Seaton railway station (Cumbria)

Last updated

Seaton
Seaton station, Cleator & Workington Junction Railway, 1951 (geograph 5323450).jpg
Seaton station, 1951.
Location Seaton, near Workington, Allerdale
England
Coordinates 54°39′44″N3°31′24″W / 54.6621°N 3.5234°W / 54.6621; -3.5234 Coordinates: 54°39′44″N3°31′24″W / 54.6621°N 3.5234°W / 54.6621; -3.5234
Grid reference NY018307
Platforms2 [1] [2] [3] [4]
Other information
StatusDisused
History
Original company Cleator and Workington Junction Railway
Key dates
4 January 1888Opened
July 1897Closed
February 1907Reopened
February 1922Closed to passengers [5]
6 April 1962Closed completely [6]
4 June 1992Line through the station closed [6]
Location
Location map United Kingdom Allerdale.svg
Red pog.svg
Seaton
Location in present-day Allerdale, Cumbria
Cumbria UK location map.svg
Red pog.svg
Seaton
Location in present-day Cumbria, England
A 1914 Railway Clearing House Junction Diagram showing the complex network which existed in the Workington area Distington, Siddick Jn, Workington & Rosehill RJD 111.jpg
A 1914 Railway Clearing House Junction Diagram showing the complex network which existed in the Workington area

Seaton railway station served the village of Seaton, near Workington in Cumberland (now in Cumbria), England. [7] [8] [9]

Contents

The station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1888 on its new "Northern Extension" from Calva Junction on the northern edge of Workington to the Maryport and Carlisle Railway's Derwent Branch at Linefoot. The C&WJR built this 7-mile-30-chain long (11.9 km) line to connect the C&WJR with Carlisle and beyond. The line was double track from Workington to Seaton, then single to Linefoot Junction.

Most stations on C&WJR lines had heavy industrial neighbours, such as ironworks next to Cleator Moor West, or served primarily industrial workforces, such as Keekle Colliers' Platform. Seaton, however, was a fairly isolated country village.

History

The C&WJR was built in the late 1870s, being one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, specifically being born as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways. [10]

It was originally intended to drive the line northwards across country to meet the Caledonian Railway and cross into Scotland by the Solway Viaduct, but an accommodation was made with the LNWR leading to the intended northern extension being greatly watered down to three lines:

All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than the Northern Extension, which passed through open country. Passenger services were provided calling at Seaton, but they were so unsuccessful they petered out in 1922. The C&WJR earned the local name "The Track of the Ironmasters". [12]

The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts. [13]

All C&WJR's lines were heavily graded. Almost all of the first three miles of the Northern Extension from Calva Junction through Seaton was rising at 1 in 70. [14] This favoured loaded coal and coke trains.

The Northern Extension became part of the London, Midland and Scottish Railway at the Grouping of 1923.

Like any business tied to one or few industries, the C&WJR was particularly at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when the C&WJR handled 1,644,514 tons of freight. [15] Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of £83,349, compared with passenger fares totalling £6,570. [16]

The high water mark for tonnage on the C&WJR was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected at Harrington Junction in 1919.

Services

C&WJR passenger trains consisted of antiquated Furness stock hauled largely by elderly Furness engines [17] [18] referred to as "rolling ruins" by one author after a footplate ride in 1949. [19]

No Sunday passenger service was ever provided on any C&WJR line.

The Northern Extension had three stations: Seaton, Great Broughton and Linefoot, the last being run jointly with the Maryport and Carlisle Railway (MCR). A passenger service was provided to Seaton over two periods: 1888 to 1897 and 1907 to 1922. The service in the first period appears to have been out and back over the 2 miles 19 chains (3.6 km) to Workington Central. This was reduced to Wednesdays and Saturdays only (Workington Market Days) from March 1891 and to Saturdays only from January 1894, being withdrawn completely in July 1897. [6] [5]

The company tried again ten years later, with what appears to have been another daily out and back from Workington Central. From September 1908 this was extended, on Saturdays only, to Great Broughton and Linefoot Junction, making those outposts qualify as stations having had a publicly advertised passenger service. That experiment failed, as they disappeared from the timetable in December of that year, leaving Seaton as the only Northern extension station with a public passenger service. [20]

On 2 June 1913 a new public passenger service was opened from Lowca to Workington Central, aimed mainly but not exclusively at workers travelling to and from the remote Harrington No 10 Colliery and associated bi-products works on the clifftop at Lowca. One of these trains ran beyond Workington to Seaton and a second one did so on Saturday afternoons. Southbound ("Down") the early morning train started at Seaton and one other made an out and back trip from Seaton to Workington, rather than a through train. [21] All others plied between Lowca and Workington Central only. This remained the case in 1919. [22] [23] The Lowca service continued to 1926, but the Seaton experiment ended altogether in February 1922. [24]

The W&CJR ran many workmen's trains. Three collieries were served by the Northern Extension - Camerton, Buckhill and Alice Pit. No source lists any station, halt or workmen's service to this last, which was at the northern end of the line near Linefoot Junction. The 1920 Working Time Table lists Alice Pit, but shows no booked services of any description.

Camerton Colliery Halt and Buckhill Colliery Halt both had workmen's services at some point, [25] but they are not mentioned in the May 1920 Working Time Table. Indeed, Camerton Colliery is not mentioned at all. [23]

The 1920 Working Time Table shows no Goods (as opposed to mineral) trains or "Through goods" trains booked to call or pass Seaton in either direction. [23]

Rundown and closure

The West Cumberland iron and steel industry was heavily dependent on supplies of coke from the Northumberland and Durham coalfields. The Northern Extension allowed "a large proportion" of this traffic to be routed away from Maryport and the coastal line. Likewise the short chord between Workington Bridge and Cloffocks Junction allowed Durham coke traffic to reach the furnaces via Cockermouth then the C&WJR. [26] These must have suffered a significant decline, as by 1920 there were just two booked mineral workings each way each weekday between Linefoot Junction and Workington through Seaton. There was also a daily booked mineral train from Workington to Buckhill Colliery which passed through Seaton. [23] It is therefore no surprise that the line north of Buckhill Colliery closed on 1 September 1921, leaving Seaton station "stranded" on what was effectively a long siding. [11]

Given this early decline it is remarkable that Seaton station remained open for goods traffic until 6 April 1962 and even more remarkable that the line through Seaton went on to outlive all other former C&WJR metals by some years. Buckhill Colliery's output and Seaton station's slender goods traffic appear to be the sole reasons for keeping the remnant of the Northern Extension open after 1922, though Camerton Colliery appears to have still been in production until 1931. [27] Buckhill Colliery closed in 1932, [28] though even here it is questionable how much rail borne coal traffic it generated after 1924 when an aerial ropeway was installed taking its coals over the Derwent to William Pit at Great Clifton. [29]

The branch's longevity came about because the Admiralty, attracted by a remote area with rail and sea access, chose part of the site of Buckhill Colliery and the surrounding area to build a rail-served armaments depot which opened in 1938 and closed in 1992, [30] taking the line with it. After the closure of the C&WJR south of Workington Central in 1965 all trains through Seaton to the armaments depot travelled south from Siddick Junction past Calva Junction, where they reversed towards Seaton.

Enthusiasts' specials

An enthusiasts' special passed through Seaton on 5 September 1954, travelling to the then limit of public railway at Buckhill, the only one to traverse the C&WJR using main line passenger stock.

The next such train to traverse any C&WJR metals was the "Solway Ranger" brakevan special on 7 May 1966, which repeated the run through Seaton to Buckhill, with a third and final such trip on 2 March 1968 [31]

Afterlife

By 2015 the trackbed through Seaton was part of the West Cumbria Cycle Network.

Preceding station Disused railways Following station
Workington Central
Line and station closed
  Cleator and Workington Junction Railway
Northern Extension
  Camerton Colliery Halt
Line and station closed

See also

Related Research Articles

Lowca railway station Disused railway station in Cumbria, England

Lowca had two railway stations that served the village of Lowca in the former county of Cumberland, England, which is now part of Cumbria.

Workington Central railway station Disused railway station in Cumbria, England

Workington Central railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879 to serve the town of Workington in Cumberland, England. It was situated almost half a mile nearer the town centre than its rival Workington station.

Cleator Moor West railway station Disused railway station in Cumbria, England

Cleator Moor West railway station was opened as "Cleator Moor" by the Cleator and Workington Junction Railway (C&WJR) in 1879. It served the growing industrial town of Cleator Moor, Cumbria, England.

High Harrington railway station Disused railway station in Cumbria, England

High Harrington railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated half a mile south of Harrington Junction on the company's main line. and served what was then the eastern extremity of Harrington in Cumbria, England. The station is not to be confused with the current Harrington station a kilometre away on the coastal line.

Great Broughton railway station Disused railway station in Cumbria, England

Great Broughton railway station briefly served the village of Great Broughton, near Cockermouth in Cumberland, England.

Arlecdon railway station Disused railway station in Cumbria, England

Arlecdon railway station served the village of Arlecdon in the former English county of Cumberland, now part of Cumbria.

Moresby Junction Halt railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1910. Very few people lived near the halt, which served nearby Walkmill Colliery and coke ovens in Cumbria, England.

Keekle Colliers' Platform railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in July 1910, closed the following January, reopened in June 1913 then closed for good on 1 October 1923. The halt was provided to enable residents of the isolated Keekle Terrace, less than 100 yds from the track, to get to and from work at the equally isolated Walkmill Colliery and coke ovens in Cumbria, England. The Platform is not shown by Jowett.

Moresby Parks railway station Disused railway station in Cumbria, England

Moresby Parks railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated just north of the summit of the company's main line and served the scattered community of Moresby Parks in Cumbria, England.

Millgrove railway station was a private station on the Cleator and Workington Junction Railway (C&WJR) main line from Moor Row to Workington Central. It appears to have served the Burnyeat family who lived at a house named Millgrove in Moresby, Cumbria, England, which was near the company's main line. William Burnyeat (1849-1921) was on the company's Board of Directors from 1900 to 1921.

Harrington Junction Disused railway station in Cumbria, England

Harrington Junction was a railway junction in Harrington, Cumbria, England. It joined three branches to the Cleator and Workington Junction Railway's (CWJR) main line from Workington Central to Moor Row via Cleator Moor West. No station ever existed at the junction, High Harrington was the nearest, 48 chains (0.97 km) to the south.

Distington railway station Disused railway station in Cumbria, England

Distington railway station was opened jointly by the Cleator and Workington Junction Railway (C&WJR) and the LNWR and Furness Joint Railway on 1 October 1879. It was situated on the northern edge of the village of Distington, Cumbria, England where the C&WJR's north-south main line crossed the Joint Line's east-west Gilgarran Branch.

Harrington (Church Road Halt) railway station Disused railway station in Cumbria, England

Harrington railway station, or Church Road halt, was a railway station in Harrington, Cumbria, England. It was opened by the Cleator and Workington Junction Railway (C&WJR) on the company's Harrington Branch which connected with the Lowca Light Railway at Rosehill to provide a through route from Lowca to Workington Central and beyond.

Rosehill (Archer Street Halt) railway station Disused railway station in Cumbria, England

Rosehill railway station was opened by the Cleator and Workington Junction Railway (C&WJR) on the company's Harrington Branch which connected with the Lowca Light Railway (LLR) at Rosehill to provide a through route from Lowca to Workington Central and beyond.

Harrington and Lowca Light Railway

The Harrington and Lowca Light Railway was a short railway on the coast of Cumberland, which is now part of Cumbria, England.

Siddick Junction railway station Disused railway station in Cumbria, England

Siddick Junction railway station was opened by the Cleator and Workington Junction (C&WJR) and London and North Western Railways in 1880 to provide exchange platforms for passengers wishing to change trains from one company's line to the other. A passenger travelling from Maryport to Distington, for example, would change at Siddick Junction. As a purely exchange station - like Dovey Junction and Dukeries Junction elsewhere in the country - the owning companies would not need to provide road or footpath access or ticketing facilities as no passengers were invited to enter or leave the station except by train.

Linefoot railway station Disused railway station in Cumbria, England

Linefoot railway station, sometimes referred to as Linefoot Junction and sometimes as Linefoot Goods, briefly served the scattered community around the crossroads at Linefoot, near Cockermouth in Cumberland, England.

Camerton Colliery Halt railway station Disused railway station in Cumbria, England

Camerton Colliery Halt railway station was an unadvertised halt for workers at one or both of the collieries at Camerton, near Cockermouth in Cumberland, England.

Buckhill Colliery Halt railway station Disused railway station in Cumbria, England

Buckhill Colliery Halt railway station was an unadvertised halt for workers at Buckhill Colliery north east of Camerton, near Cockermouth in Cumberland, England.

Oatlands railway station Disused railway station in Cumbria, England

Oatlands railway station served the village of Pica and Oatlands Colliery in the former English county of Cumberland, now part of Cumbria.

References

  1. Anderson 2002, p. 315.
  2. Robinson 2002, p. 15.
  3. Suggitt 2008, p. 70.
  4. Webb 1964a, p. 790.
  5. 1 2 Butt 1995, p. 207.
  6. 1 2 3 McGowan Gradon 2004, p. 68.
  7. McGowan Gradon 2004, pp. 6 & 63.
  8. Smith & Turner 2012, Map 26.
  9. Jowett 1989, Map 36.
  10. Anderson 2002, p. 309.
  11. 1 2 McGowan Gradon 2004, p. 59.
  12. Anderson 2002, p. 313.
  13. Marshall 1981, p. 117.
  14. McGowan Gradon 2004, p. 64.
  15. McGowan Gradon 2004, p. 50.
  16. Suggitt 2008, p. 65.
  17. Anderson 2002, p. 314.
  18. McGowan Gradon 2004, pp. 40 & 42.
  19. McGowan Gradon 2004, p. 51.
  20. Bradshaw 1968, p. 477.
  21. Andrews 2001, p. 22.
  22. McGowan Gradon 2004, pp. 28-9.
  23. 1 2 3 4 Haynes 1920, Tables.
  24. Bradshaw 1985, p. 595.
  25. Croughton, Kidner & Young 1982, pp. 55 & 53.
  26. McGowan Gradon 2004, p.11, Note 8.
  27. Camerton Colliery data, via Durham Mining Museum
  28. McGowan Gradon 2004, p. 56.
  29. Buckhill Colliery ropeway, via Durham Mining Museum
  30. McGowan Gradon 2004, pp. 58-59.
  31. McGowan Gradon 2004, pp. 60-1.

Sources

  • Anderson, Paul (April 2002). Hawkins, Chris (ed.). "Dog in the Manger? The Track of the Ironmasters". British Railways Illustrated. Clophill: Irwell Press Ltd. 11 (7). ISSN   0961-8244.
  • Andrews, Dr. Michael (May 2001). Peascod, Michael (ed.). "The Harrington & Lowca Light Railway". Cumbrian Railways. Pinner: Cumbrian Railways Association. 7 (2). ISSN   1466-6812.
  • Bradshaw, George (1968) [April 1910]. April 1910 Railway Guide. Newton Abbot: David and Charles. ISBN   978-0-7153-4246-6. OCLC   30645.
  • Bradshaw, George (1985) [July 1922]. Bradshaw's General Railway and Steam Navigation guide for Great Britain and Ireland: A reprint of the July 1922 issue. Newton Abbot: David and Charles. ISBN   978-0-7153-8708-5. OCLC   12500436.
  • Butt, R. V. J. (1995). The Directory of Railway Stations: details every public and private passenger station, halt, platform and stopping place, past and present (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN   978-1-85260-508-7. OCLC   60251199.
  • Croughton, Godfrey; Kidner, R. W.; Young, Alan (1982). Private and Untimetabled Railway Stations, Halts and Stopping Places. The Oakwood Press. ISBN   978-0-85361-281-0. OCLC   10507501.
  • Jowett, Alan (March 1989). Jowett's Railway Atlas of Great Britain and Ireland: From Pre-Grouping to the Present Day (1st ed.). Sparkford: Patrick Stephens Ltd. ISBN   978-1-85260-086-0. OCLC   22311137.
  • Haynes, Jas. A. (April 1920). Cleator & Workington Junction Railway Working Time Table. Central Station, Workington: Cleator and Workington Junction Railway.
  • McGowan Gradon, W. (2004) [1952]. The Track of the Ironmasters: A History of the Cleator and Workington Junction Railway. Grange-over-Sands: Cumbrian Railways Association. ISBN   978-0-9540232-2-5.
  • Robinson, Peter W. (2002). Cumbria's Lost Railways. Catrine: Stenlake Publishing. ISBN   978-1-84033-205-6.
  • Smith, Paul; Turner, Keith (2012). Railway Atlas Then and Now. Ian Allan Publishing. ISBN   978-0-7110-3695-6.
  • Suggitt, Gordon (2008). Lost Railways of Cumbria (Railway Series). Newbury, Berkshire: Countryside Books. ISBN   978-1-84674-107-4.
  • Webb, David R. (October 1964a). Cooke, B.W.C. (ed.). "Between the Solway and Sellafield: Part Two". The Railway Magazine . London: Tothill Press Limited. 110 (762). ISSN   0033-8923.

Further reading