USS S-1

Last updated

S-1(SS-105).jpg
USS S-1 (SS-105), 24 October 1923, a Martin MS-1 (Bureau # A-6525) scouting floatplane on her after deck, probably at Norfolk, Virginia
History
US flag 48 stars.svgUnited States
NameS-1
Builder Fore River Shipbuilding Company, Quincy, Massachusetts
Cost$1,102,931.80 (hull and machinery) [1]
Laid down11 December 1917
Launched26 October 1918
Sponsored byMrs. Elizabeth Land
Commissioned5 June 1920
Decommissioned20 October 1937
Recommissioned16 October 1940
Decommissioned20 April 1942
Stricken24 June 1942
Identification
FateTransferred to United Kingdom, 20 April 1942
Naval ensign of the United Kingdom.svgUnited Kingdom
NameP.552
Acquired20 April 1942
Fate
  • Returned to USN, 16 October 1944
  • Sold for scrapping, 20 July 1945
General characteristics [2] [3]
Class & type S-1-class submarine
Displacement
  • 854 long tons (868 t) surfaced
  • 1,062 long tons (1,079 t) submerged
Length219 feet 3 inches (66.83 m)
Beam20 ft 8 in (6.30 m)
Draft15 ft 11 in (4.85 m)
Installed power
Propulsion
Speed
  • 14.5 knots (26.9 km/h; 16.7 mph) surfaced
  • 11 kn (20 km/h; 13 mph) submerged
Test depth200 ft (61 m)
Capacity41,921 US gallons (158,690  L; 34,907  imp gal) fuel
Complement
  • 4 officers
  • 34 enlisted
Armament

USS S-1 (SS-105), also known as "Submarine No. 105", was the was the prototype of the Electric Boat Company's "Holland"-type S-class submarine of the United States Navy.

Contents

Design

In the summer of 1916, The US Navy's Bureau of Construction and Repair (BuC&R) and Bureau of Steam Engineering, developed specifications for an 800 long tons (810  t ) submarine that would be capable of crossing the Atlantic and fight while there. In Fiscal Year 1917 appropriations, they awarded contracts for the first three of these new boats, to be called the S-class. All were to have the same general specifications and tactical capabilities but were to be built by different manufacturers to different design types. The intent was to study the three FY-17 boats in order to eventually consolidate the best features of each into one type. However, all were intended for series production from the start, with the consolidation to come later in follow-on appropriations. [4]

S-1 was built to an axially oriented single hull design by the Electric Boat Company, the boats that would follow this design were referred to as the S-1-class, or "Holland"-type, boats. S-2 was a double hull design with ventrally mounted control surfaces by the Lake Torpedo Boat Company, while this is referred to as the S-2-class or "Lake"-type, this design was not repeated. S-3 another double hull design, by BuC&R, and built at the government owned Portsmouth Navy Yard, the boats built to this design were referred to as the S-3-class, "Navy Yard"-type, or even "Government"-type. [5]

Construction

S-1's keel was laid down on 11 December 1917, at the Fore River Shipbuilding Company shipyard, in Quincy, Massachusetts, subcontracted by the Electric Boat Company. She was launched on 26 October 1918, [6] sponsored by Mrs. Elizabeth Land, [7] wife of future Vice Admiral, Commander Emory S. Land, and commissioned on 5 June 1920. [6]

Service history

1920–1937

A Martin MS-1 being assembled on S-1 in 1923 Martin MS-1 being assembled on SS-105 1923.jpg
A Martin MS-1 being assembled on S-1 in 1923
S-1 in the late 1920s, after the removal of the aircraft hangar and the installation of her 4 in (100 mm)/50 caliber gun USS S-1 (SS-105).jpg
S-1 in the late 1920s, after the removal of the aircraft hangar and the installation of her 4 in (100 mm)/50 caliber gun

When the US Navy adopted its hull classification system on 17 July 1920, she received the hull number SS-105. [3]

S-1 began her service operations in July 1920, with a cruise to Bermuda attached to Submarine Division 2 (SubDiv 2), with subsequent operations out of New London, Connecticut, cruising the New England coast until 1923. [6]

On 2 January 1923, she shifted to SubDiv Zero, a division created for experimental work, and conducted winter maneuvers in the Caribbean Sea. As a single-ship division, SubDiv Zero, she returned to New London, in the spring to continue experimental duty. [6]

As part of a series of studies, conducted by the United States Navy, after World War I, into the possibility of submarine-borne observation and scouting aircraft, S-1 became the experimental platform for this project late in 1923. She was altered by having a steel capsule mounted abaft the conning tower; a cylindrical pod which could house a small collapsible seaplane, the Martin MS-1. After surfacing, this plane could be rolled out, quickly assembled, and launched by ballasting the sub until the deck was awash. These experiments were carried out into 1926, using the Martin-built plane, constructed of wood and fabric, and the all-metal Cox-Klemin versions, XS-1 and XS-2. The first full cycle of surfacing, assembly, launching, retrieving, disassembly, and submergence took place on 28 July 1926, on the Thames River at New London. [6]

Following the aircraft experiments, S-1 served as flagboat for SubDiv 2, until July 1927, when she was transferred to SubDiv 4. While attached to this division, she made operational cruises to the Panama Canal Zone in 1928–1930, during the spring months. She visited ports at Cristobal, and Coco Solo, in the Canal Zone; Cartagena, Colombia; Kingston, Jamaica; and Guantánamo Bay, Cuba, during these cruises, and spent the remaining months of those years operating along the New England coast, out of New London. [6]

January 1931, found her at Pearl Harbor. She remained there into 1937; first, attached to SubDiv 7, SubRon 4, then, from July 1932–July 1933, attached to Rotating Reserve SubDiv 14. She was returned to SubDiv 7, in August, and remained with that division until departing in May 1937, for the Philadelphia Navy Yard. S-1 arrived at Philadelphia, on 22 July, and commenced overhaul for deactivation. She was decommissioned on 20 October 1937. [6]

1940–1942

On 16 October 1940, S-1 was recommissioned at Philadelphia. She then made two cruises to Bermuda, training submariners, and returned to Philadelphia, from the second cruise on 7 December 1941. There, she prepared for transfer to Britain under the Lend-Lease program. She was decommissioned and turned over to the British, on 20 April 1942. Her name was struck from the Naval Vessel Register on 24 June 1942. [6]

Royal Navy service

S-1 served the Royal Navy as HMS P.552, a training vessel for anti-submarine warfare. In poor condition after arriving in Durban, Natal, Union of South Africa, she was often in repair and she was declared unseaworthy in January 1944, after a collision in Durban harbor. [8]

Fate

She was returned to the US Navy, at Durban, on 16 October 1944. She was stripped of vital parts and machinery, and her hull was sold for local scrapping, on 20 July 1945, and she was scrapped there on 14 September 1945. [6]

References

  1. Navy List 1921, p. 770.
  2. Friedman 1995, p. 308.
  3. 1 2 Mohl & S-1.
  4. Johnston 2025, p. 2.
  5. Johnston 2025, pp. 2–10.
  6. 1 2 3 4 5 6 7 8 9 DANFS & S-1.
  7. Hall 1925, p. 199.
  8. Helgason.

Bibliography