The British town of Scarborough has had a total of five cliff railways, or funiculars, two of which are presently operational. The town is home to the first funicular railway in the United Kingdom. [1]

Contents

Having noted the need for better transit between the town and its bays, particularly for tourists, the construction of Scarborough's first funicular commenced in 1873. Designed by William Lucas and built by Crossley Brothers on a route between Scarborough Spa on South Sands and the South Cliff Esplanade, this water-driven lift was opened on 6 July 1875. During subsequent years, multiple other funiculars were constructed; in all, two lifts served Scarborough's North Bay while three covered the South Bay. Various means of propulsion, from steam power to electricity have been used over the years, while other upgrades such as automated operations have been implemented as well.

While some of these funiculars remain operational, others have been permanently withdrawn: both of the North Bay railways have been demolished, while one on South Bay is extant but out of use since 2006. The other two South Cliff lifts are still operational. Reasons for closures have included unsuitable terrain, insufficient revenue, excessive capacity in relation to demand and excessive refurbishment/upgrade costs.

South Cliff Lift

Spa Lift Scarborough South Cliff Lift - Track.jpg
Spa Lift

During 1873, the Scarborough South Cliff Tramway Company Limited was created to construct the first funicular railway in the United Kingdom. [1] It had long been recognised that the height difference between the town and its beaches was a geographical hindrance to the burgeoning tourism industry, and the construction of a funicular was viewed as a means of better facilitating, and extracting revenue from, such movements. It was specifically decided to build this initial cliff railway between the pre-existing Scarborough Spa on South Sands and the South Cliff Esplanade. [1] [2]

The funicular was designed and engineered principally by William Lucas. [1] Its construction was undertaken by Crossley Brothers of Manchester at a cost of £8,000. Metropolitan Carriage of Birmingham constructed the two cars, each capable of carrying 14 seated passengers. Each car was attached to a twin-steel cable rope, which was originally operated by a brakeman at the top station, while the bottom of each car was also fixed to a water tank. [1] The track is 4 ft 8+12 in (1,435 mm) standard gauge wide and 284 feet (87 m) long, on 1 in 1.75 (57%) gradient. [1]

Using seawater pumped by two Crossley gas engines through a hydraulic system designed by Tangye Ltd of Smethwick, Birmingham, [3] the upper car's water tank was filled until the counterbalance point was reached. [1] The cars then proceeded along their individual tracks, its speed and safety both being regulated by the brakeman. When the upper car reached the bottom of the incline, both cars were braked, and the seawater released into a pipe set between the two tracks so that it could be reused. The procedure was then repeated. [1]

On 6 July 1875, the railway opened. [4] Since opening, it has been refurbished several times; during 1879, the original gas engines were replaced by steam pumps. Between 1935 and 1947, operations were suspended for a time prior to the completion of another refurbishment, which involved the replacement of the water system by 90 hp electric engine. [1] The cars were replaced by two built by Hudswell Clarke & Company in 1934–1935.

During 1993, Scarborough Borough Council purchased the funicular from its owners. [1] In 1997, the control infrastructure of the lift were extensively modified, enabling operations to be handled entirely by its automated systems. [4]

Central Tramway

Central Tramway viewed from bottom Cliff railway track (geograph 5933129).jpg
Central Tramway viewed from bottom

During the late 1870s, the Central Tramway Company, Scarborough Limited was formed with the goal of constructing another funicular, the Central Tramway. [1] This railway was built between Foreshore Road and St Nicholas Gardens using 4 ft 8+12 in (1,435 mm) standard gauge track, the selected route covering a distance of 233 ft (71 m) over a 1 in 2 (50%) gradient. In 1880, work on the Central Tramway was completed head of its ( 54°16′51″N0°23′52″W / 54.2809°N 0.3978°W / 54.2809; -0.3978 (Central Tramway, Scarborough) ) official commencement of operations on 1 August 1881. [1]

The funicular is operated by two cars. In its original operating configuration, the funicular used steam power generated by equipment sited roughly 59 feet (18 m) beneath the top station; this gave the driver no direct view of the cars. To minimise the risk posed by potential equipment failure, each car is equipped with a safety brake system that works in conjunction with a rail located in the centre of each track. [1]

Over its operating life, several changes have been made to this funicular. Between 1920 and 1920, its original steam plant apparatus was retired in favour of an electric drive that was powered via direct current supplied via Scarborough's tramway system. [1] Following the discontinuation of the town's trams, the railway was converted to use alternating current after 1931. During this work period, the original cars were replaced and new motors installed within the top of the station, which provided drivers with a full view of the cars. [1] The lower station has subsequently been replaced by a more modern building. [2]

Passenger demand at the Central Tramway was particularly high, especially amongst guests at Scarborough's neighbouring Grand Hotel. The construction of the nearby St Nicholas Cliff Lift was heavily influenced by the level of demand for the Central Tramway. [1] The lift had been continuously operated by the same company throughout its operating life. [2]

St Nicholas Cliff Lift

St Nicholas Cliff Lift after conversion St Nicholas Cliff Lift, Scarborough, Yorkshire.jpg
St Nicholas Cliff Lift after conversion

The St Nicholas Cliff Lift ( 54°16′47″N0°23′53″W / 54.2797°N 0.3981°W / 54.2797; -0.3981 (St Nicholas Cliff Lift, Scarborough) ) was built by the Medway Safety Lift Company Ltd in 1929 and opened on 5 August of that year. Completed at a cost of £6,000, the Saint Nicholas Cliff Lift is located on the other side of the Grand Hotel from the Central Tramway, near the Aquarium. The track is 102 feet (31 m) long on a 1 in 1.33 (75%) gradient, the track gauge is 7 ft 6 in (2,286 mm). [1]

During its initial years of operation, there was no bottom station; passengers stepped into the tramcars directly from the pavement. [1] The control equipment was incorporated in the upper station, fares were also paid solely at this station. From the onset, the St Nicholas Cliff Lift was powered by electricity. [1]

In 1945, the railway was sold to Scarborough Corporation. [1] During February 2007, the lift was closed as the borough council could not afford the estimated £445,000 of modifications needed to conform with modern health and safety standards. Furthermore, it had been operating at a loss, which was allegedly also a factor in its closure, while planners had also projected demand to be within the existing capacity of the Central Tram alone. [1] [2] In early 2011, it was announced that the still closed lift might be sold by the council, as it did not have the £630,000 that the repairs were then estimated to cost. [5] [6] The cost of demolishing the lift was estimated to be around £150,000. [1]

After its closure, the two cars were moved to the top of the track and fixed in place, becoming part of the conversion of the top station into the St Nicholas Cafe. [2] The cars offer seating and a balcony was constructed around them. [7] The lower station was converted into an ice cream parlor called The Seastrand. [8] [9] The rails the cars ran on are still present.

North Bay Cliff Lift

The North Bay Cliff lift in 1995 North Bay Cliff Lift, Scarborough - geograph.org.uk - 785340.jpg
The North Bay Cliff lift in 1995

During early 1930, the North Bay Cliff Lift was constructed by the Medway Safety Lift Company Ltd as one element of the wider development of Peasholm Gap. [10] Opening for the first time in August of that year, this lift was the only funicular serving the north bay throughout its operating life. [10]

The funicular was operated by a pair of cars running on parallel tracks, which had a length of 167 feet (51 m) and a width of 6 ft 6 in (1,981 mm). The propulsion system used an electric drive system. [10]

During September 1996, it was decided to close the lift permanently rather than undertake a series of repairs to correct mechanical issues and address corrosion, which had an estimated cost of £75,000 to complete. [10] Over the following two years, it was entirely dismantled, with the remaining elements being donated to the Launceston Civic Society in 1998. Much of these assets are presently in storage at the Launceston Steam Railway in Launceston, Cornwall. [10]

Queens Parade Cliff Lift

Observing the South Bay's first cliff railway, opened in 1875, to have been a success, proposals were rapidly actioned for a similar funicular to serve the neighboring North Bay. [10] Thus, on 4 March 1878, the Scarborough Queen's Parade Tramway Company Limited was created to build and operate such a lift. The selected route of the lift was 285 feet (87 m) in length across a 1 in 2.5 (40%) slope between Queen's Parade and the Promenade Pier. [10] Built at a relatively fast pace, it was opened for the first time on 8 August 1878. [10]

This first North Bay railway had two cars running on parallel 4 ft (1,219 mm) tracks. [10] In many respects, its configuration was that of a typical funicular. Its propulsion system involved a pair of counterbalanced water tanks, one underneath each car; these were alternatively filled and emptied while the cars were in either station to change the weight of the cars and thus move the cars via gravity alone. [10]

However, the Queens Parade Cliff Lift experienced a series of particularly unfortunate events. [10] The opening day was marred by one of the carriages having broken free and crashed into the lower station, with the resulting damage forcing the immediate closure of the funicular. It was not able to reopen until repairs were complete during the following year. This apparent bad luck continued through a series of accidents, including multiple landslips and equipment failures. [10] The quick succession of misfortune caused the railway's management to conclude that the venture was untenable, resulting in operations being permanently ceased during 1887, barely nine years after opening. The neighbouring pier was also ill-fated, being destroyed by a gale in 1905. [10]

Ticketing

Related Research Articles

<span class="mw-page-title-main">Narrow-gauge railway</span> Railway line with a gauge less than the standard of 1435 mm (4 ft 8 1⁄2 in)

A narrow-gauge railway is a railway with a track gauge narrower than standard 1,435 mm. Most narrow-gauge railways are between 600 mm and 1,067 mm.

<span class="mw-page-title-main">Funicular</span> Form of cable railway

A funicular is a type of cable railway system that connects points along a railway track laid on a steep slope. The system is characterized by two counterbalanced carriages permanently attached to opposite ends of a haulage cable, which is looped over a pulley at the upper end of the track. The result of such a configuration is that the two carriages move synchronously: as one ascends, the other descends at an equal speed. This feature distinguishes funiculars from inclined elevators, which have a single car that is hauled uphill.

<span class="mw-page-title-main">Cable transport</span> Class of transport modes

Cable transport is a broad class of transport modes that have cables. They transport passengers and goods, often in vehicles called cable cars. The cable may be driven or passive, and items may be moved by pulling, sliding, sailing, or by drives within the object being moved on cableways. The use of pulleys and balancing of loads moving up and down are common elements of cable transport. They are often used in mountainous areas where cable haulage can overcome large differences in elevation.

<span class="mw-page-title-main">Aerial tramway</span> Aerial lift in which the cars are permanently fixed to the cables

An aerial tramway, aerial tram, sky tram, aerial cablecar, aerial cableway, telepherique, or seilbahn is a type of aerial lift which uses one or two stationary ropes for support while a third moving rope provides propulsion. With this form of lift, the grip of an aerial tramway cabin is fixed onto the propulsion rope and cannot be decoupled from it during operations. In comparison to gondola lifts, aerial tramways generally provide lower line capacities and higher wait times.

<span class="mw-page-title-main">Peak Tram</span> Funicular railway on Hong Kong Island, Hong Kong

The Peak Tram is a funicular railway in Hong Kong, which carries both tourists and residents to the upper levels of Hong Kong Island. Running from Garden Road Admiralty to Victoria Peak via the Mid-Levels, it provides the most direct route and offers good views over the harbour and skyscrapers of Hong Kong. Operated since 1888, it was the first funicular railway in Asia.

<span class="mw-page-title-main">Aberystwyth Cliff Railway</span>

The Aberystwyth Cliff Railway opened on 1 August 1896. It is a 778 feet (237 m) long funicular railway in Aberystwyth and is the second longest funicular railway in the British Isles, after the Lynton and Lynmouth Cliff Railway. Since November 1987, the Aberystwyth Cliff Railway has been a Grade II listed structure.

<span class="mw-page-title-main">Great Orme Tramway</span> Cable tramway in North Wales

The Great Orme Tramway is a cable-hauled 3 ft 6 in gauge tramway in Llandudno in north Wales. Open seasonally from late March to late October, it takes over 200,000 passengers each year from Llandudno Victoria Station to just below the summit of the Great Orme headland. From 1932 onwards it was known as the Great Orme Railway, reverting to its original name in 1977.

<span class="mw-page-title-main">Clifton Rocks Railway</span> Former (1893–1934) funicular railway in Bristol, England

The Clifton Rocks Railway was an underground funicular railway in Bristol, England, linking Clifton at the top to Hotwells and Bristol Harbour at the bottom of the Avon Gorge in a tunnel cut through the limestone cliffs.

<span class="mw-page-title-main">Lynton and Lynmouth Cliff Railway</span> Water powered funicular in England

The Lynton and Lynmouth Cliff Railway is a water-powered funicular railway joining the twin towns of Lynton and Lynmouth on the rugged coast of North Devon in southwest England.

<span class="mw-page-title-main">Babbacombe Cliff Railway</span> Funicular railway in Torquay, Devon, England

Babbacombe Cliff Railway, also known as the Babbacombe Cliff Lift, is a funicular railway in the town of Torquay in the English county of Devon. It links Babbacombe Downs with Oddicombe Beach. The line formerly ran every day between 09:30 and 17:30, with a closure period in winter for maintenance. A bell is rung 30 and 15 minutes before closing. It is currently closed following the death of a staff member.

<span class="mw-page-title-main">Montmartre Funicular</span> Funicular railway serving the Montmartre neighbourhood of Paris, France

The Montmartre Funicular is an inclined transport system serving the Montmartre neighbourhood of Paris, France, in the 18th arrondissement. Operated by the RATP, the Paris transport authority, the system opened in 1900; it was entirely rebuilt in 1935 and again in 1991.

<span class="mw-page-title-main">Penang Hill Railway</span>

The Penang Hill Railway is a one-section funicular railway which climbs the Penang Hill from Air Itam, on the outskirts of the city of George Town in the Malaysian state of Penang. The railway first opened in 1923 as a two-section railway, but was overhauled in 2010 into a one-section system. It is a single-track railway with a passing loop, and it passes through a tunnel which is the steepest in the world. The total journey time can take between five and twenty minutes. The funicular train coach travels directly from the lower station to the top, but may stop at other intermediate stations upon request.

<span class="mw-page-title-main">Trams in New Zealand</span>

Trams in New Zealand were a major form of transport from the 19th century into the mid-20th century. New Zealand's first (horse) tramway was established in 1862 (Nelson), followed by a steam tramway in 1871 (Thames), and the first electric tramway in 1900. In New Zealand railway terminology a bush tramway is an industrial tramway, which usually did not carry passengers.

<span class="mw-page-title-main">The Spa, Scarborough</span> Entertainment venue in Scarborough, North Yorkshire, England

Scarborough Spa is a Grade II* listed building in South Bay, Scarborough, North Yorkshire, England. It is a venue for conferences, exhibitions, entertainment, live music and events on the Yorkshire Coast. Originally built around the source of Scarborough's spa waters, it is owned and managed by Scarborough Borough Council.

<span class="mw-page-title-main">Saltburn Cliff Lift</span> Funicular railway in North Yorkshire, England

The Saltburn Cliff Lift is a funicular railway in Saltburn-by-the-Sea, Redcar and Cleveland in the ceremonial county of North Yorkshire, England. It provides access to Saltburn Pier and the seafront from the town. The cliff lift is the oldest operating water-balance cliff lift in the United Kingdom.

<span class="mw-page-title-main">Bellevue funicular</span>

The Bellevue funicular, in Meudon, Hauts-de-Seine department, was from 1893 to 1934 a funicular running from the Bellevue-Funiculaire station on the Coteaux line, to the Gare de Bellevue, on the Paris–Brest railway line.

<span class="mw-page-title-main">Schlossbergbahn (Graz)</span>

The Schlossbergbahn, or Schloßbergbahn, is a funicular railway in the Austrian city of Graz. It connects the city centre with the Schloßberg, a hill and the site of a demolished fortress, with extensive views over the city.

<span class="mw-page-title-main">Central Tramway Company, Scarborough</span>

The Central Tramway Company is an electric-powered funicular railway located in the holiday resort of Scarborough, North Yorkshire. The company has the distinction of being the oldest surviving Tramway Company in the UK, as the original corporation still operates the funicular today. Built in just 6 months between January and August 1881, the Tramway opened on Monday 1 August becoming the 3rd such cliff railway to operate in the borough.

There have been five cliff railways in the Isle of Man, none of which remain operational. Usually referred to as 'cliff lifts', they were all railways, having wheeled carriages running on weight-bearing rails. The two Falcon lifts served the same hotel at different periods ; the first Falcon lift was moved to become the Port Soderick lift, at the south end of the Douglas Southern Electric Tramway, with the Douglas Head lift at its north end. The Browside lift served the Laxey Wheel.

References

  1. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 "Scarborough Cliff Railways, South Bay". engineering-timelines.com. Retrieved 15 January 2021.
  2. 1 2 3 4 5 Brennan, Joseph (21 June 2019). "Explorations in Britain: all the funiculars". columbia.edu. Retrieved 16 January 2021.
  3. "Lynton & Lynmouth Railway". Lynton & Lynmouth. Retrieved 5 June 2010.
  4. 1 2 "Spa Cliff Lift". Scarborough Council. Archived from the original on 16 July 2011. Retrieved 5 June 2010.
  5. "Safety cost closes historic lift". BBC News Online. BBC. 15 February 2007. Retrieved 16 January 2011.
  6. Johnston, Howard (12 January 2011). "Regional News". Rail . No. 661. Bauer Media Group. p. 12.
  7. "Cafe plan for old cliff lift". www.thescarboroughnews.co.uk. Retrieved 18 October 2017.
  8. "The Seastrand, Scarborough". Tess Willoughby. Retrieved 18 October 2017.
  9. "The Seastrand". www.facebook.com. Retrieved 18 October 2017.
  10. 1 2 3 4 5 6 7 8 9 10 11 12 13 "Scarborough Cliff Railways, North Bay, site of". engineering-timelines.com. Retrieved 15 January 2021.