Flytoget

Last updated
Flytoget AS
Company type State owned
Industry Rail transport
Founded24 November 1992 [1]
Founder Norges Statsbaner [2]
Headquarters Oslo, Norway [1]
Area served
Greater Oslo
Key people
Philipp Engedal (CEO)
Endre Skjørestad (Chair) [3]
Products Airport rail link
Revenue NOK  689 million (2007) [3]
Increase2.svg NOK  192 million (2007) [3]
Increase2.svg NOK 182 million (2007) [3]
Number of employees
265 (2007) [3]
Parent Norwegian Ministry of Trade and Industry [3]
Website flytoget.no
Previous logo Flytoget AS logo.svg
Previous logo

The Airport Express Train (Norwegian : Flytoget) is a Norwegian high-speed airport railway service connecting Oslo Airport to Oslo Central Station in nineteen minutes. [4] Run by Flytoget AS (formerly NSB Gardermobanen AS), it operates on the high-speed Gardermoen Line using sixteen GMB Class 71 electric trains. Normal service frequency is once every ten minutes, with five of the services each hour continuing westwards beyond Oslo Central. The extended services serve nine stops within Greater Oslo and take up to 60 minutes.

Contents

Flytoget transported 5.4 million passengers in 2007, [3] a 34-percent market share of airport ground transport. [5] The service, which has a top speed of 210 kilometres per hour (130 mph), is the only high-speed rail service in Norway. Construction started in 1994 and high-speed trains began serving Gardermoen Airport from the date of its opening on 8 October 1998, although full operation using the 14.5-kilometre-long (9.0 mi) Romerike Tunnel had to wait another ten and a half months after severe leaks caused by the tunnel's construction led to the partial depletion of two lakes.

Formed in 1992 as a subsidiary of Norwegian State Railways, the company has been owned since 2001 by the Norwegian Ministry of Trade and Industry.

History

Decision for a new airport connection

When the Parliament of Norway on 8 October 1992 decided to build a new central airport for Eastern Norway, they also decided that the main mode of ground transport should be by rail. While the previous airport, Oslo Airport, Fornebu, was located just outside the city limits, the new airport, Oslo Airport, Gardermoen, would be located 50 kilometres (31 mi) north of the city, outside the reach of existing public transport. The principle of the airport construction was that it was not to be footed by the tax payers; the entire airport would be built with borrowed money through Oslo Lufthavn AS, a subsidiary of the Norwegian Airport Administration. The same principle was chosen for the airport rail link—the Norwegian State Railways (NSB) creating the limited company subsidiary NSB Gardermobanen AS, founded on 24 November 1992, to perform the construction of the line. It would be able to charge train operators using the line, channeling the payments to cover down payments and interest of the debt used to build the railway. Profit margin was estimated to 7.5%. [2]

Construction

Oslo Airport, Gardermoen, is not on the Trunk Line that runs north from Oslo. With heavy traffic and many small stops until Lillestrøm, and continuing north as single track, [6] the Trunk Line would have to be supplemented by a parallel double track from Oslo, with a new route north of Kløfta to Eidsvoll, the 16 kilometres (10 mi) north of the airport allowing trains operating on the Dovre Line to Lillehammer and Trondheim to access the airport. The 64-kilometre (40 mi) line was named the Gardermo Line. [7]

The Gardermo Line was the second attempt to build high-speed rail in Norway, after the 35-kilometre (22 mi) line from Ski to Moss on the Østfold Line. But no operation speeds exceeding 160 kilometres per hour (99 mph) are achieved there due to short distances and limitations to rolling stock, making Gardermobanen the first real high-speed railway line in Norway. Due to the domination of single track in Norway, the opening of the Gardermo Line increased the total length of double track in the kingdom by two-thirds. [7]

Construction started in 1994. [2] An agreement for purchase of sixteen three-car electric multiple units was signed with Adtranz on 23 February 1995. Parliament decided on 1 October 1996 that the construction company would also operate the new train service. The trains were delivered between 19 September 1997 and 30 January 1998, [8] costing NOK  1.4 billion. [2]

Challenges

Lake Lutvann was partially drained due to construction problems during the digging of the Romerike Tunnel Lutvann.jpg
Lake Lutvann was partially drained due to construction problems during the digging of the Romerike Tunnel

The greatest challenge was the need to build the 14,580-metre (47,830 ft) Romerike railway tunnel – Norway's longest – beneath the geologically highly unstable Østmarka area between Etterstad, close to Oslo Central Station, and Lillestrøm. [6] During construction, in 1997, the water level in some lakes above the tunnel, including Lutvann and Nordre Puttjern, sank dramatically. After the leaks were discovered on 3 February 1997, sanctions were imposed by the Norwegian Water Resources and Energy Directorate requiring the elimination of all leakages. At its worst, the tunnel was leaking 3,000 litres (660 imp gal) of water per minute. [9]

Rhoca-Gil sealant was used in an attempt to fix the leaks, but failed to work properly. Not only did it not polymerise, and therefore failed to staunch the leaks, but it also poisoned its surroundings with acrylamide. Manual fixing with concrete became necessary; the fixing and cleaning up of the toxin delayed the building of the tunnel by one year. [9] Further complications arose due to conflicts between NSB Gardermobanen and the construction company, Scandinavian Rock Group, with the latter at one instance stopping work for three weeks while the parties quarrelled in court. [10]

Reports have shown a lack of inspection and reporting procedures during incidents that should have been addressed – but were never taken seriously – in 1995. Construction of the tunnel caused damage to around sixty houses and an evaluation by the Ministry of Transport and Communications showed that NOK 500 million was spent on fixing the leaks and claimed that this was to a large extent an unnecessary expenditure which more efficient engineering procedures would have avoided. The report also criticised the administrative planning and organisation of the overall construction of the railway. [9]

Airport Express Trains began operating as soon as the new airport (and the Lillestrøm to Gardermoen stretch of the new high-speed line) opened on 8 October 1998; however, for more than ten months they had to use the old Hovedbane (Trunk Line) between Oslo S and Lillestrøm, which restricted their frequency to just two trains per hour. Regular operations at full capacity, using the Romerike Tunnel, did not commence until 22 August 1999. [2]

Reorganisation

A Class 71 unit beside a Class 70 unit at Asker Station IC-tog til Larvik og Flytoget pa Asker stasjon TRS 061028 027.jpg
A Class 71 unit beside a Class 70 unit at Asker Station

Estimates for the project costs were NOK 4.3 billion, ±20%, but by completion they had ended at NOK 7.7 billion, of which NOK 1.3 billion were related to the leakages. The rest of the line had a cost exceedings of NOK 0.4 billion. The company had acquired financial costs of NOK 0.9 billion, so the company owed NOK 10.0 billion by 1999, including money spent on the new trains. [2]

The first steps of organisational restructure were taken 29 June 2000, when the CEO of NSB, Osmund Ueland, was fired due to several incidents related to the operations of NSB—not just the Gardermo Line. [11] Einar Enger took over as new CEO on 26 February 2001. [12]

The debt in NSB Gardermobanen had become unmanageable, and in April 2000 parliament accepted that it would not be possible to make the Gardermo Line—with the current structure—the profitable venture predicted in 1992. From 1 January 2001, the company changed name to Flytoget AS, retaining ownership of the trains and operations and kept as a subsidiary of NSB. The tracks and infrastructure were transferred to the Norwegian National Rail Administration (Jernbaneverket), who owns the rest of the Norwegian railway network. All debt was restored and covered by the state, and a vehicle excise duty was implemented on the Gardermo Line to cover the management and maintenance of the line, to be paid by all users. [2]

On 9 December 2002, parliament decided that Flytoget AS would become a separate railway company from 1 January 2003, owned directly by the Ministry of Transport and Communications. [2] One year later the ownership was transferred to the Ministry of Trade and Industry as part of a cleanup of political overhaul between the departments. [13] As part of the process, a new CEO, Thomas Havnegjerde, was appointed in June 2002, [14] and in January 2003 the new chair, Endre Skjørestad—who took over the position form NSB's director Einar Enger. [15] Havnegjerde announced on 6 August 2008 that he would retire from his job before the end of the year. [16] He was replaced by Linda Bernander Silseth on 10 November 2008. [17] On 30 August 2009, two of three services to Asker were extended to Drammen. [18] This followed upgrades to the Drammen Line, including the Lieråsen Tunnel, and a new parking lot at Drammen Station, in total costing NOK 20 million. [19] [20]

Operations

Airport Express Train
BSicon FLUG.svg
BSicon KBHFa.svg
0:00
Oslo Airport, Gardermoen
(6 pr. hour)
BSicon pBHF.svg
0:12
Lillestrøm
(3 pr. hour)
BSicon TUNNEL1.svg
Romerike Tunnel
(14,580 m)
BSicon SUBWAY.svg
BSicon BHF.svg
0:19
Oslo S
(6 pr. hour)
BSicon tSTRa.svg
Oslo Tunnel
(3,632 m)
BSicon SUBWAY.svg
BSicon tBHF.svg
0:22
Nationaltheatret
(5 pr. hour)
BSicon tSTRe.svg
BSicon BHF.svg
0:26
Skøyen
(5 pr. hour)
BSicon BHF.svg
0:30
Lysaker
(5 pr. hour)
BSicon KRWgl.svg
BSicon KRW+r.svg
BSicon tSTRa.svg
BSicon KBHFe.svg
0:33
Stabekk
(2 pr. hour)
BSicon tSTRe.svg
Bærum Tunnel
(5.446 m)
BSicon BHF.svg
0:39
Sandvika
(3 pr. hour)
BSicon TUNNEL1.svg
Tanum Tunnel
(3,590 m)
BSicon TUNNEL1.svg
Skaugum Tunnel
(3,790 m)
BSicon BHF.svg
0:45
Asker
(3 pr. hour)
BSicon TUNNEL1.svg
Lieråsen Tunnel
(10,732 m)
BSicon KBHFe.svg
1:00
Drammen
(3 pr. hour)

Departures operate every ten minutes from Oslo Central Station (Oslo S) to the airport - i.e. six trains per hour. Half of the trains originate in Drammen, making five intermediate stops before Oslo S, and again at Lillestrøm. One starts from Oslo S and goes directly to Gardermoen without intermediate stops. Two start from Stabekk with stops at Lysaker, Skøyen, Nationaltheateret and Oslo S. On Saturdays, Sunday mornings and during most of July, Flytoget does not operate the direct trains from Oslo S or Stabekk — only the 20-minute headway all-stop trains. [21] While the services northeast from Oslo S to the airport use the high-speed Gardermo Line, those westwards towards Asker use the Drammen Line built in 1870–72 [6] and the Asker Line; so while the 48 kilometres (30 mi) from Oslo S to the airport can be done in 19 minutes, the 24 kilometres (15 mi) from Asker to Oslo S takes 26 minutes. The latter does however include stops at five stations: Nationaltheatret, Skøyen, Lysaker, Sandvika and Asker. [21]

ServiceFromToTrains pr. hour
FLY1 Drammen Oslo Airport, Gardermoen 3
FLY2 Stabekk/Oslo S Oslo Airport, Gardermoen 3

Competition is offered from other means of ground transport and by Vy who operate trains from and to the airport. This includes one hourly departure with line R12 of the Oslo Commuter Rail north to Eidsvoll and south to Oslo, Drammen and Kongsberg; [22] two regional trains (line RE10 and RE11) hourly north to Eidsvoll and Lillehammer and south to Drammen and Vestfold; [23] and five daily express trains to Dombås and Trondheim calling Oslo Airport Station, including one night train (although the express trains to Trondheim do not accept passengers only travelling between Oslo and Gardermoen). [24]

The price of a ticket to Oslo is NOK 230, though higher if departing from Sandvika, Asker and Drammen. Reduced fares with 50% discount are offered to senior citizens, children, youth under 21 years, students, benefit recipients and military personnel. [25] Flytoget tickets are not valid on Vy trains, and vice versa. Vy tickets are generally cheaper, though not for some groups with reduced fare; for instance students are granted a greater discount with Flytoget than with Vy. [25] [26] Ticket can either be bought at vending machines or as e-tickets; there is no seat reservation. [27]

Flytoget transported 5.4 million passengers in 2007, [3] a 34% market share of airport ground transport. [5] Flytoget boasts a high service quality, with 96% of departures arriving within 3 minutes of schedule and only 0.4% of departures canceled. [4] Part of this is due to the airport express trains receiving priority over other trains in the limited capacity around Oslo. [13] Flytoget was announced to have the most satisfied, and the fourth most loyal customers of all Norwegian companies in 2008, by the customer satisfaction survey conducted by the Norwegian School of Management. [28] The same year Flytoget was declared the best place of work in Norway by Great Place to Work. [29] During the 2007 recruitment half of the newly educated train divers chose Flytoget over Vy, mostly due to higher wages. [30]

Stations

StationDistance [31] Time [21] Fare [25] Reduced fare [25]
Flytoget at Gardermoen.jpg Oslo Airport 0.00 km0 minn/an/a
Flytoget Lillestrom stasjon.jpg Lillestrøm 30.90 km12 minNOK 140NOK 70
Flytoget Oslo S.jpg Oslo Central Station 48.07 km19 / 22 minNOK 180NOK 90
Flytoget nationalteateret1.jpg Nationaltheatret 49.50 km27 minNOK 180NOK 90
Skoyen Station.jpg Skøyen 52.43 km32 minNOK 180NOK 90
Graphics of Lysaker Station.jpg Lysaker 55.07 km34 minNOK 180NOK 90
Stabekk stasjon.JPG Stabekk 57.06 km32 minNOK 180NOK 90
Sandvika Railway station TRS 070407 001.jpg Sandvika 62.24 km42 minNOK 210NOK 105
IC-tog til Larvik og Flytoget pa Asker stasjon TRS 061028 027.jpg Asker 71.93 km48 minNOK 210NOK 105
Drammen Railway Station TRS 061216 008.jpg Drammen 100.96 km60 minNOK 260NOK 130

Incidents

Train awaiting departure from Oslo Airport Station Flytoget at Gardermoen.jpg
Train awaiting departure from Oslo Airport Station

Several deaths have taken place on the route, but only one due to an accident. In 1999, an employee of the National Rail Administration was killed by a train because it was operating at 160 kilometres per hour (99 mph) instead of the temporarily reduced limit of 80 kilometres per hour (50 mph); Flytoget was fined for not informing the engineer of the speed limit reduction. [32] Several other deaths on the line have been classified as suicides, and so are not in the accident statistics; [33] [34] they do however cause delays on all services for hours after the incident takes place. [35]

In 2000–01, Flytoget experienced three derailments with empty trains at Gardermoen; one caused by the engineer falling asleep and two by the train passing a red light. [36] [37] [38] [39] No more such accidents occurred after automatic Train Control was installed in 2001. [40]

Delays have been experienced many times by travelers due to technical problems on the infrastructure. In particular the old line west of Oslo causes much delay, [41] and the National Rail Administration performed during 2008 a NOK 100 million upgrade to the Oslo Tunnel to ensure better performance. [42] But problems also incur on the new sections, regularly delaying service or capacity, and forcing Flytoget to operate fewer departures. [43] [44] In total 96% of departures arrived within 3 minutes of schedule and 0.4% of departures were canceled in 2007. [4]

Pickpocketing has been a problem since the start; even the Chief of Police in Oslo has been robbed on the train. [45] [46] The train has also been the target of sabotage, [47] and embezzlement for NOK 1 million by an employed ticket salesman, who found a way to print two tickets with the system only charging for one, by turning off and on the ticket printer. [48]

When Al Gore came to Oslo to receive his Nobel Peace Prize on 7 December 2007, he used the Airport Express Train to make his journey as environmentally friendly as possible. [49] The company has initiated a program to ensure better diet for the employees; this had made several lose weight and has reduced the level of sick leave from 12 to 8%. [50] In 2005–07, a program to reduce the energy use of the trains through smarter operation reduced energy consumption by 15%. [51]

During the 2010 volcano air travel disruption, the Gardermoen airport was closed for a period, and the Flytoget trains were used by NSB instead, to give extra train capacity for long-distance routes. [52]

Rolling stock

Class 71

A Class 71 Airport Express Train ready for departure from Oslo S GMB BFM 71104 1.jpg
A Class 71 Airport Express Train ready for departure from Oslo S
Interior of the Class 71 Airport Express Train Flytoget innvendig.jpg
Interior of the Class 71 Airport Express Train

The company operates sixteen Class 71 three-car electric multiple units delivered in 1997–98, and built domestically by Adtranz at Strømmen based on carbodies built in Adtranz factory in Kalmar. They are based on the Swedish X2 operated by SJ in their X 2000 intercity service, and developed by Kalmar Verkstad during the 1980s. The Class 71 are nearly identical to the NSB Class 73, save the 71-series lacking one car and tilting mechanism, and a different interior. Both have chosen to not use the original locomotive design, instead installing one powered bogie in each car. The 71-series is built for a maximum operating speed of 210 kilometres per hour (130 mph), but has achieved higher speeds in test runs. [8]

Among the features are pressure-tight cabins to allow comfortable travel through tunnels at high speeds, and step-free access to the cars. Instead, steps are inside the trains; this has been criticized to be in non-conformance with public accessibility policy. [53] The multiple units can only operate in fixed sets of three cars, but up to three sets can be run in multiple. Flytoget regularly uses double sets to create six-car trains. [8] In 2008–09, all units will be refit with an additional middle car by Bombardier Transportation, increasing capacity by 40% to 244 seats. [54]

Unlike the Class 71, the sister trains in service with NSB were prone to trouble, having to operate on hundred-year-old infrastructure on cross-mountain services; the Class 71 has more lenient operating conditions thanks to better infrastructure. The only incident to ground all the BM71 trains occurred on the 17 June 2000 at Nelaug when a Class 73 train operated by NSB derailed because of stress on the axle. Unlike the NSB trains, the airport express trains were back in service the next day, [55] while the 73-series had to wait another month. [56] On 24 January 2004 a unit had to be taken out of service due to smoke from a stressed bearing—within days the bearings were replaced on all units. [57]

Class 78

Class 78 train at the Velim railway test circuit Flytoget Oaris auf dem Eisenbahnversuchsring Velim (CZ).jpg
Class 78 train at the Velim railway test circuit

Flytoget purchased eight new 4-car CAF Oaris EMUs from the Spanish manufacturer CAF. [58] They started operation in June 2021. Even though the EMU's maximum speed is 245 kilometres per hour (152 mph), the infrastructure limits the speed to 210 kilometres per hour (130 mph). The trainsets delivered to Flytoget were withdrawn from service after 19 days of operation due to discovery of cracks in the chassis. [59]

Future

New tracks

There are plans to build two more tracks from Lysaker to Oslo Central Station, including a new tunnel under central Oslo. [60] This project is not decided.

Related Research Articles

<span class="mw-page-title-main">Vy</span> Norwegian state-owned railway operator

Vygruppen, branded as Vy, formerly the Norwegian State Railways, branded as NSB, is a government-owned railway company which operates most passenger train services and many bus services in Norway. The company is owned by the Norwegian Ministry of Transport. Its sub-brands include Vy Buss coach services, CargoNet freight trains and the Swedish train transport company Tågkompaniet. In 2009, NSB carried 52 million train passengers and 104 million bus passengers. On 24 April 2019, passenger train and bus services were rebranded as Vy.

<span class="mw-page-title-main">Bergen Line</span> Railway line in Norway

The Bergen Line or the Bergen Railway, is a 371-kilometre (231 mi) long scenic standard gauge railway line between Bergen and Hønefoss, Norway. The name is often applied for the entire route from Bergen via Drammen to Oslo, where the passenger trains go, a distance of 496 kilometres (308 mi). It is the highest mainline railway line in Northern Europe, crossing the Hardangervidda plateau at 1,237 metres (4,058 ft) above sea level.

<span class="mw-page-title-main">Oslo Central Station</span> Railway station in Oslo, Norway

Oslo Central Station is the main railway station in Oslo, and the largest railway station within the entire Norwegian railway system. It connects with Jernbanetorget station, which is served by trams and the Oslo Metro. It's the terminus of Drammen Line, Gardermoen Line, Gjøvik Line, Hoved Line, Østfold Line and Follo Line. It serves express, regional and local rail services by four companies. The railway station is operated by Bane NOR while its real estate subsidiary, Bane NOR Eiendom owns the station, and was opened in 1980.

<span class="mw-page-title-main">Nationaltheatret station</span> Railway station in Oslo, Norway

Nationaltheatret Station is an underground railway station on the Drammen Line serving Vika and the central business district of Oslo, Norway. It is the second-busiest railway station in Norway, behind Oslo Central Station (Oslo S), from which Nationaltheatret is 1.4 kilometers (0.9 mi) away. Owned and operated by Bane NOR, Nationaltheatret serves regional services to the Vestfold Line and the Oslo Commuter Rail operated by Vy, intercity services on the Sørland Line operated by Go-Ahead Norge, and the Airport Express Train.

Linx AB was a railway company which operated inter-Scandinavian passenger trains between 2001 and 2004. Established as a joint venture between the Norwegian State Railways (NSB) and the Swedish state-owned SJ, Linx operated the routes from Oslo, Norway, to Stockholm, Sweden, and from Oslo via Gothenburg, Sweden, to Copenhagen, Denmark. Services were provided up to ten times per day. However, slow speeds caused by curvy infrastructure in Norway, combined with competition from low-cost airlines, caused the company to lose money, and eventually grounded operations. The services were taken over by NSB and SJ. The main rolling stock were eleven X2 electric multiple units, although it used SJ Rc-hauled trains on the Gothenburg–Oslo service. The company was based in Gothenburg.

<span class="mw-page-title-main">Gardermoen Line</span> Railway line in Norway

The Gardermoen Line is a high-speed railway line between Oslo and Eidsvoll, Norway, running past Lillestrøm and Oslo Airport, Gardermoen. The line is 64 kilometres (40 mi) long and replaced the older Hoved Line as the main line north-east of Oslo. The older Hoved Line now handles commuter and freight traffic, while the Gardermoen Line handles high-speed passenger trains and freight trains laden with jet fuel for the airport. Both lines are owned by Bane NOR.

<span class="mw-page-title-main">NSB Class 71</span> High-speed electric train type operating in Norway

NSB Class 71 is an electric multiple unit used by Flytoget for the Airport Express Trains on the Gardermoen Line of Norway. Sixteen three-car train sets were built by Adtranz Strømmen between 1997 and 1998. The units are capable of 210 km/h (130 mph), connecting Oslo Central Station and other stations in Metropolitan Oslo to the Oslo Airport, Gardermoen, along Norway's only high-speed railway.

<span class="mw-page-title-main">Oslo Tunnel</span> Railway tunnel between Olav Kyrres plass and Oslo Central Station

The Oslo Tunnel is a 3,632-metre (2.257 mi), double-track, railway tunnel which runs between Olav Kyrres plass and Oslo Central Station (Oslo S) in Oslo, Norway. The tunnel constitutes the easternmost section of the Drammen Line and runs below the central business district of Oslo. It features the four-track Nationaltheatret Station, Norway's second-busiest railway station, where the Oslo Tunnels lies directly beneath the Common Tunnel of the Oslo Metro. At Frogner, the Elisenberg Station was built, but has never been used. The tunnel is the busiest section of railway line in Norway and serves all west-bound trains from Oslo, including many services of the Oslo Commuter Rail and the Airport Express Train.

<span class="mw-page-title-main">Asker Line</span> Railway line in Norway

The Asker Line is a 9.5-kilometre (5.9 mi) railway line between Asker and Lysaker in Norway. The line runs along the same corridor as the Drammen Line, offering increased capacity, speed and regularity on the rail network west of Oslo. The first part opened in 2005, and in 2011 an extension opened from Sandvika to Lysaker. Original plans called for an extension to Skøyen, but from 2020, new planning is under way for an extension all the way to Oslo Central Station. Most of the railway is in tunnel and is dimensioned for 160 km/h (99 mph) running. The entire railway is electrified at 15 kV  16.7 Hz AC. The first section cost 3.7 billion kr, while the second is budgeted at NOK 2.7 billion.

<span class="mw-page-title-main">Lysaker Station</span> Railway station in Bærum, Norway

Lysaker Station is a railway station on the Drammen Line and Asker Line situated at Lysaker in Bærum, Norway. Located 7.00 kilometers (4.35 mi) from Oslo Central Station, Lysaker is served by a mix of Vy express, regional and Oslo Commuter Rail trains, as well as Flytoget. The station is elevated and features two island platforms with four tracks. It's the terminus of the Asker Line.

<span class="mw-page-title-main">Lieråsen Tunnel</span> Railway tunnel in Norway

Lieråsen Tunnel is a single-tubed railway tunnel of the Drammen Line situated in Asker and Lier in Norway. At a length of 10.723 kilometers (6.663 mi), the double track tunnel is located immediately between Asker Station and Lier Station. It is used for a mix of short- and long-haul passenger trains and freight trains.

<span class="mw-page-title-main">Romerike Tunnel</span> Norwegian railway tunnel

The Romerike Tunnel is a 14.580-kilometre (9.060 mi) railway tunnel in Norway between Oslo and Lillestrøm. It is the second longest railway tunnel in Norway after the Blix Tunnel opened in 2022, and forms the first section of the Gardermoen Line. It is double track and electrified, permitting speeds of 210 kilometres per hour (130 mph).

The Norwegian National Rail Administration was a government agency responsible for owning, maintaining, operating and developing the Norwegian railway network, including the track, stations, classification yards, traffic management and timetables. Safety oversight was the duty of the Norwegian Railway Inspectorate, while numerous operating companies run trains on the lines; the largest being the state owned passenger company Vy and the freight company CargoNet.

<span class="mw-page-title-main">Sandvika Station</span> Railway station in Bærum, Norway

Sandvika Station is a railway station located at Sandvika in Bærum, Norway. Situated on the Drammen Line, 14.14 kilometers (8.79 mi) from Oslo S, it also an intermediate station of the Asker Line. Vy serves the station with local and regional, with about 7,000 passengers using the station daily. It is also served by the Airport Express Train and serves as the main bus terminal for the town. The station is elevated and has two island platforms and four tracks.

<span class="mw-page-title-main">Oslo Airport Station</span> Railway station in Ullensaker, Norway

Oslo Airport Station, also known as Gardermoen Station, is a railway station located in the airport terminal building of Oslo Airport, Gardermoen in Norway. Located on the Gardermoen Line, it is served by the Airport Express Trains, express trains to Trondheim and Oslo, regional trains to Lillehammer and Skien and commuter trains to Eidsvoll and Kongsberg.

<span class="mw-page-title-main">Ruter</span> Oslos public transport authority

Ruter AS is the public transport authority for Oslo and Akershus counties in Norway. Formally a limited company – 60% of its shares are owned by the Oslo county municipality and 40% by that of Viken – it is responsible for the administration, funding, and marketing of public transport in the two counties, including buses, the Oslo Metro, Oslo Trams, and ferry services. Ruter also holds agreements with Entur concerning the regulation of fares on local and regional train services operated within the two counties.

<span class="mw-page-title-main">Oslo Commuter Rail</span> Commuter rail in Norway

Oslo Commuter Rail is a commuter rail centered in Oslo, Norway, connecting the capital to six counties in Eastern Norway. The system is operated by Vy and its subsidiary Vy Gjøvikbanen, using Class 69 and Class 72 electric multiple units (EMU). The network spans eight routes and 128 stations, with Oslo Central Station (Oslo S) as the central hub. The trains run on 553 kilometers (344 mi) of electrified mainline railway owned by the Bane NOR. Deficits are financed by the Norwegian Ministry of Transport, although the network also has a ticketing cooperation with Ruter, the public transport authority in Oslo and Akershus. The network is the longest commuter rail network in the Nordic countries, and among top ten in Europe.

<span class="mw-page-title-main">Nationaltheatret metro station</span> Oslo metro station

Nationaltheatret is an underground metro station and tram stop serving Vika and the city center of Oslo, Norway. It is located on the Common Tunnel of the Oslo Metro and on the Briskeby Line of the Oslo Tramway. Also located at the same place is Nationaltheatret Station of the Drammen Line. The station is served by all five lines of the metro, and lines 11 and 13 of the tramway. In addition, several bus services call at the station. It is named for the National Theatre located nearby.

<span class="mw-page-title-main">Torp station</span> Railway station in Sandefjord, Norway

Torp Station, also known as Sandefjord Airport Station, is on the Vestfold Line in Sandefjord, Norway. It is served with regional trains operated by Vy. Located close to Sandefjord Airport, Torp, the station is served by a free four-minute shuttle bus service from the station to the airport. The trains operate northwards via towns in Vestfold to Drammen and Oslo and onwards via Oslo Airport, Gardermoen to towns in Hedmark and Oppland. Southwards, the trains serve Sandefjord, Larvik and Grenland.

<span class="mw-page-title-main">Stabekk Station</span> Railway station in Bærum, Norway

Stabekk Station is a railway station of the Drammen Line situated at Stabekk in Bærum, Norway. Located 8.99 kilometers (5.59 mi) from Oslo Central Station, it is served by line L1, L2, L2x and L21 of the Oslo Commuter Rail and by Flytoget - the express train to Oslo Airport. It is located in a primarily residential area and has four regular hourly services operated by Vy. The station features an island platform accessible from the station building on the south side.

References

  1. 1 2 Brønnøysund Register Centre. "Nøkkelopplysninger Flytoget AS" (in Norwegian). Retrieved 2008-05-20.
  2. 1 2 3 4 5 6 7 8 Flytoget AS. "History". Archived from the original on 2011-07-07. Retrieved 2008-05-24.
  3. 1 2 3 4 5 6 7 8 Flytoget AS (2008). "Annual Report 2007" (PDF) (in Norwegian). Archived from the original (PDF) on 2011-07-21. Retrieved 2008-09-13.
  4. 1 2 3 Flytoget AS. "About Flytoget, the Airport Express Train". Archived from the original on 2007-11-17. Retrieved 2008-05-24.
  5. 1 2 Flytoget AS (2007-10-21). "Rekordresultat gir utbytte" (in Norwegian). Archived from the original on 2009-07-03. Retrieved 2008-09-13.
  6. 1 2 3 Norwegian National Rail Administration (2008). "Jernbanestatistikk 2007" (PDF). p. 45. Archived from the original (PDF) on December 17, 2008. Retrieved 2008-09-13.
  7. 1 2 Norwegian National Rail Administration (2008). "Jernbanestatistikk 2007" (PDF). p. 6. Archived from the original (PDF) on December 17, 2008. Retrieved 2008-09-13.
  8. 1 2 3 Aspenberg, Nils Carl (2001). Elektrolok i Norge (in Norwegian). Oslo: Baneforlaget. ISBN   82-91448-42-6.
  9. 1 2 3 Norwegian Ministry of Transport and Communications (1999). "Særskilt om Romeriksporten" (in Norwegian). Archived from the original on 2012-03-29. Retrieved 2008-09-13.
  10. Aftenposten (1997-04-14). "NSB og SRG barket sammen i namsretten" (in Norwegian).[ permanent dead link ]
  11. Norsk Telegrambyrå (2000-06-29). "Ueland fikk sparken i NSB" (in Norwegian). Verdens Gang . Retrieved 2008-09-13.
  12. Verdens Gang (2001-02-26). "Ny mann på nytt spor?" (in Norwegian). Retrieved 2008-09-13.
  13. 1 2 Boarding (2004-02-12). "Flytoget til Nærings- og handelsdepartementet" (in Norwegian). Archived from the original on 2009-07-03. Retrieved 2008-09-13.
  14. Flytoget. "About the Organisation". Archived from the original on 2008-05-27. Retrieved 2008-05-24.
  15. Boarding (2003-01-23). "Endre Skjørestad ny styreleder". Archived from the original on 2009-07-03. Retrieved 2008-09-13.
  16. Lorentzen, Magdalena (2008-08-06). "Toppsjef begynneri barnehage" (in Norwegian). NA24 . Retrieved 2008-09-14.
  17. Flytoget (2008-10-24). "Linda Bernander Silseth ny administrerende direktør i Flytoget" (in Norwegian). Retrieved 2008-05-24.[ dead link ]
  18. Flytoget (2009-06-23). "2 Flytog i timen fra Drammen" (in Norwegian). Archived from the original on 2009-09-07. Retrieved 2009-08-29.
  19. Norwegian Ministry of Transport and Communications (2007-03-27). "Flytoget- til Drammen frå juni 2008" (in Norwegian). Retrieved 2008-09-13.
  20. Norwegian National Rail Administration (2007-03-23). "Flytoget til Drammen" (in Norwegian). Archived from the original on August 11, 2007. Retrieved 2008-09-13.
  21. 1 2 3 Flytoget AS (2008-01-06). "From Oslo Airport" (PDF). Archived from the original (PDF) on 2020-01-24. Retrieved 2008-09-13.
  22. NSB (2008-01-06). "Kongsberg-Eidsvoll" (PDF). Archived from the original (PDF) on 2009-10-07. Retrieved 2008-09-13.
  23. Norges Statsbaner (2008-01-06). "Skien-Lillehammer" (PDF). Archived from the original (PDF) on 2011-06-12. Retrieved 2008-09-13.
  24. Norges Statsbaner (2008-01-06). "Oslo-Trondheim" (PDF). Archived from the original (PDF) on 2011-06-12. Retrieved 2008-09-13.
  25. 1 2 3 4 Flytoget AS. "Fares". Archived from the original on 2010-07-04. Retrieved 2009-08-29.
  26. Norges Statsbaner. "Studentrabatt" (in Norwegian). Archived from the original on October 22, 2007. Retrieved 2008-05-24.
  27. Flytoget AS. "Tickets". Archived from the original on 2008-04-21. Retrieved 2008-05-24.
  28. Norwegian School of Management. (2008-05-07). "Flytoget vinner kundetilfredshetsprisen 2008" (in Norwegian). Retrieved 2008-09-13.
  29. Great Place to Work (2008). "Norges Beste Arbeidsplasser 2008" (in Norwegian). Archived from the original on 2008-12-04. Retrieved 2008-09-13.
  30. Aftenposten (2007-08-31). "Halve kullet gikk til Flytoget". Archived from the original on 2007-11-06. Retrieved 2008-06-30.
  31. Norwegian National Rail Administration. "Stasjonsoversikt Kongsberg – Oslo – Eidsvoll from Oslo Airport" (in Norwegian). Archived from the original on 2008-02-08. Retrieved 2008-05-24.
  32. Norsk Telegrambyrå (2001-02-21). "Flytoget bøtelagt etter dødsulykke" (in Norwegian). Verdens Gang. Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  33. Norwegian Railway Inspectorate. "Ulykkesstatisktikk 2002" (PDF) (in Norwegian). p. 4. Retrieved 2008-06-30.[ permanent dead link ]
  34. Verdens Gang (2001-01-26). "- Satt i skinnegangen da toget kom" (in Norwegian). Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  35. Ihlebæk, Jostein; Holm, Per Annar (2007-12-04). "Fullt tog-kaos på Romerike" (in Norwegian). Aftenposten. p. 4. Archived from the original on 2011-06-04. Retrieved 2008-06-30.
  36. Norwegian Railway Inspectorate. "Ulykkesstatisktikk 2000" (in Norwegian). Retrieved 2008-06-30.[ dead link ]
  37. Norsk Telegrambyrå (2001-01-03). "Flytoget sporet av" (in Norwegian). Verdens Gang. Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  38. Verdens Gang (2000-06-20). "Sovnet - kræsjet flytoget" (in Norwegian). Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  39. Verdens Gang (2000-06-14). "Flytoget kjørte mot stoppsignal" (in Norwegian). Archived from the original on 2011-06-11. Retrieved 2008-06-30.
  40. Norwegian Railway Inspectorate. "Ulykkesstatisktikk 2001" (in Norwegian). Retrieved 2008-06-30.[ dead link ]
  41. Tonstad, Hans Marius (2008-01-08). "Ny stans for flytoget" (in Norwegian). Aftenposten. Archived from the original on March 9, 2008. Retrieved 2008-06-30.
  42. Norwegian National Rail Administration (2008-05-15). "100 millioner sikrer full fart på oppgradering av Oslotunnelen" (in Norwegian). Archived from the original on May 19, 2008. Retrieved 2008-06-30.
  43. Norsk Telegrambyrå (2008-03-14). "Feil forsinker flytogene" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  44. Norsk Telegrambyrå (2001-03-22). "Flytoget fast i tunnel i én time i Oslo" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  45. Verdens Gang (1998-12-12). "Velstelte tyver på flytoget" (in Norwegian). Retrieved 2008-06-30.
  46. Norsk Telegrambyrå (2007-05-25). "Oslos politimester rundstjålet" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  47. Norsk Telegrambyrå (2003-10-27). "Livsfarlig sabotasje mot flytog" (in Norwegian). Verdens Gang. Retrieved 2008-06-30.
  48. Verdens Gang (2001-08-17). "Svindlet Flytoget med printer-triks" (in Norwegian). Retrieved 2008-06-30.
  49. Hauge, Linus (2007-12-07). "Optimistisk Gore håper på ny klimaavtale i 2010" (in Norwegian). Dagsavisen. Archived from the original on February 6, 2008. Retrieved 2008-06-30.
  50. Sandberg, Tor (2008-06-26). "Flytoget slanker staben" (in Norwegian). Dagsavisen. Archived from the original on July 3, 2009. Retrieved 2008-06-30.
  51. Aftenposten (2007-10-18). "Energi på banen" (in Norwegian). Archived from the original on 2007-10-13. Retrieved 2007-06-30.
  52. Flytog på strekningen Oslo - Halden Archived April 18, 2010, at the Wayback Machine
  53. Norwegian State Council on Disability. "Langt igjen til universell utforming" (in Norwegian). Archived from the original on 2007-05-28. Retrieved 2007-06-19.
  54. Flytoget AS. "Flytoget inngår kontrakt med Bombardier Transportation om kjøp av nye mellomvogner" (in Norwegian). Archived from the original on 2009-07-03. Retrieved 2007-06-19.
  55. Norsk Telegrambyrå (2000-06-18). "Utmatting årsak til avsporing" (in Norwegian). Verdens Gang. Archived from the original on 2011-06-12. Retrieved 2008-09-13.
  56. Norsk Telegrambyrå (2000-07-13). "Signatur endelig i drift" (in Norwegian). Verdens Gang. Archived from the original on 2011-06-12. Retrieved 2008-09-13.
  57. Norsk Telegrambyrå (2005-01-31). "Må skifte alle hjullagre i Flytogene" (in Norwegian). Verdens Gang. Archived from the original on 2011-06-11. Retrieved 2007-06-30.
  58. CAF (2015-05-01). "OARIS FLYTOGET". CAF. Retrieved 2015-12-30.
  59. "Crack causes Flytoget to withdraw brand new CAF fleet from traffic" . Retrieved 31 August 2021.
  60. Jernbaneverket (2015-08-13). "KVU Oslo-Navet" (in Norwegian). Archived from the original on 2016-01-25. Retrieved 2016-01-19.

Commons-logo.svg Media related to Flytoget at Wikimedia Commons