German submarine U-646

Last updated
History
War ensign of Germany (1938-1945).svg Nazi Germany
NameU-646
Ordered20 January 1941
Builder Blohm & Voss, Hamburg
Yard number622
Laid down23 December 1941
Launched3 September 1942
Commissioned29 October 1942
FateSunk on 17 May 1943 by British aircraft south-east of Iceland
General characteristics
Class and type Type VIIC submarine
Displacement
  • 769  t (757 long tons) surfaced
  • 871 t (857 long tons) submerged
Length
Beam
  • 6.20 m (20 ft 4 in) (o/a)
  • 4.70 m (15 ft 5 in) (pressure hull)
Height9.60 m (31 ft 6 in)
Draught4.74 m (15 ft 7 in)
Installed power
  • 2,800–3,200 PS (2,100–2,400 kW; 2,800–3,200 bhp) (diesels)
  • 750 PS (550 kW; 740 shp) (electric)
Propulsion
Speed
  • 17.7 knots (32.8 km/h; 20.4 mph) surfaced
  • 7.6 knots (14.1 km/h; 8.7 mph) submerged
Range
  • 8,500  nmi (15,700 km; 9,800 mi) at 10 knots (19 km/h; 12 mph) surfaced
  • 80 nmi (150 km; 92 mi) at 4 knots (7.4 km/h; 4.6 mph) submerged
Test depth
  • 230 m (750 ft)
  • Crush depth: 250–295 m (820–968 ft)
Complement4 officers, 40–56 enlisted
Armament
Service record
Part of:
Identification codes: M 49 751
Commanders:
  • Oblt.z.S. Heinrich Wulff
  • 29 October 1942 – 17 May 1943
Operations:
  • 2 patrols:
  • 1st patrol:
  • 28 March – 30 April 1943
  • 2nd patrol:
  • 12 – 17 May 1943
Victories: None

German submarine U-646 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 23 December 1941 at the Blohm & Voss yard at Hamburg, launched on 3 September 1942, and commissioned on 29 October 1942 under the command of Leutnant zur See d.R. Heinrich Wulff.

Contents

Attached to 5th U-boat Flotilla based at Kiel, U-646 completed her training period on 31 March 1943 and was assigned to front-line service.

Design

German Type VIIC submarines were preceded by the shorter Type VIIB submarines. U-646 had a displacement of 769 tonnes (757 long tons) when at the surface and 871 tonnes (857 long tons) while submerged. [1] She had a total length of 67.10 m (220 ft 2 in), a pressure hull length of 50.50 m (165 ft 8 in), a beam of 6.20 m (20 ft 4 in), a height of 9.60 m (31 ft 6 in), and a draught of 4.74 m (15 ft 7 in). The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of 2,800 to 3,200 metric horsepower (2,060 to 2,350 kW; 2,760 to 3,160 shp) for use while surfaced, two Brown, Boveri & Cie GG UB 720/8 double-acting electric motors producing a total of 750 metric horsepower (550 kW; 740 shp) for use while submerged. She had two shafts and two 1.23 m (4 ft) propellers. The boat was capable of operating at depths of up to 230 metres (750 ft). [1]

The submarine had a maximum surface speed of 17.7 knots (32.8 km/h; 20.4 mph) and a maximum submerged speed of 7.6 knots (14.1 km/h; 8.7 mph). [1] When submerged, the boat could operate for 80 nautical miles (150 km; 92 mi) at 4 knots (7.4 km/h; 4.6 mph); when surfaced, she could travel 8,500 nautical miles (15,700 km; 9,800 mi) at 10 knots (19 km/h; 12 mph). U-646 was fitted with five 53.3 cm (21 in) torpedo tubes (four fitted at the bow and one at the stern), fourteen torpedoes, one 8.8 cm (3.46 in) SK C/35 naval gun, 220 rounds, and one twin 2 cm (0.79 in) C/30 anti-aircraft gun. The boat had a complement of between forty-four and sixty. [1]

Service history

While on patrol in the North Atlantic, U-646 was detected by Hudson J of No. 269 Squadron RAF south-east of Iceland on 17 May 1943. In the subsequent attack, the U-boat was sunk and all 46 crew members perished. [2]

Related Research Articles

German submarine U-551 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 21 November 1939 at the Blohm & Voss yard in Hamburg as yard number 527, launched on 14 September 1940, and commissioned on 7 November 1940 under the command of Kapitänleutnant Karl Schrott.

German submarine U-292 was a Type VIIC/41 U-boat of Nazi Germany's Kriegsmarine during World War II.

German submarine U-469 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.

German submarine U-583 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.

German submarine <i>U-708</i> German World War II submarine

German submarine U-708 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. Ordered 6 August 1940, she was laid down 31 March 1941 and launched 24 March 1942. She was used only for training, and was captained by four different commanders during her 3-year life. She was scuttled on 5 May 1945 at Wilhelmshaven and her wreck was broken up in 1947.

German submarine U-668 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 11 October 1941 at the Howaldtswerke yard at Hamburg, launched on 5 October 1942, and commissioned on 16 November 1942 under the command of Oberleutnant zur See Wolfgang von Eickstedt.

German submarine U-675 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 9 April 1942 at the Howaldtswerke yard at Hamburg, launched on 8 May 1943, and commissioned on 14 July 1943 under the command of Oberleutnant zur See Karl-Heinz Sammler.

German submarine U-677 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 13 June 1942 at the Howaldtswerke yard at Hamburg, launched on 6 July 1943, and commissioned on 20 September 1943 under the command of Oberleutnant zur See Paul Weber.

German submarine U-680 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 12 October 1942 at the Howaldtswerke yard at Hamburg, launched on 20 November 1943, and commissioned on 23 December 1943 under the command of Oberleutnant zur See Max Ulber.

German submarine U-715 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 28 March 1942 at the H. C. Stülcken Sohn yard at Hamburg, launched on 14 December 1942, and commissioned on 17 March 1943 under the command of Oberleutnant zur See Helmut Röttger.

German submarine U-717 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 24 April 1942 at the H. C. Stülcken Sohn yard at Hamburg, launched on 20 February 1943, and commissioned on 19 May 1943 under the command of Oberleutnant zur See Siegfried von Rothkirch und Panthen. Attached to 5th U-boat Flotilla based at Kiel, U-717 completed her training period on 31 July 1944 and was assigned to front-line service.

German submarine U-719 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 3 July 1942 at the H. C. Stülcken Sohn yard at Hamburg, launched on 28 April 1943, and commissioned on 27 July 1943 under the command of Oberleutnant zur See Klaus-Dietrich Steffens. Attached to 5th U-boat Flotilla based at Kiel, U-719 completed her training period on 30 April 1944 and was assigned to front-line service.

German submarine U-720 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 17 August 1942 at the H. C. Stülcken Sohn yard at Hamburg, launched on 5 June 1943, and commissioned on 17 September 1943 under the command of Leutnant zur See Wolf-Harald Schüer.

German submarine U-742 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 12 May 1942 by Schichau-Werke of Danzig. She was commissioned on 1 May 1943 with Kapitänleutnant Heinz Schwassmann in command.

German submarine U-746 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 15 July 1942 by Schichau-Werke of Danzig. She was commissioned on 4 July 1943 with Tenente di vascello Augusto Biagini in command.

German submarine U-740 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 26 April 1942 by Schichau-Werke of Danzig. She was commissioned on 27 March 1943 with Oberleutnant zur See Günther Stark in command.

German submarine U-738 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 25 February 1942 by Schichau-Werke of Danzig. She was commissioned on 20 February 1943 with Oberleutnant zur See Erich-Michael Hoffmann in command.

German submarine U-747 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 19 August 1942 by Schichau-Werke of Danzig. She was commissioned on 17 July 1943 with Tenente di vascello Roberto Rigoli in command.

German submarine U-748 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 20 August 1942 by Schichau-Werke of Danzig. She was commissioned on 31 July 1943 with Capitano di Corvetta Mario Arillo in command.

German submarine U-749 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine built for service during World War II. Her keel was laid down on 28 September 1942 by Schichau-Werke of Danzig. She was commissioned on 14 August 1943 with Tenente di vascello Alberto Longhi in command.

References

Bibliography

62°10′N14°30′W / 62.167°N 14.500°W / 62.167; -14.500