Ararat railway line

Last updated

Ararat
Train entering Ballarat Station.jpg
A train entering Ballarat
Overview
Connecting lines Geelong-Ballarat and Mildura (at Ballarat); Geelong via the Regional Rail Link (at Deer Park), Bendigo and Sunbury (at Sunshine)
Former connectionsSee Former branch lines section
Stations14 in service (not including Southern Cross) [1]
Service
TypeV/Line passenger service
System V/Line passenger services to Ballarat and Ararat
Rolling stock V/Line VLocity diesel multiple-unit trains in either 3- or 6-car configurations. Locomotive-hauled services withdrawn in 2023. [2]
History
Opened1887 (to Serviceton); 1889 (direct route to Melbourne via Melton); 1995 (services past Ballarat withdrawn); 2004 (reopened to Ararat)
Completedto Serviceton in 1887; truncated to Ararat in 1994 with the line beyond converted to standard gauge and reopened as part of the Western standard gauge railway line
Closed1994 (for conversion beyond Ararat to standard gauge) 2020 (original alignment via Bungaree & Millbrook)
Technical
Number of tracksDuplicated up to Melton, single track with crossing loops the rest of the way
Route map

Contents

km
BSicon uCONTg.svg
BSicon uHST.svg
465.0
Wolseley
BSicon uSTR+GRZq.svg
463.8
BSicon ueBHF.svg
456.8
Serviceton
BSicon uPSL.svg
Leeor loop
BSicon ueHST.svg
443.2
Lillimur
BSicon ueHST.svg
433.5
Kaniva
BSicon uPSL.svg
Kaniva loop
BSicon ueHST.svg
423.9
Miram
BSicon ueHST.svg
412.2
Diapur
BSicon uPSL.svg
Diapur loop
BSicon ueHST.svg
405.2
Tarranginnie
BSicon uHST.svg
395.3
Nhill
BSicon ueHST.svg
385.2
Salisbury
BSicon uPSL.svg
Salisbury loop
BSicon ueHST.svg
381.2
Kiata
BSicon ueHST.svg
375.2
Gerang Gerung
BSicon uPSL.svg
Dimboola loop
BSicon uABZg+l.svg
BSicon uCONTfq.svg
BSicon uBHF.svg
356.9
Dimboola
BSicon ueKRWgl.svg
BSicon uexKRW+r.svg
proposed
Horsham Bypass
BSicon ueHST.svg
BSicon uexSTR.svg
347.8
Wail
BSicon uPSL.svg
BSicon uexSTR.svg
Pimpinio loop
BSicon ueHST.svg
BSicon uexSTR.svg
338.5
Pimpinio
BSicon exCONTgq.svg
BSicon uemABZg+r.svg
BSicon uexSTR.svg
BSicon uBHF.svg
BSicon uexSTR.svg
322.0
Horsham
BSicon ueHST.svg
BSicon uexSTR.svg
314.0
Dooen
BSicon ueHST.svg
BSicon uexSTR.svg
304.0
Jung
BSicon ueKRWg+l.svg
BSicon uexKRWr.svg
Horsham Bypass
(proposed)
BSicon uPSL.svg
Murtoa loop
BSicon uABZg+l.svg
BSicon uCONTfq.svg
BSicon ueBHF.svg
294.7
Murtoa
BSicon uemABZg+l.svg
BSicon exCONTfq.svg
BSicon ueHST.svg
276.6
Lubeck
BSicon uPSL.svg
Lubeck loop
BSicon ueHST.svg
267.0
Wal Wal
BSicon ueHST.svg
256.5
Glenorchy
BSicon uPSL.svg
Deep Lead loop
BSicon ueHST.svg
244.0
Deep Lead
BSicon exCONTgq.svg
BSicon uemABZg+r.svg
BSicon uBHF.svg
236.4
Stawell
BSicon uPSL.svg
Great Western loop
BSicon ueHST.svg
223.1
Great Western
BSicon ueHST.svg
214.6
Armstrong
BSicon uPSL.svg
Pyrenees loop
BSicon emSPLa.svg
BSicon dKBHFxa-L.svg
BSicon udBHF-R.svg
205.8
Ararat [b]
BSicon udSTRc2.svg
BSicon dSHI1c1.svg
BSicon vSHI1+r-.svg
BSicon uWYE3+lg.svg
BSicon ucSTRq.svg
BSicon udCONTfq.svg
BSicon ulCONTf@F.svg
BSicon uSTR+1.svg
BSicon udSTRc4.svg
BSicon dSTR.svg
BSicon eHST.svg
193.1
Dobie [3]
BSicon eHST.svg
182.6
Buangor
BSicon eHST.svg
172.2
Middle Creek [4]
BSicon HST.svg
159.8
Beaufort
BSicon eHST.svg
151.9
Trawalla
BSicon eHST.svg
134.6
Burrumbeet
BSicon SKRZ-G4u.svg
BSicon eHST.svg
129.3
Windermere
BSicon eHST.svg
120.3
Dowling [5]
via post-RFR Ballan line
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon exCONTgq.svg
BSicon eABZg+r.svg
BSicon exCONTgq.svg
BSicon eABZg+r.svg
Skipton line
Linton Junction
BSicon INT.svg
118.1
Wendouree
BSicon eHST.svg
117.4
Wendouree
(original site)
BSicon eHST.svg
116.6
White's siding
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon eHST.svg
115.1
North Ballarat
BSicon INT.svg
113.8
Ballarat
BSicon eHST.svg
113.1
Ballarat East
BSicon exCONTgq.svg
BSicon eABZgr.svg
112.5
BSicon eHST.svg
111.3
RMSP No.74 [6]
BSicon eHST.svg
107.2
148.8
Warrenheip
via North Geelong
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon eHST.svg
103.6
Dunnstown
BSicon BS2+l.svg
BSicon eBS2+r.svg
101.8
106.8
Bungaree West Junction [7]
via North Line & Bungaree
BSicon STR.svg
BSicon exHST.svg
103.8
RMSP No.73
BSicon STR.svg
BSicon exHST.svg
102.9
Bungaree
BSicon STR.svg
BSicon exABZgl.svg
BSicon exdKHSTeq.svg
105.9
Bungaree Racecourse
measured via Bungaree
BSicon STR.svg
BSicon exPSLl.svg
100.4
Bungaree loop
BSicon dWASSERq.svg
BSicon hKRZWae.svg
BSicon exWBRUCKE1.svg
BSicon dWASSERq.svg
Lal Lal Creek
BSicon STR.svg
BSicon exHST.svg
98.9
Wallace
BSicon dWASSERq.svg
BSicon WBRUCKE1.svg
BSicon exWBRUCKE1.svg
BSicon dWASSERq.svg
Moorabool River
(west branch)
BSicon STR.svg
BSicon exABZg+nl.svg
BSicon exndENDEeq.svg
98.6
G. Holden's siding
BSicon STR.svg
BSicon exHST.svg
92.4
Millbrook
BSicon BS2l.svg
BSicon eBS2r.svg
93.6
Bungaree East Junction
BSicon eHST.svg
93.3
RMSP No.72
BSicon eHST.svg
92.1
RMSP No.40
BSicon eHST.svg
91.2
Gordon [c]
BSicon dSTR.svg
BSicon dRP1q.svg
BSicon exdSTRu.svg
BSicon cRP1q.svg
BSicon dRP1.svg
adjacent heritage bridge
& abandoned line
BSicon SKRZ-G1u.svg
BSicon RP1rf.svg
87.3
Portland Flat Road
BSicon eHST.svg
86.5
RMSP No.77
(1st)
BSicon ePSLl.svg
86.2
BSicon eHST.svg
83.7
Bradshaw/
RMSP No.77 (2nd)
BSicon eHST.svg
81.7
RMSP No.71
BSicon HST.svg
79.5
Ballan
BSicon eHST.svg
72.4
Ingliston
BSicon eHST.svg
65.2
Bank Box
BSicon PSLr.svg
64.8
Bank Box loop
BSicon exnENDEaq.svg
BSicon eABZg+nr.svg
Dog Trap Gully siding
BSicon eHST.svg
55
Rowsley
BSicon PSLl.svg
55
Rowsley loop
BSicon eABZg+l.svg
BSicon exKHSTeq.svg
53.9
Maddingley
Racecourse
[8]
BSicon exnENDEaq.svg
BSicon eABZg+nr.svg
51.4
Maddingley Brown
Coal sidings
BSicon INT.svg
50.9
Bacchus Marsh
BSicon ePSLr.svg
49.9
Bacchus Marsh
works siding
BSicon eHST.svg
47.1
Parwan
BSicon PSLl.svg
45.7
Parwan loop
BSicon ePSLl.svg
42.6
Staughton siding
BSicon hbKRZWae.svg
BSicon INT.svg
41.3
Melton
BSicon eHST.svg
34.6
RMSP No.65
BSicon HST.svg
34.4
Cobblebank
BSicon ePSLr.svg
31.2
Cockbills siding
BSicon HST.svg
30.2
Rockbank
BSicon eHST.svg
27.8
RMSP No.64
BSicon HST.svg
21.3
Caroline Springs
BSicon nENDEaq.svg
BSicon ABZg+nr.svg
21
Deer Park Boral siding
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon SKRZ-G4u.svg
BSicon HST.svg
17.8
Deer Park
BSicon SKRZ-G4u.svg
BSicon eABZg+nl.svg
BSicon exnENDEeq.svg
16
Nobel/ICI factory
BSicon HST.svg
15.1
Ardeer
BSicon hbKRZWae.svg
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon INT.svg
12.3
Sunshine
BSicon LSTR.svg
Sunbury Line service
BSicon INT.svg
4.9
Footscray
BSicon CONTgq.svg
BSicon ABZg+r.svg
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon SKRZ-G4u.svg
BSicon INT.svg
1.7
North Melbourne
BSicon KBHFe.svg
0.0
Southern Cross
km

BSicon STRq.svg
BSicon exSTRq.svg
BSicon uSTRq.svg
BSicon uexSTRq.svg
Notes

The Melbourne–Ararat half is used for the Ararat V/Line rail service; the standard gauge half forms only part of the Western standard gauge railway line.

  1. Converted to standard gauge in 1995.
  2. End of Ararat V/Line service.
  3. Station preserved by the Australian Railway Historical Society.

The Ararat railway line (formerly known as the Serviceton and Western lines) is a railway line in Victoria, Australia. It links the state capital of Melbourne to the cities of Ballarat and Ararat via the Regional Rail Link.

The line began construction in 1874, when the original line to Ballarat was extended westwards to Beaufort, eventually reaching Serviceton at the disputed South Australian border in 1887 to form the Victorian part of the Melbourne–Adelaide railway. In 1889, the line became the direct Melbourne−Ballarat railway when it was extended eastwards from Ballarat to Bacchus Marsh, meeting with another line constructed from Sunshine.

In 1995, the line beyond Ararat, along with several old branch lines, was converted to standard gauge and reopened to form part of the 1435 mm (4 ft 8+12 in) Western standard gauge railway line. Services past Ballarat were withdrawn until 2004 when services to Ararat were reinstated.

The line has seen numerous packages of upgrades. As part of the Regional Fast Rail project, several parts of the track were realigned to reduce curves and grades, enabling trains to run up to 160 km/h. The Regional Rail Link project saw the construction of a new alignment between Sunshine and Southern Cross dedicated to regional trains, separating the line from the Sunbury line. As part of the Regional Rail Revival project, the line was duplicated up to Melton. The Level Crossing Removal Project has grade-separated three level crossings and rebuilt Deer Park station, making the line level-crossing free between Deer Park and Southern Cross. [9] In 2026, another four level crossings are planned to be removed, with Melton station to be rebuilt. There are plans for future quadruplication and electrification of the line up to Melton. [10] [11] [12]

Services

V/Line currently operates services on the line towards Ballarat, Ararat and Maryborough (on the Mildura line, which junctions at Ballarat) via the Regional Rail Link. In the future, the line is planned to be electrified as far as Melton. [12]

Several services on the line originate and terminate at Melton, with some additional services originating and terminating at Bacchus Marsh. [13] Four weekday services and three weekend services are operated to Ararat, [1] while only one service is operated each day to Maryborough. [14] Myki is available between Southern Cross and Wendouree.

Freight services sometimes also use the line between Ballarat and Melbourne, coming off the Mildura line.

History

20th century

Serviceton railway station lies 2.08 kilometres (1.3 mi) east of the Victoria-South Australia border, the location of which was disputed for 40 years. Serviceton (Victoria) railway station building, 2006.jpg
Serviceton railway station lies 2.08 kilometres (1.3 mi) east of the Victoria−South Australia border, the location of which was disputed for 40 years.

The first railway line from Melbourne to Ballarat was via Geelong. Construction of the Geelong–Ballarat railway line began in 1858 and took nearly four years to complete, employing up to 3,000 men and costing approximately £1.5 million. The line officially opened in 1862, with the first train running on the 10th of April. The train took about four and a half hours to reach Geelong, travelling at a maximum speed of 15 miles per hour (24 kilometres per hour) and having to overcome several difficulties, including failing an uphill grade and running out of firewood. The return journey was achieved in two hours and forty minutes. [15] [ better source needed ]

The line was extended further west from Ballarat to Beaufort in 1874, Ararat in 1875, Stawell in 1876, Murtoa, in 1878, Horsham in 1882, Dimboola in 1882, and lastly Nhill and Serviceton in 1887, where it met with the South Australian Railways line from Adelaide. The direct route from Melbourne to Ballarat opened in 1889, when a branch line from Ballarat to Warrenheip was progressively extended eastwards to Bacchus Marsh, where it met with a line originally constructed from Sunshine to Melton; that line was opened in 1874 and itself extended to Bacchus Marsh in 1887. [16] [17] [18] [19] [ better source needed ]

In 1994, V/Line passenger rail services beyond Ballarat were withdrawn to allow for the conversion of the line beyond Ararat to standard gauge. [20] The Serviceton−Ararat section, now standard gauge, was connected to a section of the Portland line, which in turn connected to the Maroona−Gheringhap line, both also converted to standard gauge as part of the project. In 1995 the completed line opened as the Western standard gauge railway line.

21st century

Restoration of Ararat services

In 2004, passenger services to Ararat were restored. [21] [22]

Regional Fast Rail

Clocktower at Ballarat station Ballarat-station-clocktower.jpg
Clocktower at Ballarat station

Major upgrades to the line occurred as part of Regional Fast Rail, a project announced in 2000 by then-Premier Steve Bracks with the aim of shortening travel times between the major Victorian regional centres and Melbourne by upgrading the tracks and introducing V/Line VLocity diesel multiple-unit trains. Heavier tracks and concrete sleepers were laid, ballast was renewed and a new signalling system was installed. Curves and grades on the line were eased by constructing new deviations from the main line and seven new bridges, including the Lal Lal Creek and Moorabool River bridges, which at the time were among the longest in Australia. [23] Most of the original alignment remained, serving as crossing loops. [24]

The first VLocity train ran on the line to Ballarat on 22 December 2005. [25]

Regional Rail Revival

VLocity train at Ararat, 2022 Vlocity vl60 at ararat.jpg
VLocity train at Ararat, 2022

Another significant round of upgrades occurred to the line as part of the Regional Rail Revival project, beginning in early 2018 with major construction completed in 2021. [26] The project, with a budget of $518 million, saw the duplication of 17 kilometres of track between Deer Park and Melton, addition of a second platform and track at Rockbank, Bacchus Marsh and Ballan, the construction of Cobblebank Station, and new a passing loop at Millbrook. [27] The upgrades enable future electrification of the line to Melton. The new passing loop at Millbrook also allowed the original line via Bungaree to be decommissioned, with level crossings and railway infrastructure at these crossings removed. [28]

Future

Level Crossing Removal Project

The Level Crossing Removal Project has removed, and is planning to remove, several level crossings along the line. In 2022, the first crossings was removed: Fitzgerald Road in Ardeer, by building a road bridge over the rail line [29] The crossing at Robinsons Road in Deer Park was removed by elevating the rail line over the road. [30] In 2023, the Mt Derrimut Road level crossing in Deer Park was removed by elevating the rail line; Deer Park Station was rebuilt as part of this removal. [31] The line is level-crossing free between Deer Park and Southern Cross.

By 2026, four more crossings are set to be removed. The crossings at Coburns Road and Exford Road in Melton will be removed by elevating the rail line; Melton Station is currently being rebuilt. The crossings at Ferris Road in Melton and Hopkins Road in Truganina will be removed by elevating the road onto a bridge. Concept designs for the new station and bridges were released in 2024. [32]

A package of accessibility upgrades at Ballarat Station began in 2025, delivered by the Level Crossing Removal Project. The northern (platform 2) entrance of the station has been modified to fit a wheelchair-accessible ramp. A new pedestrian overpass, accessible with a lift or stairs, will be completed in 2026. [33] Currently, the only way to cross the platforms at Ballarat without using stairs is by using the pedestrian level crossing over the tracks. [34] [35]

Quadruplication and Melton electrification

Electrification to Rockbank was suggested as early as the 1969 Melbourne Transport Plan. In 2013, Public Transport Victoria released the Network Development Plan – Metropolitan Rail, stage 3 of which includes quadruplication and electrification up to Melton. The Western Rail Plan, announced as a key policy of the 2018 Victorian state election by then-incumbent Premier of Victoria Daniel Andrews, also included quadruplication and electrification to Melton. [36]

In 2023, it was widely speculated that the Western Rail Plan no longer included quadruplication. [10] [11] [12] However, in 2025, a track diagram was released showing changes that will be made as part of the major upgrades planned for Sunshine Station. According to the diagram, quadruplication is planned to occur between a junction site near Caroline Springs and Sunshine; the new tracks will run into a new pair of platforms at Sunshine. The tracks at Sunshine will be reconfigured to route the future electrified Melton service through the Metro Tunnel. [37]

Introduction of 9-car VLocity trains

In 2022, then-Premier Daniel Andrews announced plans to extend the platforms on the line from Bacchus Marsh to Ardeer to allow 9-car VLocity trains to run. [38] In 2024, the Level Crossing Removal Project announced plans to "investigate" constructing a train stabling facility in Cobblebank to "support the introduction of 9-car trains". [39] In 2025, it was announced that the platform extensions were fast-tracked for completion in 2027, however, Bacchus Marsh and Ardeer will not be included. [40] The train stabling facility in Cobblebank will be "future-proofed" for electrification. [41]

Planned stations

Several new stations are proposed to be built on the line, primarily to serve new housing estates. In 2016, the Victorian Planning Authority released the Paynes Road Precinct Structure Plan, which included plans for a train station in Thornhill Park (west of Rockbank) to support a new housing development in the area. [42]

In 2020, another Precinct Structure Plan released by the Victorian Planning Authority included plans for a station in Mount Atkinson, west of Caroline Springs. [43] In 2024, a petition submitted to the Parliament of Victoria calling for the station to be built attracted over 1,700 signatures. [44]

Former branch lines

V/Line VLocity train at the junction with the Melbourne-Ballarat line at Warrenheip VLine VLocity Warrenheip.jpg
V/Line VLocity train at the junction with the Melbourne-Ballarat line at Warrenheip

Ballarat region

A branch line was built from Ballarat to Newtown and Skipton in 1883. This line closed in 1985. A branch was built between Newtown, Cressy and Irrewarra (east of Colac) about 1910. This line was closed in 1953.

A branch line was built from Linton junction to the Ballarat Cattle Yards and Redan in 1886. This line was closed in 1997.[ citation needed ]

Ararat region

Until 1993, two daily V/Line services ran from Melbourne to Dimboola, as well as the nightly The Overland service from Melbourne to Adelaide. Under the Kennett Government's economic reforms, the V/Line service to Dimboola was cut back to Ararat, with the towns beyond now served by coaches. The Ararat−Serviceton section was converted to standard gauge and reopened as part of the Western standard gauge railway line in 1995, which makes reinstatement of train services beyond Ararat unlikely.

The Overland service is now operated by Journey Beyond and runs on the Western standard gauge railway line, serving only some stations between Southern Cross and Adelaide Parklands Terminal.

A branch line was built from Lubeck (between Stawell and Murtoa) to Rupanyup in 1887, extended to Marnoo by 1909, and to Bolangum in the 1927. It closed in 1983.

A branch line was opened from Murtoa to Warracknabeal in 1886 and extended to Beulah in 1893, Roseberry and Hopetoun in 1894 and Patchewollock in 1927. The section from Hopetoun to Patchewollock was closed in the 1980s. The line from Murtoa to Hopetoun was converted to standard gauge in 1995. It has not carried passengers for many years and grain services between Roseberry to Hopetoun were suspended in 2005.

A branch line was completed between Horsham, East Natimuk and Noradjuha in 1887, and progressively extended to Balmoral by 1920, where it connected with a line from Cavendish to Hamilton. The whole line, from Noradjuha to Hamilton, was closed in 1979. A branch was opened from East Natimuk to Goroke in 1894, and extended further west to Carpolac in 1927. It closed in 1986.

A branch was opened from Dimboola to Jeparit in 1894 and extended to Rainbow in 1899 and Yaapeet in 1914. The line was converted to standard gauge in 1995. The line was deemed unusable after severe flooding in January 2011. The Victorian Government announced that they would contribute $5.3 million to restoring the line from Dimboola to Rainbow in 2011. [45]

In 1905, a branch line was opened from Stawell to the Heatherlie quarry in The Grampians, from which large amounts of high-quality freestone were railed, [46] to be used in a number of significant building projects. The branch was closed in 1949. [47]

Another branch line, from Jeparit to Lorquon, was opened in 1912, and was extended to Yanac in 1916. It closed in 1986.

A line was built from Ararat to Portland in 1877, via Maroona, Hamilton, and Heywood. A number of branch lines were built from this line, none of which are in use today. This line was converted to standard gauge in 1995; up to Maroona it forms part of the Western standard gauge railway line, where it junctions with section of the line towards North Shore. The Portland line saw further upgrades as part of the Murray Basin Rail Project, connecting it to the Mildura line via the Ararat-, which was converted to standard gauge also as part of the MBRP. [48]

The Tom Waits song Town with No Cheer from the 1982 album Swordfishtrombones refers to Serviceton, The Overland train, and the railway line's disuse. [49]

References

  1. 1 2 "Melbourne to Ararat via Ballarat". V/line. Retrieved 19 November 2024.
  2. Wong, Marcus (19 February 2024). "Farewell to V/Line's H type carriage sets". Waking up in Geelong.
  3. Maryborough-Avoca-Ararat railway: a brief history, Turton, K W, McLean, D C
  4. Maryborough-Avoca-Ararat railway: a brief history, Turton, K W, McLean, D C
  5. The Golden Steam of Ballarat, King, D & Dooley, N, 1973
  6. Waugh, Andrew (24 September 1992). "Sunshine Ballarat Station Notes: SRS Tour" (PDF). p. 21.
  7. "VLine Bungee Signalling Diagram No: 18/13" (PDF). VLine. 26 July 2013. Archived from the original (PDF) on 11 July 2016.
  8. Waugh, Andrew (2005) [1995-06-26]. "Victorian Signalling Histories: Bacchus Marsh" (PDF).
  9. "Mt Derrimut Road, Deer Park". Victoria's Big Build. 8 August 2024. Retrieved 28 September 2024.
  10. 1 2 Visontay, Elias (6 August 2023). "Meet Melton, officially part of Melbourne, but crying out for city services". The Guardian.
  11. 1 2 "Confusion and plummeting confidence in rail promises for regional Victoria". ABC News. 5 August 2023 via www.abc.net.au.
  12. 1 2 3 Hatch, Patrick (1 August 2023). "New train lines to Melton and Wyndham axed from rail plans". The Age.
  13. "Ballarat timetable". www.vline.com.au. Retrieved 23 October 2024.
  14. "Maryborough". www.vline.com.au. Retrieved 23 October 2024.
  15. "Ballarat Australia History – Rail Heritage". Ballarat History Central. Archived from the original on 22 August 2006. Retrieved 17 July 2006.
  16. "VICSIG". vicsig.net.
  17. "VICSIG". vicsig.net.
  18. "Ballarat". www.victorianrailways.net.
  19. "Last train travels over the Bungaree loop". Victoria's Big Build. 24 June 2021.
  20. "VictorianRailways.net – VR Timeline". Archived from the original on 30 May 2008. Retrieved 14 November 2007.
  21. "Ararat sleepers awake to new sound - the train". The Age. 10 July 2004.
  22. "Still no start date for Ballarat-Ararat rail services". ABC News. 12 May 2004 via www.abc.net.au.
  23. "Transport planning and projects – Regional Fast Rail". State Government of Victoria, Department of Infrastructure. 15 May 2006. Archived from the original on 30 August 2006. Retrieved 17 July 2006.
  24. Train Operating Data: Deer Park to Ararat Archived 27 March 2015 at the Wayback Machine V/Line 21 October 2014
  25. "V/Line – First Day of VLocity Revenue Operation (Ballarat)". Archived from the original on 18 May 2007.
  26. "Ballarat Line Upgrade website". Ballarat Line Upgrade. 24 July 2017. Archived from the original on 1 August 2017. Retrieved 1 August 2017.
  27. Pollock, Michael (27 April 2016). ""$518m commitment to Ballarat rail line"". The Ballarat Courier. Archived from the original on 1 August 2017. Retrieved 1 August 2017.
  28. "Last train travels over the Bungaree loop". Victoria's Big Build. 27 December 2020. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  29. "Fitzgerald Road, Ardeer". Victoria's Big Build. 7 July 2023.
  30. "Robinsons Road, Deer Park". Victoria's Big Build. 7 July 2023.
  31. "Mt Derrimut Road, Deer Park". Victoria's Big Build. 19 February 2024.
  32. "Melton level crossing removals". Victoria's Big Build. 31 May 2024.
  33. Build, Victoria’s Big (20 August 2025). "Pedestrian overpass steels the show at Ballarat Station". Victoria’s Big Build. Retrieved 5 September 2025.
  34. "Ballarat Station Upgrade". Victoria's Big Build. 12 June 2024.
  35. "Ballarat Station Upgrade community update – June 2024". Victoria's Big Build. 4 June 2024.
  36. "A Real Plan For Fast Regional Rail And Metro Rail For The West | Premier of Victoria". www.premier.vic.gov.au.
  37. Build, Victoria’s Big (2 June 2025). "Your new Sunshine Station Superhub". Victoria’s Big Build. Retrieved 5 September 2025.
  38. Hatch, Patrick (6 October 2022). "Andrews admits Metro upgrades to outer west at least six years away". The Age. Retrieved 5 September 2025.
  39. "New Melton Station designs as part of massive upgrades". Victoria's Big Build. 23 March 2024.
  40. Build, Victoria’s Big (29 August 2025). "Melton Line Upgrade fast tracked". Victoria’s Big Build. Retrieved 5 September 2025.
  41. Build, Victoria’s Big (29 August 2025). "Melton Line Upgrade". Victoria’s Big Build. Retrieved 5 September 2025.
  42. "Paynes Road Precinct Structure Plan" (PDF). Metropolitan Planning Authority. February 2016. Retrieved 19 November 2024.
  43. "Mt Atkinson & Tarneit Plains Precinct Structure Plan" (PDF). Victorian Planning Authority. June 2017. Retrieved 19 November 2024.
  44. "The proposed Mt Atkinson Train Station".
  45. "Money for rail". ABC News. 21 September 2011 via www.abc.net.au.
  46. "Heatherlie Quarry". Grampians Guide. Archived from the original on 3 October 2020. Retrieved 17 August 2020.
  47. Harrigan, Leo J. (1962). Victorian Railways to '62. Melbourne: Victorian Railways Public Relations and Betterment Board. p. 284. ASIN   B0007JJ26C. OCLC   945951383.
  48. "Murray Basin Rail Project Business Case Review" (PDF). bigbuild.vic.gov.au. April 2020. Retrieved 23 October 2024.
  49. Tom Waits. "Town With No Cheer". Archived from the original on 25 February 2015. Retrieved 22 January 2015.