Aqua Line (Noida Metro)

Last updated

Noida Metro Aqua Line
Overview
StatusOperational
Owner Noida Metro Rail Corporation
Locale Noida, Greater Noida
Termini
Stations 21
Service
Type Rapid transit
System Noida Metro
Operator(s) Delhi Metro Rail Corporation
Rolling stock CRRC Corporation
Daily ridershipNA
History
Opened25 January 2019;6 years ago (2019-01-25) [1]
Technical
Line length29.7 kilometers (18.5 mi) [2]
Character Elevated
Track gauge 1,435 mm (4 ft 8+12 in) standard gauge
Electrification 25 kV 50 Hz AC overhead catenary
Route map

Contents

BSicon hKINTa cyan.svg
Noida Sector 51
BSicon hHST cyan.svg
Rainbow
BSicon hHST cyan.svg
Noida Sector 76
BSicon hHST cyan.svg
Noida Sector 101
BSicon hHST cyan.svg
Noida Sector 81
BSicon hHST cyan.svg
NSEZ
BSicon hHST cyan.svg
Noida Sector 83
BSicon hHST cyan.svg
Noida Sector 137
BSicon hHST cyan.svg
Noida Sector 142
BSicon hHST cyan.svg
Noida Sector 143
BSicon hHST cyan.svg
Noida Sector 144
BSicon hHST cyan.svg
Noida Sector 145
BSicon hHST cyan.svg
Noida Sector 146
BSicon hHST cyan.svg
Noida Sector 147
BSicon hHST cyan.svg
Noida Sector 148
BSicon hHST cyan.svg
Knowledge Park II
BSicon hHST cyan.svg
Pari Chowk
BSicon hHST cyan.svg
ALPHA 1
BSicon hHST cyan.svg
DELTA 1
BSicon hHST cyan.svg
GNIDA Office
BSicon hKBHFe cyan.svg
Depot Station

The Aqua Line is a line of Noida Metro, a rapid transit system in Noida and Greater Noida in Uttar Pradesh, India. It consists of 21 metro stations from Sector 51 in Noida to Depot in Greater Noida. [3]

The line has been operational since 25 January 2019. It was inaugurated by Chief Minister of Uttar Pradesh Yogi Adityanath. [4]

Stations

All 21 stations on the 29.7 kilometres (18.5 mi) Aqua Line route are on elevated track. [5] [6] [7] This line has an interchange station with the Delhi Metro at Noida Sector 52 metro station. [8] All stations are equipped with platform screen doors.

Aqua Line
#Station namePhaseOpeningInterchange ConnectionStation LayoutPlatform Level TypeDepot ConnectionDepot Layout
EnglishHindi
1 Noida Sector 51 नोएडा सेक्टर ५१125 January 2019 Delhi Metro logo.svg Blue Line ElevatedSideNoneNone
2 Rainbow नोएडा सेक्टर ५०125 January 2019NoneElevatedSideNoneNone
3 Noida Sector 76 नोएडा सेक्टर ७६125 January 2019NoneElevatedSideNoneNone
4 Noida Sector 101 नोएडा सेक्टर १०१125 January 2019NoneElevatedSideNoneNone
5 Noida Sector 81 नोएडा सेक्टर ८१125 January 2019NoneElevatedSideNoneNone
6 NSEZ एन॰एस॰ई॰ज़ेड॰125 January 2019NoneElevatedSideNoneNone
7 Noida Sector 83 नोएडा सेक्टर ८३125 January 2019NoneElevatedSideNoneNone
8 Noida Sector 137 नोएडा सेक्टर १३७125 January 2019NoneElevatedSideNoneNone
9 Noida Sector 142 नोएडा सेक्टर १४२125 January 2019NoneElevatedSideNoneNone
10 Noida Sector 143 नोएडा सेक्टर 1४३125 January 2019NoneElevatedSideNoneNone
11 Noida Sector 144 नोएडा सेक्टर १४४125 January 2019NoneElevatedSideNoneNone
12 Noida Sector 145 नोएडा सेक्टर १४५125 January 2019NoneElevatedSideNoneNone
13 Noida Sector 146 नोएडा सेक्टर १५३125 January 2019NoneElevatedSideNoneNone
14 Noida Sector 147 नोएडा सेक्टर १४७125 January 2019NoneElevatedSideNoneNone
15 Noida Sector 148 नोएडा सेक्टर १४८125 January 2019NoneElevatedSideNoneNone
16 Knowledge Park II नॉलेज पार्क II125 January 2019NoneElevatedSideNoneNone
17 Pari Chowk परी चौक125 January 2019NoneElevatedSideNoneNone
18 ALPHA 1 एल्फा १125 January 2019NoneElevatedSideNoneNone
19 DELTA 1 डेल्टा १125 January 2019NoneElevatedSideNoneNone
20 GNIDA Office ग्रेनो ऑफिस125 January 2019NoneElevatedSideNoneNone
21 Depot Station डिपो स्टेशन125 January 2019NoneElevatedSideDepot StationAt Grade

Construction

The NMRC has divided the Civil Construction work of Aqua Line (21 stations and 1 Depots) into multiple packages. The list of all construction contract is as follows:

PackageStationsContractor
NC-01Noida Sector-51 to Noida Sector-137
(8 stations)
CEC and Sam India Buitwell (JV)
NC-02Noida Sector-142 to Noida Sector-148
(7 stations)
CEC and Sam India Buitwell (JV)
NC-03Knowledge Park II to Depot
(6 stations)
CEC and Sam India Buitwell (JV)
NC-04Greater Noida Depot
(1 Depot)
Anupam Constructions
NGNC-01Noida Sector-122 to Gr. Noida Sector-2
(5 stations)
GR Infraprojects

Note: The construction work of Package NGNC-01 will start by 2023 end.

Future extensions

See also

References

  1. "Uttar Pradesh CM Yogi Adityanath to inaugurate Noida Metro's 'Aqua line' on Friday". Zee News. 24 January 2019. Retrieved 25 January 2019.
  2. "DMRC" . Retrieved 16 November 2018.
  3. "Noida Aqua Metro Line to be inaugurated by CM Adityanath today; here's all you need to know". www.businesstoday.in. Retrieved 25 January 2019.
  4. "Uttar Pradesh CM Yogi Adityanath to inaugurate Noida Metro's 'Aqua line' on Friday". Zee News. 24 January 2019. Retrieved 25 January 2019.
  5. "STATIONS BETWEEN NOIDA-GREATER NOIDA". noidametrorail.com. Archived from the original on 26 March 2016.
  6. Damini Nath. "Noida Metro Projects Still Off-Track". The Hindu.
  7. "Metro rail link between Noida and Greater Noida to be completed by 2017". India TV News.
  8. "Metro Network Phase I, II, III & NCR" (PDF). Delhi Metro Rail Corporation (DMRC). February 2015. Retrieved 28 June 2015.
  9. "Greater Noida Authority approves phase 2 of Aqua Line". Moneycontrol. 4 December 2018. Retrieved 30 November 2023.