General information | |||||
---|---|---|---|---|---|
Location | Prestatyn, Denbighshire Wales | ||||
Coordinates | 53°20′10″N3°24′25″W / 53.336°N 3.407°W | ||||
Grid reference | SJ063830 | ||||
Managed by | Transport for Wales | ||||
Platforms | 2 | ||||
Other information | |||||
Station code | PRT | ||||
Classification | DfT category D | ||||
History | |||||
Opened | 1 May 1848 (original station) 28 February 1897 (current station) | ||||
Closed | 28 February 1897 (original station) | ||||
Rebuilt | 1979 (renovation) 1997, 2011–18 (refurbishment) | ||||
Key dates | |||||
1848 | 1st station opened | ||||
1897 | current station opened | ||||
Passengers | |||||
2019/20 | 0.325 million | ||||
2020/21 | 94,156 | ||||
2021/22 | 0.252 million | ||||
2022/23 | 0.289 million | ||||
2023/24 | 0.341 million | ||||
|
Prestatyn railway station on the North Wales Coast Line serves the town of Prestatyn in North Wales.
The station was built on the Chester and Holyhead Railway (CHR) line and opened on 1 May 1848. The coming of the railway is credited with bringing large numbers of tourists and prosperity to the town. [1] When the CHR was acquired by the London &North Western Railway (LNWR),further expansion occurred at Prestatyn and the station became a junction for a branch line to Dyserth. In the 1890s,the LNWR built the current station.
Passenger numbers dipped significantly during the mid 20th century. After British Rail tried to close the station in the 1960s,the line and station were rationalised but remained operational. In 1979,the station was renovated.
It is managed by Transport for Wales,who operate services from Cardiff Central,Birmingham International and Manchester Piccadilly to Holyhead and Llandudno;other services are provided by Avanti West Coast between Holyhead and London Euston.
Prestatyn station was built by the Chester and Holyhead Railway (CHR) on its line from Chester to the port of Holyhead on Anglesey. [2] The route,engineered by Robert Stephenson,ran mainly along the coastline of North Wales. A contract for the station's construction was awarded to the Hinson Brothers. [2]
On 1 May 1848,Prestatyn's first station opened when the CHR opened its line through to Bangor. It comprised a single slate-roofed two-storey brick building and adjacent shed on its westbound platform. The site is roughly 100 m to the east of the present station. [2]
The station was the junction for a branch line to Dyserth opened by the LNWR in 1869 and intended for mineral traffic. In 1905,a passenger service was started that lasted until 1930,when it was withdrawn by the London,Midland and Scottish Railway (LMS). The line remained open to serve a quarry until its closure in 1973. [3] Since then,much of the former line has been reused as a footpath. [4]
On 1 January 1859,the North Wales Coast Line and its stations became a part on the London &North Western Railway (LNWR),who had acquired the CHR. [2] The LNWR placed a great emphasis on its services between London and Ireland via the ferries at Holyhead. Traffic expanded considerably during the late 1800s and the company began a major expansion. [2] In 1897 the tracks through the town were quadrupled and the current station was constructed. [5]
The new station had prefabricated modular buildings manufactured by the LNWR at their works in Crewe. [2] Three prefabricated buildings were constructed,all 3.4 m wide and 2 m long. Timber trestles and frames supported the prefabricated units and 600mm thick concrete slabs were used for parts of the foundations to support brick footings,fireplaces and chimneys. [2]
One of the 1890s buildings is still standing on what was the line towards Chester. It had timber beam canopies along the south and west sides,three internal rooms with fireplaces and toilet facilities. [2] Two similar structures have since been demolished,one having been located on the north-westerly line (towards Holyhead) and the third being built upon yet another platform. On 28 February 1897,the new station was opened and the old station was closed. [2] [6]
In 1901,further alterations to the station layout became necessary;the work was carried out by contractors Parnell &Son. [2] The former 'up' platform was redeveloped into an island platform between the railway tracks. Another timber canopy was installed on the station building's north side. [2]
Prestatyn station suffered from diminishing passenger numbers after the Second World War. It was threatened with closure during Beeching cuts in the 1960s but objections from the community led to it being reprieved. [7]
The station and line were then rationalised,the four tracks were cut to two in the 1980s,and the island platform became the only one to remain in use. [2] In 1979,the station was rebuilt in a style sympathetic to the original structure. Two of the three prefabricated buildings were demolished. In January 1997,the remaining station buildings were given Grade II listed building status. [2]
In autumn 2011,Prestatyn was the first of six stations in Wales to receive an access footbridge and lift,repaved accessible platforms,in Network Rail's 'Access for All’programme. [8] In 2012,the station buildings were refurbished. During the first half of 2018,new signalling systems were installed along the North Wales Coast Line leading to the closure of the nearby signal box when control was centralised to the Wales Rail Operating Centre. [9] [10]
The station ticket office is staffed seven days a week. A self-service ticket machine is provided for use outside opening hours and collecting pre-paid tickets. Live train running information is via digital passenger information displays. [11]
The hourly Manchester to Llandudno and Birmingham International/Cardiff to Holyhead services call here,giving the station two trains each hour to Chester and Llandudno Junction. On weekdays,Avanti West Coast operate five trains each way per day between Crewe and Holyhead,one of which runs only to Bangor. On Saturdays there is one train each way per day between London Euston and Holyhead,with two trains each way from Crewe to Holyhead,one of which continues to Birmingham New Street. [12] [13] A few early morning and late night trains run to/from Crewe,rather than Cardiff or Birmingham.
On Sundays,there is an hourly service each way from mid-morning (to Holyhead westbound and Crewe eastbound) and two trains to/from Manchester. There are three trains per day each way between Crewe and Holyhead,one of which continues to London Euston.
Preceding station | National Rail | Following station | ||
---|---|---|---|---|
Flint | Transport for Wales North Wales Coast Line | Rhyl | ||
Flint | Avanti West Coast Holyhead/Bangor–London Euston | Rhyl |
Keep Wales Tidy - Best Kept Staffed Station Award (2017) [14]
Birmingham International is a railway station known by code "BHI" in the Metropolitan Borough of Solihull in the West Midlands of England,just east of Birmingham. It is on the Rugby–Birmingham–Stafford line 14 km (8.7 mi) east of Birmingham New Street railway station. BHI serves Birmingham Airport,the National Exhibition Centre,the Resorts World Arena,and Resorts World Birmingham.
Crewe railway station serves the railway town of Crewe,in Cheshire,England. It opened in 1837 and is one of the most historically significant railway stations in the world.
The North Wales Main Line,also known as the North Wales Coast Line,is a major railway line in the north of Wales and Cheshire,England,running from Crewe on the West Coast Main Line to Holyhead on the Isle of Anglesey. The line has 19 stations,with all except two,Chester and Crewe,being in Wales.
Bangor railway station serves the city of Bangor,Gwynedd;it is operated by Transport for Wales. The station,which is 24+3⁄4 miles (40 km) east of Holyhead,is the last mainland station on the North Wales Coast line between Crewe and Holyhead. It is the busiest in terms of passenger numbers in North Wales,as it serves the community around Caernarfon and further west. It is close to the Snowdonia National Park and Bangor University,and has an interchange with bus services to the various towns and villages of north-west Gwynedd and Anglesey.
Shrewsbury railway station serves the town of Shrewsbury,in Shropshire,England. Built in 1848,it was designated a grade II listed building in 1969.
Llandudno Junction is a station serving the village of Llandudno Junction on the North Wales Main Line between Crewe and Holyhead. The station is managed by Transport for Wales Rail,although Avanti West Coast services also stop there. It is a junction for trains to Llandudno and the Conwy Valley line.
Lichfield Trent Valley is one of two railway stations that serve the city of Lichfield in Staffordshire,England;the other being Lichfield City in the city centre. It is a split-level station:low level platforms serve the Trent Valley section of the West Coast Main Line,with a single high level platform being the northern terminus of the Cross-City Line.
Wolverhampton station is a railway station in Wolverhampton,West Midlands,England on the Birmingham Loop of the West Coast Main Line. It is served by Avanti West Coast,CrossCountry,Transport for Wales and West Midlands Trains services,and was historically known as Wolverhampton High Level. It is also a West Midlands Metro tram stop.
Chester railway station is located in Newtown,Chester,England. Services are operated by Avanti West Coast,Merseyrail,Northern and Transport for Wales. From 1875 to 1969,the station was known as Chester General to distinguish it from Chester Northgate. The station's Italianate frontage was designed by the architect Francis Thompson.
Flint railway station serves the town of Flint in Flintshire,North Wales. It is located on the North Wales Coast Line and is managed by Transport for Wales,who provide most of the passenger trains that call here. There are certain Avanti West Coast services that serve the station.
Llandudno railway station serves the seaside town of Llandudno in North Wales. It is the terminus of a 3 miles (4.8 km) long branch line from Llandudno Junction on the North Wales Coast Line,between Crewe and Holyhead. The station is managed by Transport for Wales Rail,who operate all trains serving it. Llandudno Victoria station,the lower terminus of the Great Orme Tramway,is a 15-minute walk from the main station.
Deganwy railway station serves the town of Deganwy,Wales,and is the only intermediate station located on the Llandudno branch line from Llandudno Junction to Llandudno.
Llanfairfechan railway station serves the town of Llanfairfechan,Wales,and is located on the Crewe to Holyhead North Wales Coast Line 51+1⁄4 miles (82.5 km) west of Chester.
Penmaenmawr railway station serves the town of Penmaenmawr,Wales,and is located on the North Wales Coast Line between Crewe and Holyhead,49+1⁄4 miles (79.3 km) west of Chester.
Colwyn Bay railway station is on the Crewe to Holyhead North Wales Coast Line serving the seaside town of Colwyn Bay in North Wales.
Rhyl railway station is on the Crewe to Holyhead North Wales Coast Line and serves the holiday resort of Rhyl,Wales.
Wrexham General is the main railway station serving the city of Wrexham,north-east Wales,and one of the two serving the city,alongside Wrexham Central. It is currently operated and mostly served by Transport for Wales,with some additional services provided by Avanti West Coast to London Euston.
Holyhead railway station serves the Welsh town of Holyhead on Holy Island,Anglesey. The station is the western terminus of the North Wales Main Line 105+1⁄2 miles (170 km) west of Crewe and is managed by Transport for Wales Rail. It connects with the Port of Holyhead ferry terminal. The station is connected to the town centre by a stainless steel pedestrian/cycle bridge named The Celtic Gateway.
The Chester and Holyhead Railway was an early railway company conceived to improve transmission of Government dispatches between London and Ireland,as well as ordinary railway objectives. Its construction was hugely expensive,chiefly due to the cost of building the Britannia Tubular Bridge over the Menai Strait. The company had relied on Government support in facilitating the ferry service,and this proved to be uncertain. The company opened its main line throughout in 1850. It relied on the co-operation of other railways to reach London,and in 1859 it was absorbed by the London and North Western Railway.
Telford Central railway station serves the town of Telford,Shropshire,England. It is located on the Wolverhampton to Shrewsbury Line 15+1⁄2 miles (24.9 km) north west of Wolverhampton and is operated by West Midlands Trains. It is situated close to the Telford Shopping Centre,the main commercial district of the town.
Media related to Prestatyn railway station at Wikimedia Commons