SRT Red Lines

Last updated

SRT Red Lines
SRTET Logo.svg
SRT Red Line EMU.jpg
SRT Light Red Line commuter train at Lak Hok station
Overview
Native nameรถไฟฟ้าชานเมืองสายสีแดง
Owner State Railway of Thailand
Locale Bangkok Metropolitan Region
Transit type Commuter rail
Number of lines
Number of stations58 (planned)
Operation
Began operation2 August 2021 (2021-08-02) [1]
Operator(s)S.R.T. Electrified Train Company Limited
CharacterElevated
Rolling stock Hitachi AT100
Number of vehicles25 EMUs (130 cars); ten 4 car sets and fifteen 6 car sets
Technical
System length139.3 km (86.56 mi)
No. of tracks2
Track gauge 1,000 mm (3 ft 3+38 in) metre gauge
Electrification 25 kV 50 Hz AC overhead catenary
Average speed120 km/h (75 mph)
Top speed160 km/h (99 mph)

The Red Line Mass Transit System Project is a commuter rail system serving the Bangkok Metropolitan Region in Thailand. Construction began in January 2009, and free public trial operation began on 2 August 2021, when Bang Sue Grand Station opened, with full commercial service starting in November 2021. [2] It is part of the Mass Rapid Transit Master Plan in the Bangkok Metropolitan Region.

Contents

The system consists of two lines, one (also referred to as the SRT Dark Red Line) running from Thammasat University's Rangsit campus to Maha Chai in Samut Sakhon Province, and the other (SRT Light Red Line) running from Salaya in Nakhon Pathom Province to Hua Mak in Bangkok, with both passing through Bang Sue, which acts as a connecting hub to the Bangkok MRT system.

Most of the railway runs alongside existing national railroad tracks, eventually replacing them. Segments running through inner-city areas are elevated, and the system is electrified by overhead lines. The system was developed and is owned by the State Railway of Thailand. [3] [4] Since the Red Lines run roughly along the alignment of the failed Hopewell Project, they have been described as a "Hopewell revival". [5]

See also

Related Research Articles

<span class="mw-page-title-main">BTS Skytrain</span> Elevated rapid transit system in Bangkok, Pathum thani and Samut prakan, Thailand

The Bangkok Mass Transit System, commonly known as the BTS Skytrain, is an elevated rapid transit system in Bangkok, Thailand. It is operated by Bangkok Mass Transit System PCL (BTSC), a subsidiary of BTS Group Holdings, under a concession granted by the Bangkok Metropolitan Administration (BMA) which owns the lines. The system consists of 62 stations along three lines with a combined route length of 70.05 kilometers (43.53 mi). The BTS Sukhumvit Line running northwards and south-eastwards, terminating at Khu Khot and Kheha respectively. The BTS Silom Line which serves Silom and Sathon Roads, the central business district of Bangkok, terminates at National Stadium and Bang Wa. The Gold Line people mover runs from Krung Thon Buri to Klong San and serves Iconsiam. The lines interchange at Siam station and Krung Thon Buri. The system is formally known as "The Elevated Train in Commemoration of HM the King's 6th Cycle Birthday".

<span class="mw-page-title-main">MRT (Bangkok)</span> Thai rapid transit system serving Bangkok

The Metropolitan Rapid Transit or MRT is a mass rapid transit system serving the Bangkok Metropolitan Region in Thailand. The MRT system comprises two fully operational rapid transit lines and one fully operational monorail line (Yellow). One monorail line (Pink) is in trial operation, with another rapid transit line (Orange) under construction. The MRT Blue Line, officially the Chaloem Ratchamongkhon Line, between Hua Lamphong and Bang Sue was the first to open in 2004 as Bangkok's second metro system. The MRT Blue line is officially known in Thai as rotfaifa mahanakhon (รถไฟฟ้ามหานคร) or "metropolitan electric train", but it is more commonly called rotfai taidin (รถไฟใต้ดิน), literally, "underground train" as it was distinguished from the BTS Skytrain by being completely underground when its first section between Hua Lamphong to Bang Sue opened.

<span class="mw-page-title-main">State Railway of Thailand</span> State-owned rail operator of Thailand

The State Railway of Thailand (SRT) is the state-owned rail operator under the jurisdiction of the Ministry of Transport in Thailand.

<span class="mw-page-title-main">Airport Rail Link (Bangkok)</span> Metro line in Bangkok, Thailand

The Airport Rail Link (ARL) is an express and commuter rail line in Bangkok, Thailand. The line provides an airport rail link from Suvarnabhumi Airport, via Makkasan station, to Phaya Thai station in central Bangkok. Most of the line is on a viaduct over the main eastern railway. It is owned by State Railway of Thailand (SRT) and, since 2021, operated by Asia Era One Company Limited. The 28.6-kilometer (17.8 mi)-long Airport Rail Link opened for service on 23 August 2010.

<span class="mw-page-title-main">Silom Line</span> Elevated rapid transit line in Bangkok, Thailand

The BTS Silom Line is an elevated rapid transit line of the BTS Skytrain in Bangkok, Thailand. It is operated by Bangkok Mass Transit System PCL (BTSC), a subsidiary of BTS Group Holdings, under a concession granted by the Bangkok Metropolitan Administration (BMA). The line serves Silom and Sathon Roads, the central business district of Bangkok, terminates at National Stadium and Bang Wa. The line is 14 km in length and consists of 14 stations.

<span class="mw-page-title-main">Rail transport in Thailand</span> Overview of rail transport in Thailand

Rail transport plays a crucial role in connecting various regions of Thailand, transporting both goods and passengers through a range of transportation options that include inter-city and commuter rail, mass rapid transit, monorails, and airport rail links. The State Railway of Thailand (SRT) operates a network of intercity railways spanning 4,845.1 kilometers, covering 47 provinces across the country. SRT is committed to developing railway lands through its subsidiary, SRT Asset (SRTA), which focuses on transit-oriented development (TOD) initiatives. The Krung Thep Aphiwat Central Terminal in Bangkok serves as the primary transportation hub for rail transport in Thailand, connecting various types of rail transportation throughout the country. It covers an area of 274,192 square meters, making it the largest railway station in Southeast Asia, and is situated in a new central business district (CBD) that is currently being developed.

<span class="mw-page-title-main">Purple Line (Bangkok)</span> Rapid transit line in Bangkok, Thailand

The MRT Purple line or MRT Chalong Ratchatham line is Bangkok's fifth rapid transit line, following the Sukhumvit Line, Silom Line, MRT Blue Line, and Airport Rail Link. The line is 23 km (14 mi) long, serving the north-western area of Bangkok running from Tao Poon to Klong Bang Phai in Nonthaburi Province.

<span class="mw-page-title-main">Bangkok Elevated Road and Train System</span> Cancelled Thai rail and highway project

The Bangkok Elevated Road and Train System, commonly known as the Hopewell Project (โครงการโฮปเวลล์) after main contractor Hopewell Holdings, was a failed project to build an elevated highway and rail line from central Bangkok to Don Mueang International Airport. Construction started in 1990, but was suspended by the first government of Anand Panyarachun in 1992, and was finally halted by legal acrimony in 1997 with only 10-13% complete. The project was cancelled in 1998. Due to its resemblance to standing stones, it was comically nicknamed "Thailand's Stonehenge". As of 2021, some idle pillars are still standing and litigation about the project continues.

<span class="mw-page-title-main">SRT Dark Red Line</span> Mass rapid rail line in Bangkok and Pathum thani

The SRT Dark Red Line, is part of the SRT Red Line suburban railway system to serve the greater Bangkok Metropolitan Region running for 26 km (16 mi) between Krung Thep Aphiwat and Rangsit.

<span class="mw-page-title-main">SRT Light Red Line</span> Mass rapid rail in Bangkok, Thailand

The SRT Light Red Line, or Nakhon Withi Line is a 15 km (9.3 mi) between Krung Thep Aphiwat Central Terminal and Taling Chan and is part of the SRT Red Lines suburban railway system serving the greater Bangkok Metropolitan Region.

The Light Blue Line is a planned monorail line to be built in Bangkok, Thailand. Its path runs along a north–south axis. This line would link the Din Daeng housing community areas, Bangkok City Hall 2, Makkasan Station, and the business area along Sathon Road.

<span class="mw-page-title-main">Mass Rapid Transit Master Plan in Bangkok Metropolitan Region</span> Thai urban rail transit system

The Mass Rapid Transit Master Plan in Bangkok Metropolitan Region, or M-Map, is the latest version in a series of Thai government plans for the development of an urban rail transit network serving the Greater Bangkok area. It was drafted under the care of the Office of Transport and Traffic Policy and Planning (OTP) of the Ministry of Transport.

<span class="mw-page-title-main">Rail transport in Bangkok</span>

Rail transport was introduced to Bangkok in 1893, and the national railway network was developed during the 20th century. Modern rapid transit in Bangkok includes several rail systems: the BTS Skytrain which opened in 1999, followed by the MRT, Airport Rail Link and SRT Red Lines.

<span class="mw-page-title-main">Greater Bangkok commuter rail</span> Commuter rail system in Bangkok

Greater Bangkok commuter rail is a commuter rail system in Bangkok Metropolitan Region, Phra Nakhon Si Ayutthaya Province, Saraburi Province, Lopburi Province, Suphan Buri Province, Ratchaburi Province, Chacheongsao Province, Nakhon Nayok Province, Prachinburi Province, and Samut Songkhram Province. It runs from and to the outskirts of the city during the rush hour, and the passenger number is high. It is operated by State Railway of Thailand (SRT) that also operates inter-city rail. Commuter rail services always have number 3xx. Most of the system are double track.

<span class="mw-page-title-main">Lopburi Line</span> Railway line in Thailand

Lopburi Line is a railway line of Greater Bangkok Commuter rail, operated by State Railway of Thailand (SRT). The line is all double track. There are seven commuter train services on the line. Main destinations such as Rangsit, Ayutthaya, and Lopburi.

<span class="mw-page-title-main">Kaeng Khoi Line</span> Railway line in Thailand

Kaeng Khoi Line is a railway line of Greater Bangkok Commuter rail, operated by State Railway of Thailand (SRT). The line is all double track. There are three commuter train services on the line. Main destinations such as Rangsit, Ayutthaya, Saraburi, and Kaeng Khoi.

<span class="mw-page-title-main">Krung Thep Aphiwat Central Terminal</span> Bangkok, Thailand railway hub

Krung Thep Aphiwat Central Terminal, also known by its former name Bang Sue Grand Station, is the central passenger terminal in Bangkok and the current railway hub of Thailand. It replaced the existing Hua Lamphong railway station as the city's central railway station, with long-distance rail services operating from here from 19 January 2023. The station was opened on 2 August 2021 as part of the operation of the SRT Red Lines, and from May 2021 to September 2022 served as a COVID-19 vaccination center. It is linked to the Bang Sue MRT station via an underground walkway.

The BMA Bang Na–Suvarnabhumi line is a proposed light rail line in Bangkok that would run from Bang Na junction to Suvarnabhumi Airport. The line was first proposed in 1994, but it was not included in the 2005 OTP Mass Rapid Transit Master Plan. Initially, it was planned for the line to potentially be a BTS Sukhumvit Line branch line with turnouts constructed near Bang Na junction. In December 2015, the BMA said it would advance construction and would propose it to cabinet in the near future. In April 2016, deputy governor Amorn Kitchawengkul said the project would take 3–6 years and cost THB 20 billion.

References

  1. "สายสีแดงเปิดหวูดฝ่าวิกฤต! "ศักดิ์สยาม" ปิดประตูขาดทุน รฟท.งัดทุกกลยุทธ์ปั้นรายได้-เพิ่มผู้โดยสาร". 2 August 2021.
  2. bangkokpost. "Free rides along Red Line until November". Bangkok Post. Retrieved 4 August 2021.
  3. แผนแม่บทระบบขนส่งมวลชนทางรางในเขตกรุงเทพฯและปริมณฑล พ.ศ.2553-2572 [Mass Rapid Transit Master Plan in Bangkok Metropolitan Region](PDF) (in Thai). Office of Transport and Traffic Policy and Planning. Archived from the original (PDF) on 15 July 2015. Retrieved 16 January 2012.
  4. โครงการระบบรถไฟชานเมือง (สายสีแดง) [Commuter rail system project (Red Line)]. SRT website (in Thai). State Railway of Thailand. Retrieved 20 January 2012.
  5. "Reviving the former Hopewell route", translated and summarized by Wisarut Bholsithi from Prachachart Thurakij, 4–7 March 2004. "This Northern Commuter has to connect with the Airport Link which is not even at the design stage. At the minimum, the detailed design for the Airport Link must be done by July 2004. The Hopewell revival will be an elevated single floor—either shared tracks or separated tracks for High Speed Rail, DMU/Diesel Tracks, and Red Line Commuter which all have to be done in six years. The elevated section will end at Don Muang and then it will be at grade with separated tracks."

Commons-logo.svg Media related to SRT Red Lines at Wikimedia Commons