High Harrington railway station

Last updated

High Harrington
High Harrington railway station (site), Cumbria (geograph 3566362).jpg
The site of the station in 2013
General information
Location Harrington, Cumbria, Allerdale
England
Coordinates 54°36′54″N3°33′03″W / 54.6149°N 3.5508°W / 54.6149; -3.5508 Coordinates: 54°36′54″N3°33′03″W / 54.6149°N 3.5508°W / 54.6149; -3.5508
Grid reference NX999255
Platforms2 [1] [2]
Other information
StatusDisused
History
Original company Cleator and Workington Junction Railway
Post-grouping London, Midland and Scottish Railway
Key dates
1 October 1879Opened
13 April 1931Closed [3]
1 July 1963Closed completely [4]
16 September 1963Line through the station closed [5]
A 1914 Railway Clearing House Junction Diagram showing the complex network which existed in the Workington area Distington, Siddick Jn, Workington & Rosehill RJD 111.jpg
A 1914 Railway Clearing House Junction Diagram showing the complex network which existed in the Workington area

High Harrington railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated half a mile south of Harrington Junction on the company's main line. [6] and served what was then the eastern extremity of Harrington in Cumbria, England. [7] [8] [9] The station is not to be confused with the current Harrington station a kilometre away on the coastal line.

Contents

History

The line was one of the fruits of the rapid industrialisation of West Cumberland in the second half of the nineteenth century, specifically being born as a reaction to oligopolistic behaviour by the London and North Western and Whitehaven, Cleator and Egremont Railways. [10] The station was on the line from Moor Row to Workington Central. Both line and station opened to passengers on 1 October 1879.

All lines in the area were primarily aimed at mineral traffic, notably iron ore, coal and limestone, none more so than the new line to Workington, which earned the local name "The Track of the Ironmasters". General goods and passenger services were provided, but were very small beer compared with mineral traffic. [11]

The founding Act of Parliament of June 1878 confirmed the company's agreement with the Furness Railway that the latter would operate the line for one third of the receipts. [12]

Services

Passenger trains consisted of antiquated Furness stock hauled largely by elderly Furness engines [13] [14] referred to as "rolling ruins" by one author after a footplate ride in 1949. [15]

No Sunday passenger service was ever provided on the line.

The initial passenger service in 1879 consisted of

In 1880 the extension northwards to Siddick Junction was opened. The service was extended to run to and from Siddick and an extra train was added, with

By 1922 the service reached its high water mark, with:

There was one fewer Down train, as the 09:50 Up was provided to give a connection at Siddick with a fast MCR train to Carlisle with connections beyond. [17]

Two Saturdays Only trains left Oatlands at 16:05 and 21:35 for Workington, calling at Distington and High Harrington, with balancing workings leaving Workington at 15:30 and 21:00.

There were also trains using the Lowca Light Railway plying between Lowca and Workington; they turned off the main line at Harrington Junction and therefore served no "pure" C&WJR stations other than Workington Central. [18]

As with advertised passenger trains, in 1920 workmen's trains ran on the company's three southern routes:

The situation in 1922 was similar. [17]

The 1920 Working Time Table shows relatively few Goods trains, with just one a day in each direction booked to call at High Harrington.

Mineral traffic was an altogether different matter, dwarfing all other traffic in volume, receipts and profits. The key source summarises it "...the 'Track of the Ironmasters' ran like a main traffic artery through an area honeycombed with mines, quarries and ironworks." [20] The associated drama was all the greater because all the company's lines abounded with steep inclines [21] and sharp curves, [22] frequently requiring banking. The saving grace was that south of Workington at least, most gradients favoured loaded trains. During the First World War especially, the company ran "Double Trains", akin to North American practice, with two mineral trains coupled together and a banking engine behind, i.e. locomotive-wagons-guards van-locomotive-wagons-guards van-banker. Such trains worked regularly between Distington and Cleator Moor West. [23] The practice was discontinued after dark from 1 April 1918. [24]

Most stations on the company's lines had heavy industrial neighbours, such as ironworks next to Cleator Moor West, or served primarily industrial workforces, such as Keekle Colliers' Platform. Throughout its working life High Harrington was more isolated, with heavy industry visible but not next to the station. By 2013 the station site was flanked substantial housing estates.

Like any business tied to one or few industries, the railway was at the mercy of trade fluctuations and technological change. The Cumberland iron industry led the charge in the nineteenth century, but became less and less competitive as time passed and local ore became worked out and harder to win, taking the fortunes of the railway with it. The peak year was 1909, when 1,644,514 tons of freight were handled. [25] Ominously for the line, that tonnage was down to just over 800,000 by 1922, bringing receipts of £83,349, compared with passenger fares totalling £6,570. [2]

Rundown and closure

The high water mark for tonnage was 1909, the high water mark for progress was 1913, with the opening of the Harrington and Lowca line for passenger traffic. A chronology of the line's affairs from 1876 to 1992 has almost no entries before 1914 which fail to include "opened" or "commenced". After 1918 the position was reversed, when the litany of step-by-step closures and withdrawals was relieved only by a control cabin and a signalbox being erected in 1919 and the Admiralty saving the northern extension in 1937 by establishing an armaments depot at Broughton. [26]

High Harrington station closed on 13 April 1931 when normal passenger traffic ended along the line. Diversions and specials, for example to football matches, [27] made use of the line, but it was not easy to use as a through north–south route because all such trains would have to reverse at Moor Row or Corkickle. [28]

An enthusiasts' special ran through on 6 September 1954, the only one to do so using main line passenger stock. The next such train to traverse any C&WJR metals did so in 1966 at the north end of the line, three years after the line through High Harrington closed. [29]

Afterlife

By 2013 aerial images clearly show the line of route and that the area around the station site had been transformed by housing. The trackbed through the station site was used by the West Cumbria Cycle Network.

Preceding station Disused railways Following station
Workington Central
Line and station closed
  Cleator and Workington Junction Railway   Distington
Line and station closed

See also

Related Research Articles

<span class="mw-page-title-main">Workington Central railway station</span> Disused railway station in Cumbria, England

Workington Central railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879 to serve the town of Workington in Cumberland, England. It was situated almost half a mile nearer the town centre than its rival Workington station.

<span class="mw-page-title-main">Cleator Moor West railway station</span> Disused railway station in Cumbria, England

Cleator Moor West railway station was opened as "Cleator Moor" by the Cleator and Workington Junction Railway (C&WJR) in 1879. It served the growing industrial town of Cleator Moor, Cumbria, England.

<span class="mw-page-title-main">Great Broughton railway station</span> Disused railway station in Cumbria, England

Great Broughton railway station briefly served the village of Great Broughton, near Cockermouth in Cumberland, England.

<span class="mw-page-title-main">Arlecdon railway station</span> Disused railway station in Cumbria, England

Arlecdon railway station served the village of Arlecdon in the former English county of Cumberland, now part of Cumbria.

<span class="mw-page-title-main">Seaton railway station (Cumbria)</span> Disused railway station in Cumbria, England

Seaton railway station served the village of Seaton, near Workington in Cumberland, England.

Moresby Junction Halt railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1910. Very few people lived near the halt, which served nearby Walkmill Colliery and coke ovens in Cumbria, England.

Keekle Colliers' Platform railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in July 1910, closed the following January, reopened in June 1913 then closed for good on 1 October 1923. The halt was provided to enable residents of the isolated Keekle Terrace, less than 100 yds from the track, to get to and from work at the equally isolated Walkmill Colliery and coke ovens in Cumbria, England. The Platform is not shown by Jowett.

<span class="mw-page-title-main">Moresby Parks railway station</span> Disused railway station in Cumbria, England

Moresby Parks railway station was opened by the Cleator and Workington Junction Railway (C&WJR) in 1879. It was situated just north of the summit of the company's main line and served the scattered community of Moresby Parks in Cumbria, England.

Millgrove railway station was a private station on the Cleator and Workington Junction Railway (C&WJR) main line from Moor Row to Workington Central. It appears to have served the Burnyeat family who lived at a house named Millgrove in Moresby, Cumbria, England, which was near the company's main line. William Burnyeat (1849-1921) was on the company's Board of Directors from 1900 to 1921.

<span class="mw-page-title-main">Harrington Junction</span> Disused railway station in Cumbria, England

Harrington Junction was a railway junction in Harrington, Cumbria, England. It joined three branches to the Cleator and Workington Junction Railway's (CWJR) main line from Workington Central to Moor Row via Cleator Moor West. No station ever existed at the junction, High Harrington was the nearest, 48 chains (0.97 km) to the south.

<span class="mw-page-title-main">Distington railway station</span> Disused railway station in Cumbria, England

Distington railway station was opened jointly by the Cleator and Workington Junction Railway (C&WJR) and the LNWR and Furness Joint Railway on 1 October 1879. It was situated on the northern edge of the village of Distington, Cumbria, England, where the C&WJR's north–south main line crossed the Joint Line's east–west Gilgarran Branch.

<span class="mw-page-title-main">Harrington (Church Road Halt) railway station</span> Disused railway station in Cumbria, England

Harrington railway station, or Church Road halt, was a railway station in Harrington, Cumbria, England. It was opened by the Cleator and Workington Junction Railway (C&WJR) on the company's Harrington Branch which connected with the Lowca Light Railway at Rosehill to provide a through route from Lowca to Workington Central and beyond.

<span class="mw-page-title-main">Rosehill (Archer Street Halt) railway station</span> Disused railway station in Cumbria, England

Rosehill railway station was opened by the Cleator and Workington Junction Railway (C&WJR) on the company's Harrington Branch which connected with the Lowca Light Railway (LLR) at Rosehill to provide a through route from Lowca to Workington Central and beyond.

<span class="mw-page-title-main">Siddick Junction railway station</span> Disused railway station in Cumbria, England

Siddick Junction railway station was opened by the Cleator and Workington Junction (C&WJR) and London and North Western Railways in 1880 to provide exchange platforms for passengers wishing to change trains from one company's line to the other. A passenger travelling from Maryport to Distington, for example, would change at Siddick Junction. As a purely exchange station - like Dovey Junction and Dukeries Junction elsewhere in the country - the owning companies would not need to provide road or footpath access or ticketing facilities as no passengers were invited to enter or leave the station except by train.

<span class="mw-page-title-main">Linefoot railway station</span> Disused railway station in Cumbria, England

Linefoot railway station, sometimes referred to as Linefoot Junction and sometimes as Linefoot Goods, briefly served the scattered community around the crossroads at Linefoot, near Cockermouth in Cumberland, England.

<span class="mw-page-title-main">Camerton Colliery Halt railway station</span> Disused railway station in Cumbria, England

Camerton Colliery Halt railway station was an unadvertised halt for workers at one or both of the collieries at Camerton, near Cockermouth in Cumberland, England.

<span class="mw-page-title-main">Buckhill Colliery Halt railway station</span> Disused railway station in Cumbria, England

Buckhill Colliery Halt railway station was an unadvertised halt for workers at Buckhill Colliery north east of Camerton, near Cockermouth in Cumberland, England.

<span class="mw-page-title-main">Oatlands railway station</span> Disused railway station in Cumbria, England

Oatlands railway station served the village of Pica and Oatlands Colliery in the former English county of Cumberland, now part of Cumbria.

<span class="mw-page-title-main">Copperas Hill railway station</span> Disused railway station in Cumbria, England

Copperas Hill railway station served the small clifftop community of Copperas Hill, south of Harrington in the former county of Cumberland, England, which is now part of Cumbria.

Rose Hill Platform served workmen in the Rose Hill area of Harrington in the former county of Cumberland, England, which is now part of Cumbria.

References

  1. McGowan Gradon 2004, pp. 52 & 63.
  2. 1 2 Suggitt 2008, p. 65.
  3. Butt 1995, p. 120.
  4. McGowan Gradon 2004, p. 68.
  5. McGowan Gradon 2004, p. 59.
  6. McGowan Gradon 2004, p. 64.
  7. Smith & Turner 2012, Map 26.
  8. Jowett 1989, Map 36.
  9. Robinson 2002, p. 31.
  10. Anderson 2002, p. 309.
  11. Anderson 2002, p. 313.
  12. Marshall 1981, p. 117.
  13. Anderson 2002, p. 314.
  14. McGowan Gradon 2004, pp. 40 & 42.
  15. McGowan Gradon 2004, p. 51.
  16. McGowan Gradon 2004, p. 38.
  17. 1 2 McGowan Gradon 2004, p. 39.
  18. Bradshaw 1985, p. 595.
  19. Haynes 1920, pp. 8–13.
  20. McGowan Gradon 2004, p. 41.
  21. McGowan Gradon 2004, p.64, Gradient Diagrams.
  22. McGowan Gradon 2004, p. 25.
  23. McGowan Gradon 2004, Front cover & pp.42-3.
  24. Haynes 1920, p. 5.
  25. McGowan Gradon 2004, p. 50.
  26. McGowan Gradon 2004, pp. 58–59.
  27. McGowan Gradon 2004, p. 52.
  28. Marshall 1981, p. 118.
  29. McGowan Gradon 2004, pp. 60–1.

Sources

Further reading