Bridgefoot | |
---|---|
Site of station in 1961 | |
Location | Bridgefoot, Allerdale England |
Coordinates | 54°39′01″N3°27′44″W / 54.6503°N 3.4623°W Coordinates: 54°39′01″N3°27′44″W / 54.6503°N 3.4623°W |
Grid reference | NY057293 |
Platforms | 2 [1] |
Other information | |
Status | Disused |
History | |
Original company | Whitehaven, Cleator and Egremont Railway |
Pre-grouping | LNWR & FR Joint Railway |
Post-grouping | London, Midland and Scottish Railway |
Key dates | |
2 April 1866 [2] | Opened |
13 April 1931 | Closed [3] |
Whitehaven, Cleator & Egremont Railway | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Bridgefoot railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the village of Bridgefoot, Cumbria, England. [4] [5]
The station opened on 2 April 1866. The owning company was taken over by the LNWR and Furness Railway in 1879 as a Joint Line, whereafter the northern section through Bridgefoot was usually worked by the LNWR. [6]
Passenger traffic consisted of three trains a day in each direction, with an extra on Whitehaven market day and none on Sundays. [7] From opening, northbound passenger trains terminated at Marron Junction station where passengers changed for destinations beyond. In 1897 Marron Junction station closed, with trains running west through to Workington Main thereafter, a much better arrangement for most passengers. Passengers who would otherwise have changed at Marron Junction to head east to Brigham or beyond simply changed at the first stop after Marron Junction - Camerton.
Goods traffic typically consisted of a two daily turns Up and Down.
Mineral traffic was the dominant flow, typically six loaded and six empty through to Workington, though this was subject to considerable fluctuation with trade cycles. Stations and signalling along the line north of Rowrah were changed during the Joint regime to conform to LNWR standards. [8] [9]
The station closed on 13 April 1931 when normal passenger traffic ended along the line. Goods trains continued to pass through the station until 1954. [10] An enthusiasts' special ran through on 5 September 1954. After scant occasional use the line was abandoned in 1960 and subsequently lifted.
In 2013 the course of the line through the village was clear to see and the trackbed to the south had been made into a public footpath.
Preceding station | Disused railways | Following station | ||
---|---|---|---|---|
Marron Junction Line and station closed | Whitehaven, Cleator and Egremont Railway | Branthwaite Line and station closed |
Brigham railway station was situated on the Cockermouth and Workington Railway at its junction with the Maryport and Carlisle Railway's Derwent Branch. It served the village of Brigham, Cumbria, England.
Broughton Cross railway station was situated on the Cockermouth and Workington Railway and served the village of Broughton Cross, Cumbria, England.
Moor Row railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the village of Moor Row, Cumbria, England.
Woodend railway station was planned by the Whitehaven, Cleator and Egremont Railway on its Sellafield to Moor Row branch, but by the time the station opened the company had been bought out by the LNWR and Furness Railway who operated the line jointly until grouping in 1923.
Cleator Moor has had three passenger stations:
Rowrah railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the village of Rowrah, Cumbria, England.
Marron Junction railway station was a later addition to the Cockermouth and Workington Railway. It opened on 2 April 1866 with a single, eastbound, platform when the adjacent Marron Junction opened, two months before the company was absorbed by the London and North Western Railway.
Branthwaite railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the village of Branthwaite, Cumbria, England.
Ullock railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the village of Ullock, Cumbria, England.
Lamplugh railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the scattered community of Lamplugh, Cumbria, England.
Winder railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the village of Winder, Frizington, Cumbria, England.
Yeathouse railway station was a later addition to the Whitehaven, Cleator and Egremont Railway. It served the communities of Yeathouse and Eskett, near Frizington, Cumbria, England.
Frizington railway station was built by the Whitehaven, Cleator and Egremont Railway. It served the industrial Parkside area of Frizington, Cumbria, England.
Egremont railway station was built by the Whitehaven, Cleator and Egremont Railway as the first southern terminus of what would become the Moor Row to Sellafield branch. In 1878 the company was bought out by the LNWR and Furness Railway who operated the line jointly until grouping in 1923.
Moresby Junction Halt railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1910. Very few people lived near the halt, which served nearby Walkmill Colliery and coke ovens in Cumbria, England.
Moresby Parks railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated just north of the summit of the company's main line and served the scattered community of Moresby Parks in Cumbria, England.
Millgrove railway station was a private station on the Cleator and Workington Junction Railway (C&WJR) main line from Moor Row to Workington Central. It appears to have served the Burnyeat family who lived at a house named Millgrove in Moresby, Cumbria, England, which was near the company's main line. William Burnyeat (1849-1921) was on the company's Board of Directors from 1900 to 1921.
Harrington railway station, or Church Road halt, was a railway station in Harrington, Cumbria, England. It was opened by the Cleator and Workington Junction Railway (C&WJR) on the company's Harrington Branch which connected with the Lowca Light Railway at Rosehill to provide a through route from Lowca to Workington Central and beyond.
Camerton Colliery Halt railway station was an unadvertised halt for workers at one or both of the collieries at Camerton, near Cockermouth in Cumberland, England.
Buckhill Colliery Halt railway station was an unadvertised halt for workers at Buckhill Colliery north east of Camerton, near Cockermouth in Cumberland, England.