Mars Surveyor '98

Last updated

Mars Surveyor '98
Mars Climate Orbiter 2.jpg Mars Polar Lander.jpg
Artworks of the mission's Mars Climate Orbiter (left) and Mars Polar Lander (right) spacecraft
Spacecraft properties
Spacecraft
Manufacturer Lockheed Martin
M98patch.png
Mission insignia  

Mars Surveyor '98 was a mission in NASA's Mars Exploration Program that launched the Mars Climate Orbiter and the Mars Polar Lander to the planet Mars. The mission was to study the Martian weather, climate, water and carbon dioxide (CO2) budget, to understand the reservoirs, behavior, and atmospheric role of volatiles and to search for evidence of long-term and episodic climate changes.[ citation needed ] The Mars Polar Lander also carried two surface-penetrator probes for the New Millennium Program's Deep Space 2 mission. Both spacecraft were launched in 1998 and both were lost.

Contents

Spacecraft

Orbiter

The orbiter was lost due to a miscalculation in trajectory caused by an unintended and undetected mismatch between metric and English units of measurement. [1] The use of metric units as well as the data formats to employ were specified in a navigation software interface specification (SIS) published by JPL in 1996. Despite this, the flight operations team at Lockheed Martin provided impulse data in English units of pound-force seconds rather than newton seconds. These values were incorrect by a factor of 4.45 (1 lbf = 4.45 N). This caused erroneous course corrections that caused the orbiter to descend too low in Mars's atmosphere. The vehicle either burned up or bounced off into space.[ citation needed ]

Lander

Investigators concluded that the most likely cause of the lander's failure was a spurious sensor signal associated with the craft's legs falsely indicating the craft had touched down when in fact it was some 40 meters above the surface.[ citation needed ] When the landing legs unfolded they made a bouncing motion that accidentally set off the landing sensors, causing the descent engines to shut down prematurely and the lander to fall. Another possible reason for failure was inadequate preheating of catalysis beds for the pulsing rocket thrusters.[ citation needed ] Hydrazine fuel decomposes on the beds to make hot gases that are forced out of the rocket nozzles, generating thrust; in crash review tests cold catalysis beds caused misfiring and instability.

Mission

The Mars Surveyor 1998 program spacecraft development cost US$193.1 million. Launch costs for the Mars Surveyor '98 Program was estimated at US$91.7 million and mission operations at US$42.8 million. [2] The Mars Climate Orbiter was part of NASA's 10-year Mars Surveyor Program,[ citation needed ] with launches every 26 months when the Earth and Mars are favorably positioned.

See also

Related Research Articles

Mariner program NASA space program

The Mariner program was a 10-mission program conducted by the American space agency NASA in conjunction with Jet Propulsion Laboratory (JPL). The program launched a series of robotic interplanetary probes, from 1962 to 1973, designed to investigate Mars, Venus and Mercury. The program included a number of firsts, including the first planetary flyby, the first planetary orbiter, and the first gravity assist maneuver.

Surveyor program 1960s NASA program to soft-land robotic probes on the Moon

The Surveyor program was a NASA program that, from June 1966 through January 1968, sent seven robotic spacecraft to the surface of the Moon. Its primary goal was to demonstrate the feasibility of soft landings on the Moon. The Surveyor craft were the first American spacecraft to achieve soft landing on an extraterrestrial body. The missions called for the craft to travel directly to the Moon on an impact trajectory, a journey that lasted 63 to 65 hours, and ended with a deceleration of just over three minutes to a soft landing.

<i>Mars Observer</i> Space probe

The Mars Observer spacecraft, also known as the Mars Geoscience/Climatology Orbiter, was a robotic space probe launched by NASA on September 25, 1992, to study the Martian surface, atmosphere, climate and magnetic field. During the interplanetary cruise phase, communication with the spacecraft was lost on August 21, 1993, three days prior to orbital insertion. Attempts to re-establish communication with the spacecraft were unsuccessful.

Uncrewed spacecraft

Uncrewed spacecraft or unmanned spacecraft are spacecraft without people on board, used for robotic spaceflight. Uncrewed spacecraft may have varying levels of autonomy from human input; they may be remote controlled, remote guided or even autonomous, meaning they have a pre-programmed list of operations, which they will execute unless otherwise instructed.

Lander (spacecraft)

A lander is a spacecraft that descends towards, and comes to rest on, the surface of an astronomical body. In contrast to an impact probe, which makes a hard landing that damages or destroys the probe upon reaching the surface, a lander makes a soft landing after which the probe remains functional.

<i>Mars Climate Orbiter</i> Robotic space probe launched by NASA on December 11, 1998

The Mars Climate Orbiter was a 638-kilogram (1,407 lb) robotic space probe launched by NASA on December 11, 1998 to study the Martian climate, Martian atmosphere, and surface changes and to act as the communications relay in the Mars Surveyor '98 program for Mars Polar Lander. However, on September 23, 1999, communication with the spacecraft was lost as the spacecraft went into orbital insertion, due to ground-based computer software which produced output in non-SI units of pound-force seconds (lbf·s) instead of the SI units of newton-seconds (N·s) specified in the contract between NASA and Lockheed. The spacecraft encountered Mars on a trajectory that brought it too close to the planet, and it was either destroyed in the atmosphere or re-entered heliocentric space after leaving Mars' atmosphere.

Mars Polar Lander Failed 1998 robotic Mars lander

The Mars Polar Lander, also known as the Mars Surveyor '98 Lander, was a 290-kilogram robotic spacecraft lander launched by NASA on January 3, 1999, to study the soil and climate of Planum Australe, a region near the south pole on Mars. It formed part of the Mars Surveyor '98 mission. On December 3, 1999, however, after the descent phase was expected to be complete, the lander failed to reestablish communication with Earth. A post-mortem analysis determined the most likely cause of the mishap was premature termination of the engine firing prior to the lander touching the surface, causing it to strike the planet at a high velocity.

Exploration of Mars

The planet Mars has been explored remotely by spacecraft. Probes sent from Earth, beginning in the late 20th century, have yielded a large increase in knowledge about the Martian system, focused primarily on understanding its geology and habitability potential. Engineering interplanetary journeys is complicated and the exploration of Mars has experienced a high failure rate, especially the early attempts. Roughly sixty percent of all spacecraft destined for Mars failed before completing their missions and some failed before their observations could begin. Some missions have met with unexpected success, such as the twin Mars Exploration Rovers, Spirit and Opportunity which operated for years beyond their specification.

<i>Mars Reconnaissance Orbiter</i> NASA Mars orbiter

Mars Reconnaissance Orbiter (MRO) is a spacecraft designed to study the geology and climate of Mars, provide reconnaissance of future landing sites, and relay data from surface missions back to Earth. It was launched on August 12, 2005 and reached Mars on March 10, 2006. In November 2006, after five months of aerobraking, it entered its final science orbit and began its primary science phase. The cost to develop and operate MRO through the end of its prime mission in 2010 was US$716.6 million .

<i>Phoenix</i> (spacecraft) NASA Mars lander

Phoenix was a robotic spacecraft that landed on Mars on May 25, 2008 and operated until November 2. Its instruments were used to assess the local habitability and to research the history of water on Mars. The mission was part of the Mars Scout Program; its total cost was $420 million, including the cost of launch.

Mars Surveyor 2001 Cancelled NASA spaceflight mission in the Mars Exploration Program

The Mars Surveyor 2001 project was a multi-part Mars exploration mission intended as a follow-up to Mars Surveyor '98. After the two probes of the 1998 project, Mars Climate Orbiter and Mars Polar Lander, were both lost, NASA's "better, faster, cheaper" exploration philosophy was re-evaluated, with a particular eye on the two 2001 project probes. As a result, the mission, along with the launch of its lander and rover, were canceled in May 2000, but the decision was made to continue development with its orbiter counterpart. The orbiter launched as 2001 Mars Odyssey in April 2001, in a mission independent of the Mars Surveyor project, and reached Mars in October 2001. After being placed in a cleanroom in 2001 and stored since, the nearly-completed lander component was eventually reused to fly the Phoenix mission, which launched in August 2007 and landed successfully on Mars in May 2008.

McDonnell Douglas DC-X Prototype single-stage-to-orbit rocket, 1990s

The DC-X, short for Delta Clipper or Delta Clipper Experimental, was an uncrewed prototype of a reusable single-stage-to-orbit launch vehicle built by McDonnell Douglas in conjunction with the United States Department of Defense's Strategic Defense Initiative Organization (SDIO) from 1991 to 1993. Starting 1994 until 1995, testing continued through funding of the US civil space agency NASA. In 1996, the DC-X technology was completely transferred to NASA, which upgraded the design for improved performance to create the DC-XA.

DART (satellite)

DART, or Demonstration for Autonomous Rendezvous Technology, was a NASA sponsored project with the goal to develop and demonstrate an automated navigation and rendezvous capability in a NASA spacecraft. At the time of the DART mission, only the Roscosmos and JAXA had autonomous space craft navigation. Orbital Sciences Corporation (OSC) was the prime contractor for construction, launch and operation of the DART vehicle with a project cost of US$95 million (2005). The contract was awarded in June 2001 and the spacecraft was launched on 15 April 2005. The mission ended prematurely, very shortly after an anomalous slow-velocity collision with its target spacecraft, having completed less than half of the original mission autonomous rendezvous objectives.

Lunar lander Spacecraft intended to land on the surface of the Moon

A lunar lander or Moon lander is a spacecraft designed to land on the Moon. The Apollo Lunar Module, designed to land a crew of two humans and return them to orbit, made six successful landings and takeoffs from 1969 to 1972.

Altair (spacecraft) Planned lander spacecraft component of NASAs cancelled Project Constellation

The Altair spacecraft, previously known as the Lunar Surface Access Module or LSAM, was the planned lander spacecraft component of NASA's cancelled Constellation program. Astronauts would have used the spacecraft for landings on the Moon, which was intended to begin around 2019. The Altair spacecraft was planned to be used both for lunar sortie and lunar outpost missions. On February 1, 2010, U.S. President Barack Obama announced a proposal to cancel the Constellation program, to be replaced with a re-scoped program, effective with the U.S. 2011 fiscal year budget.

Mars landing

A Mars landing is a landing of a spacecraft on the surface of Mars. Of multiple attempted Mars landings by robotic, unmanned spacecraft, ten have had successful soft landings. There have also been studies for a possible human mission to Mars, including a landing, but none have been attempted. The most recent landing took place on 26 November 2018 by the NASA probe InSight.

Mars Exploration Program Uncrewed spaceflight program by NASA focused on scientific exploration of Mars using orbiters, landers, and rovers

Mars Exploration Program (MEP) is a long-term effort to explore the planet Mars, funded and led by NASA. Formed in 1993, MEP has made use of orbital spacecraft, landers, and Mars rovers to explore the possibilities of life on Mars, as well as the planet's climate and natural resources. The program is managed by NASA's Science Mission Directorate by Doug McCuistion of the Planetary Science Division. As a result of 40% cuts to NASA's budget for fiscal year 2013, the Mars Program Planning Group (MPPG) was formed to help reformulate the MEP, bringing together leaders of NASA's technology, science, human operations, and science missions.

<i>Schiaparelli</i> EDM A Mars landing demonstration system

Schiaparelli EDM was a failed Entry, Descent and Landing Demonstrator Module (EDM) of the ExoMars programme—a joint mission of the European Space Agency (ESA) and the Russian space agency Roscosmos. It was built in Italy and was intended to test technology for future soft landings on the surface of Mars. It also had a limited but focused science payload that would have measured atmospheric electricity on Mars and local meteorological conditions.

References

  1. BBC News Sci/Tech "Confusion leads to Mars failure", September 30, 1999. Retrieved 24 June 2014
  2. "Mars Climate Orbiter". National Aeronautics and Space Administration. Retrieved January 19, 2016.