

Providence station is a railroad station in Providence, Rhode Island, served by Amtrak and MBTA Commuter Rail. The station has four tracks and two island platforms for passenger service, with a fifth track passing through for Providence and Worcester Railroad freight trains. It is now the 11th busiest Amtrak station in the country, and the second-busiest on the MBTA Commuter Rail system outside of Boston.

<span class="mw-page-title-main">Joseph Scelsi Intermodal Transportation Center</span> Transit facility in Massachusetts, US

The Joseph Scelsi Intermodal Transportation Center is a transit facility located in downtown Pittsfield, Massachusetts, United States. The $11 million facility is named after Joseph Scelsi, a longtime State Representative who represented Pittsfield. Owned by the Berkshire Regional Transit Authority (BRTA), it is serviced by local BRTA bus services, Amtrak intercity rail service, and Peter Pan intercity bus service. The second floor of the building houses two classrooms used by Berkshire Community College and Massachusetts College of Liberal Arts.

<span class="mw-page-title-main">Natick Center station</span> Train station in Natick, Massachusetts, US

Natick Center station is an MBTA Commuter Rail station in Natick, Massachusetts served by the Framingham/Worcester Line. The station, located below grade in a wide cut adjacent to North Main Street, has two side platforms serving the line's two tracks. The second-busiest non-accessible station on the system, it is undergoing a major accessibility renovation and modernization from 2020 to 2024.

<span class="mw-page-title-main">Mansfield station (MBTA)</span> Rail station in Mansfield, Massachusetts, US

Mansfield station is an MBTA Commuter Rail station in Mansfield, Massachusetts. Located in downtown Mansfield, it serves the Providence/Stoughton Line. With 1,966 weekday boardings in a 2018 count, Mansfield is the third-busiest station on the system outside Boston.

<span class="mw-page-title-main">Lansdowne station (MBTA)</span> Railway station in Boston, Massachusetts, US

Lansdowne station is an MBTA Commuter Rail station in Boston, Massachusetts. It serves the Framingham/Worcester Line. Lansdowne is located next to the Massachusetts Turnpike in the Fenway–Kenmore neighborhood near Kenmore Square, below grade between Beacon Street and Brookline Avenue.

<span class="mw-page-title-main">Ayer station</span> Railway station in Ayer, Massachusetts, US

Ayer station is an MBTA Commuter Rail station located off Main Street in the Ayer Main Street Historic District of Ayer, Massachusetts. It serves the Fitchburg Line. There are three tracks through the station, two of which are served by a pair of low-level side platforms, which are not accessible. There is a shelter on the inbound platform.

<span class="mw-page-title-main">Newtonville station</span>

Newtonville station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located between the Massachusetts Turnpike and Washington Street at Newtonville Square in the village of Newtonville in Newton, Massachusetts. Stairway entrances are located on the bridges over the Turnpike at Walnut Street and Harvard Street. Newtonville station is not accessible; renovations for accessibility are planned.

<span class="mw-page-title-main">Wellesley Square station</span> Railroad station in Wellesley, Massachusetts, US

Wellesley Square station is a commuter rail station on the MBTA Commuter Rail Framingham/Worcester Line, located just north of the MA 16-MA 135 intersection in downtown Wellesley, Massachusetts. It serves both walk-up and park-and-ride commuters, with a 224-space parking lot for the latter group. The station has low-level platforms and is not accessible.

<span class="mw-page-title-main">Ashland station (MBTA)</span> Railway station in Ashland, Massachusetts, US

Ashland station is an MBTA Commuter Rail station in Ashland, Massachusetts. It serves the Framingham/Worcester Line. It has a long driveway leading from the south parking lot to the intersection of West Union Street and Voyagers Lane. Like the other stations on the line west of Framingham, Ashland serves as a park-and-ride station with 678 parking spots.

<span class="mw-page-title-main">Westborough station</span> Train station in Westborough, Massachusetts, US

Westborough station is an MBTA Commuter Rail station in Westborough, Massachusetts. It serves the Framingham/Worcester Line. It is located off Smith Parkway, west of the Westborough town center. The station consists of two side platforms serving the line's two tracks. Each side has a small mini-high platform for accessibility; an overhead ramp structure connects the two platforms.

<span class="mw-page-title-main">Grafton station</span> Railway station in Grafton, Massachusetts, US

Grafton station is an MBTA Commuter Rail station in the North Grafton village of Grafton, Massachusetts, served by the Framingham/Worcester Line. The station is fully accessible, with mini-high platforms serving both of the line's two tracks.

<span class="mw-page-title-main">Union Station (Worcester, Massachusetts)</span> Railway station in Worcester, Massachusetts, US

Union Station is a railway station located at Washington Square in downtown Worcester, Massachusetts. It is the western terminus of the MBTA Commuter Rail Framingham/Worcester Line and a stop for the Amtrak Lake Shore Limited service. A bus terminal adjacent to the station is the hub for Worcester Regional Transit Authority (WRTA) local bus service; it is also used by PVTA, MART, Peter Pan, and Greyhound intercity buses.

<span class="mw-page-title-main">Back Bay station</span> Railway station in Boston, Massachusetts, US

Back Bay station is an intermodal passenger station in Boston, Massachusetts. It is located just south of Copley Square in Boston's Back Bay and South End neighborhoods. It serves MBTA Commuter Rail and MBTA subway routes, and also serves as a secondary Amtrak intercity rail station for Boston. The present building, designed by Kallmann McKinnell & Wood, opened in 1987. It replaced the New Haven Railroad's older Back Bay station – which opened in 1928 as a replacement for an 1899-built station – as well as the New York Central's Huntington Avenue and Trinity Place stations which had been demolished in 1964.

<span class="mw-page-title-main">East-West Passenger Rail</span> Massachusetts east-to-west rail project

East-West Rail is a proposed intercity passenger rail project that would provide new service between Boston and western Massachusetts, with stops including Worcester, Palmer, Springfield, Pittsfield, and Amtrak's Albany–Rensselaer station in New York. The 171-mile (275 km) route between Boston and Albany would use the former mainline of the Boston and Albany Railroad, which is now owned by the Massachusetts Bay Transit Authority and CSX Transportation.

References

  1. 1 2 Jacobs, Warren (October 1928). "Dates of Some of the Principal Events in the History of 100 Years of the Railroad in New England. 1826–1926". Railway and Locomotive Historical Society Bulletin . 17 (17). Railway and Locomotive Historical Society: 15–28. JSTOR   43504499.
  2. "Amtrak Fact Sheet, Fiscal Year 2023: Commonwealth of Massachusetts" (PDF). Amtrak. March 2024. Retrieved June 27, 2024.
  3. 1 2 Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
  4. 1 2 3 "National Register Information System". National Register of Historic Places . National Park Service. April 15, 2008.
  5. 1 2 3 4 5 6 7 8 9 Karr, Ronald Dale (1995). The Rail Lines of Southern New England. Branch Line Press. pp. 218, 279–286, 307–309. ISBN   0-942147-02-2.
  6. 1 2 3 4 5 6 7 Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. pp. 157–58. ISBN   978-0-942147-08-7.
  7. 1 2 Twentieth Annual Report of the Old Colony Railroad Co. to the Stockholders. Old Colony Railroad Company. November 1883. p. 7.
  8. 1 2 3 4 5 6 7 8 9 10 Humphrey, Thomas J.; Clark, Norton D. (1985). Boston's Commuter Rail: The First 150 Years. Boston Street Railway Association. pp. 22–25. ISBN   978-0-685-41294-7.
  9. 1 2 3 "Framingham/Worcester Line schedule". Massachusetts Bay Transportation Authority. Retrieved 10 August 2015.
  10. 1 2 Cummins, Abbott L. (January 1960). "Photographs: Written Historical and Descriptive Data" (PDF). Historic American Buildings Survey. United States Nation Park Service. Retrieved 19 January 2013.
  11. 1 2 3 Humphrey, Thomas J.; Clark, Norton D. (1986). Boston's Commuter Rail: Second Section. Boston Street Railway Association. pp. 39, 61. ISBN   978-0-938315-02-5.
  12. 1 2 Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
  13. National Rail Passenger Corporation (dba Amtrak) (10 November 1996). "Amtrak Northeast Timetable". Museum of Railway Timetables. p. 4. Retrieved 6 February 2013.
  14. National Rail Passenger Corporation (dba Amtrak) (1 November 2004). "Amtrak System Timetable". Museum of Railway Timetables. p. 30. Retrieved 6 February 2013.
  15. Sanborn, George M. (1992). A Chronicle of the Boston Transit System. Massachusetts Bay Transportation Authority. Archived from the original on 2019-11-27. Retrieved 2019-10-22 via Massachusetts Institute of Technology.
  16. TranSystems and Planners Collaborative (24 August 2007). "Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report" (PDF). Massachusetts Bay Transportation Agency. p. 40. Archived from the original (PDF) on 3 March 2016. Retrieved 6 February 2013.
  17. Palmer, Thomas C. Jr. (July 8, 2001). "Ramps close for Big Dig traffic shifts". Boston Globe. p. 24 via Newspapers.com. Open Access logo PLoS transparent.svg
  18. 1 2 "MWRTA to Oversee Framingham Commuter Rail Station". MassDOT Blog (Press release). Massachusetts Department of Transportation. October 6, 2016. Archived from the original on October 9, 2016. Retrieved October 7, 2016.
  19. "Baker-Polito Administration Celebrates Framingham Commuter Rail Lot Ribbon Cutting". MassDOT Blog (Press release). Massachusetts Department of Transportation. August 17, 2017. Archived from the original on August 24, 2017. Retrieved August 19, 2017.
  20. "Framingham 1895 Plate 04: South Framingham, Lake St". Barnes & Jenks. 1895. Retrieved 1 March 2013.
  21. "US – Massachusetts Listings". Healing and Revival Press. Retrieved 1 March 2013.
  22. "Other Chautaqua Assemblies". The Chautauquan. 31: 427. April–September 1900. Retrieved 1 March 2013.
  23. "To Drop Stations at Gates Crossing and Montwait". Boston Globe. January 28, 1928. p. 20 via Newspapers.com.
  24. Framingham Center (Map). 1 : 3000. Atlas of Middlesex County, Massachusetts. WardMaps LLC: Geo. H. Walker & Co. 1889. Retrieved 1 March 2013.
  25. Northborough & Shrewsbury & Southborough & Westborough (Fayville inset) (Map). 1 : 6600. New Topog. Atlas of the County of Worcester. WardMaps LLC: L. J. Richards. 1898. Retrieved 1 March 2013.
  26. Framingham Quadrant (Map). 1:31680. USGS 7.5 Minute Sheets and Quadrangles. WardMaps LLC. 1922. Retrieved 1 March 2013.
  27. "Preserving Nobscot's History". Nobscot Post Office/Library Restoration Project. Archived from the original on 29 January 2016. Retrieved 18 January 2015.
  28. Natick (Map). 1:28,800. County Atlas of Middlesex, Massachusetts. WardMaps LLC: F.W. Beers & Co. 1875. Retrieved 2 March 2013.
  29. Saxonville (Map). Atlas of Middlesex County, Massachusetts. Geo. H. Walker & Co. 1889. Retrieved 2 March 2013.
  30. Violette, Zachary (April 2018). "Form B – Building: Walenski, William and Margaret House". Massachusetts Historical Commission.
  31. "Technologically Displaced". Middlesex News. 27 February 1986. Retrieved 23 February 2013.
  32. 1 2 3 Beta Group Inc.; et al. (31 August 2009). "Final Report: Downtown Study Framingham, MA". Town of Framingham. Retrieved 23 February 2013.

Modern station