Ararat railway line

Last updated

Ararat
Train entering Ballarat Station.jpg
A train entering Ballarat
Overview
Connecting lines Geelong-Ballarat and Mildura (at Ballarat); Geelong via the Regional Rail Link (at Deer Park), Bendigo and Sunbury (at Sunshine)
Former connectionsSee Former branch lines section
Stations14 in service (not including Southern Cross) [1]
Service
TypeV/Line passenger service
System V/Line passenger services to Ballarat and Ararat
Rolling stock V/Line VLocity diesel multiple-unit trains in either 3- or 6-car configurations. Locomotive-hauled services withdrawn in 2023. [2]
History
Opened1887 (to Serviceton); 1889 (direct route to Melbourne via Melton); 1995 (services past Ballarat withdrawn); 2004 (reopened to Ararat)
Completedto Serviceton in 1887; truncated to Ararat in 1994 with the line beyond converted to standard gauge and reopened as part of the Western standard gauge railway line
Closed1994 (for conversion beyond Ararat to standard gauge)
Technical
Number of tracksDuplicated up to Melton, single track with crossing loops the rest of the way
Route map

Contents

BSicon KBHFa.svg
0 km
Southern Cross
BSicon INT.svg
1.7 km
North Melbourne
BSicon SKRZ-Bu.svg
CityLink
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon ABZgl.svg
BSicon CONTfq.svg
BSicon INT.svg
4.9 km
Footscray
BSicon LSTR.svg
Sunbury Line service
BSicon INT.svg
12.3 km
Sunshine
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon hKRZWae.svg
BSicon HST.svg
15.1 km
Ardeer
BSicon exnSTRq.svg
BSicon eABZgnr.svg
16 km
Nobel/ICI factory (closed)
BSicon SKRZ-Bu.svg
BSicon HST.svg
17.8 km
Deer Park
BSicon SKRZ-Bu.svg
BSicon ABZgl.svg
BSicon CONTfq.svg
BSicon ABZgnl.svg
BSicon nSTRq.svg
21 km
Deer Park Boral Siding
BSicon HST.svg
21.3 km
Caroline Springs
BSicon eHST.svg
27.8 km
RMSP No.64 (closed)
BSicon HST.svg
30.2 km
Rockbank
BSicon ePSLl.svg
31.2 km
Cockbills Siding (closed)
BSicon HST.svg
34.4 km
Cobblebank
BSicon eHST.svg
34.6 km
RMSP No.65 (closed)
BSicon INT.svg
41.3 km
Melton
BSicon hKRZWae.svg
BSicon ePSLr.svg
42.6 km
Staughton Siding (closed)
BSicon PSLr.svg
45.7 km
Parwan Loop
BSicon eHST.svg
47.1 km
Parwan (closed)
BSicon ePSLl.svg
49.9 km
Bacchus Marsh works siding (closed)
BSicon INT.svg
50.9 km
Bacchus Marsh
BSicon eABZgnl.svg
BSicon exnSTRq.svg
51.4 km
Maddingley Brown Coal Sidings
BSicon exKHSTaq.svg
BSicon eABZgr.svg
53.9 km
Maddingley Racecourse [3]
BSicon PSLr.svg
55 km
Rowsley Loop
BSicon eHST.svg
55 km
Rowsley (closed)
BSicon eABZgnl.svg
BSicon exnSTRq.svg
51.4 km
Dog Trap Gully Siding
BSicon PSLl.svg
64.8 km
Bank Box Loop
BSicon eHST.svg
65.2 km
Bank Box (closed)
BSicon eHST.svg
72.4 km
Ingliston (closed)
BSicon HST.svg
79.5 km
Ballan
BSicon eHST.svg
81.7 km
RMSP No.71 (closed)
BSicon eHST.svg
83.7 km
Bradshaw/RMSP No.77 2nd (closed)
BSicon ePSLr.svg
86.2 km
Llandeilo (closed)
BSicon eHST.svg
86.5 km
RMSP No.77 1st (closed)
BSicon RP1+l.svg
BSicon RP1q.svg
BSicon SKRZ-G1u.svg
87.3 km
Portland Flat Road
BSicon RP1eRP1.svg
BSicon exSKRZ-G1u.svg
BSicon STR.svg
adjacent heritage bridge & abandoned track
BSicon eHST.svg
91.2 km
Gordon (closed) (Station preserved by ARHS)
BSicon eHST.svg
92.1 km
RMSP No.40 (closed)
BSicon eHST.svg
93.3 km
RMSP No.72 (closed)
BSicon exSTR+l.svg
BSicon eABZgr.svg
93.6 km
Bungaree East Junction
BSicon exHST.svg
BSicon STR.svg
92.4 km
Millbrook (closed)
BSicon exnSTRq.svg
BSicon exABZgnr.svg
BSicon STR.svg
98.6 km
G. Holden's Siding (closed)
BSicon exWBRUCKE1.svg
BSicon WBRUCKE1.svg
Moorabool River (west branch)
BSicon exHST.svg
BSicon STR.svg
98.9 km
Wallace (closed)
BSicon exWBRUCKE1.svg
BSicon hKRZWae.svg
Lal Lal Creek
BSicon exPSLr.svg
BSicon STR.svg
100.4 km
Bungaree Loop (abolished)
BSicon exKHSTaq.svg
BSicon exABZg+r.svg
BSicon STR.svg
105.9 km
Bungaree Racecourse
measured via Bungaree
BSicon exHST.svg
BSicon STR.svg
102.9 km
Bungaree (closed)
BSicon exHST.svg
BSicon STR.svg
103.8 km
RMSP No.73 (closed)
BSicon exSTRl.svg
BSicon eABZg+r.svg
101.8 km
Bungaree West Junction
(106.8 km via North Line & Bungaree) [4]
BSicon eHST.svg
103.6 km
Dunnstown (closed)
BSicon ABZg+l.svg
BSicon CONTfq.svg
BSicon eHST.svg
107.2 km
Warrenheip (closed) (148.8km via North Geelong)
BSicon eHST.svg
111.3 km
RMSP No.74 (closed) [5]
BSicon eABZg+l.svg
BSicon exCONTfq.svg
112.5 km
Buninyong line(closed)
BSicon eHST.svg
113.1 km
Ballarat East (closed)
BSicon INT.svg
113.8 km
Ballarat
BSicon eHST.svg
115.1 km
North Ballarat (closed)
BSicon CONTgq.svg
BSicon ABZgr.svg
BSicon eHST.svg
116.6 km
White's Siding (closed)
BSicon eHST.svg
117.4 km
Wendouree (original site)
BSicon INT.svg
118.1 km
Wendouree
BSicon eHST.svg
Linton Junction and Skipton line (closed)
BSicon eABZgl.svg
BSicon exCONTfq.svg
Ballarat Cattle Yards line
BSicon eABZgl.svg
BSicon exCONTfq.svg
BSicon eHST.svg
120.3 km
Dowling (closed) [6]
Via post-RFR Ballan line
BSicon eHST.svg
129.3 km
Windermere (closed)
BSicon SKRZ-Bu.svg
BSicon eHST.svg
134.6 km
Burrumbeet (closed)
BSicon eHST.svg
151.9 km
Trawalla (closed)
BSicon HST.svg
159.8 km
Beaufort
BSicon eHST.svg
172.2 km
Middle Creek (closed) [7]
BSicon eHST.svg
182.6 km
Buangor (closed)
BSicon eHST.svg
193.1 km
Dobie (closed) [8]
BSicon uCONTgq.svg
BSicon uABZq+r.svg
BSicon mKRZ.svg
BSicon uABZq+l.svg
BSicon uCONTf@Fq.svg
Avoca line to Maryborough & Western standard gauge line
via Maroona, Gheringhap & Geelong to Melbourne
BSicon uABZg+l.svg
BSicon mKRZ.svg
BSicon uSTRr.svg
BSicon uBHF-L.svg
BSicon KBHFxe-R.svg
205.8 km
Ararat
BSicon uemABZg+l.svg
BSicon exSTRr.svg
Former extension to Serviceton
Converted to standard gauge in 1995
BSicon uPSL.svg
Pyrenees Loop
BSicon ueHST.svg
214.6 km
Armstrong
BSicon ueHST.svg
223.1 km
Great Western
BSicon uPSL.svg
Great Western Loop
BSicon uBHF.svg
236.4 km
Stawell
BSicon uemABZgl.svg
BSicon exCONTfq.svg
Grampians line
BSicon ueHST.svg
244.0 km
Deep Lead
BSicon uPSL.svg
Deep Lead Loop
BSicon ueHST.svg
256.5 km
Glenorchy
BSicon ueHST.svg
267.0 km
Wal Wal
BSicon uPSL.svg
Lubeck Loop
BSicon ueHST.svg
276.6 km
Lubeck
BSicon exCONTgq.svg
BSicon uemABZgr.svg
Bolangum line
BSicon ueBHF.svg
294.7 km
Murtoa
BSicon uCONTgq.svg
BSicon uABZgr.svg
Patchewollock line
BSicon uPSL.svg
Murtoa Loop
BSicon uexKRW+l.svg
BSicon ueKRWgr.svg
Horsham Bypass (proposed)
BSicon uexSTR.svg
BSicon ueHST.svg
304.0 km
Jung
BSicon uexSTR.svg
BSicon ueHST.svg
314.0 km
Dooen
BSicon uexSTR.svg
BSicon uBHF.svg
322.0 km
Horsham
BSicon uexSTR.svg
BSicon uemABZgl.svg
BSicon exCONTfq.svg
Carpolac and Balmoral lines
BSicon uexSTR.svg
BSicon ueHST.svg
338.5 km
Pimpinio
BSicon uexSTR.svg
BSicon uPSL.svg
Pimpinio Loop
BSicon uexSTR.svg
BSicon ueHST.svg
347.8 km
Wail
BSicon uexKRWl.svg
BSicon ueKRWg+r.svg
BSicon uBHF.svg
356.9 km
Dimboola
BSicon uCONTgq.svg
BSicon uABZgr.svg
Yaapeet line
BSicon uPSL.svg
Dimboola Loop
BSicon ueHST.svg
375.2 km
Gerang Gerung
BSicon ueHST.svg
381.2 km
Kiata
BSicon uPSL.svg
Salisbury Loop
BSicon ueHST.svg
385.2 km
Salisbury
BSicon uHST.svg
395.3 km
Nhill
BSicon ueHST.svg
405.2 km
Tarranginnie
BSicon uPSL.svg
Diapur Loop
BSicon ueHST.svg
412.2 km
Diapur
BSicon ueHST.svg
423.9 km
Miram
BSicon uPSL.svg
Kaniva Loop
BSicon ueHST.svg
433.5 km
Kaniva
BSicon ueHST.svg
443.2 km
Lillimur
BSicon uPSL.svg
Leeor Loop
BSicon ueBHF.svg
456.8 km
Serviceton
BSicon GRZq.svg
BSicon uSTR.svg
463.8 km
BSicon uCONTf.svg
BSicon uHST.svg
465.0 km
Wolseley

The Ararat railway line (formerly known as the Serviceton and Western lines) is a railway line in Victoria, Australia. It links the state capital of Melbourne to the cities of Ballarat and Ararat via the Regional Rail Link.

The line began construction in 1874, when the original line to Ballarat was extended westwards to Beaufort, eventually reaching Serviceton at the disputed South Australian border in 1887 to form the Victorian part of the Melbourne–Adelaide railway. In 1889, the line became the direct Melbourne−Ballarat railway when it was extended eastwards from Ballarat to Bacchus Marsh, meeting with another line constructed from Sunshine.

In 1995, the line beyond Ararat, along with several old branch lines, was converted to standard gauge and reopened to form part of the 1435 mm (4 ft 8+12 in) Western standard gauge railway line. Services past Ballarat were withdrawn until 2004 when services to Ararat were reinstated.

The line has seen numerous packages of upgrades. As part of the Regional Fast Rail project, several parts of the track were realigned to reduce curves and grades, enabling trains to run up to 160 km/h. The Regional Rail Link project saw the construction of a new alignment between Sunshine and Southern Cross dedicated to regional trains, separating the line from the Sunbury line. As part of the Regional Rail Revival project, the line was duplicated up to Melton. The Level Crossing Removal Project has grade-separated three level crossings and rebuilt Deer Park station, making the line level-crossing free between Deer Park and Southern Cross. [9] In 2026, another four level crossings are planned to be removed, with Melton station to be rebuilt. There are plans for future quadruplication and electrification of the line up to Melton. [10] [11] [12]

Services

V/Line currently operates services on the line towards Ballarat, Ararat and Maryborough (on the Mildura line, which junctions at Ballarat) via the Regional Rail Link. In the future, the line is planned to be electrified as far as Melton. [12]

Several services on the line originate and terminate at Melton, with some additional services originating and terminating at Bacchus Marsh. [13] Four weekday services and three weekend services are operated to Ararat, [1] while only one service is operated each day to Maryborough. [14] Myki is available between Southern Cross and Wendouree.

Freight services sometimes also use the line between Ballarat and Melbourne, coming off the Mildura line.

History

20th century

Serviceton railway station lies 2.08 kilometres (1.3 mi) east of the Victoria-South Australia border, the location of which was disputed for 40 years. Serviceton (Victoria) railway station building, 2006.jpg
Serviceton railway station lies 2.08 kilometres (1.3 mi) east of the Victoria−South Australia border, the location of which was disputed for 40 years.

The first railway line from Melbourne to Ballarat was via Geelong. Construction of the Geelong–Ballarat railway line began in 1858 and took nearly four years to complete, employing up to 3,000 men and costing approximately £1.5 million. The line officially opened in 1862, with the first train running on the 10th of April. The train took about four and a half hours to reach Geelong, travelling at a maximum speed of 15 miles per hour (24 kilometres per hour) and having to overcome several difficulties, including failing an uphill grade and running out of firewood. The return journey was achieved in two hours and forty minutes. [15] [ better source needed ]

The line was extended further west from Ballarat to Beaufort in 1874, Ararat in 1875, Stawell in 1876, Murtoa, in 1878, Horsham in 1882, Dimboola in 1882, and lastly Nhill and Serviceton in 1887, where it met with the South Australian Railways line from Adelaide. The direct route from Melbourne to Ballarat opened in 1889, when a branch line from Ballarat to Warrenheip was progressively extended eastwards to Bacchus Marsh, where it met with a line originally constructed from Sunshine to Melton; that line was opened in 1874 and itself extended to Bacchus Marsh in 1887. [16] [17] [18] [19] [ better source needed ]

In 1994, V/Line passenger rail services beyond Ballarat were withdrawn to allow for the conversion of the line beyond Ararat to standard gauge. [20] The Serviceton−Ararat section, now standard gauge, was connected to a section of the Portland line, which in turn connected to the Maroona−Gheringhap line, both also converted to standard gauge as part of the project. In 1995 the completed line opened as the Western standard gauge railway line.

21st century

Restoration of Ararat services

In 2004, passenger services to Ararat were restored. [21] [22]

Regional Fast Rail

Clocktower at Ballarat station Ballarat-station-clocktower.jpg
Clocktower at Ballarat station

Major upgrades to the line occurred as part of Regional Fast Rail, a project announced in 2000 by then-Premier Steve Bracks with the aim of shortening travel times between the major Victorian regional centres and Melbourne by upgrading the tracks and introducing V/Line VLocity diesel multiple-unit trains. Heavier tracks and concrete sleepers were laid, ballast was renewed and a new signalling system was installed. Curves and grades on the line were eased by constructing new deviations from the main line and seven new bridges, including the Lal Lal Creek and Moorabool River bridges, which at the time were among the longest in Australia. [23] Most of the original alignment remained, serving as crossing loops. [24]

The first VLocity train ran on the line to Ballarat on 22 December 2005. [25]

Regional Rail Revival

VLocity train at Ararat, 2022 Vlocity vl60 at ararat.jpg
VLocity train at Ararat, 2022

Another significant round of upgrades occurred to the line as part of the Regional Rail Revival project, beginning in early 2018 with major construction completed in 2021. [26] The project, with a budget of $518 million, saw the duplication of 17 kilometres of track between Deer Park and Melton, addition of a second platform and track at Rockbank, Bacchus Marsh and Ballan, the construction of Cobblebank Station, and new a passing loop at Millbrook. [27] The upgrades enable future electrification of the line to Melton. The new passing loop at Millbrook also allowed the original line via Bungaree to be decommissioned, with level crossings and railway infrastructure at these crossings removed. [28]

Future

Level Crossing Removal Project

The Level Crossing Removal Project has removed, and is planning to remove, several level crossings along the line. In 2022, the first crossings was removed: Fitzgerald Road in Ardeer, by building a road bridge over the rail line [29] The crossing at Robinsons Road in Deer Park was removed by elevating the rail line over the road. [30] In 2023, the Mt Derrimut Road level crossing in Deer Park was removed by elevating the rail line; Deer Park Station was rebuilt as part of this removal. [31] The line is level-crossing free between Deer Park and Southern Cross.

By 2026, four more crossings are set to be removed. The crossings at Coburns Road and Exford Road in Melton will be removed by elevating the rail line; Melton Station will be rebuilt. The crossings at Ferris Road in Melton and Hopkins Road in Truganina will be removed by elevating the road onto a bridge. Concept designs for the new station and bridges were released in 2024. [32]

Ballarat Station will receive accessibility upgrades by 2026, delivered as part of the Level Crossing Removal Project. The project will primarily focus on installing a new pedestrian overpass over the platforms, accessible by elevators and stairs, and reworking the northern (platform 2) entrance of the station to fit a wheelchair-accessible ramp. Currently, the only way to access the platforms at Ballarat without using stairs is by using the pedestrian level crossing over the tracks. Concept designs for the upgrade were released in 2024. [33] [34]

Melton quadruplication and electrification

Electrification to Rockbank was suggested as early as the 1969 Melbourne Transport Plan. In 2013, Public Transport Victoria released the Network Development Plan – Metropolitan Rail, stage 3 of which includes quadruplication and electrification up to Melton. The Western Rail Plan, announced as a key policy of the 2018 Victorian state election by then-incumbent Premier of Victoria Daniel Andrews, also included quadruplication and electrification to Melton. [35]

In 2023, it was reported that the Western Rail Plan was revised to no longer include quadruplication, and as of 2024 there are no concrete plans for electrification. [10] [11] [12] Nevertheless, Melton Station is planned to be rebuilt with 4 platforms as part of the Level Crossing Removal Project, enabling future quadruplication.

Introduction of 9-car VLocity trains

In 2022, then-Premier Daniel Andrews announced plans to extend the platforms at all stations from Bacchus Marsh to Ardeer to allow 9-car VLocity trains to run on the line, reducing overcrowding. 9-car trains are currently in use for some peak services to Wyndham Vale on the Geelong line. [36] Additionally, the 2023 Victorian state budget made reference to a "Melton Line Upgrade" project, stated to include "extra stabling and upgrade[d] stations to deliver better train services and increase train capacity". [37] In 2024, the Level Crossing Removal Project announced plans to "investigate" constructing a train stabling facility at Cobblebank to "support the introduction of 9-car [VLocity] trains", as part of the Melton Station rebuild. [38]

Planned stations

Several new stations have been planned to be built on the line, primarily to serve new housing estate developments. In 2016, the Victorian Planning Authority released the Paynes Road Precinct Structure Plan, which included plans for a train station in Thornhill Park (west of Rockbank) to support a new housing development in the area. [39]

In 2020, another Precinct Structure Plan released by the Victorian Planning Authority included plans for a station in Mount Atkinson, west of Caroline Springs. [40] In 2024, a petition submitted to the Parliament of Victoria calling for the station to be built attracted over 1,700 signatures. [41]

Former branch lines

V/Line VLocity train at the junction with the Melbourne-Ballarat line at Warrenheip VLine VLocity Warrenheip.jpg
V/Line VLocity train at the junction with the Melbourne-Ballarat line at Warrenheip

Ballarat region

A branch line was built from Ballarat to Newtown and Skipton in 1883. This line closed in 1985. A branch was built between Newtown, Cressy and Irrewarra (east of Colac) about 1910. This line was closed in 1953.

A branch line was built from Linton junction to the Ballarat Cattle Yards and Redan in 1886. This line was closed in 1997.[ citation needed ]

Ararat region

Until 1993, two daily V/Line services ran from Melbourne to Dimboola, as well as the nightly The Overland service from Melbourne to Adelaide. Under the Kennett Government's economic reforms, the V/Line service to Dimboola was cut back to Ararat, with the towns beyond now served by coaches. The Ararat−Serviceton section was converted to standard gauge and reopened as part of the Western standard gauge railway line in 1995, which makes reinstatement of train services beyond Ararat unlikely.

The Overland service is now operated by Journey Beyond and runs on the Western standard gauge railway line, serving only some stations between Southern Cross and Adelaide Parklands Terminal.

A branch line was built from Lubeck (between Stawell and Murtoa) to Rupanyup in 1887, extended to Marnoo by 1909, and to Bolangum in the 1927. It closed in 1983.

A branch line was opened from Murtoa to Warracknabeal in 1886 and extended to Beulah in 1893, Roseberry and Hopetoun in 1894 and Patchewollock in 1927. The section from Hopetoun to Patchewollock was closed in the 1980s. The line from Murtoa to Hopetoun was converted to standard gauge in 1995. It has not carried passengers for many years and grain services between Roseberry to Hopetoun were suspended in 2005.

A branch line was completed between Horsham, East Natimuk and Noradjuha in 1887, and progressively extended to Balmoral by 1920, where it connected with a line from Cavendish to Hamilton. The whole line, from Noradjuha to Hamilton, was closed in 1979. A branch was opened from East Natimuk to Goroke in 1894, and extended further west to Carpolac in 1927. It closed in 1986.

A branch was opened from Dimboola to Jeparit in 1894 and extended to Rainbow in 1899 and Yaapeet in 1914. The line was converted to standard gauge in 1995. The line was deemed unusable after severe flooding in January 2011. The Victorian Government announced that they would contribute $5.3 million to restoring the line from Dimboola to Rainbow in 2011. [42]

In 1905, a branch line was opened from Stawell to the Heatherlie quarry in The Grampians, from which large amounts of high-quality freestone were railed, [43] to be used in a number of significant building projects. The branch was closed in 1949. [44]

Another branch line, from Jeparit to Lorquon, was opened in 1912, and was extended to Yanac in 1916. It closed in 1986.

A line was built from Ararat to Portland in 1877, via Maroona, Hamilton, and Heywood. A number of branch lines were built from this line, none of which are in use today. This line was converted to standard gauge in 1995; up to Maroona it forms part of the Western standard gauge railway line, where it junctions with section of the line towards North Shore. The Portland line saw further upgrades as part of the Murray Basin Rail Project, connecting it to the Mildura line via the Ararat-, which was converted to standard gauge also as part of the MBRP. [45]

The Tom Waits song Town with No Cheer from the 1982 album Swordfishtrombones refers to Serviceton, The Overland train, and the railway line's disuse. [46]

Related Research Articles

<span class="mw-page-title-main">Sunshine railway station, Melbourne</span> Railway station in Melbourne, Australia

Sunshine railway station is a commuter and regional railway station on the Sunbury, Geelong and Ballarat lines, serving the western suburb of the same name in Melbourne, Victoria, Australia. Sunshine is a ground level, premium station. It has four platforms, an island platform with two faces and two side platforms, connected by a footbridge and concourse. The station opened on 7 September 1885, with the current station provided in 2014 when it was rebuilt as part of the Regional Rail Link project.

<span class="mw-page-title-main">Ardeer railway station</span> Railway station in Melbourne, Australia

Ardeer railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the western suburb of Ardeer, in Melbourne, Victoria, Australia. Ardeer station is a ground level unstaffed station, featuring two side platforms. It opened on 2 April 1929, with the current station provided in 1977. It was originally closed on 28 August 1956, then was reopened on 2 May 1977.

<span class="mw-page-title-main">Deer Park railway station</span> Railway station in Melbourne, Australia

Deer Park railway station is a regional railway station on the Ararat and Warrnambool lines, part of the Victorian railway network. It serves the western suburb of Deer Park, in Melbourne, Victoria, Australia. Deer Park station is an elevated premium station, featuring two side platforms. It opened on 2 April 1884, with the current station provided in 2023.

<span class="mw-page-title-main">Rockbank railway station</span> Railway station in Melbourne, Australia

Rockbank railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the western suburb of Rockbank, in Melbourne, Victoria, Australia. Rockbank station is a ground level premium station, featuring two side platforms. It opened on 2 April 1884, with the current station provided in 2019.

<span class="mw-page-title-main">Melton railway station, Melbourne</span> Railway station in Melbourne, Australia

Melton railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the outer-western suburb of Melton South, in Melbourne, Victoria, Australia. Melton Station is a ground level premium station, featuring two side platforms. It opened on 2 April 1884.

<span class="mw-page-title-main">V/Line</span> Australian railway company

V/Line is a statutory authority that operates regional passenger rail and coach services in the Australian state of Victoria. It provides passenger train services on five commuter routes and eight long-distance services from its major hub at Southern Cross railway station in Melbourne. It also provides coach bus services across Victoria and into New South Wales, the Australian Capital Territory and South Australia. In addition, V/Line is responsible for the maintenance of the Victorian freight and passenger rail network outside of the areas managed by Metro Trains Melbourne and the Australian Rail Track Corporation.

<span class="mw-page-title-main">Western Highway (Victoria)</span> Highway in Victoria

Western Highway is a major arterial route in western Victoria with a length of approximately 258 kilometres (160 mi) of single carriageway, then 161 kilometres (100 mi) of dual carriageway known as Western Freeway, linking the western suburbs of Melbourne to the border with South Australia at Serviceton. It is the Victorian part of the principal route linking the Australian cities of Melbourne and Adelaide, and is a part of the National Highway network, designated routes A8 and M8. The western end continues into South Australia as Dukes Highway, the next section of the Melbourne–Adelaide National Highway.

<span class="mw-page-title-main">Bacchus Marsh railway station</span> Railway station in Victoria, Australia

Bacchus Marsh railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the southern suburb of Maddingley, in Bacchus Marsh, Victoria, Australia. Bacchus Marsh station is a ground level premium station, featuring two side platforms. It opened on 10 February 1887, with the current station provided in 2019.

<span class="mw-page-title-main">Geelong line</span> Passenger rail service in Victoria, Australia

The Geelong line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 15 stations towards its terminus in Waurn Ponds, a southern suburb of Geelong, via the Regional Rail Link. It is the most used regional rail service in Victoria, carrying 8.15 million people in the 2022-23 financial year.

<span class="mw-page-title-main">V/Line VLocity</span> Australian passenger train

The V/Line VLocity, sometimes called the VLocity 160, is a diesel multiple unit train built by Bombardier Transportation and, later, by Alstom in Dandenong for V/Line, the regional rail operator in the Australian state of Victoria. Continuously in production since 2003, the VLocity is the highest-speed train in the V/Line fleet, with a top speed of 160 km/h (100 mph). As of November 2024, with set 125 entering service, 124 3-car sets were in revenue service, one collision damaged set was in storage, and 16 more were under construction.

<span class="mw-page-title-main">Ballarat railway station</span> Railway station in Victoria, Australia

Ballarat railway station is a regional railway station located on the Ararat and Mildura railway lines. It serves the city of Ballarat, Victoria, Australia, and opened on 11 April 1862 as Ballarat West. It gained its current name in 1865.

<span class="mw-page-title-main">Ballan railway station</span> Railway station in Victoria, Australia

Ballan railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the town of Ballan, in Victoria, Australia. Ballan station is a ground level premium station, featuring two side platforms. It opened on 22 December 1886, with the current station provided in 2021.

<span class="mw-page-title-main">Ararat railway station</span> Railway station in Victoria, Australia

Ararat railway station is located on the Ararat and Western standard gauge lines in Victoria, Australia. It serves the town of Ararat, and opened on 7 April 1875.

<span class="mw-page-title-main">Ballarat line</span> Passenger rail service in Victoria, Australia

The Ballarat line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 13 stations towards its terminus in Ballarat's western suburb of Wendouree via Melton and Bacchus Marsh. Services are operated primarily using V/Line VLocity diesel multiple unit sets in either 3- or 6-car configurations.

<span class="mw-page-title-main">Caroline Springs railway station</span> Railway station in Melbourne, Australia

Caroline Springs railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the western suburb of Ravenhall, in Melbourne, Victoria, Australia. Caroline Springs station is a ground level premium station, featuring an island platform. It opened on 28 January 2017.

<span class="mw-page-title-main">Bendigo line</span> Passenger rail service in Victoria, Australia

The Bendigo line is a regional passenger rail service operated by V/Line in Victoria, Australia. It serves 14 stations towards its terminus in the regional city of Bendigo. It is the third most-used regional rail service in Victoria, carrying 2.06 million passengers in the 2022-23 financial year.

<span class="mw-page-title-main">Cobblebank railway station</span> Railway station in Melbourne, Australia

Cobblebank railway station is a regional railway station on the Ararat line, part of the Victorian railway network. It serves the western suburb of Cobblebank, in Melbourne, Victoria, Australia. Cobblebank station is a ground level premium station, featuring two side platforms. It opened on 1 December 2019.

<span class="mw-page-title-main">Western Rail Plan</span> Metropolitan rail project in Melbourne, Australia

The Western Rail Plan is a proposed metropolitan rail infrastructure project in Melbourne, Australia. The project was initially announced during the 2018 Victorian state election by the State Government. It includes the electrification of two currently existing regional lines to Melton and Wyndham Vale, and other network capacity upgrades.

<span class="mw-page-title-main">Regional Rail Revival project</span> Railway infrastructure project in Victoria, Australia

The Regional Rail Revival is a joint initiative between the Australian federal government and the Victorian state government to upgrade all regional railway lines in Victoria. The project has an estimated total cost of A$4 billion. A$2.3 billion of the project's total cost is being funded by the Australian Government. It was delivered by Rail Projects Victoria (RPV) until April 2024, and then by the Level Crossing Removal Project. The project is guided by the 2016 Regional Network Development Plan, which outlines the short, medium and long-term priorities for a modernised regional rail network.

References

  1. 1 2 "Melbourne to Ararat via Ballarat". V/line. Retrieved 19 November 2024.
  2. Wong, Marcus (19 February 2024). "Farewell to V/Line's H type carriage sets".
  3. Waugh, Andrew (2005) [1995-06-26]. "Victorian Signalling Histories: Bacchus Marsh" (PDF).
  4. "VLine Bungee Signalling Diagram No: 18/13" (PDF). VLine. 26 July 2013. Archived from the original (PDF) on 11 July 2016.
  5. Waugh, Andrew (24 September 1992). "Sunshine Ballarat Station Notes: SRS Tour" (PDF). p. 21.
  6. The Golden Steam of Ballarat, King, D & Dooley, N, 1973
  7. Maryborough-Avoca-Ararat railway: a brief history, Turton, K W, McLean, D C
  8. Maryborough-Avoca-Ararat railway: a brief history, Turton, K W, McLean, D C
  9. "Mt Derrimut Road, Deer Park". Victoria's Big Build. 8 August 2024. Retrieved 28 September 2024.
  10. 1 2 Visontay, Elias (6 August 2023). "Meet Melton, officially part of Melbourne, but crying out for city services". The Guardian.
  11. 1 2 "Confusion and plummeting confidence in rail promises for regional Victoria". ABC News. 5 August 2023 via www.abc.net.au.
  12. 1 2 3 Hatch, Patrick (1 August 2023). "New train lines to Melton and Wyndham axed from rail plans". The Age.
  13. "Ballarat timetable". www.vline.com.au. Retrieved 23 October 2024.
  14. "Maryborough". www.vline.com.au. Retrieved 23 October 2024.
  15. "Ballarat Australia History – Rail Heritage". Ballarat History Central. Archived from the original on 22 August 2006. Retrieved 17 July 2006.
  16. "VICSIG". vicsig.net.
  17. "VICSIG". vicsig.net.
  18. "Ballarat". www.victorianrailways.net.
  19. "Last train travels over the Bungaree loop". Victoria's Big Build. 24 June 2021.
  20. "VictorianRailways.net – VR Timeline". Archived from the original on 30 May 2008. Retrieved 14 November 2007.
  21. "Ararat sleepers awake to new sound - the train". The Age. 10 July 2004.
  22. "Still no start date for Ballarat-Ararat rail services". ABC News. 12 May 2004 via www.abc.net.au.
  23. "Transport planning and projects – Regional Fast Rail". State Government of Victoria, Department of Infrastructure. 15 May 2006. Archived from the original on 30 August 2006. Retrieved 17 July 2006.
  24. Train Operating Data: Deer Park to Ararat Archived 27 March 2015 at the Wayback Machine V/Line 21 October 2014
  25. "V/Line – First Day of VLocity Revenue Operation (Ballarat)". Archived from the original on 18 May 2007.
  26. "Ballarat Line Upgrade website". Ballarat Line Upgrade. 24 July 2017. Archived from the original on 1 August 2017. Retrieved 1 August 2017.
  27. Pollock, Michael (27 April 2016). ""$518m commitment to Ballarat rail line"". The Ballarat Courier. Archived from the original on 1 August 2017. Retrieved 1 August 2017.
  28. "Last train travels over the Bungaree loop". Victoria's Big Build. 27 December 2020. Archived from the original on 20 September 2022. Retrieved 20 September 2022.
  29. "Fitzgerald Road, Ardeer". Victoria's Big Build. 7 July 2023.
  30. "Robinsons Road, Deer Park". Victoria's Big Build. 7 July 2023.
  31. "Mt Derrimut Road, Deer Park". Victoria's Big Build. 19 February 2024.
  32. "Melton level crossing removals". Victoria's Big Build. 31 May 2024.
  33. "Ballarat Station Upgrade". Victoria's Big Build. 12 June 2024.
  34. "Ballarat Station Upgrade community update – June 2024". Victoria's Big Build. 4 June 2024.
  35. "A Real Plan For Fast Regional Rail And Metro Rail For The West | Premier of Victoria". www.premier.vic.gov.au.
  36. Hatch, Patrick (6 October 2022). "Andrews admits Metro upgrades to outer west at least six years away". The Age.
  37. "2023-24 Budget Estimates questionnaire" (PDF). www.parliament.vic.gov.au. 28 May 2023. Retrieved 23 October 2024.
  38. "New Melton Station designs as part of massive upgrades". Victoria's Big Build. 23 March 2024.
  39. "Paynes Road Precinct Structure Plan" (PDF). Metropolitan Planning Authority. February 2016. Retrieved 19 November 2024.
  40. "Mt Atkinson & Tarneit Plains Precinct Structure Plan" (PDF). Victorian Planning Authority. June 2017. Retrieved 19 November 2024.
  41. "The proposed Mt Atkinson Train Station".
  42. "Money for rail". ABC News. 21 September 2011 via www.abc.net.au.
  43. "Heatherlie Quarry". Grampians Guide. Archived from the original on 3 October 2020. Retrieved 17 August 2020.
  44. Harrigan, Leo J. (1962). Victorian Railways to '62. Melbourne: Victorian Railways Public Relations and Betterment Board. p. 284. ASIN   B0007JJ26C. OCLC   945951383.
  45. "Murray Basin Rail Project Business Case Review" (PDF). bigbuild.vic.gov.au. April 2020. Retrieved 23 October 2024.
  46. Tom Waits. "Town With No Cheer". Archived from the original on 25 February 2015. Retrieved 22 January 2015.