Red Line | |
---|---|
Overview | |
Status | Proposed |
Termini | |
Stations | 18 |
Service | |
Type | Rapid transit |
System | Coimbatore Metro |
Technical | |
Line length | 20.4 km (12.7 mi) |
Number of tracks | 2 |
Character | 18 km Elevated |
Operating speed | 80 km/h (50 mph) |
The Red Line or Line 1 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Green line (Line 2). The line stretches from Ukkadam Bus Terminus to Neelambur. The line consists of 18 stations, out of which the Coimbatore Airport station has a spill off line. [1] [2]
The stations proposed in the first phase of Coimbatore Metro in the Line-1 are: [3]
Red Line | ||||||||
---|---|---|---|---|---|---|---|---|
S.No | Station Name | Interchange connection | Places Connected | Layout | Opened | Depot Connection | Depot Layout | |
English | Tamil | |||||||
1 | Ukkadam Bus Terminus | உக்கடம் பேருந்து முனையம் | Yellow Line, Blue Line | Ukkadam Bus Terminus | Elevated | Proposed Phase 1 | None | None |
2 | Townhall | நகர் மண்டபம் | None | CMC Central Office, Oppanakara Street | Elevated | Proposed Phase 1 | None | None |
3 | Coimbatore Junction | கோயம்புத்தூர் சந்திப்பு | Green Line, Coimbatore Junction railway station | Coimbatore Government Hospital | Elevated | Proposed Phase 1 | None | None |
4 | Collectorate | மாவட்ட ஆட்சியர் அலுவலகம் | None | Coimbatore District Collector Office | Elevated | Proposed Phase 1 | None | None |
5 | GKNM Hospital | ஜி.கே.என்.எம் மருத்துவமனை | None | None | Elevated | Proposed Phase 1 | None | None |
6 | Lakshmi Mills | லட்சுமி மில்ஸ் | None | None | Elevated | Proposed Phase 1 | None | None |
7 | Nava India | நவ இந்தியா | None | None | Elevated | Proposed Phase 1 | None | None |
8 | Peelamedu Pudur | பீளமேடு புதூர் | Peelamedu railway station | PSG College of Technology, PSG Hospitals | Elevated | Proposed Phase 1 | None | None |
9 | Fun Republic Mall | பன் மால் | None | Fun Republic Mall | Elevated | Proposed Phase 1 | None | None |
10 | Hope College | ஹோப் காலேஜ் | None | TIDEL Park | Elevated | Proposed Phase 1 | None | None |
11 | Coimbatore Medical College | கோவை மருத்துவக் கல்லூரி | None | Coimbatore Medical College | Elevated | Proposed Phase 1 | None | None |
12 | SITRA Circle | சித்ரா | None | None | Elevated | Proposed Phase 1 | None | None |
13 | MGR Nagar | எம்.ஜி.ஆர். நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
14 | PLS Nagar | பி.எல்.எஸ் நகர் | None | None | Elevated | Proposed Phase 1 | None | None |
15 | Venkittapuram | வெங்கிட்டாபுரம் | None | None | Elevated | Proposed Phase 1 | None | None |
16 | Park Plaza | பார்க் பிளாசா | None | None | Elevated | Proposed Phase 1 | None | None |
17 | Neelambur | நீலம்பூர் | None | None | Elevated | Proposed Phase 1 | Neelambur Depot | Under Proposal |
18 | Coimbatore International Airport | கோயம்புத்தூர் பன்னாட்டு வானூர்தி நிலையம் | Coimbatore International Airport | None | Elevated | Proposed Phase 1 | None | None |
The Mumbai Metro is a rapid transit system serving the city of Mumbai and the wider Mumbai Metropolitan Region in Maharashtra, India.
The Chennai Metro is a rapid transit system serving the city of Chennai, India. Operated by Chennai Metro Rail Limited (CMRL) – a joint venture between the Government of India and the State Government of Tamil Nadu, the network consists of two lines and spans 54.1 km (33.6 mi). The system uses standard gauge and has 41 underground and elevated stations.
Ahmedabad Metro is a rapid transit system for the cities of Ahmedabad and Gandhinagar in Gujarat state of India. Currently the System is 58.66 km (36.450 mi) and has 38 stations.
Urban rail transit in India plays an important role in intracity transportation in the major cities which are highly populated. It consists of rapid transit, suburban rail, monorail, and tram systems.
The Navi Mumbai Metro is a rapid transit system in the city of Navi Mumbai, Maharashtra, India. The planning and construction of the Navi Mumbai Metro was overseen by the City and Industrial Development Corporation (CIDCO). The system is planned to consist of five rail lines covering a total distance of 106.4 kilometres (66.1 mi), out of which one is operational and the other four are being planned. The foundation stone for the project was laid on 1 May 2011, with a target completion date of 2014. After over 9 years of delays, due to slowdowns in construction caused by lack of labour and adequate funding, along with land acquisition issues, the Line-1 of the metro commenced operations on 17 November 2023.
The Bhoj Metro is an under construction rapid transit system intended to serve the city of Bhopal, India, the capital of the Indian state of Madhya Pradesh. The total system consists of 6 corridors covering a distance of 104.87 kilometres (65.16 mi). The first phase of the Bhopal Metro project consists of 28 km (17.40 mi) of line 2 & 5 being under construction. This project will cost ₹80 billion (US$960 million) approximately. There will be three types of run – on road, on bridges, and underground in some locations.
The Indore Metro is a rapid transit system which is under construction for the city of Indore, in the state of Madhya Pradesh, India. The total system consists of 11 corridors (lines) covering a distance of 124 kilometres (77 mi). This project will cost approximately ₹12,000 crore (US$1.4 billion). The cost per km will be 182 crores and total cost is 15,000 crores. The metro system will be elevated, underground and on ground. The Indore Metro project has been subject to serious contestation due to the inappropriate shifting of Seismic zone-II to Seismic zone-IV category which has led to increase in budgetary cost for the entire project.
Coimbatore is a city in the state of Tamil Nadu, India. Most transportation in the city and suburbs is by road. Coimbatore is well-connected to most cities and towns in India by road, rail, and air, but not through waterways. The city has successful transport infrastructure compared to other Indian cities, though road infrastructures are not well maintained and developed according to the growing needs of transport, making traffic congestion a major problem in the city. A comprehensive transport development plan has been made to address many traffic problems.
Patna Metro (Patna MRTS) is a rapid transit system being constructed in the city of Patna, India. Construction will be completed over five phases, and the transit system would be owned and operated by the state-run Patna Metro Rail Corporation. In the first phase, five stations of Patna Metro will be operational by March 2025. Patna MRTS, constructed under a public-private partnership model, is estimated to cost ₹13,365.77 crore (US$1.6 billion). This cost excludes land acquisition cost, which will be paid for by the Bihar government. The first phase (consisting of the east–west and north–south corridors) will include both a 15.36 km (9.54 mi) elevated track and a 16.30 km (10.13 mi) underground track.
Nagpur Metro is a rapid transit system for the city of Nagpur, Maharashtra, India. Phase I of the metro project cost was estimated to cost ₹8,650 crore but the final project cost incurred was ₹9,279 crore (US$1.1 billion). In February 2014, the Government of Maharashtra gave approval for the Metro project, while the Government of India's Ministry of Urban Development had given "In Principle" approval for the project. On 20 August 2014, Union Cabinet gave approval for the development of the project, and the Prime Minister laid the foundation stone on 21 August. Construction began on 31 May 2015, with trial run beginning on 30 September 2017.
Line 1 of the Navi Mumbai Metro is part of the rapid transit rail system for the city of Navi Mumbai, India. When fully completed, the 23.40 km fully-elevated line will consist of 20 metro stations from Belapur to Khandeshwar.
The Noida Metro is a rapid transit system connecting the twin cities of Noida and Greater Noida in Gautam Buddh Nagar, Uttar Pradesh, India. The metro network consists of one line, with a total length of 29.7 kilometres (18.5 mi) serving 21 stations. The system has all elevated stations using standard-gauge tracks.
Coimbatore Metro, also known as Kovai Metro, is a proposed rapid transit system for Coimbatore, Tamil Nadu.
Metrolite is a light rail (LRT) urban transit system being planned in India for cities with lower ridership projection and as a feeder system for the existing metro systems. It will cater to lower passenger capacity at a reduced cost than a metro line. It will have dedicated tracks, separated from the road.
The Purple Line or Line 3 is one of the planned lines of Chennai Metro. It is part of the second phase of the project and the under construction line stretches from Madhavaram Milk Colony to Siruseri SIPCOT. The 45.4 km (28.2 mi) long line will consist of 47 stations, out of which 28 will be underground and 19 will be at grade or elevated.
The Orange Line or Line 4 is one of the planned lines of Chennai Metro. It is part of the second phase of the project and the under construction line stretches from Lighthouse to Poonamallee Bypass. The line will consist of 27 stations, out of which nine will be underground and 18 will be at grade or elevated.
The Red Line or Line 5 is one of the planned lines of Chennai Metro. It is part of the second phase of the project and the under construction line stretches from Madhavaram Milk Colony to Sholinganallur. The 44.6 km (27.7 mi) long line will consist of 45 stations, out of which six will be underground and 39 will be at grade or elevated. A branch line of corridor five from Koyambedu to Avadi has been proposed with detailed project report preparation expected to be completed by January 2025.
Madurai Metro, is a proposed rapid transit system for Madurai, Tamil Nadu. It arose from a Madurai Metrolite system, part of a major expansion of public transport in the city and one of the projects devised by the former Chief Minister of Tamil Nadu J.Jayalalithaa.
The Jammu Metro is a proposed light rail transit system for the city of Jammu in the Indian Union Territory of Jammu and Kashmir. The project has been proposed by the Housing and Urban Development Department of the Government of Jammu and Kashmir and is estimated to cost Rs. 4825 crores in phase 1. The proposed system will have a total route length of 43.50 km, consisting of 4 lines and 22 stations, and will be completed in two phases. The expected completion date for the project is 2026.
The GreenLine or Line 2 is one of the two proposed lines of Coimbatore Metro, Phase 1 Project, the second being the Red line. The line stretches from Coimbatore Junction to Valiyampalayam Pirivu. The line consists of 14 stations.