History | |
---|---|
Nazi Germany | |
Name | U-599 |
Ordered | 22 May 1940 |
Builder | Blohm & Voss, Hamburg |
Yard number | 575 |
Laid down | 27 January 1941 |
Launched | 15 October 1941 |
Commissioned | 4 December 1941 |
Fate | Sunk northwest of the Azores by a British aircraft on 24 October 1942 [1] |
General characteristics | |
Class and type | Type VIIC submarine |
Displacement | |
Length |
|
Beam |
|
Height | 9.60 m (31 ft 6 in) |
Draught | 4.74 m (15 ft 7 in) |
Installed power |
|
Propulsion |
|
Speed |
|
Range | |
Test depth |
|
Complement | 4 officers, 40–56 enlisted |
Armament |
|
Service record [2] | |
Part of: |
|
Identification codes: | M 43 302 |
Commanders: |
|
Operations: |
|
Victories: | None |
German submarine U-599 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.
She was a member of four wolfpacks, carried out one patrol and sank no ships.
She was sunk northwest of the Azores by a British aircraft on 24 October 1942.
German Type VIIC submarines were preceded by the shorter Type VIIB submarines. U-599 had a displacement of 769 tonnes (757 long tons) when at the surface and 871 tonnes (857 long tons) while submerged. [3] She had a total length of 67.10 m (220 ft 2 in), a pressure hull length of 50.50 m (165 ft 8 in), a beam of 6.20 m (20 ft 4 in), a height of 9.60 m (31 ft 6 in), and a draught of 4.74 m (15 ft 7 in). The submarine was powered by two Germaniawerft F46 four-stroke, six-cylinder supercharged diesel engines producing a total of 2,800 to 3,200 metric horsepower (2,060 to 2,350 kW; 2,760 to 3,160 shp) for use while surfaced, two Brown, Boveri & Cie GG UB 720/8 double-acting electric motors producing a total of 750 metric horsepower (550 kW; 740 shp) for use while submerged. She had two shafts and two 1.23 m (4 ft) propellers. The boat was capable of operating at depths of up to 230 metres (750 ft). [3]
The submarine had a maximum surface speed of 17.7 knots (32.8 km/h; 20.4 mph) and a maximum submerged speed of 7.6 knots (14.1 km/h; 8.7 mph). [3] When submerged, the boat could operate for 80 nautical miles (150 km; 92 mi) at 4 knots (7.4 km/h; 4.6 mph); when surfaced, she could travel 8,500 nautical miles (15,700 km; 9,800 mi) at 10 knots (19 km/h; 12 mph). U-599 was fitted with five 53.3 cm (21 in) torpedo tubes (four fitted at the bow and one at the stern), fourteen torpedoes, one 8.8 cm (3.46 in) SK C/35 naval gun, 220 rounds, and a 2 cm (0.79 in) C/30 anti-aircraft gun. The boat had a complement of between forty-four and sixty. [3]
The submarine was laid down on 27 January 1941 at Blohm & Voss, Hamburg as yard number 575, launched on 15 October and commissioned on 4 December under the command of Kapitänleutnant Wolfgang Breithaupt.
She served with the 8th U-boat Flotilla from 4 December 1941 for training and the 1st flotilla from 1 September 1942 for operations.
U-599 departed Kiel on 27 August 1942 and headed for the Atlantic Ocean. Her route took her through the gap between Iceland and the Faroe Islands. She then patrolled the area southeast of Greenland and east of Labrador.
She was sunk on 24 October northwest of the Azores by depth charges dropped by a British B-24 Liberator of No. 224 Squadron RAF.
Forty-four men died in U-599; there were no survivors.
U-599 took part in four wolfpacks, namely:
German submarine U-259 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 25 March 1941 at the Bremer Vulkan yard at Bremen-Vegesack, launched on 30 December 1941, and commissioned on 18 February 1942 under the command of Kapitänleutnant Klaus Köpke. After training with the 5th U-boat Flotilla at Kiel, U-259 was transferred to the 3rd U-boat Flotilla, based at La Pallice, France, for front-line service from 1 September 1942.
German submarine U-605 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 12 March 1941 by Blohm & Voss, Hamburg as yard number 581, launched on 27 November 1941 and commissioned on 15 January 1942 under Oberleutnant zur See Herbert-Viktor Schütze.
German submarine U-458 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 16 October 1940 by Deutsche Werke AG, Kiel as yard number 289, launched on 4 October 1941 and commissioned on 12 December 1941 under Oberleutnant zur See Kurt Diggins.
German submarine U-224 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.
German submarine U-258 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. She was laid down at the Bremer Vulkan yard at Bremen-Vegesack on 20 March 1941 as yard number 23. She was launched on 13 December and commissioned on 4 February 1942.
German submarine U-356 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down in May 1940 at the Flensburger Schiffbau-Gesellschaft yard at Flensburg, launched on 16 September 1941, and commissioned on 20 December 1941.
German submarine U-604 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 27 February 1941 by Blohm & Voss in Hamburg as yard number 580, launched on 16 November 1941 and commissioned on 8 January 1942 under Kapitänleutnant Horst Höltring.
German submarine U-332 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. She saw service in the Atlantic Ocean and Mediterranean Sea. Built in 1941 and 1942 at Nordsee-Werke, Emden, U-332 was a Type VIIC U-boat, capable of lengthy ocean patrols and of operating in distant environments.
German submarine U-623 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 15 July 1941 by Blohm & Voss, Hamburg as yard number 599, launched on 31 March 1942 and commissioned on 21 May 1942 under Oberleutnant zur See Hermann Schrüder.
German submarine U-304 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. She saw service in the Atlantic Ocean and Mediterranean Sea. Built in 1941 and 1942 at Flender-Werke, Lübeck, U-304 was a Type VIIC U-boat, capable of lengthy ocean patrols and of operating in distant environments.
German submarine U-232 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.
German submarine U-251 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 18 October 1940 at the Bremer-Vulkan-Vegesacker Werft (yard) in Bremen as yard number 16, launched on 26 July 1941 and commissioned on 20 September under the command of Kapitänleutnant Heinrich Timm.
German submarine U-279 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.
German submarine U-336 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II. The submarine was laid down on 28 March 1941 at the Nordseewerke yard at Emden as yard number 208, launched on 4 December and commissioned on 14 February 1942 under the command of Kapitänleutnant Hans Hunger.
German submarine U-384 was a Type VIIC U-boat of Nazi Germany's Kriegsmarine during World War II.
German submarine U-663 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 31 March 1941 by Deutsche Werft, Hamburg as yard number 812, launched on 26 March 1942 and commissioned on 14 May 1942 under Kapitänleutnant Heinrich Schmid.
German submarine U-619 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 19 June 1941 by Blohm & Voss, Hamburg as yard number 595, launched on 9 March 1942 and commissioned on 23 April 1942 under Oberleutnant zur See Kurt Makowski.
German submarine U-657 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 5 October 1940 by Howaldtswerke, Hamburg as yard number 806, launched on 12 August 1941 and commissioned on 8 October 1941 under Oberleutnant zur See Hans-Jürgen Radke.
German submarine U-635 was a Type VIIC U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was laid down on 3 October 1941 by Blohm & Voss, Hamburg as yard number 611, launched on 24 June 1942 and commissioned on 13 August 1942 under Oberleutnant zur See Heinz Eckelmann.
German submarine U-1274 was a Type VIIC/41 U-boat built for Nazi Germany's Kriegsmarine for service during World War II. She was ordered on 13 June 1942, and was laid down on 21 June 1943 by Vegesacker Werft AG, Bremen as yard number 69, launched on 25 January 1944 and commissioned on 1 March 1944 under Oberleutnant zur See Fedor Kuscher.